Exhibit A Contract Data Requirements List (CDRL).pdf
PDF 706 KB Posted
- Solicitation number
- W58RGZ26R0019
About this file
This document is Exhibit A—a Contract Data Requirements List (CDRL) for federal solicitation W58RGZ-26-R-0019 for Apache Airframe Contracted Field Service Report (CFSR) work.
The solicitation requires The Boeing Company to submit one data item: a Contract Field Service Report (CFSR) titled "Certificate of Services" (Data Item No. A001). The CFSR is governed by Data Acquisition Document DI-MGMT-81238/T and references contract section 3.8.1 AMAM-LAT. Submissions are required monthly, with the first submission due 45 days after contract award and subsequent submissions due no later than the 15th calendar day after the end of each contractor reporting period. The required office is AMAM-LAT, and one final copy must be submitted. The data is classified under the Management (MGMT) category and subject to Distribution D restrictions with export control markings per the Arms Export Control Act and Export Control Reform Act of 2018. The CFSR form provided captures detailed service information including authorized duty and overtime hours, travel performed (commercial and privately owned conveyance), government transportation requests, training provided, assistance provided with fault and corrective action documentation, and preventative premature removals with cost avoidance calculations. All submissions require certification by the contractor, USG/Military reviewer, and Contracting Officer's Representative (COR).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT A Contract
Data Requirement Lists
(CDRLs) Solicitation:
W58RGZ-26-R-0019
Apache Airframe CFSR
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE-ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM F. CONTRACTOR
Apache Airframe CFSR
E. CONTRACT/PR NO.
TBD The Boeing Company
1. DATA ITEM NO. 17. PRICE GROUP
A001
2. TITLE OF DATA ITEM
Contract Field Service Report
3. SUBTITLE
Certificate of Services
6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81238/T
5. CONTRACT REFERENCE
3.8.1 AMAM-LAT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION
LT MTHLY 45 DACA b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Final
A N/A SEE BLK 16 Reg Repro
16. REMARKS:
Block 4 Tailoring:
This DID has been tailored downward to address only required essential data.
The Government required format is attached.
Block 9: Distribution D, See Attachment A.
Export Control Act Warning Required, See Att. A
Block 13: NLT the 15th calendar day after the end of the contractor reporting period.
Submittals shall be in the format prescribed in below.
15. TOTAL
0 3 0
G. PREPARED BY H. DATE J. DATE
Sarah Caldwell 9/30/2025
I. APPROVED BY
Carl Jonas 9/30/2025
CCAM-AVA-A
AMAM-LAT
USARMY.REDSTONE.PEO-
AVN.MBX.APACHE-
ACQMAIL@ARMY.MIL
Draft
CERTIFICATE OF SERVICE
Instructions:
The period covered by a certificate will not include more than one calendar month. Month and year may be omitted when entering dates, except for DATE OF CERTIFICATE and Item 3. All other dates must be within the period covered by the certificate.
DATE:
One copy of travel and statements of non-availability will be attached to certificate of service on which TDY or travel is reported.
Cost avoidance must be detailed individually including the AvMC authorization number and name of authorizing AvMC Engineer.
Contractor: To: (Organization and Location)
Contract: Date of Certificate:
1. Name of CFSR/Labor SLIN/OT SLIN/Travel SLIN: 2. Location: 3. Period of Certificate:
4. Total Days Covered This Period
4A. Less Non-Work Days
4B. Less Vacation
5. Less Sick Time 6. Less Contract Holiday
7. Billable Days
8. Authorized Hours Duty/ Overtime Hours (O/T) Worked Date Duty
Hours O/T Date Duty
Hours O/T Date Duty
Hours O/T Date Duty
Hours O/T
1st 9th 17th 25th
2nd 10th 18th 26th
3rd 11th 19th 27th
4th 12th 20th 28th
5th 13th 21st 29th
6th 14th 22nd 30th
7th 15th 23rd 31st
8th 16th 24th TOTA L H- V- S-
Departed Returned Departed Returned Departed Returned
11. Authorized Travel Performed By Commercial Carrier (Including Taxi, ETC) Inclusive Dates From To Mode Total Trip Cost
Thru
Thru
Thru
12. Authorized Privately Owned Conveyance Travel Inclusive Dates From To Tolls Miles
Thru
Thru
13. Government Transportation Request Used Date Issued Issuing Agency From To
14. Training Provided: (include type of training, hours trained, number trained, and type of personnel) (use additional sheets as necessary)
Date:
Local time:
Type of training (informal, formal, On-AC):
QTY and classification:
Time spent:
TOTAL TNG HOURS:
15. Assistance Provided: (Include IETM accuracy, CTL# of any 2028, FDR, FAB, MEC, MEO, etc.)(use additional sheets as necessary)
Date:
Tail number:
Summary of fault:
Description of assistance provided:
Summary of the corrective action:
IETM accuracy:
Local time (from-to):
Time spent:
Overtime:
TOTAL MAN HOURS (MH) SAVED:
16. Preventative Premature Removals: (use additional sheets as necessary)
DATE:
LOCATION:
UNIT:
NOMEN:
NSN:
P/N:
AIRCRAFT TAIL NUMBER:
CURRENT AMDF PRICE:
AvMC MEC NUMBER:
APPROVING AvMC ENGINEER:
40% OF AMDF PRICE:
MINUS REPAIR COST:
MINUS PARTS COST:
MMH Saved:
FINAL Preventative Premature Removal Estimate:
DETAILED SUMMARY:
17. CFSR Certification: I certify that the information in Items 1 thru 16 is true and correct to the best of my knowledge and belief.
Print Name: Signature
18. USG/Military Review: To the best of my knowledge and belief, the services reported above were performed in a satisfactory manner, that all overtime and travel reported were authorized in advance by competent authority, and that appropriate written orders have been issued or requested, with the following exceptions:
Print Name Signature
19. COR Certification: I certify that, to the best of my knowledge and belief, the services reported above were performed in a satisfactory manner, that all overtime and travel reported were authorized in advance by competent authority, and that appropriate written orders have been issued or requested, with the following exceptions:
Print Name: Grade: Signature
Attachment A
Export Control Warning All technical documents that are determined to contain export-controlled technical data shall be marked "WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive
5230.25 and DoD Instruction 2040.02." When it is technically not feasible to use the entire statement, an abbreviated marking may be used, and a copy of the full statement added to the "Notice To Accompany Release of Export Controlled Data" required by DoD Directive 5230.25.”
Distribution D: Distribution authorized to the Department of War and US DoW Contractors only (Administrative or Operational Use) (1 June 2026). Other requests shall be referred to AMCOM Logistics Center, AMAM-LAT-T, Building 5307, Redstone Arsenal, AL 35898.
Blank Page
File details come from the government source that posted it. Updated .