This is a Project Location Details exhibit for the Oregon Department of Transportation's ESB US101 Davis Slough Maintenance Facility Fence Upgrade project in Coos County, Oregon. The project involves the removal of existing T-post fencing and the installation of approximately 450 linear feet of agency-supplied chain-link security fencing located along US 101 at milepost 243.2. All removed fencing material must be properly disposed of by the contractor. The project scope is focused on upgrading the security fencing infrastructure at this maintenance facility location, with the agency providing the chain-link materials for installation.
The exhibit document serves as the project location details reference, specifying the geographic coordinates and site information necessary for contractors to understand the exact location and scope of work along the US 101 corridor in Coos County. This documentation is part of the bidding package and provides contractors with critical site-specific information required for accurate project estimation and execution planning.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT 6
ESB US101: DAVIS SLOUGH MAINTENANCE FACILTY PERIMETER FENCE UPGRADE
WORK TO BE PERFORMED:
Complete the following work in accordance with the contract Special Provisions and Specifications:
• The Contractor shall identify and mark the existing fence line on-site and install the new fence along the same alignment.
• The Contractor shall demo and haul off the existing fence and dispose of it accordingly.
• The Contractor shall not remove the entire existing fence at one time. The contractor shall ensure that no sections of the site remain open or unfenced overnight. Temporary fencing shall be provided and maintained as necessary to secure all open areas during construction.
• Construct 450 feet of Chain Link Fence in accordance with Section 01050 and RD815.
US101: MP 243.2 – LOCATION OF WORK TO BE DONE:
PROJECT LOCATION
EXHIBIT 2 – ESB US101: DAVIS SLOUGH MAINTENANCE FACILITY
PERIMETER FENCE UPGRADE
REMOVE 450 FEET
OF EXISITNG BARBED
WIRE FENCE
EXHIBIT 2 – ESB US101: DAVIS SLOUGH MAINTENANCE FACILITY
PERIMETER FENCE UPGRADE
CONNECT NEW
CHAIN LINK FENCE
TO EXISTING STEEL
POSTS