Exhibit A - CDRLs.pdf

PDF 235 KB Posted

Attached to
Space Science Instruments and Experimental Payloads (SSIEP) Federal contract opportunity
Solicitation number
N00173-22-R-SD01
Issued by
Department of the Navy Secretary of the Navy Office of Naval Research

View the file

Other files for this federal contract opportunity

Other files attached to Space Science Instruments and Experimental Payloads (SSIEP), newest first.
File Type Posted
A0004 Conformed.pdf PDF
A0004 SF30.pdf PDF
Question 28 - 8.31.22.pdf PDF
A0003 Conformed.pdf PDF
A0003 SF30.pdf PDF
Question 27 - 8.24.22.pdf PDF
Questions 23-26 - 8.19.22.pdf PDF
A0002 Conformed.pdf PDF
Questions and Answers 11-22 - 8.12.22.pdf PDF
A0002 SF30.pdf PDF
J-4 Cost Proposal Format REV A0002.XLSX XLSX spreadsheet
Questions and Answers 1-10.pdf PDF
A0001 Conformed Copy.pdf PDF
Exhibit A - CDRLs Revised.pdf PDF
A0001 Mod Doc.pdf PDF
J-6 Small Business Participation Commitment Document.docx DOCX document
J-2 Requirements for Onsite Contractors - 2022.pdf PDF
J-3 Personnel Qualifications.pdf PDF
J-4 Cost Proposal Format.XLSX XLSX spreadsheet
J-5 Past Perf Questionnaire.pdf PDF
J-1 SOW.pdf PDF
J-7 Offeror Questions Submittal Form.xls XLS spreadsheet
J-8 Anticipated Distribution of Labor.xlsx XLSX spreadsheet
N00173-22-R-SD01.pdf PDF
J-9 Individual Subcontracting Plan Template.docx DOCX document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

DD FORM 1423-1, FEB 2001

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Page of Pages

DD FORM 1423-2, AUG 96

(2 Data Items)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Page ____ of ____ Pages

DD FORM 1423-2, AUG 96

(2 Data Items)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Page ____ of ____ Pages

76-8011-21 CDRL - A001 v2.pdf
76-8011-21 CDRL - A002 v2.pdf
76-8011-21 CDRL - A003-A004 v2.pdf
76-8011-21 CDRL - A005-A006 v2.pdf
A_CONTRACT_LINE_ITEM_NO: ALL
B_EXHIBIT: A
TDP:
TM:
OTHER:
DSYSTEMITEM:
E_CONTRACTPR_NO:
FCONTRACTOR: TO BE PROVIDED AT AWARD
1_DATA_ITEM_NO: A001
2_TITLE_OF_DATA_ITEM: Monthly Progress Report (MPR)
3_SUBTITLE:
4_AUTHORITY_Data_Acquisit:
5_CONTRACT_REFERENCE: SOW 2.3.1
6_REQUIRING_OFFICE: NRL Code 7687
7_DID_250_REQ:
8_APP_CODE:
DIST_STATEMENT: C
10_FREQUENCY: Monthly
11_AS_OF_DATE: SEE BLOCK 16
12_DATE_OF_FIRST_SUBMISSI: SEE BLOCK 16
13_DATE_OF_SUBSEQUENT_SUB: SEE BLOCK 16
addressee1: Code 7687
draft1:
reg1: 1
repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
reg38t: 1
total_repro: 0
16_REMARKS: The MPR shall provide a brief narrative status of the technical process and status of each major task effort, any significant technical or task-specific problems, and the proposed resolution of the identified problem areas. The MPR shall identify any items that have affected or will affect schedule performance, cost, or task schedules. The MPR shall provide a status of materials, supplies, subcontracts, Government Furnished Materials or Equipment (GFM/GFE), and Contract Data Requirements List (CDRL) items for the duration of the effort. The reports shall be in the Contractor’s format as approved by the COR. Submission in an electronic format compatible with MS-Office or in pdf is acceptable. The MPR shall be delivered by the tenth (10th) day of each month for the preceding month.

Blocks 11 & 12 - 10 days after end of first full calendar month after Contract Award.

Block 13 - 10 days after the end of each subsequent month.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY: CODE 7687
H_DATE: 7 JUL 2022
1_APPROVED_BY:
J_DATE:
Page: 1
of_pages: 4
Reset:
TIM: Off
D_SYSTEMITEM:
1_DATA_ITEM_NO1: A003
2_TITLE_OF_DATA_ITEM1: On-Site Labor Report (OLR)
3_SUBTITLE1:
4_AUTHORITY1:
5_CONTRACT_REFERENCE1: SOW 2.3.1
6_REQUIRING_OFFICE1: NRL Code 7687
7_DD_250_REQ1:
8_APP_CODE1:
9_dist1: C
10_FREQUENCY1: MTHLY
11_AS_OF_DATE1: SEE BLK. 16
12_DATE_OF_FIRST_SUB1: 30 DAC
13_DATE_OF_SUBSEQUENT_SUB1: SEE BLK. 16
addr1_1: CODE 7687
draft1_1:
reg1_1: 1
repro1_1:
addr1_2:
draft1_2:
reg1_2:
repro1_2:
addr1_3:
draft1_3:
reg1_3:
repro1_3:
addr1_4:
draft1_4:
reg1_4:
repro1_4:
addr1_5:
draft1_5:
reg1_5:
repro1_5:
addr1_6:
draft1_6:
reg1_6:
repro1_6:
addr1_7:
draft1_7:
reg1_7:
repro1_7:
addr1_8:
draft1_8:
reg1_8:
repro1_8:
addr1_9:
draft1_9:
reg1_9:
repro1_9:
addr1_10:
draft1_10:
reg1_10:
repro1_10:
addr1_11:
draft1_11:
reg1_11:
repro1_11:
addr1_12:
draft1_12:
reg1_12:
repro1_12:
addr1_13:
draft1_13:
reg1_13:
repro1_13:
addr1_14:
draft1_14:
reg1_14:
repro1_14:
15_total_Draft1: 0
15_TOTALReg1: 1
15_TOTALRepro1: 0
16_REMARKS1: The Contractor shall provide an OLR by the fifth (5th) workday of each month for the preceding month. The report shall include the following for each Contractor employee and sub-Contractor: first and last name, FY, reporting period, labor hours worked on-site at NRL and offsite, NRL code for the task, task name and CLIN, and costs for labor, travel, material, and ODC. If an employee and/or sub Contractor worked on more than one task (and CLIN) then the accounting for each shall be shown separately. The report shall be in an electronic format compatible with MS-Office and designated by the COR.
17_PRICE_GROUP1:
18_totalprice1:
1_DATA_ITEM_NO2: A004
2_TITLE_OF_DATA_ITEM2: Scientific and Technical Reports and Final Report
3_SUBTITLE2:
4_AUTHORITY2:
5_CONTRACT_REFERENCE2: SOW 2.3.1
6_REQUIRING_OFFICE2: NRL Code 7687
7_DD_250_REQ2:
8_APP_CODE2:
9_dist2: C
10_FREQUENCY2: SEE BLK. 16
11_AS_OF_DATE2: CNTRCT AWRD
12_DATE_OF_FIRST_SUB2: SEE BLK. 16
13_DATE_OF_SUBSEQUENT_SUB2: SEE BLK. 16
addr2_1: CODE 7687
draft2_1:
reg2_1: 1
repro2_1:
addr2_2:
draft2_2:
reg2_2:
repro2_2:
addr2_3:
draft2_3:
reg2_3:
repro2_3:
addr2_4:
draft2_4:
reg2_4:
repro2_4:
addr2_5:
draft2_5:
reg2_5:
repro2_5:
addr2_6:
draft2_6:
reg2_6:
repro2_6:
addr2_7:
draft2_7:
reg2_7:
repro2_7:
addr2_8:
draft2_8:
reg2_8:
repro2_8:
addr2_9:
draft2_9:
reg2_9:
repro2_9:
addr2_10:
draft2_10:
reg2_10:
repro2_10:
addr2_11:
draft2_11:
reg2_11:
repro2_11:
addr2_12:
draft2_12:
reg2_12:
repro2_12:
addr2_13:
draft2_13:
reg2_13:
repro2_13:
addr2_14:
draft2_14:
reg2_14:
repro2_14:
15_total_Draft2: 0
15_TOTALReg2: 1
15_TOTALRepro2: 0
16_REMARKS2: Scientific and Technical Reports, including a Contract Final Report, will be prepared as directed by the COR. The Contract Final Report shall be delivered within sixty (60) days from contract completion. A Contract Final Report is defined as a scientific or technical report which summarizes all work accomplished under the Contract. Reports shall be prepared, as required by the COR, according to the guidelines of ANSI/NISO Z39.18-1995, Scientific and Technical Reports-Elements, Organization, and Design. Distribution of resultant documents to the Defense Technical Information Center (DTIC) shall be through NRL distribution channels. Reprints of published articles may be accepted as technical reports with the concurrence of the COR.
17_PRICE_GROUP2:
18_totalprice2:

File details come from the government source that posted it. Updated .