About this file

This Scope of Work document outlines the deliverables for a Progressive Design-Build contract issued by the Lee County Port Authority for improvements at Southwest Florida International Airport in Florida. The project encompasses advanced planning, design, and construction of an expansion to the existing short-term parking garage, relocation and redevelopment of the rental car quick turn-around area (QTA), and demolition and environmental remediation of existing facilities. Key project elements include construction of two new parking deck levels above the existing three-level garage with associated circulation ramps, elevator extensions, and infrastructure extensions for lighting, electrical, vehicle charging stations, IT, security, and drainage systems. The scope also includes three new pedestrian bridges connecting the parking garage to the terminal building, three new mezzanines with vertical circulation infrastructure within the existing terminal, and implementation of phased temporary vehicle relocation and construction access modifications. Additional work involves expansion and reconfiguration of the QTA site into the existing long-term parking lot, relocation of rental car wash and fueling facilities, decommissioning and remediation of existing fuel storage facilities, and decommissioning and remediation of north-side rental car service areas.

The Design-Builder is responsible for target budget and schedule validation within 60 calendar days of Notice to Proceed, pre-construction services, design consultant contracting and management, design quality assurance and constructability review, cost estimating and scheduling, cost control using LCPA Procore project management software, competitive procurement and contract administration for construction, and project bonding and insurance. The project delivery must be phased to minimize impacts to existing airport operational facilities, with design, construction, start-up, commissioning, activation, and closeout occurring in coordinated phases. The Design-Builder assumes responsibility for permitting coordination, quality management across all disciplines, cost efficiency, and comprehensive project administration throughout the delivery process.

View the file

Other files

File Type Posted
2026-072-MC_Solicitation.pdf PDF
EXHIBIT_H_Concept_Design_Package.pdf PDF
EXHIBIT_G_Contractor_Release_Affidavit_Form.pdf PDF
EXHIBIT_F_Performance_and_Payment_Templates.pdf PDF
EXHIBIT_D_GMP_Amendment_R1.pdf PDF
EXHIBIT_B_Progressive_Design_Build_General_Condition.pdf PDF
FORM_15_-_CERTIFICATION_OF_NON-USE_OF_DIVERSITY,_EQUITY,_AND_INCLUSION_MATERIAL.pdf PDF
FORM_14_-_CERTIFICATION_BY_PROPOSER_REGARDING_DEBARMENT.pdf PDF
FORM_13_-_NON-COLLUSION_AFFIDAVIT.pdf PDF
FORM_12_-_PROHIBITION_ON_CERTAIN_TELECOMMUNICATIONS_AND_VIDEO_SURVEILLANCE_SERVICES_OR_EQUIPMENT.pdf PDF
FORM_11_-_CERTIFICATION_REGARDING_DOMESTIC_PREFERENCE_FOR_PROCUREMENTS.pdf PDF
FORM_10_-_CERTIFICATION_OF_RESPONDENT_REGARDING_TAX_DELINQUENCY_AND_FELONY_CONVICTIONS.pdf PDF
FORM_9_-_TRADE_RESTRICTION_CERTIFICATION.pdf PDF
FORM_8_-_CERTIFICATION_OF_COMPLIANCE_WITH_FLORIDA_STATUTE_255.0993_-_PUBLIC_WORKS_PROJECTS_IRON_AND_STEEL_REQUIREMENT.pdf PDF
FORM_7_-_CERTIFICATION_OF_COMPLIANCE_WITH_FAA_BUY_AMERICAN_PREFERENCE_–_CONSTRUCTION_PROJECTS.pdf PDF
FORM_6_-_AFFIDAVIT_OF_COMPLIANCE_WITH_SECTIONS_287.138_and_787.06.pdf PDF
FORM_5_-_SCRUTINIZED_COMPANIES_CERTIFICATION.pdf PDF
FORM_4_-_PUBLIC_ENTITY_CRIMES_CERTIFICATION.pdf PDF
FORM_3_-_LOBBYING_AFFIDAVIT.pdf PDF
FORM_2_-_RESPONDENT’S_CERTIFICATION.pdf PDF
FORM_1_-_RESPONDENT_REFERENCE_CHECK.pdf PDF
2026-072-MC_Draft_PDB_Agreement.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P a g e 1 | 2

EXHIBIT A

Scope of Work The Scope of Work for the Project is generally defined as advanced planning, design and construction of the expansion to the existing short-term parking garage; relocation and redevelopment of the existing rental car quick turn-around and staging area; demolition and environmental remediation of the existing rental car quick turn-around area and decommissioning of the existing rental service facilities.

Key elements of the project work, to be performed under the Progressive Design-Build Contract include, but are not limited to planning, design and construction of the following Project elements:

1. Parking Garage

a. Two (2) levels of parking decks above the existing three-level existing short-term parking garage;

b. Circulation ramps to connect the two (2) new parking decks;

c. Extension of existing elevator shafts and installation of new elevators and associated equipment;

d. Extension of lighting, electrical, vehicle charge stations, IT, security and monitoring equipment (sensors and cameras) and drainage infrastructure;

e. Pavement markings and signage;

f. Procurement and installation of updated parking management and revenue control system and other technology-based systems and infrastructure;

g. Three (3) new pedestrian bridges connecting the parking garage to the terminal building;

h. Three (3) new mezzanines and vertical circulation infrastructure (stairs, elevators and escalators) within the existing terminal;

i. Assessment and implementation of phased temporary relocation of vehicles in the existing short-term parking garage for construction works;

j. Temporary construction roadway modifications, marking and signage access control infrastructure;

2. Quick-Turn Area (QTA) Redevelopment

a. Expansion of the QTA site into and modification of the existing long-term parking lot;

b. Relocation / reconfiguration of access roadways within the QTA;

c. Relocation of existing rental car wash and fueling facilities;

d. Demolition and remediation of the existing rental car wash and fueling facilities;

e. Decommissioning, demolition and remediation of existing fuel storage facilities and piping;

f. Reconfiguration of the rental car ready / return and staging areas;

g. Electrical, mechanical, IT, and security infrastructure.

3. Northside Rental Car Maintenance Facilities

a. Decommission and remediate the existing north-side rental car service areas;

b. Remedial action plan and permitting coordination with Rental Car Agencies.

4. Planning, design, permitting, construction, start-up, commissioning, activation, turn-over and closeout of all project elements in a phased manner that minimizes impacts to the existing operational facilities.

P a g e 2 | 2

5. Design, Construction Management and Administration of Complete Parking Garage / QTA Project.

a. Target Budget and Schedule validation to be performed within 60 calendar days of the Notice to Proceed.

b. Pre-Construction services for advanced planning, design and procurement of phased construction works;

c. Design consultant services contracting, management and administration;

d. Design phase responsibility for quality, completeness, cross-discipline coordination, cost efficiency, and constructability;

e. Cost estimating, scheduling and reporting on project progress;

f. Cost control and records management using LCPA Procore project management software;

g. Competitive procurement, management and administration of contracts for construction of the project;

h. Bonding of construction work and insurances for project performance;

This Scope of Work and associated roles and responsibilities of the Design-Builder listed above is provided as a summary of key project requirements and is not an all-inclusive definition of roles, responsibilities and requirements for delivery of the completed project.