Exhibit A - Contract Data Requirements List (CDRL).pdf

PDF 6 MB Posted

Attached to
High Frequency Sail Array (HFSA) Underwater Fiber Optic SONAR Cable Assemblies
Solicitation number
N66604-25-R-0104
Issued by

About this file

The document is a Contract Data Requirements List (CDRL) for a naval contract involving High Frequency Sail Array (HFSA) Cable Assemblies. The CDRL outlines multiple data item submissions required throughout the contract lifecycle, including meeting agendas, minutes, production reports, test/inspection reports, engineering change proposals, and requests for variance. Each data item has specific submission requirements, with most submissions requiring draft and final versions to be reviewed by the government within 10-20 days of submission.

The contract (N66604-24-RFRPEQ-NPT-15-0003) is for the Department of Defense, specifically the Naval Undersea Warfare Center, and involves critical technology with export control restrictions. The CDRL specifies that all submissions are subject to review by the government, with various deadlines for draft and final versions across different contract stages such as preliminary configuration review (PCR), final configuration review (FCR), and first article configuration acceptance (FA-PCA). Each data submission must adhere to business day timelines and includes an export control warning about technical data restrictions under the Arms Export Control Act.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 12 of 12

DD FORM 1423

CONTRACT DATA REQUIREMENTS LIST ADDENDUM

PR TBD

CDRL A005 & A006 BLOCK 16 ADDENDUM

EVENT TO DELIVER BLOCK 12

(Date of First Submission)

BLOCK 8

(Approval Code)

BLOCK 13

(Date of Subsequent

Submission)

PCR

TOP LEVEL DRAWING

(Native, .pdf, and hardcopy printed from .pdf)

15 DAYS PRIOR TO PCR

(If PCR and FCR combined, submit top level drawing for Government review prior to complete draft development and submittal)

GOVERNMENT WILL

REVIEW WITHIN 5 DAYS

10 DARC

FCR

DRAFT COPY OF COMPLETE

DRAWING PACKAGE

(Native, .pdf, hardcopy, and indentured and numerical lists (in

.xlsx only))

20 DAYS PRIOR TO FCR

GOVERNMENT WILL

REVIEW WITHIN 10 DAYS

10 DARC

FA-PCA

COMPLETE DRAWING

PACKAGE

(.pdf and indentured and numerical lists (in .xlsx only))

10 DAYS PRIOR TO FA-

PCA

GOVERNMENT TO

PROVIDE COMMENTS AT

FA-PCA

20 DARC

FA Baseline Configuration

COMPLETE DRAWING

PACKAGE

(.pdf and indentured and numerical lists (in .xlsx only))

20 DAYS PRIOR TO

COMMENCING

CONTRACTOR FA

TESTING

GOVERNMENT WILL

REVIEW WITHIN 10 DAYS

10 DARC

FCA/PCA

COMPLETE DRAWING

PACKAGE

(Native, .pdf, and indentured and numerical lists (in .xlsx only))

10 DAYS PRIOR TO

FCA/PCA

GOVERNMENT TO

PROVIDE COMMENTS AT

FCA/PCA

20 DARC

(after all discrepancies resolved, Govt. will provide revision block information)

Note: All days are business days.