Exhibit_-_A-1_-__Map_and_Final_Report.pdf
PDF 1 MB Posted
- Attached to
- 24RS0011 - DOMESTIC HOT WATER LOOP SERVICES
- Solicitation number
- 0000034827
About this file
The document is a final report for a Domestic Hot Water Demolition and New Work project for the California Department of Veterans Affairs (CalVet) located at 3400 Knighton Road in Redding, CA. The project involves removing and replacing existing thermostatic mixing valve systems and associated piping in three mechanical rooms (AB, CD, and EH). The scope of work includes demolishing existing equipment, installing new Aerco ADMS Smart Water Tempering Systems (3 units, model ADMS150-S1-110), installing new Grundfos hot water return pumps (3 units, model TPE3 40-120), modifying Unistrut supports, relocating fire sprinkler equipment, and ensuring all electrical and plumbing connections are correctly installed and leak-free.
The project requires comprehensive system modifications with specific technical requirements, including maintaining Title-24 minimum insulation standards, providing removable insulation blankets for frequently accessed components, and completing electrical circuit management. The equipment is owner-furnished, contractor-installed (OFCI), with specific technical specifications including maximum operating pressures (200 psi), temperature ranges (80-180°F), and compliance with standards like ASSE 1017, cUPC, NSF, and CSA. The contractor is responsible for factory startup, training, and ensuring all electrical circuits are properly removed or reinstalled. The project involves precise technical work in three separate mechanical rooms with careful attention to existing fire protection and electrical systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit_D.pdf | ||
| Exhibit_B-1.pdf | ||
| Bidders_Checklist.pdf | ||
| Bid_Form_-_Cost_of_Project.pdf | ||
| Verification_Documents.pdf | ||
| Exhibit_B.pdf | ||
| Bidders_Certification.pdf | ||
| Exhibit_-_A-2_-_Appendix_A_RFI_Form.pdf | ||
| IFB_Solicitation_-_Revised_for_Dates.pdf | ||
| Exhibit_A.pdf | ||
| Exhibit_E.pdf | ||
| Addendum.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
27 March 2024
DOMESTIC HOT WATER DEMOLTION AND NEW WORK FINAL REPORT
CALIFORNIA DEPARTMENT OF VETERAN AFFAIRS
3400 KNIGHTON ROAD, REDDING, CA 96002
KEY PLAN
998 Park Ave., San Jose, CA 95126
Ph: 408-297-1881 Fax: 408-294-3186 www.adcengineers.com
AB
CD
EH
Solicitation Number: 24RS0011
CalVet Redding DHS Report Final Report 27 March 2024
Advance Design Consultants, Inc. Page 2
PROJECT SUMMARY:
Remove existing thermostatic mixing valve and associated piping and valves and replace with updated system in mechanical rooms E/H, C/D and A/B.
TABLE OF CONTENTS
COVER PAGE / KEY PLAN
PROJECT SUMMARY / TABLE OF CONTENTS
PROJECT SCOPE OF WORK
ABBREVIATIONS
SYMBOLS
EH MECHANICAL ROOM PIPING DEMOLITION PLAN
CD MECHANICAL ROOM PIPING DEMOLITION PLAN
AB MECHANICAL ROOM PIPING DEMOLITION PLAN
EH MECHANICAL ROOM PIPING NEW WORK PLAN
CD MECHANICAL ROOM PIPING NEW WORK PLAN
AB MECHANICAL ROOM PIPING FIRE EQUIPMENT RELOCATION
AB MECHANICAL ROOM PIPING RACK MODIFICATION
AB MECHANICAL ROOM PIPING NEW WORK PLAN
AB MECHANICAL ROOM PIPING RACK INSTALLATION (TOP VIEW)
TYPICAL RACK SUPPORT DETAIL
Advance Design Consultants, Inc. Page 3
PROJECT SCOPE OF WORK:
1. Introduction
CalVet DHW System Repair Services shall consist of the removal and replacement of three thermostatic mixing valve setups and associated valves, pumps, and piping in mechanical rooms AB, CD, and EH. Additionally, new Unistrut supports shall be installed to support the new thermostatic mixing valve system. For the AB mechanical room, three fire sprinkler head storage boxes shall be removed from the existing locations and placed at another fire-authority-approved location, selected by the owner, and away from the new work area.
thermostatic mixing valve rack requires preparation prior to installation. The Unistrut on the AB rack must be cut, trimmed, and reattached so that the rack can fit in the room. Note that the racks and pumps have already arrived on site.
A. Based Scope - Perform DHW System Replacement:
1. Remove the existing thermostatic mixing valves and associated electrical wiring and water piping to point of connections shown on drawings for all three mechanical rooms;
AB, CD, and EH.
2. Install (N) shutoff valves via. system shutdown (and draining) or hot-tap as needed for all three locations.
3. Prior to installing racks, install a (N) Grundfos Hot Water Pump on each of the three
(N) Aerco ADMS Smart Water Tempering System (owner furnished, contractor installed, OFCI). The (N) Aerco rack to be installed in the AB mechanical room must have its Unistrut structure modified prior to installation. Contractor to provide factory startup and training for all new equipment. Despite equipment already being purchased, contractor is expected to contact local factory representative and include startup and training in their price.
4. Install three (N) Aerco racks and seismically secure them with Unistrut supports to the ground and walls as needed.
5. Reconnect the (N) Aerco ADMS Smart Water Tempering System to power. Assure all piping and electrical connections are installed correctly, and that the system is water tight with no leaks.
Equipment Selection shown below:
Product Data AERCO AMDS SMART WATER TEMPERING SYSTEM (OFCI)
Item: A1 Qty: 3 Ready to be installed on site.
Model: ADMS150-S1-110 Maximum Operating Pressure 200psi Maximum Hot Water Temperature 200°F Minimum Hot Water Supply Temperature 2°F above set point Hot Water Inlet Temperature Range 120-180°F Cold Water Inlet Range 39-80°F Minimum Flow 0.5gpm Temperature Adjustment Range 80-180°F Compliances: ASSE 1017, cUPC, NSF, CSA 24/UL873 Pump Relay 16A @ 250 VAC Alert Relay 5A @ 250 VAC, 5A @ 30 VDC
Advance Design Consultants, Inc. Page 4
Product Data GRUNDFOS HOT WATER RETURN PUMPS (OFCI)
Item: A2 Qty: 3 Tag(s): P-1, P-2, P-3 Ready to be installed on site.
Model (all three same model): TPE3 40-120 S-A-G-I-BBQE-DCB Rated Pump Speed 3390 rpm Rated Flow 62.1 US gpm Operating Flow 13 gpm Rated Head 23.62 ft Operating Head 38 ft Maximum Head 39.37 ft
Gross Weight 60.2 lb Maximum Operating Pressure 174.05 psi
6. Contractor awarded shall be provided complete submittals upon request.
7. Provide Lock Out Tag Out for existing electrical circuits when completing work. Field verify existing power circuits serving DHW systems. Demolish, adjust, or replace circuits and circuit breakers as needed for a complete operating system. Do not abandon circuits in place, all must be completely removed.
8. New piping rack, components and all piping shall be completed insulated meeting current Title-24 minimum insulation requirements, per Table 120.3-A, see below.
Provide removable insulation blankets for components that are frequently accessed.
Repair all insulation in existing closets with serve this new rack, it is expected that this entire area shall be refreshed as needed with insulation. Provide all new labeling over new insulation and on existing exposed lines.