Exhibit A - Pricing Schedule.xlsx
XLSX spreadsheet 253 KB Posted
- Attached to
- PAINTING SERVICES Federal contract opportunity
- Solicitation number
- 191T7025R0002
- Issued by
- Department of State
About this file
This is a pricing schedule exhibit detailing the structure and terms for a painting services contract at the U.S. Tri-Mission in Rome, Italy. The contract includes a base year and three option years, with 16 Contract Line Item Numbers (CLINs) in each period covering various painting services including interior/exterior painting, wall preparation, furniture protection, and scaffolding rental. All pricing is in Euros.
The contract establishes minimum guaranteed orders of €15,000 per performance period and maximum order values that increase annually: €1,050,000 for base year, €1,100,000 for first option year, €1,150,000 for second option year, and €1,200,000 for third option year. The total contract ceiling across all periods is €4,500,000. Major service categories include interior ceiling/wall painting (estimated 94,874 square meters annually), exterior surface painting, radiator painting, iron/wooden material painting, and furniture moving services for furnished apartments, unfurnished apartments, and office spaces.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment no. 0002 - Painting Services.pdf | ||
| Questions and Answers.docx | DOCX document | |
| Conference Minutes.pdf | ||
| Amendment no. 0001.pdf | ||
| Attachment 1 to Amend. no.0001.docx | DOCX document | |
| SF-1442.doc | DOC document | |
| 191T7025R0002.doc | DOC document | |
| Prospective Offerors Cover Letter.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| B.4 PRICING - BASE YEAR |
| The Contractor shall provide the services shown below for the base period of the contract, starting on the date stated in the Notice to Proceed and continuing for a period of 12 months. The fixed unit prices, estimated quantities, and ceiling for each category are: |
| CLIN | Description of Service | Unit Price in Euro | Estimated Quantity | Unit of Service | Estimated Total² |
| 0001 | Preparation and Painting of Interior Ceiling/Walls Surfaces, Including One Coat of Paint | € - 0 | 16,992 | Sqm1 | € - 0 |
| 0002 | Preparation and Painting of Interior Ceiling/Walls Surfaces, Including One Coat of Primer and One Coat of Paint | € - 0 | 77,882 | Sqm | € - 0 |
| 0003 | Additional Coat of Paint or Primer on Interior Surfaces | € - 0 | 94,874 | Sqm | € - 0 |
| 0004 | Preparation and Painting of Exterior Surfaces, Including One Coat of Primer and One Coat of Paint on Surfaces up to 5 mts. Height | € - 0 | 300 | Sqm | € - 0 |
| 0005 | Additional Coat of Paint or Primer on Exterior Surfaces up to 5 mts. Height | € - 0 | 300 | Sqm | € - 0 |
| 0006 | Touch-up - Plaster Interior Surface | € - 0 | 600 | Sqm | € - 0 |
| 0007 | Touch-up – Plaster Exterior Surface | € - 0 | 300 | Sqm | € - 0 |
| 0008 | Removal of Wallpaper and Preparation of Surfaces, Including One Coat of Paint | € - 0 | 250 | Sqm | € - 0 |
| 0009 | Painting of Radiators | € - 0 | 700 | Sqm | € - 0 |
| 0010 | Painting Of Internal Iron/Wooden Material | € - 0 | 20,391 | Sqm | € - 0 |
| 0011 | Painting Of External Iron/Wooden Material | € - 0 | 10,195 | Sqm | € - 0 |
| 0012 | Painting and Decoration | € - 0 | 380 | Hour | € - 0 |
| 0013 | Rental, Installation and Removal of Scaffolding for Work Over 5 Mts. Height | € - 0 | 900 | Sqm | € - 0 |
| 0014 | Moving and Protection of Furniture - Furnished Apartment | € - 0 | 70 | Each | € - 0 |
| 0015 | Moving and Protection of Furniture - Unfurnished Apartment | € - 0 | 40 | Each | € - 0 |
| 0016 | Moving and Protection of Furniture – Office Space | € - 0 | 50 | Each | € - 0 |
| Total Estimated Amount for the Base Year (CLIN FROM 0001 TO CLIN 0016) | € - 0 | ||||
| 1 - Sqm=sqare meter | |||||
| 2 - This estimated amount is based on total estimated Government requirements for this period of performance. If more than one award is made, the estimated amount of work awarded under task order(s) to any single Contractor will be less than the amount shown. |
| B.5 Minimum and Maximum Amounts |
| During the Base Year of the contract, and during the option year that might be exercised, the United States Government (USG) shall place orders totaling a minimum of Euro 15,000.00. This reflects the contract minimum guarantee for each period of performance. The amount of all orders, for base and all option years shall not exceed Euro 4,500,000.00. This reflects the contract maximum.” |
| B.5.1 Contract Minimum |
| During the contract period, the Government shall place orders for a minimum of Euro 15,000.00. This is the contract minimum for this period of performance. |
| B.5.2 Contract Maximum |
| During the contract period, the amount of all orders shall not exceed Euro 1,050,000.00. This is the contract maximum for this period of performance. |
First Option Year
| B.6 PRICING - FIRST OPTION YEAR |
| The Contractor shall provide the services shown below for First Option Year, starting one year after the date stated in the Notice to Proceed and continuing for a period of 12 months. The fixed unit prices, estimated quantities, and ceiling for each category are: |
| CLIN | Description of Service | Unit Price in Euro | Estimated Quantity | Unit of Service | Estimated Total² |
| 1001 | Preparation and Painting of Interior Ceiling/Walls Surfaces, Including One Coat of Paint | € - 0 | 16,992 | Sqm1 | € - 0 |
| 1002 | Preparation and Painting of Interior Ceiling/Walls Surfaces, Including One Coat of Primer and One Coat of Paint | € - 0 | 77,882 | Sqm | € - 0 |
| 1003 | Additional Coat of Paint or Primer on Interior Surfaces | € - 0 | 94,874 | Sqm | € - 0 |
| 1004 | Preparation and Painting of Exterior Surfaces, Including One Coat of Primer and One Coat of Paint on Surfaces up to 5 mts. Height | € - 0 | 300 | Sqm | € - 0 |
| 1005 | Additional Coat of Paint or Primer on Exterior Surfaces up to 5 mts. Height | € - 0 | 300 | Sqm | € - 0 |
| 1006 | Touch-up - Plaster Interior Surface | € - 0 | 600 | Sqm | € - 0 |
| 1007 | Touch-up – Plaster Exterior Surface | € - 0 | 300 | Sqm | € - 0 |
| 1008 | Removal of Wallpaper and Preparation of Surfaces, Including One Coat of Paint | € - 0 | 250 | Sqm | € - 0 |
| 1009 | Painting of Radiators | € - 0 | 700 | Sqm | € - 0 |
| 1010 | Painting Of Internal Iron/Wooden Material | € - 0 | 20,391 | Sqm | € - 0 |
| 1011 | Painting Of External Iron/Wooden Material | € - 0 | 10,195 | Sqm | € - 0 |
| 1012 | Painting and Decoration | € - 0 | 380 | Hour | € - 0 |
| 1013 | Rental, Installation and Removal of Scaffolding for Work Over 5 Mts. Height | € - 0 | 900 | Sqm | € - 0 |
| 1014 | Moving and Protection of Furniture - Furnished Apartment | € - 0 | 70 | Each | € - 0 |
| 1015 | Moving and Protection of Furniture - Unfurnished Apartment | € - 0 | 40 | Each | € - 0 |
| 1016 | Moving and Protection of Furniture – Office Space | € - 0 | 50 | Each | € - 0 |
| Total Estimated Amount for the First Option Year (CLIN FROM 1001 TO CLIN 1016) | € - 0 | ||||
| 1 - Sqm=sqare meter | |||||
| 2 - This estimated amount is based on total estimated Government requirements for this period of performance. If more than one award is made, the estimated amount of work awarded under task order(s) to any single Contractor will be less than the amount shown. |
| B.7 Minimum and Maximum Amounts |
| During the Base Year of the contract, and during the option year that might be exercised, the United States Government (USG) shall place orders totaling a minimum of Euro 15,000.00. This reflects the contract minimum guarantee for each period of performance. The amount of all orders, for base and all option years shall not exceed Euro 4,500,000.00. This reflects the contract maximum.” |
| B.7.1 Contract Minimum |
| During the contract period, the Government shall place orders for a minimum of Euro 15,000.00. This is the contract minimum for this period of performance. |
| B.7.2 Contract Maximum |
| During the contract period, the amount of all orders shall not exceed Euro 1,100,000.00. This is the contract maximum for this period of performance. |
Second Option Year
| B.8 PRICING - SECOND OPTION YEAR |
| The Contractor shall provide the services shown below for Second Option Year, starting one year after the date stated in the Notice to Proceed and continuing for a period of 12 months. The fixed unit prices, estimated quantities, and ceiling for each category are: |
| CLIN | Description of Service | Unit Price in Euro | Estimated Quantity | Unit of Service | Estimated Total² |
| 2001 | Preparation and Painting of Interior Ceiling/Walls Surfaces, Including One Coat of Paint | € - 0 | 16,992 | Sqm1 | € - 0 |
| 2002 | Preparation and Painting of Interior Ceiling/Walls Surfaces, Including One Coat of Primer and One Coat of Paint | € - 0 | 77,882 | Sqm | € - 0 |
| 2003 | Additional Coat of Paint or Primer on Interior Surfaces | € - 0 | 94,874 | Sqm | € - 0 |
| 2004 | Preparation and Painting of Exterior Surfaces, Including One Coat of Primer and One Coat of Paint on Surfaces up to 5 mts. Height | € - 0 | 300 | Sqm | € - 0 |
| 2005 | Additional Coat of Paint or Primer on Exterior Surfaces up to 5 mts. Height | € - 0 | 300 | Sqm | € - 0 |
| 2006 | Touch-up - Plaster Interior Surface | € - 0 | 600 | Sqm | € - 0 |
| 2007 | Touch-up – Plaster Exterior Surface | € - 0 | 300 | Sqm | € - 0 |
| 2008 | Removal of Wallpaper and Preparation of Surfaces, Including One Coat of Paint | € - 0 | 250 | Sqm | € - 0 |
| 2009 | Painting of Radiators | € - 0 | 700 | Sqm | € - 0 |
| 2010 | Painting Of Internal Iron/Wooden Material | € - 0 | 20,391 | Sqm | € - 0 |
| 2011 | Painting Of External Iron/Wooden Material | € - 0 | 10,195 | Sqm | € - 0 |
| 2012 | Painting and Decoration | € - 0 | 380 | Hour | € - 0 |
| 2013 | Rental, Installation and Removal of Scaffolding for Work Over 5 Mts. Height | € - 0 | 900 | Sqm | € - 0 |
| 2014 | Moving and Protection of Furniture - Furnished Apartment | € - 0 | 70 | Each | € - 0 |
| 2015 | Moving and Protection of Furniture - Unfurnished Apartment | € - 0 | 40 | Each | € - 0 |
| 2016 | Moving and Protection of Furniture – Office Space | € - 0 | 50 | Each | € - 0 |
| Total Estimated Amount for the Second Option Year (CLIN FROM 2001 TO CLIN 2016) | € - 0 | ||||
| 1 - Sqm=sqare meter | |||||
| 2 - This estimated amount is based on total estimated Government requirements for this period of performance. If more than one award is made, the estimated amount of work awarded under task order(s) to any single Contractor will be less than the amount shown. |
| B.9 Minimum and Maximum Amounts |
| During the Base Year of the contract, and during the option year that might be exercised, the United States Government (USG) shall place orders totaling a minimum of Euro 15,000.00. This reflects the contract minimum guarantee for each period of performance. The amount of all orders, for base and all option years shall not exceed Euro 4,500,000.00.This reflects the contract maximum.” |
| B.9.1 Contract Minimum |
| During the contract period, the Government shall place orders for a minimum of Euro 15,000.00. This is the contract minimum for this period of performance. |
| B.9.2 Contract Maximum |
| During the contract period, the amount of all orders shall not exceed Euro 1,150,000.00. This is the contract maximum for this period of performance. |
Third Option Year
| B.10 PRICING -THIRD OPTION YEAR |
| The Contractor shall provide the services shown below for Third Option Year, starting one year after the date stated in the Notice to Proceed and continuing for a period of 12 months. The fixed unit prices, estimated quantities, and ceiling for each category are: |
| CLIN | Description of Service | Unit Price in Euro | Estimated Quantity | Unit of Service | Estimated Total² |
| 3001 | Preparation and Painting of Interior Ceiling/Walls Surfaces, Including One Coat of Paint | € - 0 | 16,992 | Sqm1 | € - 0 |
| 3002 | Preparation and Painting of Interior Ceiling/Walls Surfaces, Including One Coat of Primer and One Coat of Paint | € - 0 | 77,882 | Sqm | € - 0 |
| 3003 | Additional Coat of Paint or Primer on Interior Surfaces | € - 0 | 94,874 | Sqm | € - 0 |
| 3004 | Preparation and Painting of Exterior Surfaces, Including One Coat of Primer and One Coat of Paint on Surfaces up to 5 mts. Height | € - 0 | 300 | Sqm | € - 0 |
| 3005 | Additional Coat of Paint or Primer on Exterior Surfaces up to 5 mts. Height | € - 0 | 300 | Sqm | € - 0 |
| 3006 | Touch-up - Plaster Interior Surface | € - 0 | 600 | Sqm | € - 0 |
| 3007 | Touch-up – Plaster Exterior Surface | € - 0 | 300 | Sqm | € - 0 |
| 3008 | Removal of Wallpaper and Preparation of Surfaces, Including One Coat of Paint | € - 0 | 250 | Sqm | € - 0 |
| 3009 | Painting of Radiators | € - 0 | 700 | Sqm | € - 0 |
| 3010 | Painting Of Internal Iron/Wooden Material | € - 0 | 20,391 | Sqm | € - 0 |
| 3011 | Painting Of External Iron/Wooden Material | € - 0 | 10,195 | Sqm | € - 0 |
| 3012 | Painting and Decoration | € - 0 | 380 | Hour | € - 0 |
| 3013 | Rental, Installation and Removal of Scaffolding for Work Over 5 Mts. Height | € - 0 | 900 | Sqm | € - 0 |
| 3014 | Moving and Protection of Furniture - Furnished Apartment | € - 0 | 70 | Each | € - 0 |
| 3015 | Moving and Protection of Furniture - Unfurnished Apartment | € - 0 | 40 | Each | € - 0 |
| 3016 | Moving and Protection of Furniture – Office Space | € - 0 | 50 | Each | € - 0 |
| Total Estimated Amount for the Third Option Year (CLIN FROM 3001 TO CLIN 3016) | |||||
| 1 - Sqm=sqare meter | |||||
| 2 - This estimated amount is based on total estimated Government requirements for this period of performance. If more than one award is made, the estimated amount of work awarded under task order(s) to any single Contractor will be less than the amount shown. |
| B.11 Minimum and Maximum Amounts |
| During the Base Year of the contract, and during the option year that might be exercised, the United States Government (USG) shall place orders totaling a minimum of Euro 15,000.00. This reflects the contract minimum guarantee for each period of performance. The amount of all orders, for base and all option years shall not exceed Euro 4,500,000.00. This reflects the contract maximum.” |
| B.11.1 Contract Minimum |
| During the contract period, the Government shall place orders for a minimum of Euro 15,000.00. This is the contract minimum for this period of performance. |
| B.11.2 Contract Maximum |
| During the contract period, the amount of all orders shall not exceed Euro 1,200,000.00. This is the contract maximum for this period of performance. |
Grand Total
| B.12 GRAND TOTAL ESTIMATED CONTRACT AMOUNT | |
| BASE YEAR | € - 0 |
| FIRST OPTION YEAR | € - 0 |
| SECOND OPTION YEAR | € - 0 |
| THIRD OPTION YEAR | € - 0 |
| GRAND TOTAL | € - 0 |
File details come from the government source that posted it. Updated .