Exhibit A CDRLS.pdf
PDF 4 MB Posted
- Attached to
- Amendment to ACS Hardware and Support Services Federal contract opportunity
- Solicitation number
- N00421-20-RFPREQ-4K0000T-0002
About this file
This Contract Data Requirements List (CDRL) outlines seventeen required data deliverables for an ACS hardware support services contract. The CDRL includes technical reports, test plans, inventory reports, engineering drawings, and management plans to be provided to the Naval Air Warfare Center Aircraft Division on a recurring basis or as required. Deliverables are to be submitted electronically in Microsoft Office 2016 or later format, with hard copies only required upon request. Acceptance of deliverables will occur through a signature process outlined for each data item. Recurring deliverables include inventory reports quarterly, maintenance action reports monthly, and fleet metrics forms monthly. Test procedures are due 30 days prior to each test. Operations security and phase-out transition plans are one-time deliverables due 90 and 90 days prior to end of contract, respectively.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment P1 Cost Summary.xlsx | XLSX spreadsheet | |
| Attachment 3 OCI List.pdf | ||
| Attachment 2 CSP.pdf | ||
| Attachment 1 DD254.pdf | ||
| ACS Hardware Draft RFP.pdf | ||
| Attachment P4 PPIF.pdf | ||
| Attachment P2 FB Rates.xlsx | XLSX spreadsheet | |
| Attachment 6 - Wage Determination 2015-4280 Rev 13.pdf | ||
| Attachment 4 Data Transmittal Acceptance Form.pdf | ||
| Attachment P5 CPAQ Instructions.pdf | ||
| Attachment P3 CPAQ.pdf | ||
| Attachment 5 Locator Form.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
1000, 1001, 1002, 1003, 1004, 2000, 2001, 2002, 2003, 2004, 3000, 4000 A
TDP_______ TM_______ OTHER__MISC__________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
ACS Hardware Support Services TBD TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A001 Technical Report – Study/Services FACSFAC Repair Facility Return Item Form (RIF)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80508B SOW Para. 3.3.6.2; 3.3.6.9 NAWCAD WOLF ATC&LS Division
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT (See Blk 16) ASREQ 30DARP (See Blk 16)
a. ADDRESSEE
b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
Draft Final
N/A See Blk 16 30DARP (See Blk 16) Reg Repro
16. REMARKS
NAWCAD WOLF ATC&LS
Division (See Blk 16)
0 1 0
Block 7: Submission shall be via the Data Item Transmittal/Acceptance/Rejection Form (See Contract Section J Attachments).
Block 11: Data delivered shall be as of the completion of each repair executed.
Blocks 12 & 13: Reporting period is defined as the completion of each repair executed.
Block 14: Deliverables to be provided in electronic format (Microsoft 2016 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: COR, ATC&LS Division 17454 Webster Field Road Building 8271 St. Inigoes, MD 20684-4012
15.TOTAL▬▬▬▬► 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Christy Leach 02/23/2021
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _1_ of _18_Pages.
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
SUBMISSION
REQUIRED
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL FOR CONTRACTOR PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as “Provisioning”, “Configuration Management”, etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Data CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed on the ASSIST website), or onetime DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoD 5230.24).
Item 10. Specify number of time data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addresses and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 12. Examples are: Tailoring of documents cited in item 4; Clarification of submittal dates in items 12 and 13; Explanation of reproducible copies in item 14.; Desired medium for delivery of the data item.
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the Contractor’s performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the Contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or the data item.
Estimated Price - Cost to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the Contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency or submittal, preparation, control, and quality of the data item.
Estimated Price - Cost to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the Contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV Item should normally be shown on the DD Form
1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Governments’ right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
1000, 1001, 1002, 1003, 1004, 2000, 2001, 2002, 2003, 2004, 3000, 4000 A
TDP_______ TM_______ OTHER__MISC__________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
ACS Hardware Support Services TBD TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A002 Certification/Data Report Beyond Economical Repair (BER) Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80678 NOT 1 SOW Para. 3.3.6.4 NAWCAD WOLF ATC&LS Division
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX (See Blk 16) ASREQ 10DATC
a. ADDRESSEE
b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
Draft Final
A (See Blk 16) See Blk 16 10DARC Reg Repro
16. REMARKS
NAWCAD WOLF ATC&LS
Division (See Blk 16)
0 1 0
Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection Form (See Contract Section J Attachments).
Block 8: The Government will have twenty (20) business days for review and comment. The Contractor shall have ten (10) business days to incorporate Government comments. Subsequent Government approval is required ten (10) business days after incorporation of comments by Contractor.
Block 11: Data shall be as of the completion of the testing.
Block 14: Deliverables to be provided in electronic format (Microsoft 2016 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: COR, ATC&LS Division 17454 Webster Field Road
Christy Leach 02/23/2021
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _3_ of _18_Pages.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
1000, 1001, 1002, 1003, 1004, 2000, 2001, 2002, 2003, 2004, 3000, 4000 A
TDP_______ TM_______ OTHER__SESS__________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
ACS Hardware Support Services TBD TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A003 Test Plans/Test Procedures Test and Quality Control Procedures
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-81704 SOW Para. 3.3.2.1; 3.3.8.2 NAWCAD WOLF ATC&LS Division
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX (See Blk 16) ASREQ 30DPTT (See Blk 16)
a. ADDRESSEE
b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
Draft Final
A (See Blk 16) N/A 5DARC Reg Repro
16. REMARKS
NAWCAD WOLF ATC&LS
Division (See Blk 16)
0 1 0
Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection Form (See Contract Section J Attachments).
Block 8: The Government will have ten (10) business days for review and comment. The Contractor shall have five (5) business days to incorporate Government comments. Subsequent Government approval is required five (5) business days after incorporation of comments by Contractor.
Block 12: First submission due thirty (30) business days prior to testing.
Block 14: Deliverables to be provided in electronic format (Microsoft 2016 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: COR, ATC&LS Division 17454 Webster Field Road
Christy Leach 02/23/2021
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _4_ of _18_Pages.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
1000, 1001, 1002, 1003, 1004, 2000, 2001, 2002, 2003, 2004, 3000, 4000 A
TDP_______ TM_______ OTHER___MISC_________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
ACS Hardware Support Services TBD TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A004 Inventory/Utilization Data Report Inventory List Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-81107A SOW Para. 3.3.5.2 NAWCAD WOLF ATC&LS Division
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT (See Blk 16) QRTLY 10DARP (See Blk 16)
a. ADDRESSEE
b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
Draft Final
N/A O See Blk 16 Reg Repro
16. REMARKS
NAWCAD WOLF ATC&LS
Division (See Blk 16)
0 1 0
Block 7: Submission shall be via the Data Item Transmittal/Acceptance/Rejection Form (See Contract Section J Attachments).
Block 12: Reporting period is defined as the end of the quarter.
Block 13: Subsequent reporting is due ten (10) business days after the completion of each quarter.
Block 14: Deliverables to be provided in electronic format (Microsoft 2016 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: COR, ATC&LS Division 17454 Webster Field Road
Christy Leach 02/23/2021
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _5_ of _18_Pages.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
1000, 1001, 1002, 1003, 1004, 2000, 2001, 2002, 2003, 2004, 3000, 4000 A
TDP_______ TM_______ OTHER__MISC__________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
ACS Hardware Support Services TBD TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A005 Scientific and Technical Reports Recommendations Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80711A SOW Para. 3.3.2.3; 3.3.3.1; 3.3.3.2 NAWCAD WOLF ATC&LS Division
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT (See Blk 16) ASREQ ASREQ
a. ADDRESSEE
b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
Draft Final
N/A ASREQ ASREQ Reg Repro
16. REMARKS
NAWCAD WOLF ATC&LS
Division (See Blk 16)
0 1 0
Block 7: Submission shall be via the Data Item Transmittal/Acceptance/Rejection Form (See Contract Section J Attachments).
Block 14: Deliverables to be provided in electronic format (Microsoft 2016 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: COR, ATC&LS Division 17454 Webster Field Road
Christy Leach 02/23/2021
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _6_ of _18_Pages.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
1000, 1001, 1002, 1003, 1004, 2000, 2001, 2002, 2003, 2004, 3000, 4000 A
TDP_______ TM_______ OTHER__MISC__________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
ACS Hardware Support Services TBD TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A006 Trip/Travel Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-81943 NOT 1 SOW Para. 3.1.5.1 NAWCAD WOLF ATC&LS Division
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT (See Blk 16) See Blk 16 7DARP (See Blk 16)
a. ADDRESSEE
b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
Draft Final
N/A See Blk 16 ASREQ Reg Repro
16. REMARKS
NAWCAD WOLF ATC&LS
Division (See Blk 16)
0 1 0
Block 7: Submission shall be via the Data Item Transmittal/Acceptance/Rejection Form (See Contract Section J Attachments).
Block 10: A Trip/Travel Report shall be required for each trip completed.
Block 11: Data shall be as of the completion of each trip.
Block 12: Reporting period is defined as the completion of each trip.
Block 14: Deliverables to be provided in electronic format (Microsoft 2016 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: COR, ATC&LS Division 17454 Webster Field Road
Christy Leach 02/23/2021
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _7_ of _18_Pages.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
1000, 1001, 1002, 1003, 1004, 2000, 2001, 2002, 2003, 2004, 3000, 4000 A
TDP_______ TM_______ OTHER_MISC___________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
ACS Hardware Support Services TBD TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A007 Technical Report – Study/Services Fleet Metrics Forms
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80508B SOW Para. 3.3.1.1 NAWCAD WOLF ATC&LS Division
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT (See Blk 16) MTHLY 10DARP (See Blk 16)
a. ADDRESSEE
b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
Draft Final
N/A O 10DARP (See Blk 16) Reg Repro
16. REMARKS
NAWCAD WOLF ATC&LS
Division (See Blk 16)
0 1 0
Block 7: Submission shall be via the Data Item Transmittal/Acceptance/Rejection Form (See Contract Section J Attachments).
Blocks 12 & 13: Reporting period is defined as the end of each month.
Block 14: Deliverables to be provided in electronic format (Microsoft 2016 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: COR, ATC&LS Division 17454 Webster Field Road
Christy Leach 02/23/2021
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _8_ of _18_Pages.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
1000, 1001, 1002, 1003, 1004, 2000, 2001, 2002, 2003, 2004, 3000, 4000 A
TDP_______ TM_______ OTHER__DRPR__________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
ACS Hardware Support Services TBD TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A008 Engineering Drawings
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-DRPR-80651 NOT 1 SOW Para. 3.3.3.4 NAWCAD WOLF ATC&LS Division
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX (See Blk 16) ASREQ See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
Draft Final
A (See Blk 16) See Blk 16 See Blk 16 Reg Repro
16. REMARKS
NAWCAD WOLF ATC&LS
Division (See Blk 16)
0 1 0
Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection Form (See Contract Section J Attachments).
Block 8: The Government will have twenty (20) business days for review and comment. The Contractor shall have ten (10) business days to incorporate Government comments. Subsequent Government approval is required ten (10) business days after incorporation of comments by Contractor.
Block 11, 12 & 13: Due twenty (20) business days after implementation of a field change or modification to operational hardware.
Block 14: Deliverables to be provided in electronic format (Microsoft 2016 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: COR, ATC&LS Division 17454 Webster Field Road
Christy Leach 02/23/2021
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _8_ of _18_Pages.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
1000, 1001, 1002, 1003, 1004, 2000, 2001, 2002, 2003, 2004, 3000, 4000 A
TDP_______ TM_______ OTHER___NDTI_________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
ACS Hardware Support Services TBD TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A009 Test Procedure
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-NDTI-80603A SOW Para. 3.3.2.1; 3.3.3.6 NAWCAD WOLF ATC&LS Division
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX (See Blk 16) ASREQ 30DPTT (See Blk 16)
a. ADDRESSEE
b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
Draft Final
A (See Blk 16) N/A 30DPTT (See Blk 16) Reg Repro
16. REMARKS
NAWCAD WOLF ATC&LS
Division (See Blk 16)
0 1 0
Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection Form (See Contract Section J Attachments).
Block 8: The Government will have ten (10) business days for review and comment. The Contractor shall have five (5) business days to incorporate Government comments. Subsequent Government approval is required five (5) business days after incorporation of comments by Contractor.
Blocks 12 & 13: Submit within thirty (30) calendar days prior to each test.
Block 14: Deliverables to be provided in electronic format (Microsoft 2016 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: COR, ATC&LS Division 17454 Webster Field Road
Christy Leach 02/23/2021
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _10_ of _18_Pages.
REQUIRED
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
1000, 1001, 1002, 1003, 1004, 2000, 2001, 2002, 2003, 2004, 3000, 4000 A
TDP_______ TM_______ OTHER__MGMT__________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
ACS Hardware Support Services TBD TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A010 Site Preparation Requirements and Installation Plan Production Program Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-80033A SOW Para. 3.3.3.3 NAWCAD WOLF ATC&LS Division
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX (See Blk 16) ASREQ See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
Draft Final
A (See Blk 16) N/A See Blk 16 Reg Repro
16. REMARKS
NAWCAD WOLF ATC&LS
Division (See Blk 16)
0 1 0
Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection Form (See Contract Section J Attachments).
Block 8: The Government will have ten (10) business days for review and comment. The Contractor shall have five (5) business days to incorporate Government comments. Subsequent Government approval is required five (5) business days after incorporation of comments by Contractor.
Blocks 12 & 13: Submit within thirty (30) calendar days prior to each production.
Block 14: Deliverables to be provided in electronic format (Microsoft 2016 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: COR, ATC&LS Division 17454 Webster Field Road
Christy Leach 02/23/2021
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _11_ of _18_Pages.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
1000, 1001, 1002, 1003, 1004, 2000, 2001, 2002, 2003, 2004, 3000, 4000 A
TDP_______ TM_______ OTHER__MISC__________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
ACS Hardware Support Services TBD TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A011 Technical Report – Study/Services Production Acceptance Test (PAT) Results
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80508B SOW Para. 3.3.2.5; 3.3.3.7 NAWCAD WOLF ATC&LS Division
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT (See Blk 16) ASREQ 10DATC (See Blk 16)
a. ADDRESSEE
b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
Draft Final
N/A See Blk 16 ASREQ Reg Repro
16. REMARKS
NAWCAD WOLF ATC&LS
Division (See Blk 16)
0 1 0
Block 7: Submission shall be via the Data Item Transmittal/Acceptance/Rejection Form (See Contract Section J Attachments).
Block 11: Data delivered shall be as of the completion of each PAT.
Block 12: Reporting period is defined as the completion of each PAT.
Block 14: Deliverables to be provided in electronic format (Microsoft 2016 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: COR, ATC&LS Division 17454 Webster Field Road
Christy Leach 02/23/2021
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _12_ of _18_Pages.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
1000, 1001, 1002, 1003, 1004, 2000, 2001, 2002, 2003, 2004, 3000, 4000 A
TDP_______ TM_______ OTHER_MISC___________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
ACS Hardware Support Services TBD TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A012 Technical Report – Study/Services Maintenance Action Form Status Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80508B SOW Para. 3.3.4.2 NAWCAD WOLF ATC&LS Division
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT (See Blk 16) MTHLY 10DARP (See Blk 16)
a. ADDRESSEE
b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
Draft Final
N/A O 10DARP (See Blk 16) Reg Repro
16. REMARKS
NAWCAD WOLF ATC&LS
Division (See Blk 16)
0 1 0
Block 7: Submission shall be via the Data Item Transmittal/Acceptance/Rejection Form (See Contract Section J Attachments).
Blocks 12 & 13: Reporting period is defined as the end of each month.
Block 14: Deliverables to be provided in electronic format (Microsoft 2016 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: COR, ATC&LS Division 17454 Webster Field Road
Christy Leach 02/23/2021
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _13_ of _18_Pages.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
1000, 1001, 1002, 1003, 1004, 2000, 2001, 2002, 2003, 2004, 3000, 4000 A
TDP_______ TM_______ OTHER________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
ACS Hardware Support Services TBD TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A013 Contracting Officer’s Management Report Segregation of Costs and Invoice Requirements Reporting (TDLs)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-81864A SOW Para. 3.1.3.1 NAWCAD WOLF ATC&LS Division
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX (See Blk 16) See Blk 16 See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
Draft Final
A N/A See Blk 16 Reg Repro
16. REMARKS
NAWCAD WOLF ATC&LS
Division (See Blk 16)
0 1 0
Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection Form (See Contract Section J Attachments).
Blocks 10, 12, and 13: Draft format of this deliverable will be due ten (10) business days after award of the Contract. The Government has five (5) business days to comment. Final is due ten (10) business days after Government approval of draft. If the Government does not reply within thirty (30) business days, the CDRL is considered accepted. Report shall be submitted concurrently with each invoice to the COR and shall be for the exact dollar amount and period of performance as the invoice.
The Contractor shall segregate costs incurred under this Contract at the lowest level of performance, by Technical Direction Letter (TDL) level, rather than only on a Contract Line Item Number (CLIN) or total contract basis, and shall submit invoices reflecting costs incurred at that level. In addition, the Contractor shall submit invoices containing summaries of work charged during the period covered. The Contractor shall provide a percentage of funds invoiced and expended. The Contractor shall provide budgeted hours at the TDL level. The Contractor shall provide an Estimate at Completion (EAC) at the TDL level to represent the estimated cost of tasking for the period of performance of the TDL.
Block 14: Deliverables to be provided in electronic format (Microsoft 2016 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: COR, ATC&LS Division 17454 Webster Field Road
Christy Leach 02/23/2021
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _14_ of _18_Pages.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
1000, 1001, 1002, 1003, 1004, 2000, 2001, 2002, 2003, 2004, 3000, 4000 A
TDP_______ TM_______ OTHER__MGMT__________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
ACS Hardware Support Services TBD TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A014 Government Furnished Equipment Detail Transaction Status Data Government Owned Material Status Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-80377 NOT 2 (See Blk 16) SOW Para. 3.1.5.2 NAWCAD WOLF ATC&LS Division
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT (See Blk 16) QRTLY 10DARP (See Blk 16)
a. ADDRESSEE
b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
Draft Final
N/A See Blk 16 See Blk 16 Reg Repro
16. REMARKS
NAWCAD WOLF ATC&LS
Division (See Blk 16)
0 1 0
Block 4: The report shall include Part Numbers, Serial Numbers, National Stock Numbers (NSNs), and quantities.
Block 7: Submission shall be via the Data Item Transmittal/Acceptance/Rejection Form (See Contract Section J Attachments).
Block 11: Data as of date shall be the end of each quarter.
Block 12: Reporting period is defined as the end of each quarter.
Block 13: Subsequent reporting is due ten (10) business days after the completion of each quarter.
Block 14: Deliverables to be provided in electronic format (Microsoft 2016 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: COR, ATC&LS Division 17454 Webster Field Road
Christy Leach 02/23/2021
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _15_ of _18_Pages.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
1000, 1001, 1002, 1003, 1004, 2000, 2001, 2002, 2003, 2004, 3000, 4000 A
TDP_______ TM_______ OTHER__MGMT__________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
ACS Hardware Support Services TBD TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A015 Operations Security (OPSEC) Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-80934C NOT 1 (See Blk 16) SOW Para. 3.2.5 NAWCAD WOLF ATC&LS Division
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX (See Blk 16) 1TIME 90DAC
a. ADDRESSEE
b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
Draft Final
A (See Blk 16) N/A ASREQ (See Blk 16) Reg Repro
16. REMARKS
NAWCAD WOLF ATC&LS
Division (See Blk 16)
0 1 0
Block 4: Use the National Security Decision Directive (NSDD) 298 for the concept of operations security.
Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection Form (See Contract Section J Attachments).
Block 8: Acceptance will be by the COR. If acceptance has not been transmitted within ten (10) business days of submission of the CDRL, the CDRL is considered accepted. Final due forty-five (45) calendar days after Government approval of the draft.
Block 13: Revisions as required after approval of final plan only to comply with Government data protection policy documents revision.
Block 14: Deliverables to be provided in electronic format (Microsoft 2016 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: COR, ATC&LS Division 17454 Webster Field Road
Christy Leach 02/23/2021
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _16_ of _18_Pages.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
1000, 1001, 1002, 1003, 1004, 2000, 2001, 2002, 2003, 2004, 3000, 4000 A
TDP_______ TM_______ OTHER__MGMT__________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
ACS Hardware Support Services TBD TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A016 Phase-Out Transition Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-81945 NOT 1 SOW Para. 3.1.8 NAWCAD WOLF ATC&LS Division
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX (See Blk 16) 1TIME See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
Draft Final
A (See Blk 16) N/A N/A Reg Repro
16. REMARKS
NAWCAD WOLF ATC&LS
Division (See Blk 16)
0 1 0
Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection Form (See Contract Section J Attachments).
Block 8: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form. If acceptance has not been transmitted within thirty (30) business days of submission of CDRL, the CDRL is considered accepted. The Contractor shall have five (5) business days to incorporate Government comments.
Block 12: Data to be delivered ninety (90) calendar days prior to the end of contract.
Block 14: Deliverables to be provided in electronic format (Microsoft 2016 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: COR, ATC&LS Division 17454 Webster Field Road
Christy Leach 02/23/2021
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _17_ of _18_Pages.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
1000, 1001, 1002, 1003, 1004, 2000, 2001, 2002, 2003, 2004, 3000, 4000 A
TDP_______ TM_______ OTHER__MGMT__________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
ACS Hardware Support Services TBD TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A017 Government Property (GP) Inventory Report Contractor Acquired Property (CAP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-80441D SOW Para. 3.1.5.2 NAWCAD WOLF ATC&LS Division
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX (See Blk 16) 1TIME 50DPT EOC
a. ADDRESSEE
b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
Draft Final
A (See Blk 16) N/A N/A Reg Repro
16. REMARKS
NAWCAD WOLF ATC&LS
Division (See Blk 16)
0 1 0
Block 7: Acceptance will be by the Contracting Officer’s Representative (COR). If acceptance has not been transmitted within thirty (30) business days of submission of the CDRL, the CDRL is considered accepted.
Block 8: The Government will have five (5) business days to review and provide comments. If required, the Contractor shall submit the final deliverables within five (5) business days of receipt of Government comments.
Block 14: Deliverables to be provided in electronic format (Microsoft 2016 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: COR, ATC&LS Division 17454 Webster Field Road
Christy Leach 02/23/2021
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _18_ of _18_Pages.
File details come from the government source that posted it. Updated .