Exhibit_A_Scope_of_Work.pdf

PDF 88 KB Posted

Attached to
ITB 25-023 Citrus County Historic Courthouse Replacement of Exterior Windows
Solicitation number
ITB 25-023
Issued by
Citrus County, Florida

About this file

Exhibit A is a Scope of Work for Citrus County, Florida, detailing a window replacement project at the Citrus County Historic Courthouse located in Inverness. The project involves replacing eighty-six (86) windows across the clock tower and the 1st and 2nd levels of the historic courthouse, with windows being of various sizes. The contractor will be responsible for obtaining necessary building permits from the City of Inverness, and will need to replace or repair damaged window framing, trim, and sills as part of the project.

The specified windows are Andersen E Series aluminum clad wood windows in black, with flush fin frames and fixed configurations that must match the existing windows' configuration. The work is to be performed during normal facility operational hours (Tuesday through Saturday, 8am-5pm), with the building remaining open to the public during execution. The contractor must provide a 5-year 100% warranty on labor and workmanship, in addition to the window manufacturer's warranty. Extra care is required to prevent damage to the building, grounds, walkways, and monuments, with any incidental damage to be repaired at the contractor's expense.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A

Scope of Work

LOCATION: Citrus County Historic Courthouse

1 Courthouse Square

Inverness, FL 34450

PART 1 – GENERAL

1.01 Description

A. Scope of Work

This project shall include all materials, labor, equipment, disposal, and supervision necessary to replace all exterior windows on the clock tower and the 1st and 2nd levels of the Citrus County Historic Courthouse as outlined in this Scope of Work. There are eighty-six (86) windows that will need to be replaced all with various sizes.

B. Related Work

1. Repair or replace damaged framing around the windows

2. Repair or replace damaged trim and sills

1.02 Performance Requirements

A. All work shall be performed by properly trained personnel in a safe, professional, timely, and workmanlike manner and in accordance with all federal, state, and local laws, rules, and OSHA regulations.

B. Compliance with applicable building codes, as well as any required permits and/or drawings, shall be the responsibility of the Contractor.

C. Any instructions on the Manufacturer's Product Data Sheets are to be considered part of these Specifications and should be followed in any performance of the Work.

D. Contractor is required to obtain the required building permits from the City of Inverness.

1.03 Current Conditions & Specifications

A. This is a historic building and is subject to certain restrictions and special permitting requirements. It is the responsibility of the contractor to be familiar with and adhere to these restrictions and requirements. See Attachment A for more details.

B. Appearance of new materials must match existing as closely as possible in “routing” and finish. This requirement applies to casings, trim, beads, muntins, stools, aprons, stiles, and rails.

C. No changes or modifications other than those specifically outlined in this Scope of Work are to be made to the structure, walls, facia, or any other visible part of the building.

1.04 Delivery, Storage, And Handling

A. Deliver and store materials and other products in their original unopened containers or packaging until ready for installation.

B. Materials shall be clearly labeled with the manufacturer’s name, product identification, safety information, and lot numbers.

C. Store materials indoors whenever possible.

D. Comply with the manufacturer’s instructions for handling and safety procedures.

1.05 Warranty

A. Provide full 5-year 100% warranty on all labor and workmanship.

B. Provide a window manufacturer warranty.

PART 2 – PRODUCTS

2.01 Acceptable Products

A. Andersen E Series aluminum clad wood windows matching the configuration of existing windows.

B. Frames are to be flush fin.

C. Windows will be fixed.

D. Color: Black

PART 3 – EXECUTION

3.01 Safety

The building will be open to the public during execution of work. Proper steps must be taken by the contractor to ensure safety to anyone accessing the property.

3.02 Examination & Preparation

A. Since all the windows are not the same size, nor are they standard size windows, it will be the contractor’s responsibility to ensure accurate measurements and design of each window to ensure accurate fitment and appropriate match to existing.

B. The contractor will, to the best of their ability, determine where underlying damage exists. This will allow planning of execution in order to minimize the time any window opening is left exposed.

C. A report of the all underlying damage found shall be submitted to the Point of Contact for the County for approval before proceeding with repair work.

D. Extra care is to be taken to ensure that no damage is incurred to the building, grounds, surrounding walkways, monuments, etc. Any damage incurred is to be repaired at the contractor's expense to the County’s satisfaction.

3.03 Installation

A. Work is to be performed during normal operational hours of the facility: Tuesday through Saturday, from 8am until 5pm. Any work performed outside of these hours must be prearranged and approved as necessary.

B. Remove and dispose of old window assemblies in a manner that will allow the building to be secured while unoccupied.

C. Install windows according to prevailing building codes and manufacturer’s specifications.

D. Ensure that all windows and casings are sealed to prevent water intrusion.

E. Interior trim is to remain intact except where repair and/or replacement is necessary. Trim is to be left unfinished, to be stained or painted by others.

3.04 Cleaning

A. All materials, tools, equipment, and waste are to be picked up and secured at the end of each workday.

B. All work areas are to be left in a broom-clean fashion at the end of each workday.

C. Upon project completion, all materials, tools, equipment, and waste are to be removed from the site so as to return it the state in which it was originally found prior to execution.