Exhibit A -DATA Requirements T-BOSS.pdf

PDF 365 KB Posted

Attached to
Tinker Air Force Base Operations Support Service (TAFB BOSS) Federal contract opportunity
Solicitation number
FA813725R0004
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This file is Exhibit A - Data Requirements, which details the contractor deliverables required under the Tinker Air Force Base Operations Support Service (TAFB BOSS) contract. The exhibit lists over 50 different reports, logs, plans, and other documents that must be submitted electronically to the 72nd Air Base Wing Civil Engineering Squadron (72 ABW/CEO).

The deliverables cover multiple functional areas including demand maintenance, plant operations, preventive maintenance, storage tanks, HVAC systems, pest management, electrical systems, and quality control. Key requirements include monthly NEXGEN-IT data reviews, facility manager training records, various plant operating logs, preventive maintenance program portfolios, refrigerant management reports, and quality control inspection schedules. The exhibit specifies the frequency of submissions (daily, weekly, monthly, quarterly, or annually), submission dates, minimum required information, and applicable references for each deliverable. Most monthly reports are due by the 5th calendar day of each month, while annual deliverables are typically required 21 days before the end of each contract period.

View the file

Other files for this federal contract opportunity

Other files attached to Tinker Air Force Base Operations Support Service (TAFB BOSS), newest first.
File Type Posted
T-BOSS Solicitation Amendment - FA813725R00040001_D31.pdf PDF
T-BOSS Solicitation Amendment FA813725R00040001 SF 30_D31.pdf PDF
RFI_Matrix_30 Dec 2024_GOV Responses Revised T-BOSS (v4).pdf PDF
Instructions to Bidders T-BOSS 30 Dec 2024.pdf PDF
RFI_Matrix_23 Dec 2024 _GOV Responses Revised TBOSS (v3).pdf PDF
RFI Matrix 10312024_GOV Responses Revised T-BOSS.pdf PDF
PWS Appendix B T-BOSS_N8.pdf PDF
Pricing Matrix T-BOSS FINAL 26Nov24_Protected.xlsx XLSX spreadsheet
OK20240049WD_Building.pdf PDF
E3_RTL_ASO_CBA IAMAW.pdf PDF
E4_SSI CBA IAMAW.pdf PDF
DD 254 T-BOSS.pdf PDF
T-BOSS Solicitation - FA813725R0004_N26.pdf PDF
E2_Amentum CBA IAMAW.pdf PDF
MOA Industrial Process Technician.pdf PDF
Instructions to Bidders T-BOSS 25 Nov 2024.pdf PDF
Evaluation Factors T-BOSS 22 Nov 2024.pdf PDF
PWS Tinker Base Operations Support Service T-BOSS 26 NOV 2024.pdf PDF
PWS Appendix A T-BOSS_N8.pdf PDF
PWS Appendix C T-BOSS_N25.pdf PDF
OK20240015WD_Highway.pdf PDF
OK20240026WD_Heavy.pdf PDF
E1_CBA Teamsters.pdf PDF
E5_FAR 22.1010 Notice_v1.pdf PDF
Government Property T-BOSS.pdf PDF
SCA 2015-5315 Rev 24 07222024.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit Line Item Number

Performance CLIN Functional Area Title

Minimum Required Information (reference PWS & additional references for additional requirements) Frequency

Date of First Submission

Date of Subsequent Submissions Addressee PWS References Additional References

A001 X003 Demand Maintenance / Customer Service Customer Service

AF Form 332 / Service Request Submission in NEXGEN-IT Upon Request As Needed 72 ABW/CEO 2.1-2.1.18 AFI 32-1001

A002 X003 Demand Maintenance / Customer Service NEXGEN-IT DATA review See PWS for requirements. Monthly

5th calendar day of the 2nd month of full contract performance

NLT 5th calendar day of each month 72 ABW/CEO 2.1.3-2.1.6 Government Directed

A003 X003 Demand Maintenance / Customer Service

Base Civil Engineering Work Clearance Request AF Form 103 As required As Needed 72 ABW/CEO 2.1.8, 2.5.2, 3.5.4 AFI 32-1001

A005 X003 Demand Maintenance / Customer Service Facility Managers List See PWS for requirements. Upon Request As Needed 72 ABW/CEO 2.1.17 Government Directed

A006 X003 Demand Maintenance / Customer Service Facility Manager Training See PWS for requirements. Monthly

5th calendar day of the 2nd month of full contract performance

NLT 5th calendar day of each month 72 ABW/CEO 2.1.17 Government Directed

A00A X003 Plant Operations Water Treatment Operating Log for Cooling Tower Systems AF Form 1457 Monthly

5th calendar day of the 2nd month of full contract performance

NLT 5th calendar day of each month 72 ABW/CEO 2.3.6 AFI 32-1001 Chapter 14 and UFC 3-570-06

A00B X003 Plant Operations Daily Steam Plant Operating Log AF Form 1458 Monthly

5th calendar day of the 2nd month of full contract performance

NLT 5th calendar day of each month 72 ABW/CEO 2.3.7 AFMAN 32-1068 Chapter 6

A00C X003 Plant Operations Monthly Steam Plant Operating Log AF Form 1458 Monthly

5th calendar day of the 2nd month of full contract performance

NLT 5th calendar day of each month 72 ABW/CEO 2.3.7 AFMAN 32-1068 Chapter 6

A00D X003 Plant Operations Water Treatment Operating Log for Steam and Hot Water Boilers AF Form 1459 Monthly

5th calendar day of the 2nd month of full contract performance

NLT 5th calendar day of each month 72 ABW/CEO 2.3.7 AFI 32-1001 Chapter 14 and UFC 3-570-06

A00E X003 Plant Operations Boiler Start-Up Notification See PWS for requirements. As required As Needed As Needed

72 ABW/CEO

72 ABW/CEI 2.3.7. Government Directed

A00F X003 Plant Operations Boiler or Pressure Vessel Inspection Report AF Form 1222 Per AFI Within 30 days of inspection

Within 30 days of subsequent inspection 72 ABW/CEO 2.3.7. AFMAN 32-1068

A00G X003 Plant Operations Wastewater Report See PWS for requirements. Monthly

5th calendar day of the 2nd month of full contract performance

NLT 5th calendar day of each month

72 ABW/CEO

72 ABW/CEI 2.3.9.5 Government Directed

A00H X001 Preventive Maintenance (PM) Preventive Maintenance Program Portfolio See PWS and CE Playbook for requirements Annually

2nd month of full contract performance

21 calendar days before the end of every contract period 72 ABW/CEO 2.7-2.7.10 Government Directed

A00J X001 Preventive Maintenance (PM) Preventive Maintenance Annual Program Review - Quarterly Update

See CE Playbook for requirements.

Minimum information required:

1) changes in the PM hours, frequencies, schedules, equipment additions and deletions implemented by respective equipment PMTLs for any additional (increase or decrease) equipment for the PM performance

2) listing of equipment for each shop, which is not currently on Quarterly within 90 calendar days of full contract performance

NLT 14 days prior to the end of each quarter 72 ABW/CEO 2.7-2.7.10 Government Directed

Exhibit A - Data Requirements This paragraph provides details regarding the deliverables required under this contract. All deliverables will be submitted electronically. For deliverables that are not on a prescribed format or form, the contractor shall provide a proposed format to the addressee(s) no later than (NLT) 15 business days prior to the date of first submission.

All annual requirements are due prior to the end of each contract period. All semi-annual or quarterly requirements are due in the month immediately after the end of the semi-annual period or quarter, with the first semi-annual period and quarter beginning at the start of full performance.

Number

Performance CLIN Functional Area Title

Minimum Required Information (reference PWS & additional references for additional requirements) Frequency

Date of First Submission

Date of Subsequent Submissions Addressee PWS References Additional References

Exhibit A - Data Requirements This paragraph provides details regarding the deliverables required under this contract. All deliverables will be submitted electronically. For deliverables that are not on a prescribed format or form, the contractor shall provide a proposed format to the addressee(s) no later than (NLT) 15 business days prior to the date of first submission.

All annual requirements are due prior to the end of each contract period. All semi-annual or quarterly requirements are due in the month immediately after the end of the semi-annual period or quarter, with the first semi-annual period and quarter beginning at the start of full performance.

A00K X001 Preventive Maintenance (PM) Deferred PM List

Provide list of PM that was not accomplished as scheduled with justifications for deferring PM or not accomplishing a task on the PMTL Minimum information required: PM, PMTL#, UID, UID Description, UID Location, Building number, Work Location, Shop POC. Monthly

2nd month of full contract performance 5th of each month 72 ABW/CEO 2.7-2.7.10 Government Directed

A00L X001 Preventive Maintenance (PM) Preventive Maintenance Task List

Minimum information required:

PM, PMTL#, UID, UID

Description, UID Location, Building number, Work Location, Shop POC, detail Monthly

2nd month of full contract performance 5th of each month 72 ABW/CEO 2.7-2.7.10 Government Directed

A00M X003 Operations Engineering Provide Optimization Plans for all systems annually See PWS for requirements. Annually

21 calendar days before end of first contract period

21 calendar days before end of each contract period 72 ABW/CEO 3 Government Directed

A00N X003 Administrative Antiterrorism Awareness Training See PWS & Appendix A 4.5.8 for requirements. Annually Within 30 days after award Annually 72 ABW/CEO Appendix A 4.5.8 DFARS Clause 252.204-7004

A00P X003 Operations Engineering Material Costs See PWS for requirements. Monthly

5th calendar day of the 2nd month of full contract performance

NLT 5th calendar day of each month 72 ABW/CEO 3.3.8.3 Government Directed

A00Q X003 Operations Engineering CAP Invoice See PWS for requirements. Monthly

5th calendar day of the 2nd month of full contract performance

NLT 5th calendar day of each month 72 ABW/CEO 3.3.8.3 Government Directed

A00R X003 Operations Engineering CAP Inventory See PWS for requirements. Monthly

5th calendar day of the 2nd month of full contract performance

NLT 5th calendar day of each month 72 ABW/CEO 3.3.10 Government Directed

A00S X003 Operations Engineering Self-Inspection Check List MICT Annually 21 calendar days before end of first contract period

21 calendar days before end of each contract period 72 ABW/CEO 3.5.2.1 DAFI 90-302

A00T X003 Operations Engineering Barcode Plan See PWS for requirements. Annually within 90 calendar days of full contract performance

NLT 21 calendar days before end of each contract period 72 ABW/CEO 3.5.5 Government Directed

A00U X003 Operations Engineering Warranty Plan See PWS for requirements. Annually 21 calendar days before end of first contract period

21 calendar days before end of each contract period 72 ABW/CEO 3.6.2 Government Directed

A00V X005 Predictability Based Maintenance (PdM) Program List of Critical Equipment for PdM Program

See PWS for the requirements (List must be approved by FAS 72 ABW/CEOE) Annually within 90 calendar days of full contract performance

NLT 21 calendar days before the end of each contract period 72 ABW/CEO 3.7.1 Government Directed

A00W X005 Predictability Based Maintenance (PdM) Program PdM Program Quarterly Report

See PWS for the requirements.

Minimum information required:

Key Performance Indicators (KPI), Leading and Lagging indicators, Reliability, Availability, Maintainability, and Overall Equipment Effectiveness, including metrics Quarterly within 90 calendar days of full contract performance

NLT 14 days prior to the end of each quarter 72 ABW/CEO 3.7.1 Government Directed

Number

Performance CLIN Functional Area Title

Minimum Required Information (reference PWS & additional references for additional requirements) Frequency

Date of First Submission

Date of Subsequent Submissions Addressee PWS References Additional References

Exhibit A - Data Requirements This paragraph provides details regarding the deliverables required under this contract. All deliverables will be submitted electronically. For deliverables that are not on a prescribed format or form, the contractor shall provide a proposed format to the addressee(s) no later than (NLT) 15 business days prior to the date of first submission.

All annual requirements are due prior to the end of each contract period. All semi-annual or quarterly requirements are due in the month immediately after the end of the semi-annual period or quarter, with the first semi-annual period and quarter beginning at the start of full performance.

A00X X005 Predictability Based Maintenance (PdM) Program Predictability Maintenance Program Report

Detailed report including metrics for Scheduled Maintenance Work Orders versus Unscheduled Maintenance Work Orders for Critical RPIE and Non Critical RPIE; Mean Time Between Failure (MTBF) and Mean Time To Repair (MTTR). Quarterly within 90 calendar days of full contract performance

NLT 14 days prior to the end of each quarter 72 ABW/CEO 3.7.3.6 Government Directed

A00Y X005 Predictability Based Maintenance (PdM) Program Condition of Air Force RPIE Report

Detailed report includes predicting possible failure modes, condition and promote an effective planning/scheduling program in order to prevent failure of critical/high impact equipment and unscheduled outages Quarterly within 90 calendar days of full contract performance

NLT 14 days prior to the end of each quarter 72 ABW/CEO 3.7.3.8 Government Directed

A00Z X005 Predictability Based Maintenance (PdM) Program Motor Management Program Plan

Submit the Motor Current Signature Analysis (MCSA) ultrasonic, vibration analysis, Energy Efficiency Analysis, ASD Economic Evaluation, and thermography analysis records for each motor identified for the Motor Management Program.

Submit the records for the motor greasing and the root cause analysis

- Submit the report utilizing the Motor Master Software

- Submit a detail Motor Management Program Plan Annually

21 calendar days before the end of the first contract period

21 calendar days before the end of every contract period 72 ABW/CEO 3.7.4.1.4 Government Directed

A010 X005 Predictability Based Maintenance (PdM) Program Motor Inventory Report

Submit the complete inventory list of all motors (50HP and above) new and existing on TAFB for FAS approval.

Database includes list of facility number and location in the facility, Operating hours, motors, base line disable readings, model & serial number, lubrication type, bearing type, motor name plate data, L10 and L50 life.

(See Table A2.1 and Figure A2.1, A2.2, AFPAM32-1192) Annually within 180 calendar days of full contract performance

NLT 21 calendar days before the end of each contract period 72 ABW/CEO 3.7.4.1.4 Government Directed

A011 X003 Furnishings Management Master Inventory Log-Warehoused Furniture/Appliance Items

Master Inventory using eMH.

Minimum information requirements: nomenclature, manufacturer, model #, serial #, number of backup items. Monthly

5th calendar day of the 2nd month of full contract performance

NLT 5th calendar day of each month

72 ABW/CEO

72 ABW/CEIH 4.1.5 AFI 32-6000 with Tinker AFB Supplement

Number

Performance CLIN Functional Area Title

Minimum Required Information (reference PWS & additional references for additional requirements) Frequency

Date of First Submission

Date of Subsequent Submissions Addressee PWS References Additional References

Exhibit A - Data Requirements This paragraph provides details regarding the deliverables required under this contract. All deliverables will be submitted electronically. For deliverables that are not on a prescribed format or form, the contractor shall provide a proposed format to the addressee(s) no later than (NLT) 15 business days prior to the date of first submission.

All annual requirements are due prior to the end of each contract period. All semi-annual or quarterly requirements are due in the month immediately after the end of the semi-annual period or quarter, with the first semi-annual period and quarter beginning at the start of full performance.

A012 X003 Furnishings Management Furniture/Appliance Repair Log

Furniture/appliance repair log using eMH. Minimum information required: date, building number, room number, item removed, manufacture make, model number, serial number, if sent for disposal to Monthly

5th calendar day of the 2nd month of full contract performance

NLT 5th calendar day of each month

72 ABW/CEO

72 ABW/CEIH Para 4.1.5 AFI 32-6000 with Tinker AFB Supplement

A013 X003 Furnishings Management Furniture Control Log

Furniture control log using eMH.

Minimum information required:

date, quantity, building number, room number, item removed, manufacture make, model number, serial number, if sent for disposal to DRMO (need to provide receipt of items received from DRMO with manufacture make, model #, and serial #). Monthly

5th calendar day of the 2nd month of full contract performance

NLT 5th calendar day of each month

72 ABW/CEO

72 ABW/CEIH 4.1.5 AFI 32-6000 with Tinker AFB Supplement

A014 X001 Infrastructure Systems Swimming Pool Operational Log AF Form 708 Monthly 5th calendar of the month following pool opening

NLT 5th calendar day of each month pool is open 72 ABW/CEO 4.2.5.5 AFMAN 48-114 and UFC 3-230-02

A015 X001 Infrastructure Systems Backflow Prevention Inspection Data AF Form 843 Monthly 5th calendar of the month following pool opening

NLT 5th calendar day of each month pool is open 72 ABW/CEO 4.2.6.2 AFMAN 32-1067 Ch 4

A016 X001 Infrastructure Systems Backflow Prevention Vacuum Inspection Data AF Form 844 Monthly

5th calendar of the month following pool opening

NLT 5th calendar day of each month pool is open 72 ABW/CEO 4.2.6.2 AFMAN 32-1067 Ch 4

A017 X001 Infrastructure Systems Cross Connection Information AF Form 845 Monthly

21 calendar days before the end of the first contract period

21 calendar days before end of each contract period 72 ABW/CEO 4.2.6.2 AFMAN 32-1067 Ch 4

A018 X001 Infrastructure Systems Inventory of Cross Connection and Backflow Devices

AF Form 848 - Update inventory with newly installed or removed devices Annually

21 calendar days before the end of the first contract period

21 calendar days before end of each contract period 72 ABW/CEO 4.2.6.2 AFMAN 32-1067 Ch 4

A019 X001 Infrastructure Systems Backflow Prevention Cross Connection Survey AF Form 848

Every five (5)-years

21 calendar days before the end of the first contract period

5-years after completion of previous inventory 72 ABW/CEO 4.2.6.2 AFMAN 32-1067 Ch 4

A01A X001 Infrastructure Systems Valve and Hydrant Maintenance Record. Facility Operating Logs Annually

21 calendar days before the end of the first contract period

21 calendar days before end of each contract period 72 ABW/CEO 4.2.11

AFMAN 32-1067, UFC 3-230-02, Mil HDBK 1164 & 1168

A01B X001 Infrastructure Systems Hydrant Flow Test Records AF Form 1027 Monthly 5th day of the 4th month of full contract performance 5th of each month 72 ABW/CEO 4.2.11 AFI 32-2001, Mil HDBK 1164 & 1168

A01C X001 Infrastructure Systems Annual Natural Gas Leak Report

See AFMAN 32-1067 para 8.2.2.

Minimum information required:

description of location (include map) and classification of the Annually 1st of September 1st of September 72 ABW/CEO 4.2.3, 4.2.12 AFMAN 32-1067, UFC 3-430-09

A01D X001 Infrastructure Systems Natural Gas Plan See requirements in PWS and UFC 3-430-09 Annually

3 months after start of full performance

21 calendar days before the end of every contract period 72 ABW/CEO 4.2.3, 4.2.12 AFMAN 32-1067, DOT-PHMSA

Number

Performance CLIN Functional Area Title

Minimum Required Information (reference PWS & additional references for additional requirements) Frequency

Date of First Submission

Date of Subsequent Submissions Addressee PWS References Additional References

Exhibit A - Data Requirements This paragraph provides details regarding the deliverables required under this contract. All deliverables will be submitted electronically. For deliverables that are not on a prescribed format or form, the contractor shall provide a proposed format to the addressee(s) no later than (NLT) 15 business days prior to the date of first submission.

All annual requirements are due prior to the end of each contract period. All semi-annual or quarterly requirements are due in the month immediately after the end of the semi-annual period or quarter, with the first semi-annual period and quarter beginning at the start of full performance.

A01E X001 Cathodic Protection and Corrosion Control

Cathodic Protection Annual Performance Booklet Report 1) Executive Summary: synopsis of all systems

2) Report organized by system ie. rectifiers, isolation flanges/unions, ASTs, USTs, close interval survey, test point survey, water tanks, fire protection water lines, leak reports and fuels systems and each section includes:

3) Summary Sheets: Include at least testing procedures, findings, and adjustments performed, any recommendations, etc.

4) Completed Forms: AF Form 1687 - Annotated Leak information, AF Form 1689

- Water Tank Calibration, AF Form 491 - Cathodic Protection Operating Log for Impressed Current Systems, AF Form 1686 - Cathodic Protection Operating Log for Sacrificial Anode System, and AF Form 1688 - Annual Cathodic Protection Performance Survey Booklet and electronic format Annually

21 calendar days before the end of the first contract period

21 calendar days before end of each contract period 72 ABW/CEO 4.2.14.3 AFI 32-1001 Chapter 14 and UFC 3-570-06

A01K X001 Storage Tanks and Liquid Fuels Replaced Components on DLA Capitalized Assets See PWS for requirements. Quarterly within 90 calendar days of full contract performance

NLT 14 days prior to the end of each quarter 72 ABW/CEO 4.2.14.5 Government Directed

A01L X001 Storage Tanks and Liquid Fuels Tank Inspection Summary Storage Tank Accountability and Reporting (STAR) Database Monthly

5th calendar day of the 2nd month of full contract performance

NLT 5th calendar day of each month

72 ABW/CEO

72 ABW/CEI 4.2.14-4.2.14.6 AFI 32-1067, para 9.6.3, UFC 3-460-03

A01N X001 Storage Tanks and Liquid Fuels Storage Tank Compliance Plan See PWS, AFI 32-1067 and Base Environmental for requirements. Annually within 90 calendar days of full contract performance

21 calendar days before end of each contract period

72 ABW/CEO

72 ABW/CEI 4.2.14-4.2.14.6 Government Directed

A01P X001 HVAC and Refrigerant Management Refrigerant Management Standard Operating Procedures See requirements in the PWS Annually

60 days after start of full contract performance

21 calendar days before the end of every contract period 72 ABW/CEO 4.2.15.14 AFMAN 32-7002 with Tinker Supplement

A01Q X001 HVAC and Refrigerant Management List of initial refrigerant recovery and recycling equipment See requirements in the PWS Annually

60 days after start of full contract performance

21 calendar days before the end of every contract period 72 ABW/CEO 4.2.15.14 AFMAN 32-7002 with Tinker Supplement

A01R X001 HVAC and Refrigerant Management Training and certifications records See requirements in the PWS Annually NLT 14 days of full contract performance

14 calendar days before the start of every contract period 72 ABW/CEO 4.2.15.14 AFMAN 32-7002 with Tinker Supplement

A01S X001 HVAC and Refrigerant Management

Data for refrigerant consumption - Tinker Refrigerant Management Data Sheets, Leak Report, and Inventory data See requirements in the PWS Monthly

2nd month of full contract performance 5th of each month 72 ABW/CEO 4.2.15.14 AFMAN 32-7002 with Tinker Supplement

A01T X001 HVAC and Refrigerant Management Refrigerant Equipment Service Records and Maintenance and Repair Records

Include records for equipment service records and maintenance and repair requirements Quarterly within 90 calendar days of full contract performance

NLT 14 days prior to the end of each quarter 72 ABW/CEO 4.2.15.14 AFMAN 32-7002 with Tinker Supplement

A01U X001 HVAC and Refrigerant Management Annual Excessive Leakage Rate Report See requirements in the PWS Quarterly within 90 calendar days of full contract performance

NLT 14 days prior to the end of each quarter 72 ABW/CEO 4.2.15.14 AFMAN 32-7002 with Tinker Supplement

A01V X001 HVAC and Refrigerant Management Equipment Inventory Report See requirements in the PWS Quarterly within 90 calendar days of full contract performance

NLT 14 days prior to the end of each quarter 72 ABW/CEO 4.2.15.14 AFMAN 32-7002 with Tinker Supplement

Number

Performance CLIN Functional Area Title

Minimum Required Information (reference PWS & additional references for additional requirements) Frequency

Date of First Submission

Date of Subsequent Submissions Addressee PWS References Additional References

Exhibit A - Data Requirements This paragraph provides details regarding the deliverables required under this contract. All deliverables will be submitted electronically. For deliverables that are not on a prescribed format or form, the contractor shall provide a proposed format to the addressee(s) no later than (NLT) 15 business days prior to the date of first submission.

All annual requirements are due prior to the end of each contract period. All semi-annual or quarterly requirements are due in the month immediately after the end of the semi-annual period or quarter, with the first semi-annual period and quarter beginning at the start of full performance.

A01W X001 HVAC and Refrigerant Management Refrigerant Inventory Level Report

Minimum information required:

refrigerant inventory levels and consumption for each type of refrigerant Monthly

2nd month of full contract performance 5th of each month 72 ABW/CEO 4.2.15.14 AFMAN 32-7002 with Tinker Supplement

A01X X001 HVAC and Refrigerant Management HVAC air quality compliance

Document within Air Program Information Management System (APIMS) As required As Needed 72 ABW/CEO 4.2.15.14 AFMAN 32-7002, par 2.16.16.4.

A020 X001 HVAC and Refrigerant Management Kitchen Hood and Fire Suppression Inspection and Cleaning Report

See requirements in AFI 91-203 and NFPA 96 Monthly

5th calendar day of the first month of full contract performance

NLT 5th calendar day of each month

72 ABW/CEO

72ABW/CEXF 4.2.15.14 AFI 91-203, NFPA 96

A021 X003 Pest Management Pest Control Certificate of Competency DD Form 1826 or Equivalent for Contractor Applicator Annually Aug 1st Aug 1st 72 ABW/CEO 4.2.18 Government Directed

A026 X003 Pest Management Pest Control Report DD Form 1532 or Electronic System of Record Daily as required 72 ABW/CEO 4.2.18.1.3 AFMAN 32-1053

A027 X003 Pest Management Trapped or Removed Nuisance Animal Control Report

Minimum information required:

type of animal, count and date trapped or removed. Annually Jan 5th Jan 5th 72 ABW/CEO 4.2.18.2 Government Directed

A028 X003 Pest Management Agriculture Inspections See requirements in the PWS Monthly Monthly Government Directed, para

4.2.18.6 72 ABW/CEO 4.2.18.1.4 Government Directed

A029 X001 Vertical Transportation Equipment VTE Inspection Report See requirements in the PWS As required 5 days after inspection 72 ABW/CEO 4.2.19.7 Government Directed

A02C X001 Fire Alarms Inspection, Test and Maintenance Documentation of Fire Systems

See requirements in UFC 3-601-

02. Report all ITM tasks completed in the previous month. Monthly

5th calendar day of the 2nd month of full contract performance

NLT 5th calendar day of each month 72 ABW/CEO 5.3 UFC-3-601-02

A02E X001 Electrical Systems Civil Engineer Energized Electrical Work Permit AF Form 1213 As required As Needed 72 ABW/CEO 5.4.1.1 AFMAN 32-1065 Chapter 15

A02F X001 Electrical Systems Electrical Facilities Safe Clearance AF Form 269 As required As Needed 72 ABW/CEO 5.4.1.1 AFMAN 32-1065 Chapter 17

A02G X001 Electrical Systems Grounding System Test See requirements in UFC 3-560- 01 As required As Needed 72 ABW/CEO 5.4.1.4 AFMAN 32-1065

A02H X001 Electrical Systems Lightning Protection for Munitions See requirements in UFC 3-575- 01 Annually

21 calendar days before the end of the first contract period

21 calendar days before end of each contract period 72 ABW/CEO 5.4.1.4 UFC 3-575-01

A02J X001 Electrical Systems Visual Air Navigation Systems Inspection Report

See requirements in the Chapter

5 AC 150-5340-26C & UFC 3-

535-01 Monthly

5th calendar day of the first month of full contract performance

NLT 5th calendar day of each month 72 ABW/CEO 5.4.1.8

FAA Advisory Circular (AC) 150-5340-26C, 150-5340-30G, 150-5340-21, NESC, NEC, TAFB

Standards, AFI 13--204, V2 & V3, UFC 3-535-

A02K X001 Power Production Generator Run Time Form and Fuel Usage Report

OC-ALC Form 153 and Document within Air Program Information Management System Monthly 15th of January 15th of January

72 ABW/CEO

72 ABW/CEI 5.5

AFI 32-1062, AFI 32-1063, 40 CFR Part 63, CFR Part 60, OAC 252:100, NFPA 70B, 3-5- 6 Generators, NFPA 70B & 70C

A02L X001 Power Production Generator Inventory Report Include all information in the "Generator Report" attachment Annually 15th of January

15th of January and as number changes

72 ABW/CEO

72 ABW/CEN 5.5.1.1

AFI 32-1062, AFI 32-1063, 40 CFR Part 63, CFR Part 60, OAC 252:100, NFPA 70B, 3-5- 6 Generators, NFPA 70B & 70C

A02M X001 Power Production Generator Revalidation Validate inventory Annually

21 calendar days before the end of the first contract period

21 calendar days before end of each contract period

72 ABW/CEO

72 ABW/CEN 5.5.1.1 AFMAN 32-1062

A02N X001 Power Production Emergency Generator Operating Log (Inspection and Testing) AF Form 487 Monthly

5th calendar day of the 2nd month of full contract performance

NLT 5th calendar day of each month 72 ABW/CEO 5.5.1.4 AFMAN 32-1062 UFC 3-540-07

A02P X001 Power Production Historical Records - Diesel Electric Generator System AF Form 719

Annually or When Part Changed

21 calendar days before the end of the first contract period

21 calendar days before end of each contract period 72 ABW/CEO 5.5.1.4 AFMAN 32-1062 UFC 3-540-07

Number

Performance CLIN Functional Area Title

Minimum Required Information (reference PWS & additional references for additional requirements) Frequency

Date of First Submission

Date of Subsequent Submissions Addressee PWS References Additional References

Exhibit A - Data Requirements This paragraph provides details regarding the deliverables required under this contract. All deliverables will be submitted electronically. For deliverables that are not on a prescribed format or form, the contractor shall provide a proposed format to the addressee(s) no later than (NLT) 15 business days prior to the date of first submission.

All annual requirements are due prior to the end of each contract period. All semi-annual or quarterly requirements are due in the month immediately after the end of the semi-annual period or quarter, with the first semi-annual period and quarter beginning at the start of full performance.

A02Q X001 Fire Suppression Pumps Fire Pump Runtime/Fuel Usage Form

1) Total annual hours of operation (from Fire Pumps Runtime Forms located at each fire house).

2) Annual fuel usage for each fire pump Annually First January 15th Subsequent January 15ths

72 ABW/CEO

72 ABW/CEI 5.7 UFC 3-601-02

A02R X003 Administrative QPI Supporting Documents and Information

Include required supporting documents along with the detailed calculation for each QPI (Quality Monthly

5th calendar day of the 2nd month of full contract performance

NLT 5th calendar day of each month 72 ABW/CEO 6 FAR 52.246-4, FAR 52.246-2

A02S X003 Administrative Air Force Common Output Level Standards and Key Performance Indicators As directed by Government As required As Needed 72 ABW/CEO Appendix A 3.3-3.5 Government Directed

A02T X003 Administrative Meeting Minutes Record of Meeting/Minutes As required within 5 working days of every meeting within 5 working days of every meeting 72 ABW/CEO Appendix A 3.1.2 Only if requested by government or contractor

A02U X003 Administrative Ad Hoc Reports As directed by Government As required As Needed 72 ABW/CEO Appendix A 3.3-3.5 Government Directed

A02W X003 Administrative Contractor Demographics Data

Submit percentages of the workforce as follows:

Single - No family members/dependents Single with family members/dependents Married - No Children Married - With Children Annually

60 days after start of full contract performance

21 calendar days before the end of every contract period 72 ABW/CEO Appendix A 3.5 Government Directed

A02X X003 Quality Control Quality Control Plan See PWS for detailed requirements. Annually

15 calendar days before start of first contract period.

21 calendar days before end of each contract period

72ABW/CEO

AFSC/PZIOC Appendix A 5-5.3.11 FAR 52.246-4, FAR 52.246-2

A02Y X003 Quality Control Standard Operating Procedures and Maintenance Control Plan

See PWS for detailed requirements. As required

60 days after start of full contract performance

As needed when requested by government (New and updated plans) 72 ABW/CEO

4.2.19.4, Appendix A 5.3.9-

5.3.9.5 Government Directed

A02Z X003 Quality Control Inspection Schedule

Minimum information required:

name of the QC Inspector, phone number, items to be checked (UID), PMTL #, PWS paragraph reference, bldg. number, location and the approximate time of the Weekly

Monday of first week of full contract performance Monday of each week

72ABW/CEO

AFSC/PZIOC Appendix A 5-5.3.11 FAR 52.246-4, FAR 52.246-2

A030 X003 Administrative Update Recall Roster

Maintain recall roster with current address and contact information. As required As Needed 72 ABW/CEO Appendix A 9.6 Government Directed

A031 X003 Administrative Minimum Team Complement

Minimum information required:

Personnel name, skill classification,assigned shop, FTE per CLIN# , hours worked, certification or license number and state/city of issue, and notes/comments Monthly

5th calendar day of the first month of full contract performance

NLT 5th calendar day of each month

72ABW/CEO

AFSC/PZIOC 1.5-1.5.3

Update required for any personnel that are newly hired and/or replaced.

Number

Performance CLIN Functional Area Title

Minimum Required Information (reference PWS & additional references for additional requirements) Frequency

Date of First Submission

Date of Subsequent Submissions Addressee PWS References Additional References

Exhibit A - Data Requirements This paragraph provides details regarding the deliverables required under this contract. All deliverables will be submitted electronically. For deliverables that are not on a prescribed format or form, the contractor shall provide a proposed format to the addressee(s) no later than (NLT) 15 business days prior to the date of first submission.

All annual requirements are due prior to the end of each contract period. All semi-annual or quarterly requirements are due in the month immediately after the end of the semi-annual period or quarter, with the first semi-annual period and quarter beginning at the start of full performance.

A032 X003 Quality Control Customer Survey/Customer Complaint

Include procedures for a customer feedback program to collect customer input and address customer complaints. A Weekly

Monday of first week of full contract performance Monday of each week 72 ABW/CEO Appendix A 5.3.8 Government Directed