This document provides details for a federal solicitation requesting proposals for the overhaul, modernization, and alteration of three 11-meter support craft watercraft in Kodiak, Alaska. The Naval Surface Warfare Center, Carderock Division is seeking a firm-fixed price contract for engine replacement, surface preparation, painting, trailer repairs, electrical repairs, structural repairs, mechanical repairs, and hardware replacements on the three vessels. The solicitation is set aside for small businesses and uses NAICS code 336612 with a size standard of 1,000 employees. The period of performance is anticipated to be from May 1, 2022 through April 30, 2024. Questions regarding this requirement should be directed to the specified Navy contacts. Offerors must be registered in the System for Award Management database to be eligible for award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0016722R0011-0002.pdf | ||
| N0016722R0011-0001.pdf | ||
| Attachment 1_Past Performance References_N0016722R0011.doc | DOC document | |
| Attachment 1_Past_Performance_References_N0016722R0011.docx | DOCX document | |
| Attachment 2_Past_Performance_Questionnaire_N0016722R0011.docx | DOCX document | |
| N0016722R0011.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0007 A ADMN
11 MSC KODIAK
A001 Contractor Progress, Status and Management Report Monthly Program Status
DI-ADMIN-80447A SOW Para. 4.20 NSWCCD Code 83
LT
N/A SEE BLOCK 16
SEE BLOCK 16
N/A
SEE BLK 16
SEE BLK 16
NSWCCD, C807 COR 1
0 1 0
Blk 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only for administrative or operational use: 05 April 2019. Other requests for this document shall be referred to: Naval Surface Warfare Center Carderock Division, Code 807, 9500 MacArthur Blvd., Bethesda, MD 20817.
Block 10, 12, 13: First report due 15 days after award. Reports due monthly, based on a calendar month and shall be submitted by the 15th of each month.
Blk 14: Distribution by electronic mail preferred. Reports shall be in electronic format using Microsoft Office product(s) or Portable Document Format (PDF) suitable for reproduction, with all fonts and images embedded within the documents.
Vanessa M. Goddard 02/10/22
David R. McAfee 02/10/22
Adobe Professional 8.0
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
0007 A ADMN
11 MSC KODIAK
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0007 A FNCL
11 MSC KODIAK
A002 Report, Record of Meeting Minutes and Developing Agendas Meeting Minutes and Program Manager Review Agenda
DI-ADMIN-81505 SOW Para. 4.21 NSWCCD Code 83
LT
N/A SEE BLOCK 16
SEE BLOCK 16
N/A
SEE BLK 16
SEE BLK 16
NSWCCD, C807 COR 1
0 1 0
Blk 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only for administrative or operational use: 05 April 2019. Other requests for this document shall be referred to: Naval Surface Warfare Center Carderock Division, Code 807, 9500 MacArthur Blvd., Bethesda, MD 20817.
Block: 10, 12, 13: Meeting minutes shall be provided to the Navy within one (1) week of the meeting. The contractor shall prepare and submit an agenda for Government review at least five (5) business days before Program Manager Review.
Block 14: Distribution by electronic mail is acceptable
Vanessa M. Goddard 02/10/22
David R. McAfee
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
0007 A FNCL
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0007 A ADMN
11 MSC KODIAK
A003 Plan of Action and Milestone Project Planning Chart
DI-MGMT-80507C SOW Para. 4.2, 4.3 NSWCCD Code 83
LT
N/A SEE BLOCK 16
ASREQ
N/A
ASREQ
ASREQ
NSWCCD, C807 COR 1
0 1 0
Block 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only for administrative or operational use: 05 April 2019. Other requests for this document shall be referred to: Naval Surface Warfare Center Carderock Division, Code 807, 9500 MacArthur Blvd., Bethesda, MD 20817.
Block: 10, 12, and 13: The Procuring Contracting Officer (PCO) will disseminate more detailed schedule information via an email or Contract Modification directed to the contractor.
Block 14: Distribution by electronic mail is acceptable
Vanessa M. Goddard 02/10/22
David R. McAfee
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0007 A ADMN
11 MSC KODIAK
A004 CRAFT CONSTRUCTION SCHEDULES Ordering and Receiving Materials
DI-MISC-81623 SOW Para. 4.2, 4.3 NSWCCD Code 83
LT
N/A SEE BLOCK 16
ASREQ
N/A
ASREQ
ASREQ
NSWCCD, C807 COR 1
0 1 0
Block 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only for administrative or operational use: 05 April 2019. Other requests for this document shall be referred to: Naval Surface Warfare Center Carderock Division, Code 807, 9500 MacArthur Blvd., Bethesda, MD 20817.
Block: 10, 12, and 13: The Procuring Contracting Officer (PCO) will disseminate more detailed schedule information via an email or Contract Modification directed to the contractor.
Block 14: Distribution by electronic mail is acceptable
Vanessa M. Goddard 02/10/22
David R. McAfee
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0007 A MISC
11 MSC KODIAK
A005 Engineering Analysis Engineering Analysis
DI-MISC-80508B SOW Para. 4.3 NSWCCD Code 83
LT
N/A SEE BLOCK 16
SEE BLOCK 16
N/A
SEE BLCK 16
SEE BLCK 16
NSWCCD, C807 COR 1
0 1 0
Block 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only for administrative or operational use: 05 April 2019. Other requests for this document shall be referred to: Naval Surface Warfare Center Carderock Division, Code 807, 9500 MacArthur Blvd., Bethesda, MD 20817.
Block: 10, 12, and 13: The Procuring Contracting Officer (PCO) will disseminate more detailed schedule information via an email or Contract Modification directed to the contractor.
Block 14: Distribution by electronic mail is acceptable
Vanessa M. Goddard 02/10/22
David R. McAfee
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
0007 A MISC
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0007 A MGMT
11 MSC KODIAK
A006 TECHNICAL DOCUMENTATION REPORT FUNCTIONAL REQUIREMENTS
SPECIFICATION and VALIDATION
DI-MGMT-80508B SOW Para. 4.3 NSWCCD Code 83
LT
N/A SEE BLOCK 16
SEE BLOCK 16
N/A
SEE BLCK 16
SEE BLCK 16
NSWCCD, C807 COR 1
0 1 0
Block 4: Requirements in paragraph 1(a), 1(b), and 1(c) are not required.
Block 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only for administrative or operational use: 05 April 2019. Other requests for this document shall be referred to: Naval Surface Warfare Center Carderock Division, Code 807, 9500 MacArthur Blvd., Bethesda, MD 20817.
Block 10, 12, and 13: The Procuring Contracting Officer (PCO) will disseminate more detailed schedule information via an email or Contract Modification directed to the contractor.
Block 14: Distribution by electronic mail is acceptable
Vanessa M. Goddard 02/10/22
David R. McAfee
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
0007 A MGMT
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0007 A MGMT
11 MSC KODIAK
A007 TEST / INSPECTION REPORTS
DI-NDTI-80809B SOW Para. 4.2, 4.3 NSWCCD Code 83
LT
N/A SEE BLOCK 16
ASREQ
N/A
SEE BLCK 16
SEE BLCK 16
NSWCCD, C807 COR 1
0 1 0
Block 4 - Section 10.2.1 does not apply, utilize the cover sheet format included with this CDRL.
Block 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only for administrative or operational use: 05 April 2019. Other requests for this document shall be referred to: Naval Surface Warfare Center Carderock Division, Code 807, 9500 MacArthur Blvd., Bethesda, MD 20817.
Block 10: The Procuring Contracting Officer (PCO) will disseminate more detailed schedule information via an email or Contract Modification directed to the contractor.
Block 12: The Procuring Contracting Officer (PCO) will disseminate more detailed schedule information via an email or Contract Modification directed to the contractor. The government will provide comments no more than 14 days after submission of the preliminary draft.
Block 13: The Procuring Contracting Officer (PCO) will disseminate more detailed schedule information via an email or Contract Modification directed to the contractor. Final submission of the Test / Inspection Report is required prior to End of Contract (EOC).
Block 14: Distribution by electronic mail is acceptable.
Vanessa M. Goddard 02/10/22
David R. McAfee
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0007 A MGMT
11 MSC KODIAK
A008 GOVERNMENT FURNISHED PROPERTY INVENTORY
REPORT
GOVERNMENT FURNISHED PROPERTY
BASELINE REPORT
DI-MGMT-80441C (SEE BLK 16) SOW Para. 7.1 NSWCCD Code 83
LT
N/A SEE BLOCK 16
SEE BLOCK 16
SEE BLCK 16
SEE BLCK 16
SEE BLCK 16
NSWCCD, C807 COR 1
0 1 0
BLOCK 4: The contractor shall utilize the MS Excel Tracking Template provided by Contracting Officer. DI-MGMT-80441C shall be tailored in accordance with the following instructions:
The contractor shall only report on Government Furnished Property and should not capture Contractor Acquired Property in this report.
BLOCK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only for administrative or operational use: 05 April 2019. Other requests for this document shall be referred to: Naval Surface Warfare Center Carderock Division, Code 807, 9500 MacArthur Blvd., Bethesda, MD 20817.
BLOCKS 10, 11, 12 AND 13: The Government Furnished Property Baseline Report shall be provided by the contractor within 30 days of the award . Subsequent submissions shall be provided every three months thereafter.
BLOCK 14: Unclassified documents shall be submitted electronically to the COR.
Classified documents shall be submitted via to NSWCCD via Compact Disc (CD) that is properly packaged and marked. Additional addressees shall be as required by individual Description of Specification.
Vanessa M. Goddard 02/10/22
David R. McAfee
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
DATA ITEM DESCRIPTION
Title: Contract Summary Report
Number: DI-ADMN-80447A Approval Date: 08 NOV 2006 AMSC Number: 7625 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/DA02 Applicable Forms: N/A
Use/relationship:
This report summaries all work performed under the contract.
This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
This DID supersedes DI-ADMN-80447.
Requirements:
1. Reference documents. None.
2. Format. The report shall be prepared in contractor’s format.
2.1 It shall be typewritten and is to be duplicated in non-fading ink.
2.2 The data indicated below shall be contained on the title page:
2.2.1 Type of Report, Final
2.2.2 Purchase Description Title
2.2.3 Contract Number
2.2.4 Dates of the Reporting Period
2.3 Security classification and distribution limitation markings shall be included on all pages.
3. Content.
Downloaded from http://www.everyspec.com
DI-ADMN-80447A
3.1 Table on Contents.
3.2 Brief summary of all work accomplished, to include both negative and positive results. All information shall be referenced to the appropriate Progress Report, or section of the Final Report, where the subject is discussed in detail.
3.3 The body of the report shall describe all work accomplished, including as applicable, theoretical studies, experimental work mechanical design, theory of operation, test procedures, test results, and those drawings, charts, graphs, illustrations, or other material needed to clarify the presentation.
3.4 When test equipment has been designed and constructed for use on this contract, a listing of all such equipment is to be included. This listing shall include all related drawings and associated lists. It shall be referenced in the report and included as an appendix.
3.5 Conclusions, recommendations, and proposals.
3.6 Appendixes for any necessary tables, references, photographs, charts, and illustrations.
4. END OF DI-ADMN-80447A
Title: Project Planning Chart
Number: DI-MGMT-80507C Approval Date: 14 Apr 2009 AMSC Number: 9061 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/BA02 Applicable Forms: N/A
Use/relationship:
The Project Planning Chart graphically depicts the schedule and actual progress of work on a contract.
This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
This DID is used as a attachment to a status or progress report to illustrate the amount of work accomplished relative to the work schedule.
For fixed prices contracts, tailor out 3.18 and 3.19.
This DID supersede DI-MGMT-80507B
Requirements:
1. Reference documents. None.
2. Format: The chart shall be in contractor’s format.
3. Content.
3.1 Project planning chart. It shall depict actual and schedules progress for each subdivision using horizontal lines and symbols. Actual progress will be noted by a percentage of the completion figure.
3.2 Progress of work. Subsequent additions to the work breakdown shall be made as they occur in contract work performance. Items shall not be deleted even though work may be cancelled or stopped before completion.
3.3 Description. Description entry on the chart will be by task. Tasks are divided into
DI-MGMT-80507C
subdivisions. For computer software task, the subdivisions shall be Design, Coding, Debugging, Acceptance Testing, and Management. Entries shall be complete and reflect all contract effort.
3.4 Milestone symbol. The triangle symbol will be white if the task has not be achieved. It shall be shaded if the task has been achieved.
3.5 Date released. Last date to which chart was posted.
3.6 Date revised. Date of subsequent contract modification.
3.7 Contractor name.
3.8 Contract title.
3.9 Contract number.
3.10 Purchase description number.
3.11 Security classification.
3.12 Delivery dates. Includes dates for all deliverable items.
3.13 Scheduled starting date. Date each subdivision of work is scheduled to start.
3.14 Actual starting date. Date each subdivision of work actually started.
3.15 Scheduled completion date. Date each subdivision of work is scheduled for completion.
3.16 Actual completion date. Date each subdivision of work actually was completed.
3.17 Manhours Expended. Total manhours expended per task for each reporting period.
Manhours defined as total number of direct labor hours regardless of type.
3.18 Funds expended. Contracts funds expended per task for each reporting period.
Costs defined as total direct cost plus burden, overhead, general and administrative (G&A), and any other load. Total of all items to equal the total target cost.
DI-MGMT-80507C
3.19 Expenditures. Manhours expended figures and contract funds expended figures used on the chart will be developed on the same basis as the planned figures. Chart depicts these figures for each report period as cumulative totals, accurate to the as-of-date of the report.
4. END OF DI-MGMT-80507C
Title: CRAFT CONSTRUCTION SCHEDULES
Number: DI-MISC-81623 Approval Date: 20010801 AMSC Number: N7453 Limitation:
DTIC Applicable: GIDEP Applicable:
Office of Primary Responsibility: N/PMS377 Applicable Forms:
Use/Relationship: Schedules provide a systematic, planned sequence of starting and completing program actions, and establishing need dates for supporting requirements. They may also serve as periodic reports providing information on work progress, production effort, milestone completions, program/project progress, and ordering/receiving materials.
a. This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task required as delineated in the contract.
Requirements:
1. Format. Craft Construction Schedules shall be presented in the contractor’s format.
2. Content. Schedules shall be identical in all respects to those used by the contractor to manage the craft construction program. Schedule(s) shall portray in chronological sequence the actions/events/milestones/requirements with corresponding planned start/complete dates and actual start and complete dates which shall be retained on each issue of the schedule. As appropriate, a column/line/space shall be provided for comments: explanation of problems encountered, and/or any remarks providing clarification.
3. Craft Construction Schedules shall include:
3.1 Baseline Key Event Schedule. This schedule shall contain start and complete dates for Navy/Contractor agreed to significant construction and construction related events and activities selected from the contractor’s various detailed production, design, and material schedules. Emphasis shall be placed on the interdependency of related events/activities. The schedule shall contain a minimum of 120 events/activities per year and will serve as a uniform baseline for monitoring and reporting by both the Navy and the Contractor. Schedule format will show Baseline, current estimated and actual dates and shall be used in conjunction with QPR’s.
DISTRIBUTION STATEMENT A: APPROVED FOR PUBLIC RELEASE;
DISTRIBUTION IS UNLIMITED.
Source: https://assist.dla.mil -- Downloaded: 2019-02-20T19:40Z Check the source to verify that this is the current version before use.
3.2 Material Ordering Schedule. This schedule shall consist of the following information as applicable:
1) Items being ordered
2) Vendor
3) Applicable purchase order number
4) Applicable specification number
5) Scheduled and actual dates for purchase requisition processing
6) Schedule and actual dates of purchase order placement
7) Respective purchase order number
8) Respective purchase order vendor name
9) Release for manufacture, if required
10) Shipyard need dated to support production
11) Vendor promised delivery dates
12) Actual delivery dates
3.2.1 This information shall be retained on each issue of the schedule.
Equipment identified as long lead-time items shall be annotated on the schedule.
The material ordering schedule shall be fully integrated with the Baseline Key Schedule.
NOTE: For Government Furnished Property, the schedule shall reflect dates specified in Schedule “A”.
3.3 Drawing Schedules. This schedule shall consist of a list of drawings with the following information as applicable:
1) Drawing Title
2) NAVSEA drawing number
3) Local drawing number
4) Craft number
5) Latest revision letter
6) Outstanding design change notices
7) Scheduled completion dates and actual completion dates
8) Validation dates
9) Date of Regulatory Body submittal and approval, if required.
3.3.1 The Drawing Schedule shall include identification of original and current schedule dates. The Drawing Schedule shall also contain a list of Craft Equipment Drawings.
3.4 Government Furnished Property Schedule (Exception Report). This schedule shall include identification of property, Schedule “A” item number, schedule date, promised date and source, and a brief description of production impact.
3.5 Test Schedule. This schedule shall identify scheduled an actual dates for each test and shall be integrated with the Baseline Key Event Schedule.
3.6 All schedules shall contain current information. Completion of each item on the schedules shall be indicated.
End of DI-MISC-81623.
Title: Technical Report–Study/Services
Number: DI-MISC-80508B Approval Date: 14 Nov 2006 AMSC Number: 7633 Limitation: N/A DTIC Applicable: Yes Defense Technical Information Center (DTIC), 8725 John J. Kingman Rd.
Suite. 0944, Fort Belvoir, VA 22060-6218 GIDEP Applicable: No Office of Primary Responsibility: NS/DA02 Applicable Forms: N/A
Use/relationship: A technical report provides fully documented results of studies or analysis performed.
This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
This DID supersede DI-MISC-80508A
Requirements:
1. Reference documents. None.
2. Format.
(a) The report and all attachments shall be typewritten, or otherwise clearly lettered, and shall be duplicated using non-fading ink.
(b) Text shall be prepared on standard letter size paper (8 ½ x 11”) .
(c) When attachments are included, they shall be fully identified, referenced in the text, and folded to conform to the size paper used in the report.
(d) Security classification and distribution markings shall conform to the requirements of the contract, purchase description and security requirements checklist, as applicable.
DI-MISC-80508B
3. Contents.
(a) Title Page – Identifies the report by providing contract number, project name or purchase description title, task number, and reporting period.
(b) Table of Contents.
(c) Section I – Includes the following:
(1) Introduction
(2) Summary – A brief statement of results obtained for the analytic effort.
(3) Conclusions and their condensed technical substantiation’s.
(d) Section II – A complete and detailed description of the analytic results which led to the conclusions stated in Section I above.
4. END OF DI-MISC-80508B
Title: Technical Report–Study/Services
Number: DI-MISC-80508B Approval Date: 14 Nov 2006 AMSC Number: 7633 Limitation: N/A DTIC Applicable: Yes Defense Technical Information Center (DTIC), 8725 John J. Kingman Rd.
Suite. 0944, Fort Belvoir, VA 22060-6218 GIDEP Applicable: No Office of Primary Responsibility: NS/DA02 Applicable Forms: N/A
Use/relationship: A technical report provides fully documented results of studies or analysis performed.
This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
This DID supersede DI-MISC-80508A
Requirements:
1. Reference documents. None.
2. Format.
(a) The report and all attachments shall be typewritten, or otherwise clearly lettered, and shall be duplicated using non-fading ink.
(b) Text shall be prepared on standard letter size paper (8 ½ x 11”) .
(c) When attachments are included, they shall be fully identified, referenced in the text, and folded to conform to the size paper used in the report.
(d) Security classification and distribution markings shall conform to the requirements of the contract, purchase description and security requirements checklist, as applicable.
DI-MISC-80508B
3. Contents.
(a) Title Page – Identifies the report by providing contract number, project name or purchase description title, task number, and reporting period.
(b) Table of Contents.
(c) Section I – Includes the following:
(1) Introduction
(2) Summary – A brief statement of results obtained for the analytic effort.
(3) Conclusions and their condensed technical substantiation’s.
(d) Section II – A complete and detailed description of the analytic results which led to the conclusions stated in Section I above.
4. END OF DI-MISC-80508B
DATA ITEM DESCRIPTION I Form Approved OMB No.0704.0188
1.nTLE 2.IOENTIFICATIONNUMBER
TEST/ INSPECTION REPORT DI-NM’I-80809B
L OESCRIPTlOtVPURPOSE
3.1 The testl inspection report is used to document testl inspection results, findings, and analyses that will enable the government or contracting agency to evaluate compliance with system requirements, performance objectives, specifications, and test linspection plans.
1.APPROVALDATE 5.OFFICEOFPRIMARYRESPONSIBILITY(OPB) Ea.DTICAPPLICABLE 6b.CWIEP AppliCable
(YVMMOD)
F/AFMC-DCJP
970124
,.APPLlCAT\0NflNTER7iElAT10NSH1P
7.1 This data item description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement
I as delineated in the contract.
I
7.2 This DID is applicable to engineering (developmental ), preliminary qualification, qualification, and acceptance testing.
7.3 This DID supersedes DI-NDTI-80809A and DI-MISC-80653
1.APPROVALLIMITATION 9a.APPLICABLEFORMS 9b.AMSCNUMBER
F7231
10,PREPARATIONlNSTRUCnONS
10.1 Format. Contractor format is acceptable.
paragraph 10.2 and its subparagraphs in a manner understanding
10.2 CQnL!aL. The test/inspection report shall
applicable.
Organize the information required by that facilitates presentation and contain the following information, as
10. 2.1 Cove. and tile uaae. The following information shall appear on the outside front :over and title page:
a. Report date.
b. Report number (contractor or government)
Contractor’ s name, address, and commercia 1 and government entity code.
Contract number and contract line item number or sequence number (if applicable)
e. ‘fvpe of test/inspection (for example. first article acceptance test, aualitv con formanc-e-inspection, d-evelopmental test-, qualification test, f Identification of item tested/inspected.
9. Date or period of test/inspection.
h. Name and address of requiring government activity.
i. Security classification, downgrading and declassifying environmental Lest) .“ information, if applicable.
(Continued on page 2 )
1.DIS77UBUTIONSTATEMEW
DISTRIBUTION STATEMRNT A : APPROVED FOR PUBLIC RELBASE; DISTRIBUTION IS UNLIMITED.
ID Form 1664,APR 89 PreviOLIsedtliomwe obsdem. Page 1 of & Pages 39123
DI-NDTI-80809B
Block 10, Preparation Instructions (continued)
10.2.2 ~. The table of contents shall identify the following:
a. The title and starting page of each major section, paragraph, and apPendix of the report.
b. The page, identifying number, and title of each illustration (for example; figure, table, photograph, chart, and drawing)
10 .2.3 -ductim. The introduction shall include the following information:
10.2 .3.1 obyectlve W. The specific test/ inspection objective (s) as specified in the contract tasking document.
10. 2.3.2 L.temls) tes~. Complete identification of the item(s) testedl inspected including the following:
a. Nomenclature.
b. National stock number.
Model number, part number t and serial number :: Type of item (for example, prototype, production item, laboratory model )
e. Serial or lot number.
f. Applicable engineering changes
9. Production item specification, if applicable.
h. Date of manufacture.
10.2 .3.3 Complete inspection requirements correlated to contractual following:
Required testl inspection parameters :: Performance requirements, acceptance or environmental criteria.
10.2.4 ~. Complete test/inspection report following:
identification of the testl requirements including the compliance limits, and summary including the
a. A brief discussion of the significant test/inspection results, ObSerVati Qns, conclusions, and recommendations covered in greater detail elsewhere in the report.
b. Proposed corrective actions and schedules for failures or problems encountered.
c. Identification of deviations, departures, or limitations encountered, referenced to the contract requirements.
d. Tables, graphs, illustrations, or charts as appropriate to simplify the summary data.
10.2.5 ~. Complete identification of all documents referenced in the test finspection report including the following, as applicable:
a. Prior testf inspection reports on the same item.
b. Test /inspection plans and procedure documents
c. Prior certifications of compliance.
d. Contractor’ s file designation where test/ inspection records are maintained.
e. Input parameters used.
The applicable issue of the documents cited therein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
Page 2 of 4 Pages
10.2.6 ~. The body of the testlinspection report shall be as follows :
10 .2.6.1 KzZL_ + de.tlflca~.
Complete identification of each item of test equipment used in the testlinspection including the following:
a.
b.
c.
d.
e.
f.
9.
10. 2.6.2
Nomenclature.
Model number.
Serial number.
Manufacturer.
Calibration status.
Accuracy data.
Comments, if applicable.
Testlinmection kuhtv mstd.b&mn and set–w. Complete description of the physical set-up used in conducting the test/inspection to include the following:
a. Location or orientation of the item.
b. Location. orientation, or settinm of test equipment and instrumentation.
c. Location, orientation, or settings of sensors and probes
d. Location or orientation of interconnections, cables, and hoop-ups.
e. Electrical power, pneumatic, fluidic, and hydraulic requirements.
Drawings, illustrations, and photographs maY be used for clarification.
10 .2.6.3 wrocedur~. Complete description of the procedures used in conducting the test/inspection to include the following:
a. Item selection and inspection that verified suitability for test/ inspection.
b. Summarized sequence of testing/inspection steps, including a description of how the item was operated during the test/inspection, and any control conditions imposed.
10 .2.6.4 A copy of all testlinspection results and analysis to include the following:
10.2.6 .4.1 ~. The actual recorded data (for example, log book entries, oscillographs, instrument readings, plotter graphs) If the recorded data is extensive, provide it in an appendix.
10. 2.6.4.2 Test/ insQec!iion resu. Identification of all testlinspection results to include the following:
a. Matrices comparing results achieved against test/inspection objectives or requirements
b. A discussion of these matrices as to their significance, and how they compare to any prior testlinspections.
Calculation examples.
;; Discussion of anomalies, deviations, discrepancies, or failures, including their impact, causes, and proposed corrective actions The discussion shall address discrepancies between design requirements and the tested/inspected Configuration.
10. 2.6.5 Conclusicxls Test/ inspection conclusions distinguished between objective and subjective to include the following:
a. The effectiveness of the testlinspection procedures in measuring item performance.
Page 3 of 4 Pages
b. The success or failure of the item to meet required test/inspection objectives.
c. The need for repeat, additional, or alternative tests linspections.
d. The need for item redesign or further development.
e. The need for improved test/inspection procedures, techniques, or facilities.
f. The adequacy and completeness of the test/inspection requirements.
10.2 .6.6 Recommendations appropriate to the test/inspection results and conclusions including the following:
a b.
c.
d.
e.
f.
9.
h.
Acceptability of the item tested/inspected (pass or fail) Additional testing/inspection required. ,.
Redesign required.
Problem resolution.
Test/inspection procedure or facility improvements Disposition of items tested/inspected.
Documentation changes required.
Testing/ inspection improvements
10.2.7 The following certifications shall be included, .as
applicable:
10.2 .7.1 A statement that the testlinspection was performed in accordance with applicable testlinspection plans and procedures, and that the results are true and accurate. The authentication shall include the signature of the contractor personnel that performed the test(s) /inspection(s) , a contractor representative authorized to make such certification, and any government witnesses
10.2 .7.2 A statement identifying those requirements not tested/inspected or measured that were previously validated.
Include identification of the data and method employed for such validation (for example, prior test/inspection, analytical verification, equivalent item, and so on) The authentication shall include the signature of a contractor representative authorized to make such authentication and any government witness.
10.2 .7.3 A statement that the item tested/ inspected either passed or failed item acceptability requirements This authentication shall include the signature of a contractor representative authorized to make such authentication and any government witness
10.2.8 Appendices shall be used to append detailed
test/inspection daia, drawings, photographs , or other documentation too voluminous to include in the main body of the report This includes referenced documentation not previously provided by the government, and test/ inspection reports from any associated test/inspection activity that may have performed some of the testing/inspecting requirements.
Page 4 of 4 Pages
Title: GOVERNMENT PROPERTY INVENTORY REPORT
Number: DI-MGMT-80441C Approval Date: 20171101 AMSC Number: 9865 Limitation:
DTIC Applicable: No GIDEP Applicable: No Preparing Activity: MDA Project Number: MGMT-2017-059 Applicable Forms: None
Use/Relationship: This report enables the contractor to periodically provide to the DoD Service/Agency an inventory listing of Government Property (i.e., both Government Furnished Property (GFP) and Contractor Acquired Property (CAP)) in the contractor’s possession (to include subcontractors) by contract.
This DID is applicable to all contracts where Government Property will be furnished by the Government (i.e., GFP) or acquired, fabricated, or otherwise provided by a contractor (i.e., CAP) in performance of a contract.
This DID contains the format and content preparation instructions for the data deliverable resulting from the work task described in the solicitation.
This…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .