This is a Statement of Work for the PIP-II Main Ring Crossing construction project at Fermi National Accelerator Laboratory, dated May 7, 2026. The project, assigned ISD/Engineering project number 4-3-6A, is located in Batavia, Illinois and managed by Fermi Forward Discovery Group, LLC for the U.S. Department of Energy Office of Science.
The Subcontractor must furnish all supervision, labor, materials, tools, equipment, and appurtenances necessary to complete construction work as specified in the project drawings and technical specifications. All costs include transportation, overhead, bonding, safety oversight, quality control oversight, and supervision. The base scope of work encompasses eight primary categories: excavation and backfilling; utility relocations; subsurface bearing conditions improvement; concrete foundations, floor slabs, retaining walls and related work; electrical systems including temporary lighting and connections; plumbing systems including floor piping, underdrains, clean outs, and connections to existing systems; architectural finishes and stairs; and site work including access roads, grading, and landscaping. The document explicitly states that cost proposals must be developed by the Offeror based solely on estimates derived from the drawings, specifications, and site examination, and that the general descriptions and quantities provided are not to be used as the basis for cost proposals.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work PIP-II Main Ring Crossing Date: May 7, 2026
Description This work scope includes the construction of the project known as PIP-II Main Ring Crossing, ISD/Engineering project number 4-3-6A..
The Subcontractor will furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained within the project documents.
The Subcontractor’s scope of work is not limited to the general work outline described below. The Subcontractor will perform all work required to complete the construction work in accordance with the drawings and/or specifications. The description and quantities listed below are general in nature and are only intended to describe the range and complexity of this scope of work. The description and quantities provided below are not to be used as the basis for establishing a cost proposal. Specific quantities and definitions of the scope of work for providing a proposal will be based solely on estimates developed by the Offer from the drawings, specifications, and the information obtained from examining of the project site.
Base Scope: The base scope of work includes:
1. Excavation and backfilling.
2. Utility relocations.
3. Subsurface bearing conditions improvement.
4. Concrete foundations, floor slabs, retaining walls and related work.
5. Electrical systems including temporary lighting and related work and connections.
6. Plumbing systems including floor piping, underdrains, clean outs, connections to existing systems and related work.
7. Architectural finishes and stairs.
8. Site work including access roads, grading, landscaping and related work.
END OF DOCUMENT
PIP-II Division P.O. Box 500, MS 312 Kirk Road and Pine Street Batavia, Illinois 60510-5011
USA
Description
File details come from the government source that posted it. Updated .