00014939 Bid Results.xlsx
XLSX spreadsheet 32 KB Posted
- Solicitation number
- S-73000-00014937
- Issued by
- Douglas County, Oregon
About this file
This is a bid results tabulation for an Invitation to Bid (ITB) issued by the Oregon Department of Transportation (ODOT) for the ER OR42 MP18.9 Culvert Repair Project, with bid closing on October 7, 2025, at 2:00 PM. The project, located in Oakland, Oregon, encompasses comprehensive culvert repair and site stabilization work including mobilization, temporary traffic control and protection measures, erosion and pollution control, surveying, removal of existing pipes and structures, asphalt pavement work, general excavation totaling 13,025 cubic yards, stone embankment placement of 21,210 tons, installation of 172 feet of 30-inch culvert pipe, geotextile applications, permanent seeding, and topsoil placement across 470 cubic yards. Eight contractors submitted competitive bids ranging from approximately $1.57 million to $3.41 million, with Johnson Rock Products, Inc. (Coos Bay, OR) submitting the lowest bid at $1,648,947.50, followed by JRT Construction, LLC at $1,570,568.00. The bid tabulation presents 45 distinct line items with unit prices and total costs for each bidder, allowing for detailed cost comparison across all proposed work elements.
The pricing structure reflects individual unit rates applied to estimated quantities for each work item, with significant variation among bidders particularly evident in specialized items such as the 30-inch culvert pipe installation, where prices ranged from $212 to $6,250 per linear foot, and the temporary water management facility, where bids varied from $4,300 to $50,000. The tabulation indicates this is preliminary documentation for bid consideration and does not constitute an award notification. All bidders hold appropriate Oregon Construction Contractors Board (CCB) certifications, with CCB numbers listed for each firm. The project funding is sourced through state and federal mechanisms, consistent with ODOT's standard procurement practices for intermediate-level construction contracts. No incumbent contractor information or small business set-asides are indicated in the bid results documentation, and the contract is subject to prevailing wage requirements and Davis-Bacon wage standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sample Contract~51.docx | DOCX document | |
| RFCQ Bid Results.xlsx | XLSX spreadsheet | |
| 00014937_Prequote_Signup.pdf | ||
| Exhibit A Special Provisions and Specifications.docx | DOCX document | |
| 00014937 Request for Competitive Quotes.docx | DOCX document | |
| ATT B FHWA Form 1273.pdf | ||
| ATT A Project Wage Rates.pdf | ||
| ATT C Contract Closeout Compliance Checklist.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 10/7/25 | |||||||||||
| ITB No. | S-73000-00014939 | BIDDER | ||||||||||
| NAME: | JRT Construction, LLC | Johnson Rock Products, Inc. | Moore Excavation Inc. | Rogue Line LLC | LaDuke Construction, LLC | LTM, Incorporated dba Knife River Materials | Granite Construciton Co. | Farline Bridge, Inc | ||||
| Bid Closing: | 10/7/2025 @ 2:00 PM | CITY/STATE: | Oakland, OR | Coos Bay, OR | Fairview, OR | Myrtle Point, OR | Central Point, OR | Coos Bay, OR | Hermiston, OR | Stayton, OR | ||
| Description: | ER OR42 MP18.9 Culvert Repair Project | CCB# | 205161 | 34185 | 28397 | 171399 | 97502 | 56603 | 101195 | 194787 | ||
| This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | Mobilization | 1 | LS | $156,000.00 | $156,000.00 | $95,300.00 | $95,300.00 | $170,000.00 | $170,000.00 | $60,000.00 | $60,000.00 | $188,000.00 | $188,000.00 | $168,085.00 | $168,085.00 | $180,000.00 | $180,000.00 | $341,000.00 | $341,000.00 |
| 2 | Temporary Protection and Direction of Traffic | 1 | LS | $26,000.00 | $26,000.00 | $53,100.00 | $53,100.00 | $30,000.00 | $30,000.00 | $57,000.00 | $57,000.00 | $28,000.00 | $28,000.00 | $66,420.00 | $66,420.00 | $50,000.00 | $50,000.00 | $100,000.00 | $100,000.00 |
| 3 | Temporary Signs | 180 | SQFT | $40.00 | $7,200.00 | $41.60 | $7,488.00 | $32.00 | $5,760.00 | $40.00 | $7,200.00 | $36.00 | $6,480.00 | $30.00 | $5,400.00 | $25.00 | $4,500.00 | $30.00 | $5,400.00 |
| 4 | Sequential Arrow Signs | 3 | EA | $2,500.00 | $7,500.00 | $1,900.00 | $5,700.00 | $1,800.00 | $5,400.00 | $1,550.00 | $4,650.00 | $2,000.00 | $6,000.00 | $1,135.00 | $3,405.00 | $2,000.00 | $6,000.00 | $1,350.00 | $4,050.00 |
| 5 | Portable Changeable Message Signs | 2 | EA | $5,000.00 | $10,000.00 | $3,425.00 | $6,850.00 | $6,000.00 | $12,000.00 | $4,500.00 | $9,000.00 | $4,500.00 | $9,000.00 | $1,135.00 | $2,270.00 | $4,000.00 | $8,000.00 | $1,350.00 | $2,700.00 |
| 6 | Temporary Barricades, Type III | 5 | EA | $175.00 | $875.00 | $345.00 | $1,725.00 | $275.00 | $1,375.00 | $195.00 | $975.00 | $180.00 | $900.00 | $200.00 | $1,000.00 | $200.00 | $1,000.00 | $175.00 | $875.00 |
| 7 | Temporary Plastic Drums | 88 | EA | $50.00 | $4,400.00 | $49.50 | $4,356.00 | $75.00 | $6,600.00 | $52.00 | $4,576.00 | $80.00 | $7,040.00 | $57.00 | $5,016.00 | $70.00 | $6,160.00 | $50.00 | $4,400.00 |
| 8 | Temporary Non-Reflective Tape | 4950 | FT | $5.00 | $24,750.00 | $10.50 | $51,975.00 | $4.25 | $21,037.50 | $3.00 | $14,850.00 | $10.25 | $50,737.50 | $4.00 | $19,800.00 | $8.25 | $40,837.50 | $4.00 | $19,800.00 |
| 9 | Temporary Barrier | 850 | FT | $27.50 | $23,375.00 | $34.90 | $29,665.00 | $30.00 | $25,500.00 | $42.00 | $35,700.00 | $40.00 | $34,000.00 | $27.65 | $23,502.50 | $35.00 | $29,750.00 | $18.00 | $15,300.00 |
| 10 | Temporary Impact Attenuator, Narrow Site System | 2 | EA | $4,500.00 | $9,000.00 | $5,710.00 | $11,420.00 | $5,000.00 | $10,000.00 | $5,000.00 | $10,000.00 | $4,000.00 | $8,000.00 | $4,525.00 | $9,050.00 | $5,000.00 | $10,000.00 | $3,500.00 | $7,000.00 |
| 11 | Temporary Impact Attenuator, Truck Mounted | 1 | EA | $10,000.00 | $10,000.00 | $6,600.00 | $6,600.00 | $12,000.00 | $12,000.00 | $16,000.00 | $16,000.00 | $14,000.00 | $14,000.00 | $4,260.00 | $4,260.00 | $15,000.00 | $15,000.00 | $10,000.00 | $10,000.00 |
| 12 | Repair Temporary Impact Attenuator, Narrow Site System | 4 | EA | $500.00 | $2,000.00 | $630.00 | $2,520.00 | $1,000.00 | $4,000.00 | $1,200.00 | $4,800.00 | $300.00 | $1,200.00 | $500.00 | $2,000.00 | $2,500.00 | $10,000.00 | $10.00 | $40.00 |
| 13 | Repair Temporary Impact Attenuator, Truck Mounted | 2 | EA | $150.00 | $300.00 | $1,900.00 | $3,800.00 | $1,000.00 | $2,000.00 | $26,000.00 | $52,000.00 | $1,100.00 | $2,200.00 | $850.00 | $1,700.00 | $5,000.00 | $10,000.00 | $10.00 | $20.00 |
| 14 | Temporary Water Management Facility | 1 | LS | $5,500.00 | $5,500.00 | $4,300.00 | $4,300.00 | $9,000.00 | $9,000.00 | $4,500.00 | $4,500.00 | $32,000.00 | $32,000.00 | $8,250.00 | $8,250.00 | $50,000.00 | $50,000.00 | $35,000.00 | $35,000.00 |
| 15 | Erosion Control | 1 | LS | $3,000.00 | $3,000.00 | $3,150.00 | $3,150.00 | $4,000.00 | $4,000.00 | $3,000.00 | $3,000.00 | $9,400.00 | $9,400.00 | $1,135.00 | $1,135.00 | $30,000.00 | $30,000.00 | $15,000.00 | $15,000.00 |
| 16 | Plastic Sheeting | 500 | SQYD | $5.00 | $2,500.00 | $0.70 | $350.00 | $2.75 | $1,375.00 | $0.60 | $300.00 | $5.00 | $2,500.00 | $1.50 | $750.00 | $4.00 | $2,000.00 | $9.00 | $4,500.00 |
| 17 | Construction Entrance, Type 1 | 1 | EA | $2,500.00 | $2,500.00 | $2,550.00 | $2,550.00 | $4,500.00 | $4,500.00 | $2,500.00 | $2,500.00 | $3,400.00 | $3,400.00 | $3,900.00 | $3,900.00 | $15,000.00 | $15,000.00 | $3,500.00 | $3,500.00 |
| 18 | Sediment Fence | 500 | FT | $3.00 | $1,500.00 | $0.60 | $300.00 | $5.00 | $2,500.00 | $5.00 | $2,500.00 | $6.00 | $3,000.00 | $4.00 | $2,000.00 | $10.00 | $5,000.00 | $6.00 | $3,000.00 |
| 19 | Straw Bale | 30 | EA | $60.00 | $1,800.00 | $13.00 | $390.00 | $45.00 | $1,350.00 | $20.00 | $600.00 | $23.00 | $690.00 | $77.00 | $2,310.00 | $100.00 | $3,000.00 | $50.00 | $1,500.00 |
| 20 | Pollution Control Plan | 1 | LS | $500.00 | $500.00 | $400.00 | $400.00 | $1,500.00 | $1,500.00 | $600.00 | $600.00 | $1,200.00 | $1,200.00 | $115.00 | $115.00 | $2,500.00 | $2,500.00 | $3,500.00 | $3,500.00 |
| 21 | Construction Survey Work | 1 | LS | $12,500.00 | $12,500.00 | $2,550.00 | $2,550.00 | $24,000.00 | $24,000.00 | $11,000.00 | $11,000.00 | $26,500.00 | $26,500.00 | $8,850.00 | $8,850.00 | $15,000.00 | $15,000.00 | $16,800.00 | $16,800.00 |
| 22 | Removal of Pipes | 172 | FT | $7.00 | $1,204.00 | $135.00 | $23,220.00 | $10.00 | $1,720.00 | $50.00 | $8,600.00 | $20.00 | $3,440.00 | $6.00 | $1,032.00 | $150.00 | $25,800.00 | $87.20 | $14,998.40 |
| 23 | Removal of Structures and Obstructions | 1 | LS | $15,000.00 | $15,000.00 | $19,850.00 | $19,850.00 | $15,000.00 | $15,000.00 | $2,200.00 | $2,200.00 | $14,000.00 | $14,000.00 | $395.00 | $395.00 | $15,000.00 | $15,000.00 | $55,000.00 | $55,000.00 |
| 24 | Asphalt Pavement Saw Cutting (10 Inch Depth) | 400 | FT | $5.00 | $2,000.00 | $9.65 | $3,860.00 | $9.00 | $3,600.00 | $24.00 | $9,600.00 | $8.00 | $3,200.00 | $11.00 | $4,400.00 | $6.00 | $2,400.00 | $4.25 | $1,700.00 |
| 25 | Clearing and Grubbing | 1 | LS | $15,000.00 | $15,000.00 | $7,350.00 | $7,350.00 | $32,000.00 | $32,000.00 | $19,000.00 | $19,000.00 | $46,000.00 | $46,000.00 | $9,700.00 | $9,700.00 | $10,000.00 | $10,000.00 | $50,000.00 | $50,000.00 |
| 26 | General Excavation | 13025 | CUYD | $16.00 | $208,400.00 | $12.10 | $157,602.50 | $27.00 | $351,675.00 | $23.00 | $299,575.00 | $18.20 | $237,055.00 | $20.20 | $263,105.00 | $50.00 | $651,250.00 | $33.90 | $441,547.50 |
| 27 | Stone Embankment | 21210 | TONS | $30.00 | $636,300.00 | $36.60 | $776,286.00 | $28.00 | $593,880.00 | $33.00 | $699,930.00 | $39.65 | $840,976.50 | $36.05 | $764,620.50 | $60.00 | $1,272,600.00 | $36.10 | $765,681.00 |
| 28 | 18 Inch Subgrade Stabilization | 25 | SQYD | $50.00 | $1,250.00 | $81.00 | $2,025.00 | $65.00 | $1,625.00 | $90.00 | $2,250.00 | $43.00 | $1,075.00 | $225.00 | $5,625.00 | $140.00 | $3,500.00 | $130.00 | $3,250.00 |
| 29 | Riprap Geotextile, Type 2 | 3500 | SQYD | $3.00 | $10,500.00 | $2.60 | $9,100.00 | $2.40 | $8,400.00 | $4.00 | $14,000.00 | $3.00 | $10,500.00 | $1.62 | $5,670.00 | $10.00 | $35,000.00 | $5.00 | $17,500.00 |
| 30 | Subgrade Geotextile | 700 | SQYD | $2.25 | $1,575.00 | $1.75 | $1,225.00 | $1.75 | $1,225.00 | $4.00 | $2,800.00 | $2.30 | $1,610.00 | $1.03 | $721.00 | $10.00 | $7,000.00 | $3.00 | $2,100.00 |
| 31 | Riprap Basins | 1 | EA | $2,250.00 | $2,250.00 | $1,600.00 | $1,600.00 | $2,000.00 | $2,000.00 | $1,675.00 | $1,675.00 | $1,600.00 | $1,600.00 | $1,500.00 | $1,500.00 | $3,000.00 | $3,000.00 | $5,000.00 | $5,000.00 |
| 32 | Mainline Video Inspection | 172 | FT | $17.00 | $2,924.00 | $35.00 | $6,020.00 | $20.00 | $3,440.00 | $25.00 | $4,300.00 | $30.00 | $5,160.00 | $17.50 | $3,010.00 | $5.00 | $860.00 | $30.00 | $5,160.00 |
| 33 | 30 Inch Culvert Pipe, Over 20 FT Depth | 172 | FT | $330.00 | $56,760.00 | $212.00 | $36,464.00 | $400.00 | $68,800.00 | $1,150.00 | $197,800.00 | $550.00 | $94,600.00 | $2,193.00 | $377,196.00 | $500.00 | $86,000.00 | $6,250.00 | $1,075,000.00 |
| 34 | Sloped End Sections, 30 Inch | 2 | EA | $500.00 | $1,000.00 | $1,950.00 | $3,900.00 | $1,200.00 | $2,400.00 | $650.00 | $1,300.00 | $450.00 | $900.00 | $2,810.00 | $5,620.00 | $2,000.00 | $4,000.00 | $5,500.00 | $11,000.00 |
| 35 | Safety End Sectins, 30 Inch | 2 | EA | $4,250.00 | $8,500.00 | $2,125.00 | $4,250.00 | $9,000.00 | $18,000.00 | $1,600.00 | $3,200.00 | $1,000.00 | $2,000.00 | $3,077.00 | $6,154.00 | $7,500.00 | $15,000.00 | $3,500.00 | $7,000.00 |
| 36 | Trench Resurfacing | 40 | SQYD | $230.00 | $9,200.00 | $190.00 | $7,600.00 | $120.00 | $4,800.00 | $380.00 | $15,200.00 | $90.00 | $3,600.00 | $380.00 | $15,200.00 | $600.00 | $24,000.00 | $150.00 | $6,000.00 |
| 37 | Cold Plan Pavement Removal, 3 Inches Deep | 250 | SQYD | $30.00 | $7,500.00 | $44.92 | $11,230.00 | $72.00 | $18,000.00 | $34.00 | $8,500.00 | $29.00 | $7,250.00 | $42.24 | $10,560.00 | $50.00 | $12,500.00 | $18.00 | $4,500.00 |
| 38 | Aggregate Base and Shoulders | 1310 | TON | $32.00 | $41,920.00 | $56.00 | $73,360.00 | $42.00 | $55,020.00 | $65.00 | $85,150.00 | $29.00 | $37,990.00 | $50.00 | $65,500.00 | $75.00 | $98,250.00 | $130.00 | $170,300.00 |
| 39 | Level 3, 1/2 Inch ACP Mixture (64-22 oil) | 800 | TON | $245.00 | $196,000.00 | $195.00 | $156,000.00 | $185.00 | $148,000.00 | $200.00 | $160,000.00 | $165.00 | $132,000.00 | $144.00 | $115,200.00 | $200.00 | $160,000.00 | $202.60 | $162,080.00 |
| 40 | Delineators, Type 1 | 2 | EA | $125.00 | $250.00 | $160.00 | $320.00 | $150.00 | $300.00 | $240.00 | $480.00 | $120.00 | $240.00 | $126.00 | $252.00 | $250.00 | $500.00 | $500.00 | $1,000.00 |
| 41 | Culvert Drainage Markers, Type 1 | 2 | EA | $85.00 | $170.00 | $110.00 | $220.00 | $150.00 | $300.00 | $240.00 | $480.00 | $120.00 | $240.00 | $86.00 | $172.00 | $85.00 | $170.00 | $85.00 | $170.00 |
| 42 | Bi-Directional Yellow Type IAR Markers | 20 | EA | $12.00 | $240.00 | $15.00 | $300.00 | $13.00 | $260.00 | $70.00 | $1,400.00 | $45.00 | $900.00 | $12.00 | $240.00 | $12.00 | $240.00 | $12.00 | $240.00 |
| 43 | Thermoplastic, Sprayed, Surface, Non-Profiled | 900 | FT | $3.85 | $3,465.00 | $5.00 | $4,500.00 | $5.00 | $4,500.00 | $6.00 | $5,400.00 | $4.00 | $3,600.00 | $4.00 | $3,600.00 | $3.85 | $3,465.00 | $3.85 | $3,465.00 |
| 44 | Permanent Seeding | 0.5 | ACRE | $12,000.00 | $6,000.00 | $15,230.00 | $7,615.00 | $7,500.00 | $3,750.00 | $10,500.00 | $5,250.00 | $14,000.00 | $7,000.00 | $12,000.00 | $6,000.00 | $12,000.00 | $6,000.00 | $12,000.00 | $6,000.00 |
| 45 | Topsoil | 470 | CUYD | $68.00 | $31,960.00 | $86.30 | $40,561.00 | $52.00 | $24,440.00 | $102.00 | $47,940.00 | $78.00 | $36,660.00 | $69.00 | $32,430.00 | $68.00 | $31,960.00 | $24.00 | $11,280.00 |
| TOTAL | $ 1,570,568.00 | $ 1,648,947.50 | $1,717,032.50 | $ 1,897,781.00 | $ 1,925,844.00 | $2,037,121.00 | $2,962,242.50 | $3,413,356.90 |
File details come from the government source that posted it. Updated .