Exhibit A - MSS2 CDRLs.pdf
PDF 7 MB Posted
- Solicitation number
- FA702221R0001
About this file
This document contains two Contract Data Requirements Lists (CDRLs) and information on a related federal contract opportunity. The CDRLs require the contractor to submit a Data Accession List and Small Business Subcontractor Report on a quarterly basis. Deliverables are to be provided electronically in Microsoft Office or PDF format. The federal contract opportunity is a Request for Information to obtain comments on draft documents for contract FA7022-16-C-0007, a follow-on for professional services to maintain, sustain, and develop an existing management information system and software applications at Patrick Air Force Base. Comments on the classified Performance Work Statement are due by November 6, 2020 to the contracting officer. The proposed NAICS code is 541511 with a $30 million size standard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 7 Rates_Hours_Indir.xlsx | XLSX spreadsheet | |
| Attachment 3 GFP.xlsx | XLSX spreadsheet | |
| Attachment 10 Total Evaluated Price.xlsx | XLSX spreadsheet | |
| Attachment 4 PPIS.docx | DOCX document | |
| Attachment 5 SubK_consent_letter.docx | DOCX document | |
| Attachment 11 MSS2 DD254 Draft.pdf | ||
| Attachment 9 Other Direct Costs.xlsx | XLSX spreadsheet | |
| Attachment 8 Historical Labor Categories and Hours.png | PNG image | |
| MSS2 L-M_10_19_20.pdf | ||
| Exhibit B - Scenario.docx | DOCX document | |
| Attachment 6 PP Questionnaire(1).docx | DOCX document | |
| Attachment 2 GFE.docx | DOCX document | |
| DRAFT Solicitation FA702221R0001.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST (CORL)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters SeNices, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form t� the government Issuing Contracting Officer for the ContracVPR No. in Block E.
A. CONTRACT LINE ITEM NO.
I
B. EXHIBIT
I
C. CATEGORY;
TDP __ --- OTHER NIA REF: DOD 5010.12-M
D. SYSTEM/ITEM
I
E. CONTRACT/PR NO. F. CONTRACTOR
MISSION SYSTEM SUPPORT 2
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A002 DATA ACCESSION LIST {DAL)
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-81453A PWS 2.1.1 THROUGH 2.2.13 AFTAC/SDA
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION LT REQUIRED SEE BLK 16 SEE BLK 16 b. COPIES
8.APP CODE SEE BLK 16 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE final NIA SEE BLK 16 SEE BLK 16 kJraft reg trepr
16. REMARKS �FTAC/SDAB 1
/\MIC DET 2 OL/PKA LT
BLK 9 - DISTRIBUTION STATEMENT 8; ADMINISTRATIVE OR OPERATIONAL PURPOSES. FURTHER
REQUEST FOR DISSEMINATION SHOULD BE REFERRED TO AFTAC/SDAB.
BLKS 10-13 FREQUENCY AND SUBMISSION WILL BE DETERMINED BY TECHNICAL INTERCHANGE
MEETINGS. GOVERNMENT WOULD ANTICIPATE A LIST OF AVAILABLE DOCUMENTS TO BE
PRESENTED AT PROGRAM MANAGEMENT REVIEWS AND SCHEDULED TECHNICAL INTERCHANGE
MEETINGS
BLK 14 & 15 - ADDITIONAL DISTRIBUTION REQUIREMENTS MAY BE IDENTIFIED IN THE TECHNICAL
INTERCHANGE MEETING. DELIVERIES SHOULD BE IN MICROSOFT OFFICE (2016 OR
GOVERNMENTS CURRENT VERSION) COMPATIBLE FORMAT (PDF 1$ ACCEPTABLE WITH
GOVERNMENT PROGRAM MANAGER APPROVAL) AND BE PROVIDED ELECTRONICALLY OR ON A
CD ROM. A LETTER OF TRANSMITTAL SHALL ACCOMPANY BOTH DRAFTS AND FINAL
REPRODUCIBLE COPY.
11/(H}�L
- - · - - · -> 1
�u� I
H.DATE
�Z�fa---
J. DATE
5129/19 5/29/19
DD Form 1423-1, JUN 90 Previous editions are ob .,fe!e_....----1'� Page 1 of 1 Pages
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed. and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the ContracVPR No. in Block E.
A. CONTRACT LINE ITEM NO.
I
B. EXHIBIT
I
C. CATEGORY:
TDP __ TM --- OTHER MGMT
0. SYSTEM/ITEM
I
E. CONTRACT/PR NO. F. CONTRACTOR
MISSION SYSTEM SUPPORT 2
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
SMALL BUSINESS SUBCONTRACTOR REPORT
A030
4. AUTHORITY (Data Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
0I-MGMT-81642 2.1.11 & 2.2.13 AFTAC/SDA
7. OD 250 REQ 9. DIST STATEMENT 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED SEE BLK 16 b. COPIES
8.APP CODE SEE BLK 16 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE final N/A
10. FREQUENCY
QUARTERLY
11. AS OF DATE
SEE BLK 16 SEE BLK 16 !draft eg epr
16. REMARKS AFTAC/SDAB 1
AMIC OET 2 OL/PKA 1
BLK 9 • OISTIBUTION STATEMENT B: ADMINISTRATIVE OR OPERATIONAL PURPOSES. FURTHER
REQUEST FOR DISSEMINATION SHOULD BE REFERRED TO AFTAC/SOAB.
BLK 11. THE REPORTING PERIOD FOLLOWING CONTRACT AWARD THAT BEST ALIGNS WITH THE
SMALL BUSINESS REPORTING CYCLE (MAR OR SEP).
BLK 12 & 13. CONTRACTOR SHALL DELIVER THE REPORT ON THE 151H OF THE MONTH
FOLLOWING SMALL BUSINESS REPORTING CYCLE (MAR OR SEP).
BLK 14 · 16 • DELIVERIES SHOULD BE PROVIDED ELECTRONICALLY OR ON A CO. CONTRACTOR
FORMAT ACCEPTABLE.
1s.7qv;y ........ -> 0 1
U-�
I
H.DATE
�� V�- J. DATE
5/29/19 5/29/19
Form 1423-1, JUN 90 Previous editions are QgSOlefe ,f/ Page of Pages
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
File details come from the government source that posted it. Updated .