Exhibit 8a SCNF Herbicide Requirements.pdf

PDF 511 KB Posted

Attached to
Invasive Species/Rare Plants Vegetation Management Services IDIQ
Solicitation number
1240LS24R0002
Issued by

About this file

This document is an exhibit outlining the required herbicide application mitigation measures for the Salmon-Challis National Forest (SCNF) as part of a federal contract opportunity. The key details are:

The exhibit specifies 19 mandatory requirements for the handling, transportation, storage, mixing, and application of approved herbicides and surfactants during invasive plant control activities on the SCNF, including designated Wilderness areas. Requirements cover topics such as the use of certified applicators, development of safety and spill contingency plans, adherence to herbicide label directions, equipment maintenance and calibration, weather monitoring, and restrictions on application near water bodies. The approved herbicides and surfactants are listed, along with requirements for indicator dyes. This exhibit is likely part of a Performance Work Statement or Statement of Objectives for the related federal contract opportunity, Solicitation Number 1240LS24R0002 for Invasive Species/Rare Plants Vegetation Management Services IDIQ.

View the file

Other files

File Type Posted
Exhibit 8g SCNF 05_SCNF Use Regulations.pdf PDF
Exhibit 2d Nez Perce Biocontrol Release Form 2005.pdf PDF
Exhibit 6c PNF Special Status Plant List.pdf PDF
Exhibit 2i SAMPLE Equipment Calibration Worksheets.pdf PDF
Exhibit 2h SAMPLE AIM Monitoring Manual Vol.2.pdf PDF
Exhibit 5a CT_CNG_Herbicide_Requirements.pdf PDF
Exhibit 3d NISIMS_Pesticide Application Record.pdf PDF
Attachment 1-Statement of Work.pdf PDF
Exhibit 8b SCNF 2A_North Zone Application Record.pdf PDF
Exhibit 2o Survey-Inventory Data Collection Standards_Part B.pdf PDF
Exhibit 9 Index of Exhibits.pdf PDF
Attachment 2_Wage Determination.pdf PDF
Exhibit 4e BSNF Required Herbicide Application Mitigation Measures.pdf PDF
Exhibit 2k SAMPLE Pesticide Use Inspection.pdf PDF
Exhibit 2e Noxious Weeds List.pdf PDF
Exhibit 2c Method for Vegetation and Soil Status Trend Monitoring.pdf PDF
Exhibit 4d BSNF Rare Plants List_20221116.pdf PDF
Exhibit 5d CT_CNG Spill_Response_Storage_Transportation_Disposal.pdf PDF
Exhibit 6a Annual Requirements NPDES Rep.pdf PDF
Exhibit 8c SCNF 2B_South Zone Application Record.pdf PDF
Exhibit 5b CT_CNG_Manual_Mechanical_Requirements.pdf PDF
Exhibit 4c BSNF Invasive Data Collection Exhibit.pdf PDF
Exhibit 8e SCNF 4A_Method for Vegetation and Soil Status Trend Monitoring.pdf PDF
Exhibit 4b BSNF Hazardous Spill Response Protocol.pdf PDF
Exhibit 3c NISIMS_25_User_Guide.pdf PDF
Exhibit 6b PNF Invasive Data Collection.pdf PDF
Exhibit 4f R4_TABLET_DATA_2022_FieldMaps_FINAL.xlsx XLSX spreadsheet
Exhibit 2g SAMPLE AIM Monitoring Manual Vol.1.pdf PDF
Exhibit 8d SCNF 03_Qualitative Efficacy Monitoring Form.pdf PDF
Exhibit 2j SAMPLE Herbicide Spill Plan.pdf PDF
Exhibit 7c SWNF Weed Treatment Data Record.pdf PDF
Exhibit 2p Survey-Inventory Data Collection Standards_Part C.pdf PDF
Exhibit 2b Form for Vegetation and Soil Status Monitoring.pdf PDF
Exhibit 2a All Rare Plants List.xlsx XLSX spreadsheet
Exhibit 5c CT_CNG_Adjuvants.pdf PDF
Exhibit 2m SIMP Monitoring Form.pdf PDF
Exhibit 4a BSNF Data Collection Standards.pdf PDF
Exhibit 2l SAMPLE Terrestrial Ecological Unit Inventory_Monitoring Technical_Guide.pdf PDF
Exhibit 7b SWNF SampleTreatment Form.pdf PDF
Exhibit 1 Rare Plants Sample Task Order.pdf PDF
Exhibit 2f Quality Assurance and Surveillance Plan.pdf PDF
Exhibit 3a BLM 2018 Weeds BO.pdf PDF
Exhibit 3e Pesticide Application Record.pdf PDF
1240LS24R0002.pdf PDF
Exhibit 3b BLMSalmon-Challis EA.pdf PDF
Exhibit 7a SWNF Required Herbicide Application Mitigation Measures.pdf PDF
Exhibit 2n Survey-Inventory Data Collection Standards_Part A.pdf PDF
Exhibit 4g Sample Treatment Form.pdf PDF
Exhibit 8f SCNF 4B_Form for Vegetation and Soil Status Monitoring.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit 1: SCNF Required Herbicide Application Mitigation Measures

1. A certified professional herbicide applicator must oversee all spray projects, per Idaho State Department of Agriculture requirements.

2. A Safety Plan which contains spill contingency measures will be developed and reviewed with all personnel involved in handling of herbicides. A spill continency plan meeting miniumum Forest Service standards (see Sample Spill Plan) must be developed prior to all herbicide applications. Individuals involved in herbicide handling or application must be instructed on the spill contingency plan and spill control, containment, and cleanup procedures.

3. All herbicide and spray adjuvant (including surfactants and indicator dyes) will be used in accordance with label directions. The COR may require certain types of control methods or specify herbicides, use rates, application techniques and season of application. Where Forest Service-approved application rates, distance to water, etc., are more restrictive than EPA maximum application rates or Forest Service-approved application practices are more strict than the herbicide label direction, the more conservative Forest Service direction shall be followed.

4. Equipment used for transportation, storage, or application of chemicals shall be maintained in a leak-proof condition. Only those quantities of herbicides necessary for a project shall be transported. Transported herbicides shall be stowed securely and protected from unauthorized access, exposure to the elements, puncture hazards, etc.

5. Herbicides transported by boat shall be securely wrapped and stowed in leakproof storage, such as coolers, dry boxes, etc., large enough to contain 110% of the full volume of the herbicide being carried.

6. If it is necessary to use boats to reach a treatment area, added caution shall be used while loading and unloading herbicides and spray equipment to minimize the potential for contamination of water. When possible, the boat should be grounded before loading or unloading.

7. A spill cleanup kit must be available onsite whenever herbicides are transported, stored or used.

8. Spray equipment shall be properly maintained and calibrated to ensure proper application rates. Equipment calibration must be documented and available to the COR, EPA or ISDA on request (refer to Sample Calibration Exhibit).

9. The COR may require the Contractor to post areas of special public concern with signs prior to treatment and immediately following treatment in areas of high human use such as trailheads, campsites, or boat launches.

10. The COR may require the Contractor to post “crew working” signs on roads open to motor vehicle use to provide for Contractor employee safety and to notify motorists of invasive plant control activities.

11. No herbicide storage, mixing or post-application cleaning may occur within 100 feet of any live or seasonal waterways to the extent practical based on site conditions. Mixing and loading operations must take place in an area where an accidental spill would not contaminate a stream or body of water before it could be contained.

12. No carrier other than water may be used.

13. The COR must approve all herbicide and adjuvant formulations prior to use to be certain the Terms and Conditions of the Biological Opinion from the National Marine Fisheries Service for ESA-listed fish species.

are met. This includes pre-mixed commercial formulations of multiple herbicides. No use of ANY ester herbicide formulation is permitted.

14. Weather conditions will be monitored at spray sites during application. Conditions to be monitored include minimum and maximum temperatures, minimum and maximum wind speeds, direction from which wind is blowing, precipitation within the past 24 hours of herbicide application, precipitation during or shortly after herbicide application, and ground and soil conditions.

15. Stop spraying if precipitation begins to wash spray solution off plants before the rainfast period, as specified by the herbicide label, has been achieved. The Contractor needs to use his professional judgment and assessment of site conditions to determine when an application needs to stop due to precipitation, keeping in mind that payment is based on target plant mortality.

16. No spraying of any herbicide may occur within 50 feet of live water when wind velocity exceeds 5 miles per hour. No spraying of any herbicide may occur when sustained wind velocity exceeds 10 miles per hour, per Idaho State Department of Agriculture standard.

17. Hoses used to draft water water from streams, rivers, lakes or ponds to add dilution water to sprayers or containers will be equipped with a device to prevent back-siphoning into the water body. Screening shall be used on the intake to prevent entrapment of aquatic organisms such as fish, frogs, etc. of all ages and life stages.

18. Applicators will mix only those quantities of herbicides that can be reasonably used in a day.

19. All empty containers will be triple rinsed and rinsate will be disposed of by spraying near the application site at rates that do not exceed those on the spray site. Idaho state law and the Forest Service prohibit the burning of herbicide and adjuvants containers. All empty, rinsed herbicide containers shall be punctured and packed out of the treatment area with all other refuse.

These are the ONLY herbicides and adjuvants that may be used on SCNF, including designated Wilderness areas, in association with Task Orders awarded under this master Contract.

Herbicides Approved for Use:

• 2,4-D Amine (aquatic formulations only)

• Aminopyralid

• Chlorsulfuron methyl

• Clopyralid

• Dicamba

• Fluroxypyr (approved for use only WITHIN the FC-RONR Wilderness ONLY)

• Glyphosate (aquatic formulations only)

• Imazapic

• Imazamox

• Imazapyr

• Metsulfuron methyl

• Picloram

• Sulfometuron methyl

• Triclopyr TEA

Surfactants Approved for Use (MUST be on Washington State Aquatics Approval List*):

• Modified Vegetable Oil/Modified Seed Oil with greater than 60% functioning agent

• Non-Ionic Surfactant with at least 80% principle functioning agent

• Silicon-based surfactant

• Non-ionic penetrating/acidifying surfactant

• Drift reduction agents

• Buffering agents/water conditioners

• Sticker/spreader

Indicator Dyes Approved for Use on the Salmon-Challis National Forest:

• Any dye capable of lasting 3-5 days (e.g. Bullseye or Hi-Light)

* https://ecology.wa.gov/DOE/files/e8/e8ce4f84-6df5-4209-8199-9b24005e655b.pdf https://ecology.wa.gov/DOE/files/e8/e8ce4f84-6df5-4209-8199-9b24005e655b.pdf

File details come from the government source that posted it. Updated .