Attachment P1 Cost Summary.xlsx

XLSX spreadsheet 43 KB Posted

Attached to
Amendment to ACS Hardware and Support Services Federal contract opportunity
Solicitation number
N00421-20-RFPREQ-4K0000T-0002
Issued by
Department of the Navy Naval Air Systems Command

About this file

This document contains a cost proposal template and instructions for a federal contract opportunity to provide hardware and support services. The template requires offerors to provide labor categories, hours, rates, and costs for prime contractor and subcontractor personnel for the base year and four option years. Indirect rates and fees must be included. Subcontractor information and pass-through costs are to be separately identified. The summary tab requires breakouts by contract line item number. Instructions provide formatting and completion requirements. This appears to be a template for assembling and submitting the cost portion of a proposal in response to Solicitation N00421-21-R-0161 for hardware and support services.

View the file

Other files for this federal contract opportunity

Other files attached to Amendment to ACS Hardware and Support Services, newest first.
File Type Posted
Attachment 5 Locator Form.pdf PDF
Exhibit A CDRLS.pdf PDF
Attachment P5 CPAQ Instructions.pdf PDF
Attachment P3 CPAQ.pdf PDF
Attachment P4 PPIF.pdf PDF
Attachment P2 FB Rates.xlsx XLSX spreadsheet
Attachment 6 - Wage Determination 2015-4280 Rev 13.pdf PDF
Attachment 4 Data Transmittal Acceptance Form.pdf PDF
Attachment 3 OCI List.pdf PDF
Attachment 2 CSP.pdf PDF
Attachment 1 DD254.pdf PDF
ACS Hardware Draft RFP.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions for Prime Contractor:
1Enter Prime offeror name into cell B3.
2Enter all prime employee names in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas.
3Enter all prime labor categories in Column B (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column B, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
4Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
5The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
6All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
7All dollar figures shall be carried out no further than two decimal places.
8In column E, identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
9In column F, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces.
10Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordingly.
11For each subcontractor, enter the subcontractor name, labor category the subcontractor will be performing, total hours, and total amount for each period of performance.
12Please note if more subcontractors are needed, the contractor may add additional rows to accommodate them, but ensure integrity of formulas.
13The prime should insert the subcontractor handling charge, if any.
14The prime should insert the fixed fee rate applied to its cost excluding subcontractor labor.
15The prime should insert the fixed fee rate it is applying to the subcontractor labor, if any.
16Under Other Direct Costs, the prime contractor should separate by Travel and Material as applicable.
17Apply indirects to the Other Direct Costs if applicable and if in compliance with the RFP instructions.
18On the Summary tab, break out all costs by CLIN. Ensure that the total costs of the CLINs match Section B and the total on the Cost Summary Spreadsheet
19When submitting this file, the instructions may be deleted.
Instructions for Subcontractors:
1Enter Prime offeror name into cell B3.
Enter Subcontractor offeror name into cell B4.
2Replace Prime Contractor with Subcontractor in cells B7, B82, and B89.
3Enter all subcontractor employee names in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas.
4Enter all subcontractor labor categories in Column B (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column B, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
5Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
6The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
7All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
8All dollar figures shall be carried out no further than two decimal places.
9In column E, identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
10In column F, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces.
11Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordingly.
12For subcontractor cost summary sheets, please delete Rows 90-135 as well as any unused labor category rows.
When submitting this file, the instructions may be deleted.

N00421-21-R-0161

Cost Spreadsheet (LOE)

COST SUMMARY SPREADSHEET (LOE)

Prime Offeror Name:
Subcontractor(s) Name (if applicable):
Base YearOption Year 1Option Year 2Option Year 3Option Year 4Total
PositionGovernment Labor CategoryEmployee NameSCA CodeF/PSiteRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountHoursAmount
Prime Contractor Labor CostK = Contractor
G = Government
1General and Operations Managers (Program Manager)*Employee Name 1K4800.004800.004800.004800.004800.0024000.00
2General and Operations Managers (Project Manager)*Employee Name 2G19200.0019200.0019200.0019200.0019200.0096000.00
3Electrical Engineers (Engineer/Scientist V)Etc.G9600.009600.0038400.0038400.0038400.00134400.00
4Electrical Engineers (Engineer/Scientist V) OTEtc.G960.00960.003840.003840.003840.0013440.00
5Electrical Engineers (Engineer/Scientist IV)Etc.K9600.009600.009600.009600.009600.0048000.00
6Electrical Engineers (Engineer/Scientist IV) OTEtc.K960.00960.00960.00960.00960.004800.00
7Electrical Engineers (Engineer/Scientist IV)Etc.G9600.009600.009600.009600.009600.0048000.00
8Electrical Engineers (Engineer/Scientist IV) OTEtc.G960.00960.00960.00960.00960.004800.00
9Electrical Engineers (Engineer/Scientist III)Etc.K9600.009600.009600.009600.009600.0048000.00
10Electrical Engineers (Engineer/Scientist III) OTEtc.K960.00960.00960.00960.00960.004800.00
11Electrical Engineers (Engineer/Scientist III)Etc.G9600.009600.004800.009600.009600.0043200.00
12Electrical Engineers (Engineer/Scientist III) OTEtc.G960.00960.00480.00960.00960.004320.00
13Electrical Engineers (Engineer Scientist II)Etc.K9600.009600.009600.009600.009600.0048000.00
14Electrical Engineers (Engineer Scientist II) OTEtc.K960.00960.00960.00960.00960.004800.00
15Electrical Engineers (Engineer Scientist II)Etc.G9600.009600.004800.009600.009600.0043200.00
16Electrical Engineers (Engineer Scientist II) OTEtc.G960.00960.00480.00960.00960.004320.00
17Electrical Engineers (Engineer/Scientist I)Etc.K9600.009600.009600.009600.009600.0048000.00
18Electrical Engineers (Engineer/Scientist I) OTEtc.K960.00960.00960.00960.00960.004800.00
19Electrical Engineers (Engineer/Scientist I)Etc.G9600.009600.009600.009600.009600.0048000.00
20Electrical Engineers (Engineer/Scientist I) OTEtc.G960.00960.00960.00960.00960.004800.00
21Management Analysts (Management Analyst I)Etc.K9600.009600.009600.009600.0019200.0057600.00
22Management Analysts (Management Analyst I) OTEtc.K480.00480.00480.00480.00960.002880.00
23Management Analysts (Management Analyst I)Etc.G9600.009600.009600.009600.0019200.0057600.00
24Management Analysts (Management Analyst I) OTEtc.G480.00480.00480.00480.00960.002880.00
25Management Analysts (Project Analyst)Etc.K9600.009600.009600.009600.0019200.0057600.00
26Management Analysts (Project Analyst) OTEtc.K480.00480.00480.00480.00960.002880.00
27Management Analysts (Project Analyst)Etc.G9600.009600.009600.009600.0019200.0057600.00
28Management Analysts (Project Analyst) OTEtc.G480.00480.00480.00480.00960.002880.00
29Logisticians (Logistics Analyst II)Etc.K9600.009600.009600.009600.009600.0048000.00
30Logisticians (Logistics Analyst II) OTEtc.K480.00480.00480.00480.00480.002400.00
31Logisticians (Logistics Analyst II)Etc.G19200.0019200.0019200.0019200.0019200.0096000.00
32Logisticians (Logistics Analyst II) OTEtc.G960.00960.00960.00960.00960.004800.00
33Logisticians (Logistics Analyst I)Etc.K19200.0019200.0019200.0019200.0019200.0096000.00
34Logisticians (Logistics Analyst I) OTEtc.K960.00960.00960.00960.00960.004800.00
35Logisticians (Logistics Analyst I)Etc.G19200.0019200.0019200.0019200.0019200.0096000.00
36Logisticians (Logistics Analyst I) OTEtc.G960.00960.00960.00960.00960.004800.00
37Computer Programmer I (Computer Programmer I)Etc.K19200.0019200.0019200.0019200.0019200.0096000.00
38Computer Programmer I (Computer Programmer I) OTEtc.K960.00960.00960.00960.00960.004800.00
39Computer Programmer I (Computer Programmer I)Etc.G19200.0019200.0019200.0019200.0019200.0096000.00
40Computer Programmer I (Computer Programmer I) OTEtc.G960.00960.00960.00960.00960.004800.00
41Management Analysts (Systems Analyst II)Etc.K19200.0019200.0019200.0019200.0019200.0096000.00
42Management Analysts (Systems Analyst II) OTEtc.K960.00960.00960.00960.00960.004800.00
43Management Analysts (Systems Analyst II)Etc.G19200.0019200.0019200.0019200.0019200.0096000.00
44Management Analysts (Systems Analyst II) OTEtc.G960.00960.00960.00960.00960.004800.00
45Management Analysts (Systems Analyst I)Etc.K19200.0019200.0019200.0019200.009600.0086400.00
46Management Analysts (Systems Analyst I) OTEtc.K960.00960.00960.00960.00480.004320.00
47Management Analysts (Systems Analyst I)Etc.G9600.009600.009600.009600.009600.0048000.00
48Management Analysts (Systems Analyst I) OTEtc.G480.00480.00480.00480.00480.002400.00
49Engineering Technicians, Except Drafters, All Other (Engineering Technician VI)Etc.30086G38400.0038400.0038400.0038400.0057600.00211200.00
50Engineering Technicians, Except Drafters, All Other (Engineering Technician VI) OTEtc.30086G1920.001920.001920.001920.002880.0010560.00
51Engineering Technicians, Except Drafters, All Other (Engineering Technician V)Etc.30085G57600.0038400.0038400.0057600.0057600.00249600.00
52Engineering Technicians, Except Drafters, All Other (Engineering Technician V) OTEtc.30085G2880.001920.001920.002880.002880.0012480.00
53Engineering Technicians, Except Drafters, All Other (Engineering Technician IV)Etc.30084G38400.0057600.0038400.0038400.0057600.00230400.00
54Engineering Technicians, Except Drafters, All Other (Engineering Technician IV) OTEtc.30084G1920.002880.001920.001920.002880.0011520.00
55Electrical and Electronic Engineering Technologists and Technicians (Electronics Technician Maintenance III)Etc.23183K38400.0038400.0038400.0038400.0057600.00211200.00
56Electrical and Electronic Engineering Technologists and Technicians (Electronics Technician Maintenance III) OTEtc.23183K1920.001920.001920.001920.002880.0010560.00
57Electrical and Electronic Engineering Technologists and Technicians (Electronics Technician Maintenance II)Etc.23182K38400.0038400.0038400.0038400.0057600.00211200.00
58Electrical and Electronic Engineering Technologists and Technicians (Electronics Technician Maintenance II) OTEtc.23182K1920.001920.001920.001920.002880.0010560.00
59Electrical and Electronic Engineering Technologists and Technicians (Electronics Technician Maintenance I)Etc.23181K38400.0038400.0038400.0057600.0038400.00211200.00
60Electrical and Electronic Engineering Technologists and Technicians (Electronics Technician Maintenance I) OTEtc.23181K1920.001920.001920.002880.001920.0010560.00
61Drafter / CAD Operator IIEtc.30062K9600.009600.009600.0019200.0019200.0067200.00
62Drafter / CAD Operator II OTEtc.30062K480.00480.00480.00960.00960.003360.00
63Drafter / CAD Operator IIEtc.30062G9600.009600.009600.0019200.0019200.0067200.00
64Drafter / CAD Operator II OTEtc.30062G480.00480.00480.00960.00960.003360.00
65Technical Writer IIEtc.30462K9600.0019200.0019200.0019200.0019200.0086400.00
66Technical Writer II OTEtc.30462K480.00960.00960.00960.00960.004320.00
67Technical Writer IIEtc.30462G9600.0019200.0019200.0019200.0019200.0086400.00
68Technical Writer II OTEtc.30462G480.00960.00960.00960.00960.004320.00
69General Clerk IEtc.01111K19200.0019200.0019200.0019200.0019200.0096000.00
70General Clerk I OTEtc.01111K960.00960.00960.00960.00960.004800.00
71General Clerk IEtc.01111G19200.0019200.0019200.0019200.0019200.0096000.00
72General Clerk I OTEtc.01111G960.00960.00960.00960.00960.004800.00
Total Direct Labor Cost68,35270,36870,46477,56886,640373,3920.00
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
<Insert Subcontractor Name>
83<Insert Labor Category >Employee Name 1
84Employee Name 2
85Etc.
86Etc.
87Etc.
88Etc.
89Etc.
90Etc.
91Etc.
92Etc.
<Insert Subcontractor Name>
93<Insert Labor Category >Employee Name 1
94Employee Name 2
95Etc.
96Etc.
97Etc.
98Etc.
99Etc.
100Etc.
101Etc.
102Etc.
<Insert Subcontractor Name>
103<Insert Labor Category >Employee Name 1
104Employee Name 2
105Etc.
106Etc.
107Etc.
108Etc.
109Etc.
110Etc.
111Etc.
112Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor *
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF)

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF all CLINs (Labor and ODCs)

Grand Total of CPFF all CLINs

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor *
Total Pass Through Amount (including fee)ERROR:#DIV/0!
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime ContractorERROR:#DIV/0!

Solicitation N00421-20-R-0119 Page &P &F

KTR: (name) Source Selection Information - See: FAR 2.101 and 3.104 RFP:

Summary CLIN Summary Sheet

CLINS CLIN Description Total Hours Total Cost Total Fixed Fee Total Value $

Total

N00421-21-R-0161 P1 Cost Summary

File details come from the government source that posted it. Updated .