Exhibit A CDRLs.pdf

PDF 2 MB Posted

Attached to
Corporate Operations Support Services Federal contract opportunity
Solicitation number
N6133125R0001
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This is a Contract Data Requirements List (CDRL) form DD 1423-1 containing 24 data items (A001-A024) for NSWC PCD Corporate Operations Support contract N6133125R0001. The CDRLs detail various technical reports, documentation, and deliverables required from the contractor.

Key deliverables include: Transition Plan (A001), Facilities Management Documentation (A002), Furniture Layout Drawings (A003), Site Visit & Building Assessment Documentation (A004), Meeting Minutes (A005), Scope & Design Documentation (A006), Presentation Materials (A007-A009), Multi-Media Graphics Video Products (A010), Security Special Programs Support Documentation (A011), Management Internal Control Documentation (A012), Property Management Documentation (A013), Management and Program Analysis Reports (A014), Travel Documentation (A015), Monthly Status Reports (A016), Accident Prevention Plan (A017), Accident/Incident Reports (A018), Safety Data Sheets (A019), High Hazard Operations Forms (A020), Quality Assurance Program Plan (A021), Monthly GFP Reports (A022), Non-Disclosure Agreements (A023), and Contractor Personnel Roster (A024). Most deliverables require draft and final submissions, with government review periods of 3-5 days and contractor revision periods of 2-3 days. Deliverables must be provided in MS Office 365 compatible formats via email, with distribution to NSWC PCD Code offices.

View the file

Other files for this federal contract opportunity

Other files attached to Corporate Operations Support Services, newest first.
File Type Posted
Final_Questions_Responses_N6133125R0001.pdf PDF
FinalQuestions_Responses_N6133125R0001 Corporate Operations Support Services.pdf PDF
Solicitation Amendment N6133125R00010001 SF 30.pdf PDF
Solicitation - N6133125R0001.pdf PDF
J.3 Key Personnel Desired Qualifications.pdf PDF
J.12 WageDet_2015-4559_Rev28_Dec2024.pdf PDF
J.6 NSWCPCDINST 2280.4D .pdf PDF
J.4 Past Performance Reference.docx DOCX document
J.11 GFP N6133120D0016.xlsx XLSX spreadsheet
Attachment_J.9_PriceSummaryFormat_TaskOrder.xlsx XLSX spreadsheet
J.7_Staffing_Plan_WITHOUT_Price.xlsx XLSX spreadsheet
J.1 COSS PWS 14Jan2025.docx DOCX document
J.10+Labor+Mix.docx DOCX document
Attachment_J.8_PriceSummaryFormat_IDIQ.xlsx XLSX spreadsheet
J.5 NSAPCINST 11320.2F Fire Regulations.pdf PDF
J.2 DD 254 Security Classification.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 1 of 25 Pages 1161/183

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

NSWC PCD Corporate Operations Support N6133125R0001

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A001 Technical Report – Study/Services Transition Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-80508B PWS Para 3 (a) NSWC PCD Code 10B 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ONE/R 10 DAC b. COPIES NSP

8. APP CODE D

See BLK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

N SEE BLK 16 Reg Repro

16. REMARKS NSWC PCD Code 025 1 1 0

BLK 4: Contractor format is acceptable. DID is cited for guidance only as to content.

BLK 8, 13: The Government will review the initial submittal for approval of technical content and feasibility of the plan and will provide review comments within 5 days after receipt. Government comments shall be addressed and the revised plan submitted within 3 days after receipt of comments. “DAC” means “Days After Contract” award.

BLK 9: Data shall be marked in accordance with PWS paragraph 9.0

BLK 12: Submit within ten days of contract award.

BLK 14: MEDIA requirement: Copy shall be provided via e-mail in MS OfficeTM 365 compatible files. E-mail addresses for recipients will be provided at award.

NSWC PCD COR 1 1 0

15. TOTAL 2 2 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

NSWC PCD Code 10B See Section G. J. Zimmerman, NSWC PCD Code 02T See Section I.

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 2 of 25 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

NSWC PCD Corporate Operations Support

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A002 Technical Report – Study/Services Facilities Management Documentation and Reports

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-80508B PWS Para 3.2.1 and subparagraphs NSWC PCD Code 10 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16 b. COPIES NSP

8. APP CODE D

See BLK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

N SEE BLK 16 Reg Repro

16. REMARKS SEE BLK 16 1 1 0

Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.

Blks 8,10,12,13: Provide initial submittal within 5 days after receipt of GFI requiring generation of the data or identification of need to submit the data unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.

Government comments shall be incorporated and the data resubmitted as final within 2 days after receipt of comments.

Blk 9: Data shall be marked in accordance with PWS paragraph 9.0

BLK 14: MEDIA requirement: Copy shall be provided via e-mail in MS OfficeTM 365

(LT ONLY)

NSWC PCD Code 025

NSWC PCD COR

15. TOTAL 1 1 0

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 3 of 25 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr

A TDP TM OTHER SESS

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

NSWC PCD Corporate Operations Support

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A003 Commercial Engineering Design Data and Associated Lists Furniture Layout Drawings and Sketches

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-SESS-81003F PWS Para 3.2.1 (b) NSWC PCD Code 10B 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16 b. COPIES NSP

8. APP CODE D

See BLK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A SEE BLK 16 Reg Repro

16. REMARKS SEE BLK 16 1 1 0

Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.

Blks 8,10,12,13: Provide initial submittal within 5 days after receipt of GFI requiring generation of the data or identification of need to submit the data unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.

Government comments shall be incorporated and the data resubmitted as final within 2 days after receipt of comments.

Blk 9: Data shall be marked same as A001.

BLK 14: MEDIA requirement: Copy shall be provided via e-mail in Autocad or Adobe (.PDF) compatible files. E-mail addresses for recipients will be provided at award.

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 4 of 25 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

NSWC PCD Corporate Operations Support

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A004 Technical Report – Study/Services Site Visit & Building Assessment Documentation

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-80508B PWS Para 3.2.1 (g) (1) NSWC PCD Code 10B 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16 b. COPIES NSP

8. APP CODE D

See BLK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A SEE BLK 16 Reg Repro

16. REMARKS NSWC PCD Code 102 1 1 0

Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.

Blks 8,10,12,13: Provide initial submittal within 5 days after receipt of GFI requiring generation of the data or identification of need to submit the data unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.

Government comments shall be incorporated and the data resubmitted as final within 2 days after receipt of comments.

Blk 9: Data shall be marked same as A001.

BLK 14: MEDIA requirement: Copy shall be provided via e-mail in MS OfficeTM 365

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 5 of 25 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr

A TDP TM OTHER ADMN

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

NSWC PCD Corporate Operations Support

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A005 Report, Record of Meeting/Minutes

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-ADMN-81505 PWS Para 3.2.1 (g) (2) NSWC PCD Code 102 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16 b. COPIES NSP

8. APP CODE D

See BLK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A SEE BLK 16 Reg Repro

16. REMARKS NSWC PCD Code 102 1 1 0

Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.

Blks 8,10,12,13: Provide initial submittal within 5 days after meeting unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.

Government comments shall be incorporated and the data resubmitted as final within 2 days after receipt of comments.

Blk 9, 14: Same as A001.

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 6 of 25 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

NSWC PCD Corporate Operations Support

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A006 Technical Report – Study/Services Scope & Design Documentation Input or Review

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-80508B PWS Para 3.2.1 (g) (4) NSWC PCD Code 10B 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16 b. COPIES NSP

8. APP CODE D

See BLK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A SEE BLK 16 Reg Repro

16. REMARKS NSWC PCD Code 102 1 1 0

Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.

Blks 8,10,12,13: Provide initial submittal within 7 days after receipt of GFI requiring generation of the data or identification of need to submit the data unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.

Government comments shall be incorporated and the data resubmitted as final within 2

Blk 9, 14: Same as A001.

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 7 of 25 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

NSWC PCD Corporate Operations Support

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A007 Presentation Materials

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-ADMN-81373 PWS Para 3.2.2 and subparagraphs NSWC PCD Code 10B 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16 b. COPIES NSP

8. APP CODE D

See BLK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A SEE BLK 16 Reg Repro

16. REMARKS SEE BLK 16 1 1 0

Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.

Blks 8,10,12,13: Provide initial submittal within 5 days after receipt of GFI requiring generation of the data or identification of need to submit the data unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.

Government comments shall be incorporated and the data resubmitted as final within 2 days after receipt of comments.

Blk 9: Data shall be marked in accordance with PWS paragraph 8.0

BLK 14: Same as A002.

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 8 of 25 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

NSWC PCD Corporate Operations Support

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A008 Technical Report – Study/Services Multi-Media Graphics Scheduling, Documentation, and Products

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-80508B PWS Para 3.2.2 and subparagraphs NSWC PCD Code 10B 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16 b. COPIES NSP

8. APP CODE D

See BLK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A SEE BLK 16 Reg Repro

16. REMARKS SEE BLK 16 1 1 0

Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.

Blks 8,10,12,13: Provide initial submittal within 5 days after receipt of GFI requiring generation of the data or identification of need to submit the data unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.

Government comments shall be incorporated and the data resubmitted as final within 2

Blk 9, 14: Same as A002

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 9 of 25 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

NSWC PCD Corporate Operations Support

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A009 Presentation Material Still Photo Coverage and Photographic Products

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-ADMN-81373 PWS Para 3.2.2 and subparagraphs NSWC PCD Code 10B 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16 b. COPIES NSP

8. APP CODE D

See BLK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A SEE BLK 16 Reg Repro

16. REMARKS SEE BLK 16 1 1 0

Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.

Blks 8,10,12,13: Provide initial submittal within 5 days after receipt of GFI requiring generation of the data or identification of need to submit the data unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.

Government comments shall be incorporated and the data resubmitted as final within 2 days after receipt of comments.

Blk 9: Same as A002

BLK 14: Copy shall be provided via e-mail in .pdf or .jpg files. E-mail addresses for recipients will be provided at award.

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 10 of 25 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

NSWC PCD Corporate Operations Support

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A010 Technical Videotape Presentation Multi-Media Graphics Video Products

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-81275 PWS Para 3.2.2 and subparagraphs NSWC PCD Code 10B 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16 b. COPIES NSP

8. APP CODE D

See BLK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A SEE BLK 16 Reg Repro

16. REMARKS SEE BLK 16 1 1 0

Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.

Blks 8,10,12,13: Provide initial submittal within 5 days after receipt of GFI requiring generation of the data or identification of need to submit the data unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.

Government comments shall be incorporated and the data resubmitted as final within 2 days after receipt of comments.

Blk 9: Same as A002

BLK 14: Copy shall be provided via e-mail in a format agreed upon by the Contractor and the Government. E-mail addresses for recipients will be provided at award.

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 11 of 25 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

NSWC PCD Corporate Operations Support

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A011 Technical Report – Study/Services Security Special Programs Support Documentation and Reports

DI-MISC-80508B PWS Para 3.2.3 (a) (2) NSWC PCD Code 10B 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16 b. COPIES NSP

8. APP CODE D

See BLK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A SEE BLK 16 Reg Repro

16. REMARKS SEE BLK 16 1 1 0

Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.

Blks 8,10,12,13: Provide initial submittal within 5 days after receipt of GFI requiring generation of the data or identification of need to submit the data unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.

Government comments shall be incorporated and the data resubmitted as final within 2

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 12 of 25 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

NSWC PCD Corporate Operations Support

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A012 Technical Report – Study/Services Management Internal Control and Records Management Analyses, White Papers, Studies, and Support Documentation

DI-MISC-80508B PWS Para 3.2.4 and subparagraphs NSWC PCD Code 10B 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16 b. COPIES NSP

8. APP CODE D

See BLK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A SEE BLK 16 Reg Repro

16. REMARKS SEE BLK 16 1 1 0

Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.

Blks 8,10,12,13: Provide initial submittal within 5 days after receipt of GFI requiring generation of the data or identification of need to submit the data unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.

Government comments shall be incorporated and the data resubmitted as final within 2

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 13 of 25 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

NSWC PCD Corporate Operations Support

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A013 Technical Report – Study/Services Input to Property Management (Materials and Equipment) Documentation, Analyses, Studies, and Reports

DI-MISC-80508B PWS Para 3.2.5 and subparagraphs NSWC PCD Code 10B 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16 b. COPIES NSP

8. APP CODE D

See BLK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A SEE BLK 16 Reg Repro

16. REMARKS SEE BLK 16 1 1 0

Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.

Blks 8,10,12,13: Provide initial submittal within 5 days after receipt of GFI requiring generation of the data or identification of need to submit the data unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.

Government comments shall be incorporated and the data resubmitted as final within 2

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 14 of 25 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

NSWC PCD Corporate Operations Support

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A014 Technical Report – Study/Services Management and Program Analysis Documentation, Analyses, Studies, and Reports

DI-MISC-80508B PWS Para 3.2.6 and subparagraphs NSWC PCD Code 10B 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16 b. COPIES NSP

8. APP CODE D

See BLK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

N SEE BLK 16 Reg Repro

16. REMARKS SEE BLK 16 1 1 0

Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.

Blks 8,10,12,13: Provide initial submittal within 5 days after receipt of GFI requiring generation of the data or identification of need to submit the data unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.

Government comments shall be incorporated and the data resubmitted as final within 2

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 15 of 25 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

NSWC PCD Corporate Operations Support

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A015 Technical Report – Study/Services Travel Documentation and Reports

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-80508B PWS Para 3.3.1 and subparagraphs;

and 3.9

NSWC PCD Code 10B 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16 b. COPIES NSP

8. APP CODE D

See BLK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A SEE BLK 16 Reg Repro

16. REMARKS SEE BLK 16 1 1 0

Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.

Blks 8,10,12,13: Provide initial submittal within 5 days after receipt of GFI requiring generation of the data or identification of need to submit the data unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.

Government comments shall be incorporated and the data resubmitted as final within 2

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 16 of 25 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr

A TDP TM OTHER MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

NSWC PCD Corporate Operations Support

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A016 Status Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-80368A PWS Para 3.5.3, 3.6.4, and 3.10 NSWC PCD Code 10B 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED MONTHLY 30 DAC b. COPIES NSP

8. APP CODE D

See BLK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

N/A N/A SEE BLK 16 Reg Repro

16. REMARKS NSWC Code 10B 0 1 0

Blk 4: Contractor format is acceptable. DID cited for guidance only as to content – only DID paragraphs 3.2.1(c), 3.2.1(f), 3.2.1(g) and 3.2.1(i) apply.

Blk 13: Subsequent submittals due the 10th of each month during the period of performance including any options exercised.

Blk 14: MEDIA Requirements: Microsoft Office 365 compatible files via e-mail. E-mail addresses will be provided at award.

NSWC PCD COR 0 1 0

15. TOTAL 0 2 0

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 17 of 25 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr

A TDP TM OTHER SAFT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

NSWC PCD Corporate Operations Support

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A017 Occupational Safety and Health Plan Accident Prevention Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-SAFT-82193 PWS Para 3.11 NSWC PCD Code 10B 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ONE/R SEE BLK 16 b. COPIES NSP

8. APP CODE D

See BLK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A N/A N/A Reg Repro

16. REMARKS NSWC Code 10B 0 1 0

Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.

Blks 8,10,12,13: Provide initial submittal within 5 days after award. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt. Government comments shall be incorporated and the data resubmitted as final within 2 days after receipt of comments.

Blk 9, 14: Same as A002

NSWC PCD COR 0 1 0

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 18 of 25 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

NSWC PCD Corporate Operations Support

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A018 Occupational Safety and Health Plan Accident/Incident Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-SAFT-81563 PWS Para 3.11.2 (b) NSWC PCD Code 10B 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16 b. COPIES NSP

8. APP CODE D

See BLK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A SEE BLK 16 SEE BLK 16 Reg Repro

16. REMARKS NSWC Code 10B 0 1 0

Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.

Blks 8,10,12,13: Provide initial submittal within 8 hours of injury.

Blk 9, 14: Same as A002

NSWC PCD COR 0 1 0

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 19 of 25 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

NSWC PCD Corporate Operations Support

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A019 Occupational Safety and Health Plan Safety Data Sheet (SDS) Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-SAFT-82112 PWS Para 3.11.3 NSWC PCD Code 10B 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16 b. COPIES NSP

8. APP CODE D

See BLK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A SEE BLK 16 SEE BLK 16 Reg Repro

16. REMARKS NSWC Code 10B 0 1 0

Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.

Blks 8,10,12,13: Provide initial submittal within 5 days after award, or when it is known that HAZMAT will be brought onto the base. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt. Government comments shall be incorporated and the data resubmitted as final within 2 days after receipt of comments.

Blk 9, 14: Same as A002

NSWC PCD COR 0 1 0

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 20 of 25 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

NSWC PCD Corporate Operations Support

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A020 Occupational Safety and Health Plan High Hazard Operations Form

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-SAFT-82193 PWS Para 3.11.4 (h) NSWC PCD Code 10B 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16 b. COPIES NSP

8. APP CODE D

See BLK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A SEE BLK 16 SEE BLK 16 Reg Repro

16. REMARKS NSWC Code 10B 0 1 0

Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.

Blks 8,10,12,13: Provide initial submittal within 5 days after award, or when it is known that high hazard operations will be performed on the base. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt. Government comments shall be incorporated and the data resubmitted as final within 2 days after receipt of comments.

Blk 9, 14: Same as A002

NSWC PCD COR 0 1 0

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 21 of 25 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr

A TDP TM OTHER QCIC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

NSWC PCD Corporate Operations Support

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A021 Quality Assurance Program Plan (QAPP)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-QCIC-81794A PWS Para 3.12 NSWC PCD Code 10B 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ONE/R SEE BLK 16 b. COPIES NSP

8. APP CODE D

See BLK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A N/A N/A Reg Repro

16. REMARKS NSWC Code 10B 0 1 0

Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.

Blks 8,10,12,13: Provide initial submittal within 5 days after award. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt. Government comments shall be incorporated and the data resubmitted as final within 2 days after receipt of comments.

Blk 9, 14: Same as A002

NSWC PCD COR 0 1 0

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 22 of 25 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

NSWC PCD Corporate Operations Support

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A022 Government Property Inventory Report Monthly GFP Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-80441D PWS Para 3.13, DFARS PGI 245.103-73

NSWC PCD Code 10B 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED MTHLY SEE BLK 16 b. COPIES NSP

8. APP CODE D

See BLK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A N/A SEE BLK 16 Reg Repro

16. REMARKS NSWC Code 10B 0 1 0

Blk 4: If the Contractor has custody of GFP then this report shall be submitted. If the Contractor does not have custody of GFP no report is required. This requirement applies to the basic contract and any orders issued under the contract.

Blks 8,10,12,13: Subsequent submittals are due monthly, no later than the 10th of each month unless otherwise approved by the Government PCO.

Blk 9, 14: Same as A002. Also, send copy of each report to NSWCPCD PP&E@us.navy.mil

NSWC PCD COR 0 1 0

NSWC PCD Code 025 0 1 0

NSWC PCD Code 1073 0 1 0

15. TOTAL 0 4 0

mailto:NSWCPCD%20PP&E@us.navy.mil

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 23 of 25 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

NSWC PCD Corporate Operations…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .