This document is a Contract Data Requirements List (CDRL) for a Precision Aim Kit contract with USSOCOM SOF AT&L SW-PMCP. Two data items are detailed: A001 Monthly Status Report and A002 Design Review Report. The monthly status report requires the contractor to submit a report by the end of each month plus 10 days, covering project progress, risks, milestones, and any schedule deviations. The design review report must be submitted within 10 working days after the Design Phase, providing detailed engineering documentation demonstrating that the Precision Aim Kit meets all performance, weight, and stability requirements. Both reports must be distributed electronically to three points of contact: Elizabeth Charleson, Dave Jordan, and Chris Shepherd, using editable Microsoft Office file formats.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Original Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER -

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Precision Aim Kit

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A001 Monthly Status Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-80227 SOW Para 4 USSOCOM SOF AT&L SW-PMCP

7. DD 250 REQ

No

9.DIST STATEMENT

REQUIRED

10. FREQUENCY

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

MONTHLY EOM + 10 days b. COPIES

8. APP CODE

N/A

B 11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

EOM + 10 days

a. ADDRESSEE Draft

Final

Block 4: Format: Contractor format is acceptable.

Content:

- Summary of progress on tasks (e.g., design, fabrication, assembly, testing, and delivery).

- Identification of any risks or issues impacting schedule, performance, or deliverables.

- Updates on milestones achieved and upcoming milestones.

- Any deviations from the approved schedule or requirements.

Block 11, 12, and 13: The report shall be submitted no later than the End of the Month (EOM) + 10 days to the POCs listed in Blk 14.

Block 14: Distribution shall be by electronic media whenever possible.

The information shall be prepared and delivered in editable and current Microsoft Office Suite file format (MS Word, MS Excel, MS PowerPoint, MS Project, etc.) to the POCs listed.

Elizabeth Charleson

USSOCOM, SOF AT&L-SW-CP

Elizabeth.charleson@socom.mil

Dave Jordan

USSOCOM, SOF AT&L-SW-CP

jordanj@jdi.socom.mil

Chris Shepherd christopher.w.shepherd.ctr@soc om.mil

G. PREPARED BY H. DATE i. APPROVED BY J. DATE

Elizabeth Charleson, APM

USSOCOM PMCP

26-Aug-25 26-Aug-25

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Original Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER -

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Precision Aim Kit

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A002 Design Review Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

SOW Para 3.1 USSOCOM SOF AT&L SW-PMCP

7. DD 250 REQ

No

9.DIST STATEMENT

REQUIRED

10. FREQUENCY

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

ONCE SEE BLK 16 b. COPIES

8. APP CODE

N/A

B 11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

AS REQ’D

a. ADDRESSEE Draft

Final

Block 4: Format: Contractor format is acceptable.

Content: It must contain detailed engineering documentation for the Precision Aim Kit, demonstrating that the design meets all performance, weight, and stability requirements outlined in the SOW.

Block 10: Contractor must deliver the Design Review Report to the POCs listed in Blk 14.

Block 11 and 12: The report shall be submitted no later than ten (10) working days after the Design Phase to the POCs listed in Block 14.

Block 13: Any design revisions to the report shall be submitted no later than five (5) working days after the design changes to the POCs listed in Block 14.

Block 14: Distribution shall be by electronic media whenever possible.

The information shall be prepared and delivered in editable and current Microsoft Office Suite file format (MS Word, MS Excel, MS PowerPoint, MS Project, etc.) to the POCs listed.

Elizabeth Charleson

USSOCOM, SOF AT&L-SW-CP

Elizabeth.charleson@socom.mil

Dave Jordan

USSOCOM, SOF AT&L-SW-CP

jordanj@jdi.socom.mil

Chris Shepherd christopher.w.shepherd.ctr@soc om.mil

G. PREPARED BY H. DATE i. APPROVED BY J. DATE

Elizabeth Charleson, APM

USSOCOM PMCP

26-Aug-25 26-Aug-25