This is a Report of the Traffic Engineers prepared by LeighFisher for Miami-Dade County Aviation Department regarding the proposed issuance of Aviation Revenue Bonds, Series 2025A (AMT), Series 2025B (Non-AMT), and Series 2025C (Taxable). The report evaluates the County's ability to generate revenues sufficient to satisfy Rate Covenant requirements under the Trust Agreement throughout the forecast period of Fiscal Years 2025 through 2031. The proposed 2025ABC Bonds are being issued to refund $180 million in outstanding Commercial Paper Notes, Series 2021, finance approximately $320 million in capital improvements, and pay associated costs of issuance and capitalized interest. The Capital Improvement Program totals $7.46 billion in project costs expected through the mid-2030s, with approximately $1.19 billion (15.9%) expended through FY 2024. Major CIP elements include South Terminal Expansion ($616.7 million), Terminal Wide Projects ($444.8 million), North Terminal improvements ($358.8 million), Central Terminal redevelopment ($249.6 million), and Terminal Wide Roof replacement ($261.7 million), among 24 subprograms collectively addressing terminal, landside, airfield, cargo, and support facilities at Miami International Airport and four general aviation airports in the system.
The financial analysis projects Net Revenues will be sufficient to meet Rate Covenant requirements, with debt service coverage ratios ranging from 1.48 in FY 2025 to 1.29 in FY 2031. The 2025ABC Bonds represent approximately $500 million in net proceeds, with anticipated future bond issuances totaling approximately $5.38 billion through 2030 to complete CIP funding. Funding sources include federal FAA grants ($168.9 million), state DOT grants ($95.7 million), Passenger Facility Charges pay-as-you-go ($93.9 million), Reserve Maintenance Funds ($348.7 million), previously issued Commercial Paper ($60.8 million), and other miscellaneous sources ($127.1 million). The forecast assumes enplaned passenger growth from 28.0 million in FY 2025 to 30.8 million by FY 2031, with airline cost per enplaned passenger increasing from $17.45 to $30.62. Security for the proposed bonds is provided by Net Revenues of Port Authority Properties under the Trust Agreement on a parity basis with outstanding bonds. The analysis is based on the Airline Use Agreement residual cost rate-setting methodology and accounts for Passenger Facility Charge revenues that MDAD intends to dedicate toward debt service and capital project costs.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix A
REPORT OF THE TRAFFIC ENGINEERS
on the proposed issuance of
MIAMI-DADE COUNTY, FLORIDA,
AVIATION REVENUE BONDS, SERIES 2025A (AMT),
AVIATION REVENUE BONDS, SERIES 2025B (Non-AMT), and
AVIATION REVENUE BONDS, SERIES 2025C (Taxable)
Prepared for
Miami-Dade County Aviation Department
Miami-Dade County, Florida
Prepared by
LeighFisher
San Francisco, California
February 12, 2025
Exhibit 3
[THIS PAGE INTENTIONALLY LEFT BLANK]
Mr. Ralph Cutié, Aviation Director and Chief Executive Officer
Miami-Dade County Aviation Department
P. O. Box 592075
Miami, Florida 33159
Re: Report of the Traffic Engineers
Miami-Dade County, Florida, Aviation Revenue Bonds, Series 2025A (AMT), Aviation Revenue Bonds, Series 2025B (Non-AMT), and
Aviation Revenue Bonds, Series 2025C (Taxable)
Dear Mr. Cutié:
We are pleased to submit this Report of the Traffic Engineers (the Report) on certain aspects of the proposed issuance of Aviation Revenue Bonds, Series 2025A (AMT), Aviation Revenue Bonds, Series
2025B (Non-AMT), and Aviation Revenue Bonds, Series 2025C (Taxable) (collectively, the 2025ABC
Bonds), by Miami-Dade County (the County) on behalf of the Miami-Dade County Aviation
Department (MDAD). This letter and the accompanying attachment and exhibits constitute our
Report.
The proposed 2025ABC Bonds are being issued under the Amended and Restated Trust Agreement
(the Trust Agreement) dated as of December 15, 2002, and are secured by a pledge of Net
Revenues. Capitalized terms not otherwise defined in this Report have the meanings set forth in the
Trust Agreement and the Airline Use Agreement (the AUA).
The 2025ABC Bonds are being issued to provide funds, together with other legally available funds of
MDAD, for the purposes of: (i) refunding all of MDAD’s outstanding Commercial Paper Notes, Series
2021 (AMT), previously issued to finance capital improvements, (ii) financing or reimbursing MDAD for all or a portion of the cost of certain capital improvements, (iii) making certain reserve deposits,
(iv) paying capitalized interest on the 2025ABC Bonds, and (v) paying certain costs of issuance.
The purpose of this Report is to evaluate the ability of the County to satisfy the requirements of the
Rate Covenant (defined below) of the Trust Agreement throughout the forecast period, taking into account the Outstanding Bonds, the proposed 2025ABC Bonds, and future Bonds expected to be issued for capital development through the end of the forecast period. The forecast period covers
Fiscal Year (FY) 2025 through FY 2031. The County’s fiscal year ends on September 30.
AIRPORT SYSTEM
The County owns Miami International Airport (the Airport or MIA), the principal airport serving the
Miami-Dade County region, three active general aviation airports, one decommissioned general aviation airport, and one airport used primarily for flight training. The six airports together constitute the Airport System and are operated by MDAD.
Mr. Ralph Cutié
A-2
CAPITAL IMPROVEMENT PROGRAM
MDAD has identified a Capital Improvement Program (CIP) for the Airport System, totaling $7.46 billion of project costs expected to be incurred between 2017 and the mid-2030s. MDAD categorizes the CIP into 24 subprograms. Through the end of FY 2024, approximately $1.19 billion
(15.9% of the total CIP) had been expended. A significant share of the CIP ($2.14 billion, or 28.7% of the total) is currently projected to be undertake after FY 2030 and so is not reflected in the forecasts discussed in this Report, which extend to FY 2031.
The table below summarizes the CIP costs by subprogram, and the projected spending profile.
Summary of CIP Spending by Subprogram and by Year
Miami-Dade County Aviation Department
(in thousands)
Spending ($000)
Through FY 2025 to FY 2031 &
CIP Subprogram FY 2024 FY 2030 beyond Total
MIA Central Base Apron and Utilities 78,664$ 12,341$ 17,477$ 108,482$
MIA Concourse E 237,790 55,454 38,933 332,177
MIA South Terminal Program 307,634 5,461 2,000 315,095
MIA Miscellaneous Projects 153,776 214,916 154,090 522,783
MIA Passenger Boarding Bridges 48,994 32,064 - 81,058
MIA Land Acquisition 105,519 61,652 - 167,171
MIA Terminal Wide Roof 6,315 261,685 40,000 308,000
MIA North Terminal 17,456 358,847 18,979 395,283
MIA Central Terminal 19,109 249,630 549,821 818,561
MIA Fuel Facilities 684 42,441 24,626 67,750
General Aviation Airports 35,030 171,674 8,923 215,627
Support Projects 40,143 14,782 - 54,925
MIA Airfield/Airside - 217,598 72,140 289,738
MIA South Terminal Expansion 14,939 616,678 226,001 857,618
MIA Terminal Wide Projects 19,619 444,751 56,799 521,169
MIA Cargo and Non-Terminal Buildings 7,285 376,752 133,720 517,757
MIA Landside/Roadways 4,115 138,800 44,816 187,731
Terminal Wide Restrooms 19,251 111,835 6,574 137,660
Terminal Bridge Subprogram - 19,000 - 19,000
Facilities Lifecycle Replacement (FLRP) - 93,320 - 93,320
Airport Wide Projects - 26,300 - 26,300
Conveyance Equipment Replacement - 193,500 315,000 508,500
Building Recertification 2,000 70,367 12,000 84,367
Program Contingency - - 418,412 418,412
MIA Reserve Maintenance Projects 69,297 348,789 - 418,086
Total Approved CIP 1,187,620$ 4,138,639$ 2,140,309$ 7,466,569$
Source: MDAD.
A-3
The table below summarizes funding sources for the CIP.
Summary of CIP Funding
Miami-Dade County Aviation Department
Amount
Funding Sources ($000)
Spending through 9/30/24 1,187,620$
Spending in future years
Commercial Paper previously issued (a) 60,831$
PFCs pay-as-you-go 93,892
Florida DOT grants 95,710
FAA grants 168,881
Reserve Maintenance Funds 348,738
Other funds 127,149
Subtotal 895,202$
Plus: Future Bond financing (b) 5,383,747
Total spending 10/1/24 onwards 6,278,949$
Total approved CIP 7,466,569$
(a)
(b)
Series 2025ABC Bonds (Winter 2025) 320,000$
Series 2025DE Bonds (Fall 2025) 500,000
Series 2026 Bonds (Fall 2026) 575,000
Series 2027 Bonds (Fall 2027) 650,000
Series 2028 Bonds (Fall 2028) 700,000
Series 2029 Bonds (Fall 2029) 700,000
Total Bond issues through 2029 3,445,000
Series 2030 and later Bond issues 1,938,747
Total 5,383,747$
Source: MDAD.
Note: The Series 2025ABC Bond issue is expected to total approximately $500 million of net proceeds ($180 million for Commercial Paper paydown plus $320 million of funding for project costs).
Currently outstanding Commercial Paper balances of $180 million expected to be repaid with Series 2025ABC Bond proceeds.
Including approximately the following Bond issuance timing and net new money Bond proceeds:
A-4
MDAD intends to issue Aviation Revenue Bonds to finance a portion of the CIP. Where applicable, the elements of the CIP have been, or are expected to be, reviewed and approved by the airlines as part of the majority-in-interest (MII) review process. As of the date of this Report, approximately
$3.67 billion of improvements have been MII reviewed and approved by the airlines. For purposes of this Report, the proposed 2025ABC Bonds and the anticipated future Bonds required to complete the CIP (except for the anticipated Bond issuance to be undertaken to fund capital spending after FY
2030) have been included in the financial analysis.
MDAD expects to continue to develop and finance needed capital improvements at the Airport, including repair and rehabilitation of existing facilities and development of new facilities to accommodate anticipated airline traffic demand at the Airport over the long-term. These projects would only be undertaken as needed, based on market demand for airfield facilities, terminal facilities, gates, and landside facilities.
MDAD is currently reviewing its capital needs for the long-term and expects to add projects totaling approximately $4.5 billion in cost that are in addition to the current $7.4 billion CIP, and are not reflected in the financial projections described in this Report. The specifics of project scopes, costs and timing of development are yet to be determined, but substantially all of the associated additional capital spending is expected to occur beyond the forecast period described in this Report.
TRUST AGREEMENT
The County issues Aviation Revenue Bonds for improvements to the Airport System on behalf of
MDAD pursuant to the terms and conditions set forth in the Trust Agreement between the County and the Trustee and Co-Trustee. Aviation Revenue Bonds are special, limited obligations of the
County payable solely from and secured by Net Revenues of the Port Authority Properties (PAP), which generally includes all properties in the Airport System, except for third-party-financed facilities. The faith and credit of the County are not pledged to the payment of Aviation Revenue
Bonds. Principal and Interest Requirements on Outstanding Bonds are payable from the Sinking
Fund, to which the County has covenanted to deposit sufficient Net Revenues after retention of an operating reserve. Discussions in this Report regarding the Trust Agreement and the AUA are not intended to be comprehensive or definitive, and all such references are qualified in their entirety by reference thereto.
Security for the Proposed 2025ABC Bonds
The proposed 2025ABC Bonds are to be issued under the Trust Agreement on a parity basis with other Outstanding Bonds and are likewise to be secured by Net Revenues. The proposed 2025ABC
Bonds are to be issued as fixed-rate debt.
Pursuant to the Trust Agreement, unless otherwise provided by resolution of the Board of County
Commissioners (the Board), Passenger Facility Charge (PFC) revenues are excluded from Revenues and, therefore, are not included in Net Revenues, and are not pledged to the payment of the
Aviation Revenue Bonds. However, MDAD has historically elected to use PFC revenues to pay principal and interest on Aviation Revenue Bonds and plans to continue to do so in the future at its discretion. Pursuant to the Trust Agreement, Principal and Interest Requirements exclude the amount of funds set aside or deposited for debt service payments in the Bond Service Account.
A-5
Thus, for purposes of this Report, principal and interest expected to be paid from PFC revenues are excluded in computing Principal and Interest Requirements for the corresponding forecast fiscal years. Assumptions regarding the use of PFC revenues to pay Principal and Interest Requirements are as described in this Report.
Customer facility charge (CFC) revenues are also not included in the definition of Revenues under the
Trust Agreement. CFC revenues are used to pay the operating costs of the Rental Car Center (RCC), among other uses.
Rate Covenant
Section 501 of the Trust Agreement (the Rate Covenant) provides that Revenues will, at all times, be sufficient to: (1) provide funds for the payment of Current Expenses; (2) provide for making deposits to the Reserve Maintenance Fund in the amounts recommended by the Consulting Engineers; and
(3) provide for (a) deposits to the Sinking Fund (other than the Reserve Account) that in each fiscal year will equal not less than 120% of the Principal and Interest Requirements due in that fiscal year and (b) deposits to the Reserve Account and payments to reimburse providers of Reserve Facilities.
AIRLINE AGREEMENTS
In addition to the Trust Agreement, the AUA with the airlines operating at the Airport is also a key document governing MDAD’s financial operations.
Airline Use Agreement
The County has entered into separate but substantially similar AUAs with various airlines serving the
Airport (the Signatory Airlines). The AUA became effective on August 10, 2018, for approximately a
15-year term through April 30, 2033. The AUA provides that the County, acting through the Board, has the right to calculate a landing fee using an Airport System residual methodology, and to collect such fee from the Signatory Airlines so that related revenues together with revenues from other sources will, at all times, be sufficient to meet the Revenue Requirement, including (1) the Rate
Covenant and other requirements under the Trust Agreement; (2) certain other requirements, including funding of certain indebtedness payable from moneys in the Improvement Fund; and
(3) funding of a discretionary capital account. The Revenue Requirement is described in detail later in this Report.
The Signatory Airlines have agreed to pay landing fees as long as they operate at the Airport or at any other airport in the Airport System. If any airline ceases operations at the Airport System, then it would have no obligation to pay landing fees, and the landing fees payable by other Signatory
Airlines would, other things being equal, be increased to make up for the landing fee revenue that would otherwise have been received from airlines terminating service.
A-6
Substantially all of the airlines operating at MIA have signed the AUA. American Airlines and its affiliate, American Eagle*, accounted for approximately 60.2% of all enplaned passengers at the
Airport during FY 2024.
Terminal Building Lease Agreements
MDAD has also entered into separate but substantially similar Terminal Building Lease Agreements
(TBLA) with various airlines (including American Airlines) providing for the general right of the
Signatory Airlines to use and occupy space in the passenger terminal premises for a 5-year term, and the specific right to designated lease space as identified in that airline’s TBLA. Under the TBLA, the separate provisions for specific space are subject to cancellation by either party on 30-days’ notice.
SCOPE OF THE REPORT
This Report was prepared to evaluate the ability of the County to generate Revenues sufficient to satisfy the requirements of the Rate Covenant throughout the forecast period, taking into account
Outstanding Bonds, the proposed 2025ABC Bonds, and anticipated future series of Aviation Revenue
Bonds to be issued during the forecast period to complete projected CIP spending through FY 2030.
In preparing the Report, we analyzed:
Future airline traffic demand at the Airport, considering the demographic and economic characteristics of the region served; historical trends in airline traffic; recent airline service development and airfares; and other key factors that may affect future airline traffic at the
Airport
The status, schedule, and estimated costs of the CIP
Historical and future awarded and anticipated grants from the Federal Aviation
Administration (FAA), the State of Florida, and the Transportation Security Administration
(TSA)
Sources and uses of funds and annual Principal and Interest Requirements for the proposed
2025ABC Bonds and the anticipated future Bonds
Historical relationships among revenues, expenses, and airline traffic at the Airport
Historical and forecast PFC revenues, and MDAD’s intention to use PFC revenues to reduce the amount of the Principal and Interest Requirements and to pay capital project costs on a pay-as-you-go basis during the forecast period
Historical financial results for the Airport System, estimated unaudited FY 2024 financial results, the FY 2025 budget, projected staffing requirements, and other operational considerations
*All references to American Eagle in this Report, unless otherwise noted, refer to American Eagle Airlines together with other regional affiliates of American Airlines operating under the American Eagle brand.
A-7
The County’s policies and contractual arrangements relating to the use and occupancy of
Airport System facilities, including the calculation of airline rentals, fees, and charges under the AUA; the operation of concession privileges; and the leasing of buildings and grounds
We have relied upon MDAD and its other consultants regarding the status of the CIP and plan for future projects, including Hilltop Securities Inc., MDAD’s financial advisor, for the projected debt service on the proposed 2025ABC Bonds and anticipated future Bonds for the CIP.
We also identified key factors upon which the future financial results of the Airport System may depend and, with MDAD management, formulated assumptions about those factors. Based on those assumptions, we assembled the financial forecasts presented in the exhibits provided at the end of this Report.
SUMMARY OF FORECASTS
As shown in Exhibit G and the table below, the residual cost rate-setting methodology for computing landing fee rates is forecast to result in calculated Net Revenues sufficient to meet the requirements of the Rate Covenant, based on the assumption that the passenger and all-cargo airlines will collectively pay landing fees and other rentals, fees, and charges calculated under the AUA.
Principal and Interest Requirements shown in the table below are net of PFC revenues MDAD has deposited or intends to deposit for the payment of debt service.
The table also presents estimates and forecasts of passenger airline payments to MDAD in the form of terminal rentals, landing fees, and other charges under the AUA, expressed on a per enplaned passenger basis. The landing fees, passenger terminal rentals and user fees, and related terminal charges paid by the passenger airlines are often expressed in relation to numbers of enplaned passengers; the ratio is known as airline payments per enplaned passenger, or cost per enplaned passenger (CPE). The CPE represents the average unit cost paid to an airport operator by the passenger airlines serving the Airport.
A-8
Summary of Forecasts
Miami-Dade County Aviation Department
For Fiscal Years Ending September 30
(in thousands, except ratios)
Assumptions Underlying the Financial Forecasts
The financial forecasts are based on information and assumptions that were provided by, or reviewed with and agreed to by, MDAD management. Accordingly, the forecasts reflect management’s expected course of action during the forecast period and, in management’s judgment, present fairly the expected financial results of the Airport System.
Those key factors and assumptions that are significant to the forecasts are set forth in the attachment, “Background, Assumptions, and Rationale for the Financial Forecasts.” The attachment should be read in its entirety for an understanding of the forecasts and the underlying assumptions.
In our opinion, the underlying assumptions provide a reasonable basis for the forecasts. However, any forecast is subject to uncertainties and there can be no assurance that the forecast financial results will be realized. Inevitably, some assumptions will not be realized, and unanticipated events and circumstances may occur. Therefore, there are likely to be differences between the forecast and actual results, and those differences may be material. Neither LeighFisher nor any person acting on behalf of LeighFisher makes any warranty, expressed or implied, with respect to the information, assumptions, forecasts, opinions, or conclusions disclosed in the Report.
We have no responsibility to update this Report for events and circumstances occurring after the date of the Report.
Budget
2025 2026 2027 2028 2029 2030 2031
Enplaned Passengers 28,000 28,300 28,800 29,300 29,800 30,300 30,800
% change 1.1% 1.8% 1.7% 1.7% 1.7% 1.7%
Revenues (a) 1,056,817$ 1,116,826$ 1,208,371$ 1,334,802$ 1,435,942$ 1,554,172$ 1,655,629$
Interest income 22,184 17,324 17,264 17,568 18,390 19,612 20,872
Current Expenses (736,756) (788,594) (828,024) (869,425) (916,548) (975,035) (1,023,787)
Net Revenues 342,245$ 345,556$ 397,611$ 482,945$ 537,784$ 598,749$ 652,715$
Deposit to Reserve Maint. Fund (40,000) (40,000) (40,000) (40,000) (40,000) (40,000) (40,000)
302,245$ 305,556$ 357,611$ 442,945$ 497,784$ 558,749$ 612,715$
Gross Debt Service 362,050$ 384,979$ 420,343$ 460,995$ 505,306$ 554,016$ 602,075$
Deposit of PFC revenues and set-asides (158,000) (166,000) (156,000) (126,000) (126,000) (126,000) (126,000)
Net Debt Service 204,050$ 218,979$ 264,343$ 334,995$ 379,306$ 428,016$ 476,075$
Debt Service Coverage 1.48 1.40 1.35 1.32 1.31 1.31 1.29
Airline Cost per Enplaned Passenger 17.45$ 19.60$ 21.87$ 24.48$ 26.28$ 28.81$ 30.62$
(a) Excluding interest income.
Sources: MDAD for Budget FY 2025; LeighFisher for Forecast.
Forecast
A-9
We appreciate the opportunity to assist the County and MDAD on this proposed financing.
Respectfully submitted, LEIGHFISHER
A-10
A-11
Attachment
BACKGROUND, ASSUMPTIONS, AND RATIONALE
FOR THE FINANCIAL FORECASTS
REPORT OF THE TRAFFIC ENGINEERS
on the proposed issuance of
MIAMI-DADE COUNTY, FLORIDA,
AVIATION REVENUE BONDS, SERIES 2025A (AMT),
AVIATION REVENUE BONDS, SERIES 2025B (Non-AMT), and
AVIATION REVENUE BONDS, SERIES 2025C (Taxable)
A-12
A-13
CONTENTS
Page
OVERVIEW ................................................................................................................................ A-19
Airports in the System ................................................................................................. A-19
Existing Facilities at Miami International Airport ........................................................ A-20
Terminal Facilities .............................................................................................. A-20
Landside Facilities .............................................................................................. A-21
Airfield Facilities ................................................................................................ A-22
Cargo and Other Facilities ................................................................................. A-23
Capital Improvement Program .................................................................................... A-23
AVIATION DEMAND AND AIRLINE TRAFFIC ANALYSIS .............................................................. A-29
Airport Service Region ................................................................................................. A-29
Demand for Passenger and Cargo Service .................................................................. A-31
Economy of the Airport Service Region............................................................. A-31
Key International Markets ................................................................................. A-47
International Trade Sector ................................................................................ A-57
Airline Service and Traffic ............................................................................................ A-62
Airport Rankings and Roles ............................................................................... A-64
Airline Service at the Airport and Competing Airports ..................................... A-77
Historical Airline Traffic at the Airport .............................................................. A-88
Key Factors Affecting Future Airline Traffic ................................................................. A-96
National Economic Conditions .......................................................................... A-96
International Economic and Geopolitical Conditions ........................................ A-97
Financial Health of the Airline Industry ............................................................. A-97
Airline Consolidation ......................................................................................... A-99
Airline Service and Routes ................................................................................. A-100
Airline Competition and Airfares ....................................................................... A-100
Availability and Price of Aviation Fuel ............................................................... A-101
Aviation Safety and Security Concerns .............................................................. A-102
Public Health Concerns ...................................................................................... A-103
Climate Change Concerns .................................................................................. A-104
Capacity of the National Air Traffic Control System .......................................... A-104
Capacity of the Airport ...................................................................................... A-105
Airline Traffic Forecasts ............................................................................................... A-105
Airline Traffic Forecast Assumptions ................................................................. A-105
Passenger Forecast Summary ............................................................................ A-106
Landed Weight Forecast .................................................................................... A-106
FINANCIAL ANALYSIS ................................................................................................................ A-110
Framework for Financial Operations ........................................................................... A-110
The Trust Agreement ......................................................................................... A-110
Net Revenues..................................................................................................... A-110
A-14
CONTENTS (continued)
Page
Application of Revenues .................................................................................... A-110
Rate Covenant ................................................................................................... A-111
Conditions for Issuing Additional Bonds............................................................ A-111
Airline Agreements and Related Fees ......................................................................... A-113
Airline Use Agreement ...................................................................................... A-113
Key Nonairline Agreements ............................................................................... A-117
The Passenger Facility Charge Program ...................................................................... A-117
Bond Issuance and Debt Service ................................................................................. A-118
The Proposed 2025ABC Bonds and Anticipated Future Bonds ......................... A-118
Debt Service Paid from PFC Revenues .............................................................. A-119
Other Debts Payable from Revenues ................................................................ A-119
Current Expenses ......................................................................................................... A-120
Revenues ..................................................................................................................... A-120
Aviation Fees ..................................................................................................... A-120
Commercial Revenues ....................................................................................... A-122
Rental Revenues ................................................................................................ A-125
General Aviation Airports Revenues ................................................................. A-126
Other Revenues ................................................................................................. A-126
Passenger Airline Payments ........................................................................................ A-126
Application of Revenues .............................................................................................. A-126
Rate Covenant Compliance and Debt Service Coverage ............................................. A-127
A-15
TABLES
Page
1 Gate Distribution and Use by Concourse .......................................................................... A-21
2 Public Parking Facilities ...................................................................................................... A-22
3 Capital Improvement Program Costs ................................................................................ A-26
4 Capital Improvement Program Funding Plan .................................................................... A-28
5 Economic Projections for the U.S. Economy ..................................................................... A-33
6 Economic Projections for the State and Airport Service Region ....................................... A-35
7 Historical and Projected Population Trends ...................................................................... A-37
8 Total Nonagricultural Employment Trends ....................................................................... A-39
9 Per Capita Personal Income Trends ................................................................................... A-40
10 Visitors to Miami-Dade County ......................................................................................... A-42
11 Top 10 Domestic Overnight Visitors .................................................................................. A-43
12 Top 10 International Overnight Visitors ............................................................................ A-43
13 Cruise Ship Passengers ...................................................................................................... A-45
14 PortMiami Trade ................................................................................................................ A-46
15 Latin America and The Caribbean: Historical Economic Indicators ................................... A-50
16 Latin America and The Caribbean; Selected Economic Indicators .................................... A-52
17 Miami Customs District Exports and U.S. Total ................................................................. A-58
18 Miami Customs District Imports and U.S. Total ................................................................ A-59
19 Historical Enplaned Passengers by Airline Group .............................................................. A-63
20 Enplaned Passengers at Top-Ranking U.S. Airports ........................................................... A-65
21 Originating Passengers at Top-Ranking U.S. Airports ........................................................ A-66
22 Connecting Passengers at Top-Ranking U.S. Airports ....................................................... A-67
23 International Passengers at Top-Ranking U.S. Airports ..................................................... A-68
A-16
TABLES (continued)
Page
24 Scheduled Departing Seats on Flights Operated by American at U.S. Airports ................ A-69
25 American Airlines Enplaned Passengers at its Principal Airports ...................................... A-70
26 Scheduled Departing Seats by Alliance Group .................................................................. A-72
27 Scheduled International Departing Seats, by World Region Destination .......................... A-74
28 Comparative Trends in International Air Cargo ................................................................. A-76
29 Trends in Scheduled Passenger Service ............................................................................. A-81
30 Domestic Originating Patterns and Airline Service ............................................................ A-84
31 International Departing Passengers by World Region ...................................................... A-85
32 Ranking of Cities in the United States by Gateway Shares of International
Departing Passengers ........................................................................................................ A-87
33 Historical Enplaned Passengers, by Component ............................................................... A-88
34 Airline Market Shares of Enplaned Passengers ................................................................. A-92
35 Trends in Total Air Cargo Tonnage, by Type of Airline ...................................................... A-93
36 Summary of Airlines Reporting Air Cargo .......................................................................... A-94
37 Airline Market Shares of Air Cargo Tonnage ..................................................................... A-95
38 Enplaned Passenger Forecast ............................................................................................ A-108
39 Forecasts of Departing Seats, Flight Operations, and Aircraft Landed Weight ................. A-109
40 Summary of Key Provisions of the AUA ............................................................................. A-114
41 Bond Financing Assumptions ............................................................................................. A-118
42 FY 2024 Revenues .............................................................................................................. A-121
A-17
FIGURES
Page
1 Airport Layout Plan ............................................................................................................ A-20
2 Airport Service Region ....................................................................................................... A-30
3 Historical Enplaned Passengers ......................................................................................... A-62
4 Passengers Enplaned on Flights from the United States to Cuba ..................................... A-75
5 U.S. Airport Served by Daily Scheduled Nonstop Passenger Flights ................................. A-78
6 Airports in Mexico, Central America, South America, and the Caribbean Served by Scheduled Nonstop Passenger Flights .......................................................................... A-79
7 Transatlantic Destinations Served by Scheduled Nonstop Passenger Flights ................... A-80
8 Enplaned Passengers ......................................................................................................... A-82
9 Trends in Domestic Originating Passengers and Airline Fares .......................................... A-83
10 Enplaned Passenger Trends by Passenger Segment ......................................................... A-89
11 Originating Passenger Trends by Type of Passenger ......................................................... A-90
12 Historical Enplaned Passengers on U.S. Airlines ................................................................ A-97
13 Net Income for U.S. Airlines .............................................................................................. A-98
14 Historical Domestic Yield for U.S. Airlines ......................................................................... A-101
15 Historical Monthly Jet Fuel Prices for U.S. Airlines ............................................................ A-102
16 Enplaned Passenger Forecast ............................................................................................ A-107
17 Application of Port Authority Properties Revenues Under the Trust Agreement ............. A-112
A-18
EXHIBITS
Page
A Sources and Uses of Funds ................................................................................................ A-128
B Principal and Interest Requirements ................................................................................. A-129
C Passenger Facility Charge Revenues .................................................................................. A-130
D Current Expenses ............................................................................................................... A-131
E Revenues ........................................................................................................................... A-132
E-1 Airline Landing Fees ........................................................................................................... A-133
E-2 Terminal and Concourse Use Fees and Revenues ............................................................. A-134
E-3 Airline Payments per Enplaned Passenger ........................................................................ A-135
F Application of Revenues .................................................................................................... A-136
G Rate Covenant Compliance ............................................................................................... A-137
A-19
OVERVIEW
Miami-Dade County operates the Airport System through MDAD with policy guidance from the
County Mayor and the Board of County Commissioners (the Board). The County operates under a strong mayoral form of government; the Mayor is the chief administrative officer and appoints the
Aviation Director, who serves as the chief administrative officer of MDAD. MDAD operates the
Airport System as a financially self-sufficient entity, without property tax or budgetary support from the County.*
In 1973, the Board established the Dade County Aviation Department as the successor organization to the Dade County Port Authority and, in 1997, this organization was renamed the Miami-Dade
Aviation Department to reflect the change in the County’s name to Miami-Dade County. The term
“Port Authority Properties” (PAP) as used in the Trust Agreement remains in effect.
PAP includes all properties financed or refinanced by debt obligations issued under the Trust
Agreement and any other properties added to the PAP pursuant to Section 1308 of the Trust
Agreement. PAP generally includes all land in the Airport System, the runways and taxiways in the
Airport System, the passenger terminal building at the Airport, and most other infrastructure of the
Airport System.
The County pledges Net Revenues derived from PAP to secure bonds issued under the Trust
Agreement. All properties that were not financed or refinanced using bonds backed by PAP revenues or that were not converted to PAP status under Section 1308 of the Trust Agreement are referred to herein as Non-Port Authority Properties (NPAP). Such properties are mainly tenant-financed cargo facilities and may include other types of tenant-financed facilities. Any NPAP can be added to PAP subject to the provisions of Section 1308 of the Trust Agreement. As of the date of this Report, the County has no plan to add any existing NPAP to PAP under the Trust Agreement.
AIRPORTS IN THE SYSTEM
The Airport System consists of five active airports and one decommissioned airport. MIA is the only commercial-service airport in the Airport System and accounted for approximately 98% of the
Revenues of the Airport System in FY 2024. MIA occupies approximately 3,230 acres of land in the unincorporated area of the County, approximately 7 miles west of the downtown area of the City of
Miami and 9 miles west of the City of Miami Beach.
Miami-Opa-locka Executive Airport is the largest general aviation airport in the Airport System and is designated as a reliever to MIA. Kendall-Tamiami Executive Airport is one of the busiest general aviation airports in Florida. Homestead General Aviation Airport serves sport, agricultural, and other private users. Dade-Collier Training and Transition Airport is used for commercial air carrier and military flight training. Opa-locka West Airport was decommissioned in 2006.
*In 2010, the County issued Double-Barreled Aviation Bonds (General Obligation), Series 2010 to fund certain projects at the Airport, which were refunded in October 2020 (the 2020 Double-Barreled Bonds). Debt service on the 2020 Double-Barreled Bonds is expected to be paid from airline rentals, fees, and charges during the forecast period.
A-20
EXISTING FACILITIES AT MIAMI INTERNATIONAL AIRPORT
Existing facilities at the Airport include terminal, landside, airfield, cargo, and other facilities.
Terminal Facilities
Figure 1 shows the Airport Layout Plan (ALP) for MIA. The terminal complex at MIA consists of a single horseshoe-shaped passenger terminal with six concourses (designated by a letter code) radiating from the passenger terminal building. Counterclockwise from the northeast, the concourses are D*, E, F, G, H, and J.
Figure 1
Airport Layout Plan
MIC = Miami Intermodal Center; RCC = Rental Car Center.
*Former Concourses A-D were renamed Concourse D in 2009.
A-21
Concourse D and the associated terminal areas are referred to as the North Terminal. Concourses E, F, and G and associated terminal areas between those concourses are referred to as the Central
Terminal. Concourses H and J, together with the associated terminal area between those concourses, are referred to as the South Terminal. Table 1 shows the distribution and use of gates by concourse.
Table 1
Gate Distribution and Use by Concourse
Miami International Airport
(gate counts as of November 2024; departures and seats for March 2025)
Notes: Numbers may not add to totals shown because of rounding.
Excludes charter (non-scheduled) activity.
Gate utilization data provided by MDAD was used to estimate the number of departures and seats on American Airlines in concourses D and E.
(a) Including E Satellite, with one preferential gate and 8 common use gates (9 total).
Sources: MDAD; Airline Data Inc, Schedules database, accessed December 2024.
Federal Inspection Services (FIS) centers for U.S. Immigration and Customs Enforcement are located in Concourse E, Concourse J, and in the North Terminal. Passengers on international flights arrive at the Airport through the dual-purpose gates located on Concourses D, E, F, H, and J, which could accommodate both international and domestic operations. MIA’s terminals also provide facilities and services for processing interline and international in-transit passengers. Additional facilities include the 259-room Miami International Airport Hotel (the Hotel), owned by MDAD and located within the terminal building near Concourse E.
Landside Facilities
Table 2 presents the number of public parking spaces at MIA as of September 2024. Most of the parking spaces are provided in two parking garages, referred to as the Dolphin and Flamingo
Average daily departures
Gates Per Per
Preferential Common Total Number gate Number departure
North Terminal
Concourse D 61 - 61 333.9 5.5 52,029.9 156
North Terminal 61 - 61 333.9 5.5 52,029.9 156
Central Terminal
Concourse E (a) 8 11 19 62.9 3.3 11,661.3 185
Concourse F 4 10 14 41.1 2.9 8,265.9 201
Concourse G 4 9 13 23.4 1.8 3,777.2 162
Central Terminal 16 30 46 127.4 2.8 23,704.4 186
South Terminal
Concourse H 8 5 13 69.0 5.3 12,525.4 182
Concourse J - 15 15 50.2 3.3 11,056.3 220
South Terminal 8 20 28 119.1 4.3 23,581.7 198
AIRPORT TOTAL 85 50 135 580.4 4.3 99,316.1 171
Average daily departing seats
A-22 garages, located within the semicircle formed by the passenger terminal building and its access roadway.
Direct access to the bi-level roadway serving the passenger terminal building is provided via NW
21st Street. LeJeune Road (NW 42nd Avenue), which borders the Airport on the east, is the arterial road feeding NW 21st Street. LeJeune Road draws traffic from the north via State Road 112 (Airport
Expressway) and Okeechobee Road, and from the south via State Road 836 (Dolphin Expressway) and Flagler Street. Airport Expressway and Dolphin Expressway connect with north-south
Interstate 95 east of the Airport. A four-lane roadway directly connects Airport Expressway with
Airport property, bypassing LeJeune Road. Dolphin Expressway connects with north-south State
Road 826 (Palmetto Expressway) and the Florida Turnpike west of the Airport.
Table 2
Public Parking Facilities
Source: MDAD, September 2024.
The Florida Department of Transportation (FDOT) financed and constructed a Rental Car Center in the Miami Intermodal Center (MIC). The MIC is the connecting point from the Metrorail, an elevated rapid transit system in South Florida, to the MIA Mover, which is an automated people mover system that connects the MIC/RCC with the terminal complex.
Airfield Facilities
The Airport has four air carrier aircraft runways, consisting of three parallel east-west runways
(8L-26R, 9-27, and 8R-26L) and a crosswind northwest-southeast runway (Runway 12-30). The parallel runways are 10,500 feet, 13,000 feet, and 8,600 feet long, respectively, and Runway 12-30 is
9,355 feet long. Runways 8L-26R, 9-27, and 12-30 are each 150 feet wide, and Runway 8R-26L is
200 feet wide. Runways 8R-26L and 9-27 can accommodate all passenger aircraft currently in use and are equipped with parallel precision approach capabilities. Runways 9-27, 8R-26L, and 12-30
Parking Facilities Spaces
Garage parking
Dolphin Garage 4,065
Flamingo Garage 3,009
Park 1 Garage 318
Total garage parking 7,392
Other
High-vehicle 57
Economy Park & Ride 350
Valet parking 242
Total other spaces 649
Total parking spaces 8,041
A-23 provide for Category I instrument landing system precision approaches and Runway 8L-26R, provides for nonprecision localizer-only approaches.
Cargo and Other Facilities
Cargo and other facilities are concentrated on the north and west sides of the Airport. The cargo warehouse areas serve a combination of belly cargo (cargo carried in the belly compartments of passenger aircraft) and freighter cargo (cargo carried in dedicated all-cargo aircraft). Other facilities include aircraft maintenance hangars and shops; aircraft simulator and flight training facilities; test cell engine facilities; a Cargo Clearance Center that houses U.S. Customs and Border Protection, the
U.S. Department of Agriculture and the Food and Drug Administration; a fixed base operator (FBO) and General Aviation Center; two aircraft rescue and firefighting (ARFF) stations; a U.S. Postal
Service center; and the FAA’s Airport Traffic Control Tower and Terminal Radar Approach Control facility.
CAPITAL IMPROVEMENT PROGRAM
MDAD has identified a Capital Improvement Program (CIP) for the Airport System, totaling $7.46 billion of project costs expected to be incurred between 2017 and the mid-2030s. MDAD categorizes the CIP into 24 subprograms. Through the end of FY 2024, approximately $1.19 billion
(15.9% of the total CIP) had been expended. A significant share of the CIP ($2.14 billion, or 28.7% of the total) is currently projected to be undertake after FY 2030.
Among the major elements of the CIP are following:
South Terminal Expansion (estimated cost of $616.7 million between FY 2025 and FY 2030):
The major component of this subprogram consists of the MIA South Terminal Expansion East
Phase 1 (Building-Apron, South Terminal Ground Service Equipment (GSE) & 20th Street
Modifications) which comprises one major project that will include scope for the South
Terminal Expansion East; the South Terminal Apron and Utilities Relocation; and the GSE
Building. The South Terminal Expansion includes a three-level expansion of the South
Terminal to the east. It will add six domestic contact gates with their associated holdrooms and facilities along with three hardstand positions. The new facility will include baggage systems and connections to the existing Central and South Terminals baggage screening system.
Terminal Wide Projects (estimated cost of $444.8 million between FY 2025 and FY 2030):
This subprogram includes tenant relocation to support the south and central terminal projects, CBP Network and Circuit Upgrades, Police/Fire Microwave System Relocation, the
MIA Terminal Wide Two-Way Radio MDFR, and the MIA Public Address System Infrastructure hardware upgrade. Scope also includes the passenger boarding bridges (PBB) Phase II project, which consists of the replacement of 35 PBBs throughout the concourses. The scope includes PC Air, hose management systems, Visual Docking Guidance System interlock and safe-gate, potable water cabinets, pre-cool DX systems, glycol pumps supports and
400Hz. The subprogram also includes the MIA Security Checkpoints Upgrades at South
Terminal, Central Terminal, and North Terminal D2, replacing the existing x-ray machines with full size automated screening lanes that will provide a higher throughput of passengers per lane, greatly improving passenger flow. Also included in this subprogram are the MIA
Central and South Terminal Bag Claim Optimization Phase 2 projects which will replace the existing domestic baggage claim devices in the Central and South Terminals that have
A-24 reached the end of their useful life. The Concourse F-to-H Interconnector will provide secure and sterile connectivity from Concourse F to Concourse J and improve efficiencies in security checkpoints that will improve MIA passenger circulation and airline operations.
Cargo and Non-Terminal Buildings (estimated cost of $376.8 million between FY 2025 and
FY 2030): This subprogram consists of multiple projects, including the demolition of several buildings; the environmental assessment and remediation of these buildings; and tenant relocations. The apron and airside improvements to Building 702 to convert it from belly cargo to a freight cargo facility are part of this subprogram. The subprogram also includes a new GSE Facility for the North Terminal, and the Consolidated Office Complex which consists of the Landside & Finance Division and Administration Offices Relocation to Terminal D. Part of this subprogram are also the West Cargo Truck Parking, AAR-Group III Aircraft Hangar
Facility with a three-story back support Shop, a GSE facility, and the IBC Airways construction of a two-story hangar/office building with ramp/apron improvements.
North Terminal (estimated cost of $358.8 million between FY 2025 and FY 2030): This includes the Concourse D West Extension - D60 (Building Expansion and Apron & Utilities) project which consists of the redevelopment of North Terminal’s Regional Commuter Facility to serve larger aircraft and to provide adequate holdroom space and improve the passenger experience. The subprogram includes the MIA North Terminal Ramp Level Restrooms project which encompasses the modification/upgrade of nine existing employee restrooms and construction of three new ones at the ramp level of the North Terminal area to comply with Florida Building Code and meet AA operational needs based on current occupancy loads. In addition, the MIA North Terminal Gate Infrastructure Upgrades, and MIA North
Terminal Gate Optimization projects which are currently under schematic design are part of this subprogram and consist of up-gauging gates for larger aircraft. Another project added to the subprogram is the North Terminal Baggage System TSA Recapitalization project that includes upgrades to the existing in-line TSA screening equipment within the North Terminal
Baggage Handling System (BHS). The implementation of this project is required to meet current TSA and Department security requirements. The North Terminal Additional Skytrain
Vehicles that includes scope to purchase additional four-car train (two (2)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .