This document is a Contract Data Requirements List (CDRL) in DD Form 1423-1 format, specifying three data items required under a contract with Curtiss-Wright Electro-Mechanical Corporation for work at Pearl Harbor Naval Shipyard (PNSY). The contract authority is DI-QCIC-81187 and DI-NDTI-80809B, with requiring office C260.7 and C379.
The three required data items are: (1) Work Completion Certification Certificate (Data Item 001, DI-MGMT-82050) referencing SOW paragraphs 3.1.1.1.1 and 3.1.3.2.1; (2) Test/Inspection Report (Data Item 002, DI-NDTI-80809B) covering SOW paragraphs 3.1.1.2.1, 3.1.2.1.1, 3.1.2.1.3, 3.1.3.2, and 3.1.3.2.1 through 3.1.3.2.3; and (3) Quality Assessment Report on New Material Quality Evidence (Data Item 003, DI-QCIC-81187) referencing SOW paragraph 3.1.4.2. All submissions are required with one final copy each to distribution addresses C260.7, C420, and C379, with submissions made as requirements are completed and returned to PNSY. Electronic submissions shall be submitted through Wide Area Workflow (WAWF), and hard copies sent per SOW specifications. Distribution is authorized to the Department of Defense and U.S. DoD contractors only, with other requests referred to PNSY. The form is dated 3/13/2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.
Draft
Final Reg Repro
16. REMARKS
H. DATE J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page of Pages
A NDTI
RDM LLT Curtiss-Wright Electro-Mechanical Corporation
002 TEST/INSPECTION REPORT N/A
DI-NDTI-80809B See Block 16 C260.7 SUBMEPP
DD
D
ASGEN ASGEN
N/A See Block 16 ASGEN
SUBMEPP
C260.7* 0
10C379 10C420*
3/13/2026
3/13/2026 2 3
Block 5. Reference SOW Para. 3.1.1.2.1., 3.1.2.1.1., 3.1.2.1.3., 3.1.3.2., 3.1.3.2.1. (see Reference noted for additional details), 3.1.3.2.2., 3.1.3.2.3., Block 9. Distribution authorized to the Department of Defense and U.S. DoD contractors only CTI 9/22/2025.
Other requests for this document must be referred to PNSY.
Block 10. Frequency will be as requirements are completed and being returned to PNSY.
Block 11. As of Date will be the date the inspections are completed.
Block 12. Date of First Submission will be the date the inspection is completed.
Block 13. Date of Subsequent Submissions will be the date of any remaining inspections are completed.
Block 14. Hard copies will be sent to address indicated in SOW Paragraph 3.1.3.2.1. per Reference.
Electronic submissions will be submitted through Wide Area Workflow (WAWF).
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.
Draft
Final Reg Repro
16. REMARKS
H. DATE J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page of Pages
A MGMT
RDM LLT Curtiss-Wright Electro-Mechanical Corporation
001 WORK COMPLETION CERTIFICATION
CERTIFICATE
N/A
DI-MGMT-82050 See Block 16 C260.7, C379
DD
D
ASGEN ASGEN
N/A See Block 16 ASGEN
C420* C260.7* 0
10C379
3/13/2026
3/13/2026 1 3
Block 5. See SOW Para. 3.1.1.1.1., 3.1.3.2.1.
Block 9. Distribution authorized to the Department of Defense and U.S. DoD contractors only CTI 9/22/2025.
Other requests for this document must be referred to PNSY.
Block 10. Frequency will be as requirements are completed and being returned to PNSY.
Block 11. As of Date will be the date the requirements listed in the SOW are completed.
Block 12. Date of First Submission will be the date the material is returned after accomplishing the required tasks.
Block 13. Date of Subsequent Submissions will be the date of any remaining material not returned in the first submission after tasks are completed.
Block 14. Hard Copy shall be sent with the material and electronic submissions will be submitted through Wide Area Workflow (WAWF).
| Attachment 7 A003 CDRL Form New Material Quality_Redacted |
| Attachment 8 A002 CDRL Form Test Inspection Report_Redacted |
| Attachment 9 A001 CDRL Form Work Completion Certificate_Redacted |
File details come from the government source that posted it. Updated .