EXHIBIT 6 - ESB US101 DAVIS SLOUGH MAINTENANE FACILITY FENCE UPGRADE - PROJECT LOCATION-DETAILS.pdf

PDF 7 MB Posted

Attached to
ESB US101 Davis Slough Maintenance Facility Fence Upgrade
Solicitation number
S-73000-00017821
Issued by
Coos County, Oregon

About this file

This is a Project Location Details exhibit for the Oregon Department of Transportation's ESB US101 Davis Slough Maintenance Facility Fence Upgrade project in Coos County, Oregon. The project involves the removal of existing T-post fencing and the installation of approximately 450 linear feet of agency-supplied chain-link security fencing located along US 101 at milepost 243.2. All removed fencing material must be properly disposed of by the contractor. The project scope is focused on upgrading the security fencing infrastructure at this maintenance facility location, with the agency providing the chain-link materials for installation.

The exhibit document serves as the project location details reference, specifying the geographic coordinates and site information necessary for contractors to understand the exact location and scope of work along the US 101 corridor in Coos County. This documentation is part of the bidding package and provides contractors with critical site-specific information required for accurate project estimation and execution planning.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 6

ESB US101: DAVIS SLOUGH MAINTENANCE FACILTY PERIMETER FENCE UPGRADE

WORK TO BE PERFORMED:

Complete the following work in accordance with the contract Special Provisions and Specifications:

• The Contractor shall identify and mark the existing fence line on-site and install the new fence along the same alignment.

• The Contractor shall demo and haul off the existing fence and dispose of it accordingly.

• The Contractor shall not remove the entire existing fence at one time. The contractor shall ensure that no sections of the site remain open or unfenced overnight. Temporary fencing shall be provided and maintained as necessary to secure all open areas during construction.

• Construct 450 feet of Chain Link Fence in accordance with Section 01050 and RD815.

US101: MP 243.2 – LOCATION OF WORK TO BE DONE:

PROJECT LOCATION

EXHIBIT 2 – ESB US101: DAVIS SLOUGH MAINTENANCE FACILITY

PERIMETER FENCE UPGRADE

REMOVE 450 FEET

OF EXISITNG BARBED

WIRE FENCE

EXHIBIT 2 – ESB US101: DAVIS SLOUGH MAINTENANCE FACILITY

PERIMETER FENCE UPGRADE

CONNECT NEW

CHAIN LINK FENCE

TO EXISTING STEEL

POSTS