Summary
This is a comprehensive set of construction plans and specifications for the Water Conserv II Water Reclamation Facility (WRF) BNR System Blower Improvements project prepared by CPH Consultants, LLC for the City of Orlando Department of Public Works. The project involves the demolition of five existing blowers and associated piping within the BNR blower building and the installation of five new blowers with updated process air piping, ductwork, and motor cooling systems. The scope includes roofing replacement (removal of existing modified bitumen roof and installation of new 60-mil PVC membrane with polyiso insulation), construction of new CMU infill walls to replace roll-up door openings, installation of motorized screen enclosures on three building openings, and associated mechanical, electrical, and structural improvements. The project location is 5420 LB McLeod Road, Orlando, Florida 32811. Construction must maintain minimum operational air capacity at all times, with a detailed six-step construction sequence specified to ensure continuity of the facility's biological nutrient removal processes serving aeration basins 1-4 and 5-10. Key coordination requirements include strict adherence to plant operation rules, restricted access through designated construction gates, prohibition of activities during chlorine tank changes, and mandatory maintenance of all plant utilities and existing operations throughout construction.
The plans specify extensive coordination requirements with the Water Conserv II Plant, including notification to Maintenance Supervisor Luis Ramos (407-709-3778) and Plant Manager Keith Jordan (407-325-5653) for all activities. The project requires compliance with the Florida Building Code 8th Edition (2023), Florida Existing Building Code, and ASCE 7-22, with all work subject to City of Orlando Building Department inspection. The concrete work includes 4,000 PSI pads for equipment and 5,000 PSI concrete for trench filling, with stainless steel Type 316 specified for all process air piping. Electrical work involves new single-line diagrams showing demolition and improvement configurations, with complete instrumentation P&IDs provided for each blower system. All piping must be pressure and leak tested per specifications, with temporary means to maintain stormwater conveyance during construction. The contractor is responsible for obtaining all permits, including the building permit with associated structural, electrical, and utility permits, and must provide as-built surveys by a Florida licensed surveyor upon completion. A SWPPP (Stormwater Pollution Prevention Plan) must be implemented for the project site, with all disturbed areas to be restored with sod rather than seed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WATER CONSERV II WRF
BNR SYSTEM
BLOWER IMPROVEMENTS
CITY OF ORLANDO
J:\O3153\Civil\DWG\_Current_Plan_Set\O3153 G-1 - COVER SHEET.dwg, 11/21/2025 2:59:27 PM
DEPARTMENT OF PUBLIC WORKS
PROJECT NO.: WAS0039_P
BUDDY DYER
MAYOR
JIM GRAY
COMMISSIONER DISTRICT 1
TONY ORTIZ
COMMISSIONER DISTRICT 2
ROBERT F. STUART
COMMISSIONER DISTRICT 3
PATTY SHEEHAN
COMMISSIONER DISTRICT 4
SHAN ROSE
COMMISSIONER DISTRICT 5
COREY F. KNIGHT, P.E.
DIRECTOR OF PUBLIC WORKS
CHRISTOPHER ANDRES, P.E.
WATER RECLAMATION DIVISION MANAGER
KRISTINA L. FRIES, P.E.
PROJECT MANAGER
LOCATION MAPVICINITY MAP
N
L B McLEOD RD
P R
E S
ID
E
N T
B A
R A
C K
O B
A M
A P
K W
Y
N
NOVEMBER 2025
BAKARI F. BURNS
COMMISSIONER DISTRICT 6
1117 East Robinson Street Orlando, FL 32801 Ph: 407.425.0452 www.cphcorp.com Building Better
Communities Together
Plans Prepared By:
State of Florida Licenses:
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
PROJECT LOCATION
5420 L B MCLEOD RD
ORLANDO, FL 32811
PROJECT LOCATION
5420 L B MCLEOD RD
ORLANDO, FL 32811
Job No.
Date:
Checked by:
Designed by:
Drawn by:
Sheet No.No. DateNo. Date Revision
THIS SHEET NOT VALID FOR CONSTRUCTION WITHOUT COMPLETE SET OF PLANS. SEE GENERAL NOTES FOR MASTER LEGEND.
Revision
B
ID
S E
T
O3153
OCTOBER 2025
BMF
RSS
DH / RBB
J:\O3153\Civil\DWG\_Current_Plan_Set\O1353 G-1A - SIGNATURE SHEETS.dwg, 11/21/2025 2:59:20 PM, Robert Luo, Convert - Cph Fullsize.stb
CITY OF ORLANDO / DEPARTMENT OF PUBLIC WORKS
WATER CONSERV II WRF
BNR SYSTEM BLOWER IMPROVEMENTS
www.cphcorp.com C 2025
1117 East Robinson Street Orlando, FL 32801 Ph: 407.425.0452
Plans Prepared By:
State of Florida Licenses:
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
Building Better Communities Together
DAVID ELTON MAHLER, P.E.
P.E. LIC. # 50041
SIGNATURE SHEET G-1A
THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY:
ON THE DATE ADJACENT TO THE SEAL.
EDUARDO AVILES, P.E.
P.E. LIC. # 85877
CPH CONSULTING, LLC
EDUARDO AVILES, P.E.
FLORIDA REGISTRATION NUMBER 85877
500 W. FULTON ST.
SANFORD, FL 32771
CERTIFICATE OF AUTHORIZATION NO. 3215
THE ABOVE NAMED PROFESSIONAL ENGINEER
SHALL BE RESPONSIBLE FOR THE FOLLOWING
SHEETS IN ACCORDANCE WITH RULE
61G15-23.004, F.A.C.
THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY:
ON THE DATE ADJACENT TO THE SEAL.
WILLIAM C. NELSON, P.E.
P.E. LIC. # 42012
ELECTRICAL DESIGN ASSOCIATES
WILLIAM C. NELSON, P.E.
FLORIDA REGISTRATION NUMBER 42012
6965 PIAZZA GRANDE AVE., STE. 311
ORLANDO, FL 32835
CERTIFICATE OF AUTHORIZATION NO. 8079
THE ABOVE NAMED PROFESSIONAL ENGINEER
SHALL BE RESPONSIBLE FOR THE FOLLOWING
SHEETS IN ACCORDANCE WITH RULE
61G15-23.004, F.A.C.
THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY: THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY:
ON THE DATE ADJACENT TO THE SEAL.
DAVID E. MAHLER, P.E.
P.E. LIC. # 50041
CPH CONSULTING, LLC
DAVID E. MAHLER, P.E.
FLORIDA REGISTRATION NUMBER 59505
1117 E. ROBINSON ST.
ORLANDO , FL 32801
CERTIFICATE OF AUTHORIZATION NO. 3215
THE ABOVE NAMED PROFESSIONAL ENGINEER
SHALL BE RESPONSIBLE FOR THE FOLLOWING
SHEETS IN ACCORDANCE WITH RULE
61G15-23.004, F.A.C.
ON THE DATE ADJACENT TO THE SEAL.
CPH CONSULTING, LLC
SIDNEY K. (KET) WEST II, AIA
FLORIDA REGISTRATION NUMBER AR102902
1117 E. ROBINSON STREET
ORLANDO , FL 32801
CERTIFICATE OF AUTHORIZATION NO. 3215
THE ABOVE NAMED REGISTERED ARCHITECT
SHALL BE RESPONSIBLE FOR THE FOLLOWING
SHEETS IN ACCORDANCE WITH RULE
616-16.003, FAC.
STRUCTURAL INDEX
S1 BNR BLOWER BUILDING STRUCTURAL FLOOR PLAN, SECTIONS, & GENERAL
NOTES
S2 BNR BLOWER BUILDING STRUCTURAL ROOF PLAN & SECTIONS
ELECTRICAL INDEX
E-1 ELECTRICAL SYMBOLS, NOTES, AND ABBREVIATIONS
E-2 BNR BLOWER BUILDING DISTRIBUTION SINGLE LINE DIAGRAM (DEMOLITION)
E-3 BNR BLOWER BUILDING DISTRIBUTION SINGLE LINE DIAGRAM (IMPROVEMENTS)
E-4 C2-BB-SWG-MTM FRONT VIEWS (DEMOLITION AND IMPROVEMENTS)
E-5 EXISTING BNR BLOWER BUILDING POWER PLAN (DEMOLITION)
E-6 EXISTING BNR BLOWER BUILDING POWER PLAN (IMPROVEMENTS)
E-7 ELECTRICAL DETAILS
I-1 INSTRUMENTATION SYMBOLS, NOTES, AND ABBREVIATIONS
I-2 BLOWER 1 P&ID
I-3 BLOWER 2 P&ID
I-4 BLOWERS 4 AND 5 P&ID
I-5 BLOWER 3 P&ID
I-6 PROCESS BLOWERS NETWORK ARCHITECTURE
ARCHITECTURAL INDEX
A-1 SHEET INDEX AND ARCHITECTURAL DRAWINGS CONVENTIONS
A-2 GENERAL INFORMATION AND ARCHITECTURAL ABBREVIATIONS
A-3 DEMOLITION FLOOR PLAN / ELEVATION
A-4 ROOF DEMOLITION PLAN
A-5 FLOOR PLAN / ELEVATIONS - NEW CONSTRUCTION
A-6 BNR BUILDING ROOF PLAN - NEW CONSTRUCTION
A-7 BNR BUILDING - ROOF DETAILS
A-8 DOOR SCHEDULE AND DOOR DETAILS
CIVIL INDEX
G-1 COVER
G-1A SIGNATURE SHEET
G-2 INDEX OF SHEETS, SYMBOLS AND ABBREVIATIONS
G-3 GENERAL NOTES
G-4 OVERALL SITE PLAN AND KEY PLAN
D-1 BNR BLOWER BUILDING DEMOLITION PLAN
D-2 BNR BLOWER BUILDING DEMOLITION SECTION
M-1 BNR BLOWER BUILDING IMPROVEMENTS - VIEW
M-2 BNR BLOWER BUILDING IMPROVEMENTS - SECTION AND DETAILS
M-3 CONSTRUCTION SEQUENCE - STEPS 1 & 2
M-4 CONSTRUCTION SEQUENCE - STEPS 3 & 4
M-5 CONSTRUCTION SEQUENCE - STEPS 5 & 6
M-6 BNR BLOWER BUILDING, PIPING & EQUIPMENT - ISOMETRIC VIEW
SIDNEY K. (KET) WEST II, AIA
FL LIC. # AR102902
SIGNATURE MUST BE VERIFIED ON ANY
ELECTRONIC COPIES.
SIGNATURE MUST BE VERIFIED ON ANY
ELECTRONIC COPIES.
SIGNATURE MUST BE VERIFIED ON ANY
ELECTRONIC COPIES.
SIGNATURE MUST BE VERIFIED ON ANY
ELECTRONIC COPIES.
kwest Florida Arch Seal kwest Stamp
Checked by:
Designed by:
Drawn by:
Sheet No.No. DateNo. Date Revision
THIS SHEET NOT VALID FOR CONSTRUCTION WITHOUT COMPLETE SET OF PLANS. SEE GENERAL NOTES FOR MASTER LEGEND.
Revision
B
ID
S E
T
O3153
OCTOBER 2025
BMF
RSS
DH / RBB
J:\O3153\Civil\DWG\_Current_Plan_Set\O3153 G-2 - INDEX OF SHEETS.dwg, 11/21/2025 2:59:53 PM, Robert Luo, Convert - Cph Fullsize.stb
CITY OF ORLANDO / DEPARTMENT OF PUBLIC WORKS
WATER CONSERV II WRF
BNR SYSTEM BLOWER IMPROVEMENTS
www.cphcorp.com C 2025
1117 East Robinson Street Orlando, FL 32801 Ph: 407.425.0452
Plans Prepared By:
State of Florida Licenses:
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
Building Better Communities Together
DAVID ELTON MAHLER, P.E.
P.E. LIC. # 50041
INDEX OF SHEETS, SYMBOLS,
AND ABBREVIATIONS
Standard Abbreviations
EXISTING PIPE (EXPOSED)
EXISTING PIPE (HIDDEN)
PROPOSED PIPE (EXPOSED)
PROPOSED PIPE (HIDDEN)
MECHANICAL JOINT
FLANGED JOINT
FLEXIBLE COUPLING WITH
FLANGED COUPLING ADAPTER
COUPLING
ELBOW UP
ELBOW DOWN
CONCENTRIC REDUCER
ECCENTRIC REDUCER
TEE DOWN
TEE UP
UNION
BLIND FLANGE
Typical Valve Symbols
GATE VALVE
BALL OR GLOBE VALVE
PLUG VALVE
CHECK VALVE
BUTTERFLY VALVE
SOLENOID VALVE
PRESSURE REGULATING VALVE
THRUST TIES
General Piping Symbols
CAP OR PLUG
PRESSURE GAUGE LOCATIONS
EXISTING PIPE (ABANDONED)
NOTE: VALVES MAY BE DRAWN WITH DIFFERENT JOINT
CONNECTIONS (FLANGED SHOWN)
SCHEDULE OF PIPE MATERIALS
FLOW STREAM ID SERVICE EXPOSURE MATERIAL CLASS /SCHEDULE JOINTS LINING TEST PRESSURE SPEC SECTION
PA PROCESS AIR, 4 IN AND
LARGER EXPOSED 316 SST PIPE SCH 10S
FLANGED, WELDED, AND
COUPLINGS AS SHOWN ON
DRAWINGS
NONE 25 PSI 15066
NOTES:
1. STAINLESS STEEL PIPE IS NOT TO BE PAINTED.
2. PRESSURE TESTING IS TO USE PNEUMATIC METHOD USING AIR. REFER TO SECTION 15044.
Detail and Section Identification
DETAIL NUMBER
DRAWING NUMBER
ON WHICH DETAIL
IS DRAWN
DRAWING NUMBER
ON WHICH DETAIL
IS TAKEN
DETAIL SECTION
LETTER
DRAWING NUMBER
ON WHICH SECTION
IS DRAWN
DRAWING NUMBER
ON WHICH SECTION
IS TAKEN
GENERAL
G-1 COVER SHEET
G-1A SIGNATURE SHEET
G-2 INDEX OF SHEETS, SYMBOLS, AND ABBREVIATIONS
G-3 GENERAL NOTES
G-4 OVERALL SITE PLAN AND KEY PLAN
DEMOLITION
D-1 BNR BLOWER BUILDING DEMOLITION PLAN
D-2 BNR BLOWER BUILDING DEMOLITION SECTION
MECHANICAL
M-1 BNR BLOWER BUILDING IMPROVEMENTS - VIEW
M-2 BNR BLOWER BUILDING IMPROVEMENTS - VIEW AND DETAILS
M-3 CONSTRUCTION SEQUENCE - STEPS 1 & 2
M-4 CONSTRUCTION SEQUENCE - STEPS 3 & 4
M-5 CONSTRUCTION SEQUENCE - STEPS 5 & 6
M-6 BNR BLOWER BUILDING, PIPING, & EQUIPMENT - ISOMETRIC VIEW
ARCHITECTURAL
A-1 SHEET INDEX AND ARCHITECTURAL DRAWINGS CONVENTIONS
A-2 GENERAL INFORMATION AND ARCHITECTURAL ABBREVIATIONS
A-3 DEMOLITION FLOOR PLAN / ELEVATION
A-4 ROOF DEMOLITION PLAN
A-5 FLOOR PLAN / ELEVATIONS - NEW CONSTRUCTION
A-6 BNR BLOWER BUILDING ROOF PLAN - NEW CONSTRUCTION
A-7 BNR BLOWER BUILDING - ROOF DETAILS
A-8 DOOR SCHEDULE AND DOOR DETAILS
STRUCTURAL
S-1 BNR BLOWER BUILDING STRUCTURAL FLOOR PLAN, SECTIONS & GENERAL NOTES
S-2 BNR BLOWER BUILDING STRUCTURAL ROOF PLAN AND SECTIONS
ELECTRICAL
E-1 ELECTRICAL SYMBOLS, NOTES, AND ABBREVIATIONS
E-2 BNR BLOWER BUILDING DISTRIBUTION SINGLE LINE DIAGRAM (DEMOLITION)
E-3 BNR BLOWER BUILDING DISTRIBUTION SINGLE LINE DIAGRAM (IMPROVEMENTS)
E-4 C2-BB-SWG-MTM FRONT VIEWS (DEMOLITION AND IMPROVEMENTS)
E-5 EXISTING BNR BLOWER BUILDING POWER PLAN (DEMOLITION)
E-6 EXISTING BNR BLOWER BUILDING POWER PLAN (IMPROVEMENTS)
E-7 ELECTRICAL DETAILS
INSTRUMENTATION
I-1 INSTRUMENTATION SYMBOLS, NOTES, AND ABBREVIATIONS
I-2 BLOWER 1 P&ID
I-3 BLOWER 2 P&ID
I-4 BLOWERS 4 & 5 P&ID
I-5 BLOWER 3 P&ID
I-6 PROCESS BLOWERS NETWORK ARCHITECTURE
Index of Sheets # Number & And @ At AASHTO American Association of State Highway and Transportation Officials AB Anchor Bolts ACI American Concrete Institute ACT Actual ADA Americans with Disabilities Act/Americans Disability Association ADD'L Additional ADJ Adjacent AFF Above Finished Floor AISI American Iron and Steel Institute AL or ALUM Aluminum ALT. Alternate ANSI American National Standards Institute ARCH. Architectural ASCE American Society of Civil Engineers ASPH Asphalt ASTM American Society for Testing and Materials AWS American Welding Society AWWA American Water Works Association BF Blind Flange BFV Butterfly Valve BLDG Building BLK Block BM Bench Mark or Beam BMPs Best Management Practices BNR Biological Nutrient Removal BOT Bottom BRG Bearing BT Buried Telephone BTU British Therman Unit/Biological Treatment Unit BV Ball Valve CF Cubic Feet CFS Cubic Feet per Second CIP Cast Iron Pipe or Cast in Place CJ Control or Construction Joint CL Centerline CLF Chain Link Fence CLR Clear CMU Concrete Masonry Unit COL Column CONC Concrete CONN Connection CONST Construction CONT Continued COV Cover(ed) CTR Center CV Check Valve CY Cubic Yard ID Identification/Inside Diameter INF Influent INS Insulation INT Interior INV Invert IP Iron Pipe ISO Isometric L Length LB or LBS American Pound(s) LF Linear Feet LGTH Length LOC Location LT Light LW Lightweight MANU Manufacturer MAT or MATL Material MAX Maximum MCC Motor Control Center MECH Mechanical MFR Manufacturer MG Million Gallon MGD Million Gallons per Day MIN Minimum MISC Miscellaneous MJ Mechanical Joint N/C Normally Closed N/O Normally Open NAVD North American Vertical Datum NIC Not in Contract NOM Nominal
NPW Non-Potable Water NS Near Side NTS Not to Scale NWL Normal Water Level OC On Center OD Outside Diameter OHU Overhead Utility PA Process Air PC Precast PE Polyethylene/Plain End PL Plate PLY Plywood PP Power Pole PREFAB Prefabricated PROP Proposed PSF Pounds per Square Foot PSI Pounds per Square Inch PT Pressure Treated PV Plug Valve PVC Polyvinyl Chloride PVMT Pavement PW Potable Water R Radius or Radiant R/W Right-of-way RAS Return Activated Sludge RCP Reinforced Concrete Pipe RD Roof Drain RED Reducer REF Reference REIN Reinforced REL Relocate or Relocated REQ, REQ'D OR REQ'T Require, Required, or Requirement REUSE Reuse Water RT Right RWM Reclaimed Water Main SAN Sanitary SCH Schedule SEC Section SF Square Feet SPEC Specification SQ Square SS or SST StainlessSteel STA Station STD Standard STR Structural SW or S/W Sidewalk SWD Side Water Depth SWPPP Stormwater Pollution Prevention Plan SY Square Yards SYM Symmetric T/Top of TBM Temporary Benchmark TH Thick THRU Through or Through-out TOF Top of Floor TRANS Transverse TYP Typical UE Underground Electric UG Underground UT Underground Telephone UV Ultra-violet VAC Vacuum VENT Ventilation VERT Vertical W Width W/ With W/O Without WAS Waste Activated Sludge WJ Welded Joint WL Water Line WM Water Main WWF Welded Wire Fabric YD Yard
G-2
DETAIL TITLE
SECTION TITLE
SCALE: XXXXXXX
SCALE: XXXXXXX
CROSS SECTION
LETTER
SHEET CROSS
SECTION IS FOUND
ON
SHEET CROSS
SECTION IS TAKEN
FROM
Checked by:
Designed by:
Drawn by:
Sheet No.No. DateNo. Date Revision
THIS SHEET NOT VALID FOR CONSTRUCTION WITHOUT COMPLETE SET OF PLANS. SEE GENERAL NOTES FOR MASTER LEGEND.
Revision
B
ID
S E
T
O3153
OCTOBER 2025
BMF
RSS
DH / RBB
J:\O3153\Civil\DWG\_Current_Plan_Set\O3153 G-3 - GENERAL NOTES.dwg, 11/21/2025 3:00:02 PM, Robert Luo, Convert - Cph Fullsize.stb
CITY OF ORLANDO / DEPARTMENT OF PUBLIC WORKS
WATER CONSERV II WRF
BNR SYSTEM BLOWER IMPROVEMENTS
www.cphcorp.com C 2025
1117 East Robinson Street Orlando, FL 32801 Ph: 407.425.0452
Plans Prepared By:
State of Florida Licenses:
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
Building Better Communities Together
DAVID ELTON MAHLER, P.E.
P.E. LIC. # 50041
GENERAL NOTES G-3
WATER CONSERV II
PHONE: 407-246-2151
PLANT CONSTRUCTION RULES
1. NORMAL BUSINESS HOURS ARE 7:00 AM TO 3:30 PM. HOWEVER THE FACILITY OPERATES 24 HOURS, 7 DAYS/WEEK.
2. THE MAINTENANCE SUPERVISOR, LUIS RAMOS, WILL BE THE PLANT CONTACT, IF LUIS RAMOS IS NOT
AVAILABLE, THE PLANT MANAGER WILL REPRESENT THE FACILITY.
3. ALL CONTRACTOR PERSONNEL MUST OBTAIN & WEAR AT ALL TIMES A PICTURE ID SUPPLIED BY
CONTRACTOR.
4. ALL CONSTRUCTION RELATED EMPLOYEES WILL ENTER AND EXIT THROUGH THE CONSTRUCTION
GATE. CONTACT THE CONTRACTOR REPRESENTATIVE FOR ENTRY. COMPANY PHOTO ID OF A VALID
CONTRACTOR OR SUB CONTRACTOR IS REQUIRED. THE CONTRACTOR REPRESENTATIVE WILL
MAINTAIN A LIST OF EMPLOYEES, SUB-CONTRACTORS AND VENDORS.
5. BE SURE YOU ARE AWARE OF THE DIFFERENCE IN WATER LINES. POTABLE (DRINKING WATER) AND
RECLAIMED (REUSE WATER FROM PLANT EFFLUENT). REUSE LINES ARE ALL MARKED/PAINTED
PANTONE 522C LAVENDER.
6. NO FIREARMS, ALCOHOL, OR DRUGS ON PREMISES.
7. PLACE SIGNS SO DELIVERIES CAN BE MADE TO THE CONSTRUCTION SITE. LOCATIONS TO BE
APPROVED BY MAINTENANCE SUPERVISOR. PLANT PERSONNEL WILL NOT ACCEPT CONSTRUCTION
DELIVERIES.
8. MAXIMUM SPEED LIMIT THROUGHOUT THE PLANT IS 15 MPH. FULL STOP AT ALL STOP SIGNS IS
REQUIRED. THE SPEED LIMIT SHALL BE STRICTLY ENFORCED.
9. VEHICLES AND SECURITY: ALL VEHICLES WILL BE PARKED IN ASSIGNED AREAS ONLY AND SHOULD
BE LOCKED AT ALL TIMES. CITY WILL NOT BE RESPONSIBLE.
10. MATERIAL STORAGE IN CONTRACTOR'S TRAILERS: THE CITY IS NOT RESPONSIBLE FOR SECURITY.
11. CONFINE CONSTRUCTION PERSONNEL TO THE JOB SITE.
12. EMERGENCY SERVICES BY CITY OF ORLANDO POLICE AND FIRE DEPARTMENTS ARE 9-911.
13. CONSTRUCTION PERSONNEL, EXCEPT FOR EMERGENCIES, WILL NOT USE PLANT PHONES.
14. COORDINATE ALL ELECTRICAL/PIPE CONNECTIONS THROUGH MAINTENANCE SUPERVISOR OR
PLANT MANAGER.
15. GENERAL CONTRACTOR WILL BE RESPONSIBLE FOR HIS EMPLOYEES AND SUBCONTRACTORS
EMPLOYEES FOLLOWING PLANT RULES AND VEHICULAR SAFETY.
16. CONTRACTOR WILL FURNISH PORTABLE RESTROOMS. CONTRACTOR PERSONNEL WILL NOT USE
RESTROOMS IN THE PLANT.
17. THE CONTRACTOR'S PERSONNEL WILL NOT USE PLANT LUNCHROOM OR GYM.
18. A LIST OF SUBCONTRACTORS WILL BE GIVEN TO THE PLANT MANAGER.
19. A LIST OF EMERGENCY PHONE NUMBERS WILL BE GIVEN TO THE PLANT MANAGER.
20. NO ONE IS ALLOWED IN THE AREA OF THE CHLORINE HANDLING FACILITY DURING CHLORINE TANK
CHANGES. PLANT PERSONNEL WILL PLACE SIGNS IN STREETS DURING THESE CHANGE OUT TIMES.
PRIOR TO WORK COMMENCING AN EMERGENCY PLAN WILL BE REVIEWED WITH CONTRACTOR.
CHLORINE CHANGE OUTS AND DELIVERIES GENERALLY OCCUR WEEKLY. ADVANCE NOTICE WILL BE
GIVEN TO THE CONTRACTOR.
21. NO OPEN FIRES ON PLANT GROUNDS.
22. SMOKING IN DESIGNATED AREAS ONLY.
23. TRASH, RUBBLE, ETC. SHOULD BE REMOVED FROM THE PROJECT DAILY. DURING HURRICANE
SEASON, THE CONTRACTOR WILL BE RESPONSIBLE FOR SECURING CONSTRUCTION MATERIALS
DURING STORM EVENTS.
24. CONTRACTORS WILL SUPPLY THEIR OWN DRINKING WATER AND ICE FOR THEIR PERSONNEL.
25. THERE IS A STORM WATER POLLUTION PREVENTION PLAN IN EFFECT AT THIS FACILITY, WHICH
MUST BE FOLLOWED.
TELEPHONE NUMBERS (AFTER HOURS)
KEITH JORDAN PLANT MANAGER 407-325-5653
LUIS RAMOS MAINT. SUPERVISOR 407-709-3778
JOSHUA REYES CHIEF OPERATOR 407-272-7476
GENERAL CONSTRUCTION NOTES
1. THE CONTRACTOR SHALL PLAN AND SCHEDULE THE SEQUENCE OF WORK IN ORDER TO PREVENT
UNNECESSARY DELAYS OR COSTS ASSOCIATED WITH CRITICAL PATH ITEMS OF THE WORK.
2. RESTORE ALL PROPERTY AND INFRASTRUCTURE, INCLUDING UTILITIES DISTURBED BY
CONSTRUCTION OPERATIONS TO THE CONDITIONS WHICH EXISTED PRIOR TO CONSTRUCTION OR
BETTER. THE COST OF SUCH RESTORATION SHALL BE INCLUDED IN THE CONTRACTOR'S BID. ANY DAMAGE TO EXISTING PROPERTY, UTILITIES, STRUCTURES AND/OR SERVICES SHALL BE REPAIRED
AT THE CONTRACTOR'S EXPENSE IN A MANNER AS DIRECTED BY THE ENGINEER AND OWNER.
REMOVE AND REPLACE ALL PIPE, CONDUIT AND CULVERTS DAMAGED DURING CONSTRUCTION, AT
NO EXPENSE TO THE OWNER. THE CONTRACTOR SHALL REMOVE AND REPLACE OR TEMPORARILY
RELOCATE, STORM SEWERS, CULVERTS AND OTHER UTILITIES AS REQUIRED DURING THE
INSTALLATION OF THE PROJECT WORK. THE CONTRACTOR SHALL PROVIDE A TEMPORARY MEANS
OF CONVEYING STORMWATER. WHERE TEMPORARY SUPPORT OF UTILITIES IS REQUIRED, THE
CONTRACTOR SHALL PAY ALL ASSOCIATED COSTS AND COORDINATE WITH THE OWNER AND
ENGINEER.
3. CURRENT ADA STANDARDS SHALL BE UPHELD AT ALL TIMES.
4. ANY SIDEWALK OR CURBING DISTURBED SHALL BE RESTORED TO FULL WIDTHS AND LENGTHS
(DEFINED BY EDGES OF THE SIDEWALK AND / OR THE NEAREST CONTROL JOINTS OR EXPANSION JOINTS). PARTIAL PATCHING OF SIDEWALKS AND CURBING SHALL NOT BE ACCEPTABLE. PAVEMENT
FINISHES, THICKNESS AND GRADES SHALL MATCH THE EXISTING SIDEWALK.
5. THE CONTRACTOR IS REQUIRED TO BRING ANY DESIGN DISCREPANCIES TO THE IMMEDIATE
ATTENTION OF THE ENGINEER, IN WRITING, PRIOR TO CONSTRUCTION OR AS SOON AS
DISCOVERED.
6. BEFORE A CONNECTION IS TO BE MADE TO AN EXISTING PIPE OR MANHOLE, THE CONTRACTOR SHALL EXCAVATE THE AREA TO VERIFY THE TYPE, SIZE, ELEVATION, AND CONDITION OF THE PIPE
AND/OR MANHOLE, AND OBTAIN THE ENGINEER'S APPROVAL FOR THE PROPOSED CONNECTION
METHOD, UNLESS OTHERWISE DETAILED IN THE SPECIFICATIONS OR DRAWINGS.
7. LOCATE ALL UTILITIES / FACILITIES PRIOR TO THE START CONSTRUCTION BY CONTACTING
SUNSHINE 811.
8. THE CONTRACTOR SHALL NOTIFY ALL UTILITY OWNERS A MINIMUM OF SEVEN (7) WORKING DAYS PRIOR TO COMMENCING CONSTRUCTION. RECORDS OF ALL NOTICES SHALL BE SUBMITTED TO THE
ENGINEER UPON REQUEST.
9. UNDER NO CIRCUMSTANCE SHALL THE ACTIVITIES OF THE CONTRACTOR OR HIS
SUBCONTRACTORS CAUSE ANY INTERRUPTIONS TO THE SERVICE OR OPERATION OF EXISTING
UTILITIES WITHOUT WRITTEN AUTHORIZATION FROM AN AUTHORIZED REPRESENTATIVE OF THE
UTILITY COMPANY OR OWNER. ANY PIPING OR OTHER UTILITIES WHICH CAN BE REMOVED DURING
CONSTRUCTION WITHOUT UNDUE INTERRUPTION OF SERVICE MAY BE REMOVED AND REPLACED
BY THE CONTRACTOR WITH THE PERMISSION OF THE ENGINEER AND THE UTILITY OWNER.
CONTRACTOR SHALL COPY ENGINEER ON ALL CORRESPONDENCE WITH UTILITY OWNER.
10. LOCATIONS, ELEVATIONS AND DIMENSIONS OF EXISTING UTILITIES AND STRUCTURES ARE APPROXIMATE. WHILE CONSIDERABLE EFFORT HAS BEEN MADE BY THE CITY, THE SURVEYOR, THE VARIOUS UTILITY COMPANIES AND THE ENGINEER TO ACCURATELY LOCATE EXISTING LINES AND APPURTENANCES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL UTILITY LOCATIONS, ELEVATIONS AND DIMENSIONS BY UTILIZING EXPLORATORY EXCAVATION, WHICH SHALL BE MADE 7 DAYS OR 1000 FEET IN ADVANCE OF THE WORK, WHICHEVER IS GREATER. IF THERE IS A POTENTIAL
CONFLICT, THE CONTRACTOR IS TO NOTIFY THE ENGINEER IMMEDIATELY. CONTRACTOR SHALL
MAKE EVERY EFFORT TO AVOID OR RESOLVE CONFLICTS AND COORDINATE RELOCATIONS BY THE
UTILITY OWNERS. NO CLAIMS FOR DELAYS WILL BE PAID UNLESS THIS PROCEDURE HAS BEEN
FULLY FOLLOWED. ANY DAMAGE TO UTILITIES, STRUCTURES AND/OR SERVICES SHALL BE
REPAIRED AT THE CONTRACTOR'S EXPENSE, IN A MANNER APPROVED BY AND COORDINATED WITH
THE PLANT MANAGER. THE CONTRACTOR SHALL COORDINATE WITH THE PLANT MANAGER ON ALL
UTILITY WORK, PLANT INTERRUPTIONS VIA THE ENGINEER AND CONSTRUCTION MANAGER AT
LEAST 72 HOURS IN ADVANCE OF ANY PLANNED EVENT UNLESS OTHERWISE SPECIFIED.
11. ALL CONCRETE TO BE REMOVED SHALL BE SAW CUT AT THE NEAREST GOOD JOINT. ALL SAW
CUTTING SHALL BE WET CUT TO CONTROL DUST.
12. THE OWNER SHALL PROVIDE THE SERVICES OF A TESTING LABORATORY TO DETERMINE WHETHER
THE REQUIREMENTS FOR MATERIALS SPECIFICATIONS ARE MET. THE CONTRACTOR SHALL GIVE
THE ENGINEER A MINIMUM OF 48 HOURS NOTICE WHEN REQUESTING FIELD TESTS. THE
CONTRACTOR SHALL NOTIFY THE ENGINEER 48 HOURS BEFORE STARTING ANY ACTIVITY THAT
REQUIRES TESTING.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY TEMPORARY CONTROLS AND/OR
STRUCTURES REQUIRED TO MAINTAIN SUITABLE AND SAFE WORKING CONDITIONS AT ALL TIMES.
SUCH ITEMS SHALL BE REMOVED ONCE THAT PORTION OF WORK HAS BEEN COMPLETED.
14. CONTRACTOR'S USE OF THE PREMISES SHALL BE CONFINED TO THE LIMITS OF CITY OWNED
PROPERTY. ALL PUBLIC AND PRIVATE PROPERTY AFFECTED BY THE CONSTRUCTION SHALL BE
PROTECTED WHERE POSSIBLE. ALL AREAS DISTURBED AS PART OF THIS WORK SHALL BE
RESTORED TO ORIGINAL OR BETTER CONDITION AT NO ADDITIONAL COST TO THE OWNER. ALL
EXISTING SODDED AREAS DISTURBED DURING THE CONSTRUCTION SHALL BE REPLACED WITH THE
SAME TYPE OF SOD IN CONFORMANCE WITH THE STANDARD SPECIFICATIONS. FIELD ENGINEER
SHALL APPROVE THE REMOVAL AND REPLACEMENT OF EXISTING IRRIGATION SYSTEMS, AS
REQUIRED, AT NO ADDITIONAL COST TO THE CITY OR PROPERTY OWNER. PROPER TEMPORARY
ADJUSTMENTS SHALL BE DONE AT SUCH TIME TO MAINTAIN IRRIGATION SYSTEMS FROM BEING
INTERRUPTED FOR EXTENDED PERIODS DURING CONSTRUCTION. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR MAINTENANCE OF ALL NEWLY PLANTED GRASS OR VEGETATION UNTIL WELL
ESTABLISHED AND ACCEPTED BY THE CITY.
15. ALL EXISTING PAVEMENT MARKINGS AND MESSAGES, WHICH ARE TO BE OBLITERATED, SHALL BE
INVENTORIED AND RESTORED TO ORIGINAL CONDITION AND DAMAGED ONES REPLACED (UPON
COMPLETION OF CONSTRUCTION AND PRIOR TO REINSTATING VEHICULAR TRAFFIC) BY THE
CONTRACTOR, UNLESS OTHERWISE SPECIFIED IN THE PLANS OR LATEST DESIGN STANDARD. ALL
PERMANENT PAVEMENT MARKINGS SHALL BE ALKYD THERMOPLASTIC. TEMPORARY PAVEMENT
MARKINGS MAY BE PAINT PRODUCTS AND RETRO-REFLECTIVE PAVEMENT MARKERS (ON SURFACES TO BE MILLED AND RESURFACED) OR TEMPORARY TAPE (ON ALL AREAS NOT BEING RESURFACED).
TEMPORARY TAPE SHALL BE 3M BRAND STAMARK REMOVABLE TAPE, SERIES 780, WET REFLECTIVE TEMPORARY TAPE OR APPROVED EQUAL. THE USE OF "FOIL BLACK" TYPES OF TEMPORARY TAPE IS NOT PERMITTED. 3M BRAND REMOVABLE BLACK MASK TAPE, SERIES 145, IS THE ONLY APPROVED
MATERIAL FOR "BLACKING OUT" EXISTING PAVEMENT MARKINGS ON FINAL ROADWAY SURFACES
OR SURFACES NOT BEING PAVED. UNDER NO CIRCUMSTANCES WILL BLACK PAINT OR GRINDING BE
PERMITTED. ALL CONFLICTING EXISTING MARKINGS SHALL BE REMOVED.
16. MAINTAIN ACCESS AND UTILITIES TO ALL EXISTING PLANT OPERATIONS UNTIL THE PROPOSED
IMPROVEMENTS AT THE FACILITY ARE FULLY OPERATIONAL AND FUNCTIONALLY.
17. THE CONTRACTOR SHALL ENSURE THAT ALL SURVEY CONTROL POINTS SHOWN ON THE PLANS AND
ANY PROPERTY CORNERS ALONG THE ROUTE OF THE PROJECT ARE PROTECTED AND SHALL BE
REFERENCED AND MAINTAINED PRIOR TO BEING DISTURBED. THIS WORK MUST BE PERFORMED
UNDER THE DIRECT SUPERVISION OF A FLORIDA LICENSED SURVEYOR AND MAPPER WHO SHALL
PROVIDE SIGNED AND SEALED COPIES OF THE WORK AT THE REQUEST OF THE CITY. ALL
REFERENCING WORK IS SUBJECT TO REVIEW AND APPROVAL BY THE OFFICE OF THE CITY
SURVEYOR, AS REQUIRED BY SECTION 01050 OF CONTRACT DOCUMENTS.
18. THE CONTRACTOR SHALL FURNISH THE CITY WITH AN "AS-BUILT SURVEY" PREPARED BY A FLORIDA LICENSED SURVEYOR AND MAPPER ACCORDING TO SECTION 01050. THE AS-BUILT SURVEY WILL
INCLUDE HORIZONTAL AND VERTICAL DIMENSIONS OF ALL CONSTRUCTED IMPROVEMENTS
(INCLUDING SANITARY AND STORM SEWERS AND STRUCTURES, CLEAN-OUTS, WATER MAINS,
VALVES, ETC.) WHICH MUST BE CLEARLY SHOWN BY SYMBOLS, NOTATIONS AND DELINEATION, AND
SHALL BE LOCATED IN STATE PLANE COORDINATES. THE CONTRACTOR SHALL SUBMIT THE
AS-BUILT SURVEY WITH EACH PAY REQUEST FOR PARTIAL APPROVAL, AS SPECIFIED IN SECTION
01050. NOT MEETING THIS REQUIREMENT WILL BE REASON TO REJECT FUTURE PAY REQUESTS
UNTIL APPROVAL IS OBTAINED. ALL AS-BUILT SURVEYS WILL BE REVIEWED AND APPROVED FOR CONFORMITY WITH FLORIDA ADMINISTRATIVE CODE 61G17-6.005-(2) BY THE OFFICE OF THE CITY
SURVEYOR, AS REQUIRED BY SECTION 01050 OF THE CONTRACT DOCUMENTS.
GENERAL NOTES
1. ALL CONSTRUCTION PROJECTS 1 OR MORE ACRES IN SIZE THAT DISCHARGE TO OFFSITE AREAS
ARE REQUIRED TO COMPLY WITH THE REQUIREMENTS OF THE NATIONAL POLLUTANT DISCHARGE
ELIMINATION SYSTEM (NPDES) GENERAL PERMIT FOR STORMWATER DISCHARGE FROM SMALL AND LARGE CONSTRUCTION ACTIVITIES. IN ORDER TO MEET NPDES REQUIREMENTS, THE CONTRACTOR
IS RESPONSIBLE FOR PREPARING A STORMWATER POLLUTION PREVENTION PLAN (SWPPP),
IMPLEMENTING, INSPECTING, MAINTAINING, AND REPORTING ON ALL ELEMENTS OF THE SWPPP, COMPLETING AND SUBMITTING THE REQUIRED NOTICE OF INTENT (NOI) AND NOTICE OF
TERMINATION (NOT) FORMS AS THE OPERATOR, AND PAYING ALL ASSOCIATED FEES. FOR
PROJECTS LESS THAN 1 ACRE IN SIZE THAT ARE NOT REQUIRED TO COMPLY WITH THE NPDES
GENERAL PERMIT, THE CONTRACTOR IS STILL RESPONSIBLE FOR IMPLEMENTING AND MAINTAINING
EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO AND DURING CONSTRUCTION IN
ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS.
2. UNLESS OTHERWISE NOTED ON THE PLANS, THE CONTRACTOR SHALL USE THE GEOMETRY
PROVIDED ON THE CONSTRUCTION PLANS. BENCHMARK INFORMATION SHALL BE PROVIDED TO
THE CONTRACTOR BY THE OWNER OR OWNER'S SURVEYOR. ANY DISCREPANCIES BETWEEN FIELD
MEASUREMENTS AND CONSTRUCTION PLAN INFORMATION SHALL BE BROUGHT TO THE ATTENTION
OF THE ENGINEER IMMEDIATELY.
3. BASE SURVEY INFORMATION INCLUDING BUT NOT LIMITED TO ELEVATIONS, EASEMENTS, RIGHTS OF
WAY, AND OTHER TOPOGRAPHIC INFORMATION HAS BEEN PREPARED BY OTHER PROFESSIONALS.
CPH CONSULTING, LLC ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THIS INFORMATION.
4. THIS SET OF PLANS MAY CONTAIN DRAWINGS PREPARED BY OTHER PROFESSIONALS, WHICH
CONTAIN THE NAME, ADDRESS, AND LOGO OF THE PROFESSIONAL. CPH, LLC IS NOT RESPONSIBLE
FOR DRAWINGS PREPARED BY OTHER PROFESSIONALS.
5. SUBMIT ELECTRONIC COPIES (PDF FORMAT) OF EACH SHOP DRAWING AND PRODUCT DATA TO THE
ENGINEER FOR APPROVAL PRIOR TO ORDERING THE MATERIALS REQUIRED FOR CONSTRUCTION.
PRIOR TO SUBMISSION, THE CONTRACTOR SHALL THOROUGHLY CHECK SHOP DRAWINGS,
PRODUCT DATA, AND SAMPLES FOR COMPLETENESS AND FOR COMPLIANCE WITH THE
CONSTRUCTION PLANS AND SHALL VERIFY ALL DIMENSIONS AND FIELD CONDITIONS AND SHALL
COORDINATE THE SHOP DRAWINGS WITH THE REQUIREMENTS FOR OTHER RELATED WORK. THE
CONTRACTOR'S RESPONSIBILITY FOR ERRORS AND OMISSIONS IN SUBMITTALS IS NOT RELIEVED BY THE ENGINEER'S REVIEW OF SUBMITTALS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER, IN WRITING AT THE TIME OF SUBMISSION, OF DEVIATIONS IN SUBMITTALS FROM THE REQUIREMENTS
OF THE CONTRACT DOCUMENTS.
6. PROTECT BENCHMARKS, PROPERTY CORNERS, AND OTHER SURVEY MONUMENTS FROM DAMAGE
OR DISPLACEMENT. IF MARKER NEEDS TO BE REMOVED IT SHALL BE REFERENCED BY LICENSED
LAND SURVEYOR AND REPLACED, AS NECESSARY, BY SAME.
7. IN ADDITION TO QUALITY CONTROL TESTING, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
REQUIRED TESTING OR APPROVALS FOR ANY WORK (OR ANY PART THEREOF) IF LAWS OR
REGULATIONS OF ANY PUBLIC BODY HAVING JURISDICTION SPECIFICALLY REQUIRE TESTING,
INSPECTIONS OR APPROVAL. THE CONTRACTOR SHALL PAY ALL COSTS IN CONNECTION
THEREWITH AND SHALL FURNISH THE OWNER AND ENGINEER THE REQUIRED CERTIFICATES OF
INSPECTION, TESTING OR APPROVAL.
8. ANY DESIGN OR TESTING LABORATORY UTILIZED BY THE CONTRACTOR SHALL BE AN INDEPENDENT
LABORATORY ACCEPTABLE TO THE OWNER AND THE ENGINEER, APPROVED IN WRITING, AND
COMPLYING WITH THE LATEST EDITION OF THE "RECOMMENDED REQUIREMENTS FOR
INDEPENDENT LABORATORY QUALIFICATION", PUBLISHED BY THE AMERICAN COUNCIL OF
INDEPENDENT LABORATORIES.
9. TESTING RESULTS SHALL BE PROVIDED TO THE CITY AND THE ENGINEER. ALL TEST RESULTS
SHALL BE PROVIDED (PASSING AND FAILING) ON A REGULAR AND IMMEDIATE BASIS.
10. THE ENTIRE PROJECT SITE SHALL BE THOROUGHLY CLEANED AT THE COMPLETION OF THE WORK.
CLEAN ALL INSTALLED PIPELINES, STRUCTURES, SIDEWALKS, PAVED AREAS, ACCUMULATED SILT IN PONDS, PLUS ALL ADJACENT AREAS AFFECTED BY CONSTRUCTION, AS DIRECTED BY THE CITY.
EQUIPMENT TO CLEAN THESE SURFACES SHALL BE SUBJECT TO APPROVAL BY THE OWNER.
11. ALL SHUTDOWN PROCEDURES AND TIMING SHALL BE COORDINATED WITH THE PLANT MANAGER.
THE CONTRACTOR IS REFERRED TO SPECIFICATIONS SECTION 01014, CONSTRUCTION SEQUENCE, FOR FURTHER INFORMATION REGARDING SHUTDOWN.
12. ALL PIPING SHALL BE PRESSURE AND LEAK TESTED IN ACCORDANCE WITH THE SPECIFICATIONS.
THE CONTRACTOR SHALL FURNISH AND INSTALL ALL TEMPORARY PLUGS, BLOCKING, TAPS AND
TESTING EQUIPMENT REQUIRED TO COMPLETE THE TESTING AS SPECIFIED.
13. ALL STAINLESS STEEL WILL BE TYPE 316, UNLESS OTHERWISE NOTED.
14. ALL ABANDONED PIPE IS TO BE PLUGGED AND GROUT FILLED.
15. EQUIPMENT DIMENSIONS ARE PROVIDED FOR REFERENCE ONLY. THE CONTRACTOR SHALL
COORDINATE THE DIMENSIONS OF ALL PROJECT EQUIPMENT WITH THE EQUIPMENT
MANUFACTURER'S RECOMMENDATIONS.
16. INTERNAL FACILITY ROADWAY CLOSURES WILL BE PER THE CONTRACTOR'S APPROVED
MAINTENANCE OF TRAFFIC (MOT) PLAN AND COORDINATED WITH THE PLANT MANAGER.
17. NOTE THAT AT ANY GIVEN TIME TWO OR MORE CONTRACTORS WILL BE ON-SITE.
18. ALL WORK SHALL BE IN ACCORDANCE WITH CITY OF ORLANDO BUILDING REQUIREMENTS AND IS
SUBJECT TO INSPECTION BY THE CITY OF ORLANDO BUILDING DEPARTMENT. ALL WORK SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF THE CITY OF ORLANDO UTILITY STANDARDS AND
CONSTRUCTION SPECIFICATIONS MANUAL.
PERMITS
1. THE CONTRACTOR SHALL OBTAIN FROM THE OWNER COPIES OF ALL AVAILABLE REGULATORY
AGENCY PERMITS AND LOCAL AGENCY PERMITS OBTAINED BY THE OWNER. THESE PERMITS
INCLUDE:
PERMIT NO. ISSUING AGENCY DATE OF PERMIT
X CITY OF ORLANDO X
PERMIT TYPE PERMITTING AGENCY PERMIT FEE TO BY PAID
BY CONTRACTOR
BUILDING PERMIT
(INCLUDING PERMITS
FOR ALL SUBCONTRACTOR ORLANDO YES
WALLS, ETC.) WORK
SUCH AS ELECTRICAL,
STRUCTURES, RETAINING
2. THE CONTRACTOR SHALL REVIEW AND BECOME FAMILIAR WITH ALL PERMITS FOR THE PROJECT, COMPLETE WITH ALL CONDITIONS, ATTACHMENTS, EXHIBITS AND PERMIT MODIFICATIONS. A COPY OF ALL PERMITS FOR THE PROJECT SHALL BE MAINTAINED BY THE CONTRACTOR AT THE PROJECT
SITE, AND SHALL BE AVAILABLE FOR REVIEW UPON REQUEST.
3. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE TO ABIDE BY ALL PROVISIONS OF THE PERMITS.
THE CONTRACTOR IS RESPONSIBLE FOR THE SELECTION, IMPLEMENTATION AND OPERATION OF
ALL MEASURES REQUIRED BY THE PERMITS, INCLUDING THE MAINTENANCE OF SAID MEASURES AS NECESSARY DURING CONSTRUCTION. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR ANY
WORK ASSOCIATED WITH PERMIT REQUIREMENTS.
4. THE CONTRACTOR SHALL KEEP LOCATE TICKETS UP TO DATE AT ALL TIMES.
5. THE CONTRACTOR IS RESPONSIBLE FOR ALL COORDINATION WITH EACH UTILITY AND ALL COSTS
ASSOCIATED WITH THE PROTECTION OF EXISTING FACILITIES DURING CONSTRUCTION. THE
CONTRACTOR SHALL ALSO COORDINATE NECESSARY RELOCATIONS OR OTHER CONSTRUCTION
RELATED MATTERS WITH EACH UTILITY.
6. IT SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO MAINTAIN IN SERVICE ALL EXISTING PIPING
ENCOUNTERED DURING CONSTRUCTION UNLESS OTHERWISE INDICATED IN THE DRAWINGS. ANY
PIPING WHICH CAN BE REMOVED DURING CONSTRUCTION WITHOUT UNDUE INTERRUPTION OF
SERVICE MAY BE REMOVED AND REPLACED BY THE CONTRACTOR WITH THE PERMISSION OF THE
OWNER AND THE ENGINEER.
7. TYPICAL DETAILS AND PROPOSED CONSTRUCTION AS SHOWN ILLUSTRATE THE ENGINEER’S INTENT
AND ARE NOT PRESENTED AS A SOLUTION TO ALL CONSTRUCTION PROBLEMS ENCOUNTERED IN
THE FIELD. THE CONTRACTOR MAY ALTER THE PROPOSED CONSTRUCTION TO SUIT FIELD
CONDITIONS, PROVIDED IT COMPLIES WITH THE PROJECT SPECIFICATIONS AND APPROVAL IS
RECEIVED FROM THE ENGINEER. WHERE SUCH PROPOSED REVISIONS DEVIATE FROM THE FDEP
CONSTRUCTION PERMIT, THEN SUCH REVISIONS WILL ALSO REQUIRE APPROVAL FROM FDEP.
8. TYPICAL DETAILS AND PROPOSED CONSTRUCTION AS SHOWN ILLUSTRATE THE ENGINEER’S INTENT
AND ARE NOT PRESENTED AS A SOLUTION TO ALL CONSTRUCTION PROBLEMS ENCOUNTERED IN
THE FIELD. THE CONTRACTOR MAY ALTER THE PROPOSED CONSTRUCTION TO SUIT FIELD
CONDITIONS, PROVIDED IT COMPLIES WITH THE PROJECT SPECIFICATIONS AND APPROVAL IS
RECEIVED FROM THE ENGINEER. WHERE SUCH PROPOSED REVISIONS DEVIATE. THEN SUCH
REVISIONS WILL ALSO REQUIRE APPROVAL FROM FDEP.
9. FOR EACH RESPECTIVE PIPELINE CONSTRUCTION REQUIRED, THE CONTRACTOR SHALL FIELD VERIFY THE LOCATION, ELEVATION, SIZE, MATERIAL TYPE, AND ALIGNMENT OF ALL EXISTING PIPES, CABLES, ETC. TO BE CROSSED OR CONNECTED TO. IF THE CONTRACTOR DEEMS NECESSARY: (A) A
CHANGE IN ALIGNMENT OR ELEVATION, OR THE NEED FOR ADDITIONAL FITTINGS, BENDS, OR
COUPLINGS, WHICH REPRESENT A DEPARTURE FROM THE CONTRACT DRAWING; OR (B) A NEED
FOR RELOCATION OF EXISTING UTILITIES, THEN DETAILS OF SUCH DEPARTURES, RELOCATIONS, OR ADDITIONAL FITTINGS, INCLUDING CHANGES IN RELATED PORTIONS OF THE PROJECT AND THE
REASONS THEREFORE, SHALL BE SUBMITTED WITH SHOP DRAWINGS. APPROVED DEPARTURES
FOR THE CONTRACTOR’S CONVENIENCE SHALL BE MADE AT NO ADDITIONAL COST TO THE OWNER.
10. A SINGLE POINT UTILITY IDENTIFICATION SERVICE HAS BEEN SET UP FOR EXISTING UTILITIES. THE CONTRACTOR IS TO CONTACT THE SUNSHINE STATE ONE CALL CENTER BY DIALING “811” AT LEAST TWO (2) AND NO MORE THAN FIVE (5) WORKING DAYS PRIOR TO THE SPECIFIC CONSTRUCTION ACTIVITY FOR FIELD LOCATION. NOTE THAT NOT ALL UTILITIES PARTICIPATE IN THIS PROGRAM.
THE CONTRACTOR SHOULD CONTACT ALL NON-PARTICIPATING UTILITIES SEPARATELY FOR FIELD LOCATION OF THEIR FACILITIES AT LEAST TWO (2) WORKING DAYS PRIOR TO CONSTRUCTION.
SITE PREPARATION
1. UNLESS OTHERWISE DIRECTED BY THE OWNER OR ENGINEER, THE CONTRACTOR IS EXPECTED TO
CONTAIN ALL CONSTRUCTION ACTIVITIES WITHIN THE DESIGNATED AREAS AS INDICATED ON THE
DRAWINGS. AT NO TIME SHALL THE CONTRACTOR DISTURB SURROUNDING PROPERTIES OR
TRAVEL ON SURROUNDING PROPERTIES WITHOUT WRITTEN CONSENT FROM THE PROPERTY
OWNER. ANY REPAIR OR RECONSTRUCTION OF DAMAGED AREAS IN SURROUNDING PROPERTIES
SHALL BE REPAIRED BY THE CONTRACTOR ON AN IMMEDIATE BASIS. ALL COSTS FOR REPAIRS
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND NO EXTRA COMPENSATION SHALL BE
PROVIDED.
2. STAKE OUT THE CONSTRUCTION, ESTABLISH LINES AND LEVELS, TEMPORARY BENCH MARKS, BATTER BOARDS, CENTERLINES, BASELINES, AND REFERENCE POINTS FOR THE WORK, AND VERIFY
ALL DIMENSIONS RELATING TO INTERCONNECTION WITH EXISTING FEATURES. REPORT ANY
INCONSISTENCIES IN THE PROPOSED GRADES, LINES AND LEVELS, DIMENSIONS AND LOCATIONS
TO THE ENGINEER BEFORE COMMENCING WORK.
3. AREAS TO RECEIVE CLEARING AND GRUBBING SHALL INCLUDE ALL AREAS TO BE OCCUPIED BY THE
PROPOSED IMPROVEMENTS, AREAS FOR FILL AND SITE GRADING, AND BORROW SITES. REMOVE
TREES OUTSIDE OF THESE AREAS ONLY AS INDICATED ON THE DRAWINGS OR AS APPROVED IN
WRITING BY THE ENGINEER.
4. ALL COMBUSTIBLE DEBRIS AND REFUSE FROM SITE PREPARATION OPERATIONS SHALL BE
REMOVED TO LEGAL OFFSITE DISPOSAL AREAS.
5. SIDEWALKS, DRIVEWAYS AND CURBING DAMAGED OR REMOVED DURING CONSTRUCTION SHALL BE
REPLACED IN ACCORDANCE WITH THE CITY OF ORLANDO'S STANDARD SPECIFICATIONS.
6. ALL PAVEMENT REPAIR SHALL BE IN ACCORDANCE WITH THE CITY OF ORLANDO'S STANDARD
SPECIFICATIONS.
7. THE CONTRACTOR SHALL MAINTAIN AND PRESERVE NEWLY GRADED AREAS AND REPAIR AREAS
WHERE SETTLING AND EROSION HAVE OCCURRED.
8. ALL DISTURBED GRASS AREAS ARE TO BE RESODDED. SEED AND MULCH ARE NOT ALLOWED.
9. ALL DISRUPTED AREAS SHALL BE RETURNED TO THEIR ORIGINAL CONDITION OR BETTER.
UP
T
L B McLEOD ROAD
RECLAIMED
WATER
STORAGE TANK
REJECT
WATER
TANK
FLOCCULATION
& RAPID MIX
MASTER PUMP STATION
INTERMEDIATE
PUMP STATION
UNIT
POWER
CENTER
PLANT WATER
PUMP STATION
CHLORINE
CONTACT
CHAMBER
TRANSMISSION
PUMP STATION
CHLORINE GAS
HANDLING BUILDING
AND SCRUBBERS
LOCAL REUSE
PUMP STATION
MOTOR
CONTROL
CENTER
SURGE
TANK
ELECTRICAL
SUBSTATION
NO. 3
BELT FILTER PRESS
BIOSOLIDS PROCESS BUILDING
STORAGE BUILDING
WAS STORAGE
TANK
(EMERGENCY)
SLUDGE
STORAGE TANK
NO. 2
SLUDGE
DISTRIBUTION
BUILDING
IAG
BUILDING
AERATED
WAS
STORAGE
TANK
TUF
TANK/IPS
OVERFLOW
BACKWASH
DIVERSION
STRUCTURE
THICKENER
BUILDING
SLUDGE
ROUTING
BOX
TUF PUMP
STATION
SLUDGE HAULING
EQUIPMENT
PARKING AREA
WASTE GAS
BURNERS
FINAL CLARIFIER
NO. 4
FINAL CLARIFIER
NO. 2
FINAL CLARIFIER
NO. 3
FINAL CLARIFIER
NO. 1
BNR
BASINS 5-10
BNR
BASINS 1-4
ADMINISTRATIVE
CENTER
EMERGENCY
GENERATOR
BUILDING
BNR BLOWER
BUILDING
MAINTENANCE
BUILDING
PRELIMINARY
TREATMENT
ODOR CONTROL
OPERATIONS
BUILDING
EQ PUMP
STATION
CLARIFIER
SPLITTER BOX
SPLITTER BOX
EXISTING
PRELIMINARY
TREATMENT
STRUCTURE
NEW
PRELIMINARY
TREATMENT
UNDER
CONSTRUCTION
BIOSOLIDS TRAILER
LOADING FACILITY
TERTIARY
FILTERS
ODOR CONTROL UNIT
MASTER PUMP STATION
ELECTRICAL BUILDING
FLOW EQUALIZATION
TANK
GRIT SETTLING
BASIN NO. 1
GRIT SETTLING
BASIN NO. 2
FUEL
STORAGE
FACILITY
SLUDGE
STORAGE TANK
NO. 1
COMPRESSOR
BUILDING
SLUDGE
STORAGE TANK
NO. 3
AIR
COMPRESSOR
FACILITY
SILT FENCE REFER TO
DETAIL ON SHEET C1
BIOSET LIME
STABILIZATION
PROCESS
N
Job No.
Date:
Checked by:
Designed by:
Drawn by:
Sheet No.No. DateNo. Date Revision
THIS SHEET NOT VALID FOR CONSTRUCTION WITHOUT COMPLETE SET OF PLANS. SEE GENERAL NOTES FOR MASTER LEGEND.
Revision
B
ID
S E
T
O3153
OCTOBER 2025
BMF
RSS
DH / RBB
J:\O3153\Civil\DWG\_Current_Plan_Set\O3153 G-4 - OVERALL SITE PLAN.dwg, 11/21/2025 2:59:40 PM, Robert Luo, Convert - Cph Fullsize.stb
CITY OF ORLANDO / DEPARTMENT OF PUBLIC WORKS
WATER CONSERV II WRF
BNR SYSTEM BLOWER IMPROVEMENTS
www.cphcorp.com C 2025
1117 East Robinson Street Orlando, FL 32801 Ph: 407.425.0452
Plans Prepared By:
State of Florida Licenses:
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
Building Better Communities Together
DAVID ELTON MAHLER, P.E.
P.E. LIC. # 50041
OVERALL SITE PLAN
AND KEY PLAN
Graphic Scale in Feet
60 60 120
AREA OF BLOWER
IMPROVEMENTS
CONSTRUCTION
STORAGE AREA
G-4
REMOVE EX. BLOWER
AND TURN OVER TO CITY
(TYP OF 5)
EX. BLOWER 5 EX. BLOWER 3 EX. BLOWER 1
EX. BLOWER 4 EX. BLOWER 2
EX. DOOR
EX. ELECTRICAL ROOM
EX. 30" AIR PA-SST EX. 20" AIR PA
EX. 16"
RUBBER
EXPANSION
JOINT (TYP)
EX. 16" AIR
SST (TYP)
EX. 20" BFV MOTORIZED
EX. TRENCH W/ GRATING
TO AERATION BASIN 5-10
EX. 16" AIR
SST (TYP)
EX. 30" AIR PA
TO BNR BASINS 1-4
EXISTING 17'-4" W x 12'-0"H
OPENING (TYP OF 3)
EXISTING 13'-0" W x 12'-0"H
ROLLUP DOOR (TYP OF 2)
EXISTING 17'-4" W x 12'-0"H
ROLLUP DOOR (TYP OF 3)
A D-2
REMOVE AND
REINSTALL 16" BFV TO
HAVE OPERATOR
WHEEL ON OPPOSITE
SIDE
EX. PVC NPW
PIPING
REMOVE EX
GRATING
AND CHANNEL
SUPPORTS
CUT/REMOVE ABANDONED
4" DI SLUDGE PIPE TO
FLUSH W/ FLOOR AND
GROUT
REMOVE DRAIN COVER
AND PLUG EX. DRAIN
REFER TO DETAIL
AND NOTE 4
REMOVE EX. HOSE BIB
REMOVE AND DISPOSE OF
EXISTING ROLL UP DOOR
AND OPERATOR SYSTEM
CAP EX. 3/4"
RECLAIMED WATER
PIPE BELOW FLOOR
AND ABANDON
EX. DOUBLE DOOR
REMOVE EX. HANDWHEEL
ACTUATOR AND RETAIN
FOR REINSTALLATION
EX. OVERHEAD ELECTRICAL
CONDUITS TO REMAIN
REMOVE PROCESS
AIR PIPE FROM EX.
BINARY TO VALVE
(TYP OF 2)
REMOVE EX.
STANCHION
PIPE SUPPORT
EXISTING PIPE
SUPPORTS TO
BE REMOVED
OR BE REUSED
(TYPICAL)
EXISTING ELECTRICAL RACK TO REMAIN
REMOVE AND DISPOSE OF EX. 16"
SST PROCESS AIR PIPING, AND
FILLINGS BEFORE BLOWERS AND
FLANGED PIPE (TYP. OF 5)
REMOVE ELECTRIC MOTOR
ACTUATORS ON EX. 20" BFVS (TYP
OF 2) AND TURNOVER TO CITY
EX. 16" FLG
SPOOL PIECE
TO REMAIN
(TYP.)
REMOVE AND DISPOSE OF
EXISTING 16" BLIND FLANGE
REMOVE AND
DISPOSE OF EX.
16" SST PROCESS
AIR PIPING, AND
FILLINGS BEFORE
BLOWERS AND
FLANGED PIPE
(TYP. OF 5)
EX. 16" BFV (TYP.)
FASTEN PLUG IN EX.
DRAIN PIPE MIN OF 6"
INTO PIPE AND FILL
WITH GROUT
TO BNR BASINS 1-4
1.
2.
3.
4.
NOTES:
EX. BLOWER DISCHARGE 16" BFVS ARE WAFER STYLE AND MUST BE BOLTED BETWEEN
FLANGES ON BOTH SIDES OF VALVE TO BE RETAINED IN PLACE.
BLOWERS AND ASSOCIATED PIPING AND VALVES TO BE REPLACED IN ACCORDANCE WITH
CONSTRUCTION SEQUENCE SHEET M-3 TO MAINTAIN SUFFICENT PROCESS AIR CAPACITY
AT ALL TIMES.
EX. BLOWERS ARE TO BE PROTECTED FROM DAMAGE DURING REMOVAL AND TURNED
OVER TO THE CITY.
CONTRACTOR TO INCLUDE IN BID ALLOWANCE FOR PLUGGING AND GROUTING UP 6 FLOOR
DRAINS INSIDE BLOWER BUILDING PER DETAIL 3/M-5.
REMOVE AND TURN OVER TO
OWNER
REMOVE AND DISPOSE OF
LEGEND
3/8" = 1'-0"
DEMOLITION PLAN
Job No.
Date:
Checked by:
Designed by:
Drawn by:
Sheet No.No. DateNo. Date Revision
THIS SHEET NOT VALID FOR CONSTRUCTION WITHOUT COMPLETE SET OF PLANS. SEE GENERAL NOTES FOR MASTER LEGEND.
Revision
B
ID
S E
T
O3153
OCTOBER 2025
BMF
RSS
DH / RBB
J:\O3153\Civil\DWG\_Current_Plan_Set\O3153 D-1 - BLOWER BUILDING DEMOLITION PLAN.dwg, 11/21/2025 2:59:47 PM, Robert Luo, Convert - Cph Fullsize.stb
CITY OF ORLANDO / DEPARTMENT OF PUBLIC WORKS
WATER CONSERV II WRF
BNR SYSTEM BLOWER IMPROVEMENTS
www.cphcorp.com C 2025
1117 East Robinson Street Orlando, FL 32801 Ph: 407.425.0452
Plans Prepared By:
State of Florida Licenses:
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
Building Better Communities Together
DAVID ELTON MAHLER, P.E.
P.E. LIC. # 50041
BNR BLOWER BUILDING
DEMOLITION PLAN D-1
N
T/ EX. SLAB
98.50 ft
MATCH EX. PIPE CL
CL EL.= 110.92 ft
BLOWER 2 BLOWER 1
MATCH EX. PIPE CL
CL EL.= 110.21 ft
REMOVE AND DISPOSE
EXISTING 17'-4" W X 12'-0"
ROLLUP DOOR SYSTEM
EX. ELECTRICAL CONDUIT
TO REMAIN
REMOVE AND DISPOSE OF
EX. 16" SST. AIR PIPING.
WAFER CV. EXPANSION
JOINT AND BLOW DOWN
VALVE (TYP. OF 5).
REMOVE BLOWER
AND TURN OVER TO
CITY (TYP. OF 5)
REMOVE GRATING FROM
CHANNELS
CUT EX. 16" SST AIR
PIPE 8" FROM EX.
FLANGE (TYP OF 2)
T/ EX. WALL
117.25 ft
T/ EX. ROOF
115.83 ft
EX. 30" PA SST.
EX. 30" PA SST. AIR
EX. 30" PA SST. AIR
REMOVE AND TURN OVER TO
OWNER
REMOVE AND DISPOSE OF
LEGEND
3/8" = 1'-0" D-2
SECTION (DEMOLITION) A
D-1
Job No.
Date:
Checked by:
Designed by:
Drawn by:
Sheet No.No. DateNo. Date Revision
THIS SHEET NOT VALID FOR CONSTRUCTION WITHOUT COMPLETE SET OF PLANS. SEE GENERAL NOTES FOR MASTER LEGEND.
Revision
B
ID
S E
T
O3153
OCTOBER 2025
BMF
RSS
DH / RBB
J:\O3153\Civil\DWG\_Current_Plan_Set\O3153 D-2 - BNR BLOWER BUILDING DEMOLITION SECTION.dwg, 11/21/2025 2:59:55 PM, Robert Luo, Convert - Cph Fullsize.stb
CITY OF ORLANDO / DEPARTMENT OF PUBLIC WORKS
WATER CONSERV II WRF
BNR SYSTEM BLOWER IMPROVEMENTS
www.cphcorp.com C 2025
1117 East Robinson Street Orlando, FL 32801 Ph: 407.425.0452
Plans Prepared By:
State of Florida Licenses:
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
Building Better Communities Together
DAVID ELTON MAHLER, P.E.
P.E. LIC. # 50041
BNR BLOWER BUILDING
DEMOLITION SECTION D-2
FILL EXISTING TRENCH WITH CONCRETE,
REFER TO STRUCTURAL DWGS
A M-2
EX. 30" PA-SST EX. 20" PA-SST
NEW
BLOWER 3
INLET FILTER/
SILENCER BOX
(TYP OF 5)
INSTALL NEW BLOWER (TYP OF 5)
16" 90 DEG
BEND, FLG X
WJ (TYP OF 5)
DOUBLE DOOR
WAFER CHECK
VALVE PROVIDED
BY BLOWER
MANUF. (TYP OF 5)
EX. 16" FLG
SPOOL PIECE
(TYP OF 3)
EX. 30" PA-SST
TO BNR BASINS 5-10
EX. DOOR
EXISTING 17'-4" W x 12'-0"H
OPENING (TYP OF 3)
EXISTING 17'-4" W x 12'-0"H
ROLLUP DOOR (TYP OF 2)
11'1" L X 5'11" W 4" H
CONCRETE EQUIPMENT
PAD (TYP OF 5)
EX. 16" PA
SST (TYP)
EX. 20" BFV MOTORIZED
EX. ELECTRICAL ROOM
12" GOOSENECK EXHAUST
VENT WITH SST INSECT
SCREEN ON CONTROL
CENTER COOLING OUTLET
(TYP OF 5)
20" PA SST
TO BNR BASINS 1-4
20" BFV, FLG
SEE NOTE 2
16" PA SST
(TYP.)16" BFV, FLG
(TYP OF 2)
CORE 26" PENETRATION
THROUGH EX. PRECAST
DOUBLE TEE ROOF
(ABOVE)
24" SST AIR
DUCT
16" 90° BEND, FLG x WJ
(TYP OF 3)
20" SST AIR DUCT
10" SST AIR DUCT
(TYP OF 5)
10" SST AIR DUCT 10" SST AIR DUCT
16" SST AIR DUCT
HANGER PIPE
SUPPORT
DAMPER
(TYP. OF 5)
SEE NOTE 5
NEW
BLOWER 2
NEW
BLOWER 1
NEW
BLOWER 4
NEW
BLOWER 5
BLOWER 6
FUTURE
20" x 10" SST DUCT TEE
(TYP OF 2)
10" SST DUCT 45° BEND
10" SST AIR DUCT
(2) 10" DUCT 90 BENDS
26.5"X26.5"
SQUARE
OPENING
EX. DOUBLE DOOR
TYP.
6' - 10"
T
THERMOSTAT
10" SST DUCT CAP
(TYP OF 2)
CONTROL CENTER
COOLING EXHAUST (TYP)
INSTALL NEW ELECTRIC MOTOR
ACTUATORS ON EX. 20" BFVS (TYP OF 2)
MOTOR COOLING AIR EXHAUST DUCT
INSTALL SCREEN DOOR WITH MAN
DOOR WITHIN EXISTING OPENINGS,
REFER TO ARCHITECTURAL DWGS
SHEET A5
20"x16" TEE, WJ X
FLG (TYP OF 2)
WALL MOUNTED EXHAUST
FAN GREENHECK PRODUCT
CUBE-180HP-10130G3QD-DR2
INSTALL NEW PIPE/DUCT
SUPPORT (TYP.)
INSTALL SCREEN EXISITNG
OPENING, REFER TO
ARCHITECTURAL DWGS
NEW CONCRETE MASONRY BLOCK
WALL TO MATCH EXISTING
BUILDING STRUCTURE AND DOOR,
REFER TO STRUCTURAL AND
ARCHITECTURAL DWGS
30"x20" SST RED.
SEE NOTE 2 FLG
24" x 10" SST DUCT
TEE (TYP OF 3)
24" 90° SST
ELBOW DUCT
24" 90° SST
ELBOW DUCT
24" SST DUCT TO
ROOFTOP EXHAUST
16" x 10" SST
DUCT TEE
(TYP OF 2)
10" SST DUCT 90°
BEND (TYP OF 5)
REINSTALL EX.
ACTUATOR W/
HANDWHEEL FACING
EAST AS SHOWN
EXISTING 13'-0" W x
12'-0"H ROLLUP
DOOR (TYP OF 2)
20" SST 90
DEGREE BEND
20" X 16" SST TEE, WJ
X FLG (TYP. OF 2)
INSTALL 16" BLIND
FLANGE (TYP OF 2.)
INSTALL 16" BLIND
FLANGE (TYP OF 2.)
EXISTING
ELECTRICAL
RACK
CONNECTION FOR FUTURE
10" SST AIR DUCT
INSTALL NEW 20"
EXPANSION COUPLING
INSTALL NEW 24"
EXPANSION COUPLING
NOTES:
1. A MIN. TOTAL OF 4 BLOWERS (2 BLOWERS SERVING BASINS 1-4 AND 2 BLOWERS SERVING BASINS 6-10) TO BE OPERATIONAL AT ALL TIMES.
2. FOR INSTALLATION OF 30"X20" REDUCING FLANGE AND 20" BFV ON EXISTING 30" TEE LEADING TO BASINS 1-4, PROCESS AIR TO BASINS 1-4
MAY BE SHUT DOWN FOR NO MORE THAN 15 MINUTES.
3. THE DISTANCE BETWEEN TWO BLOWERS AND THE DISTANCE BETWEEN THE BLOWERS AND THE ROOM WALLS MUST BE AT LEAST 31.5". THIS
SPACE IS REQUIRED FOR INSTALLATION . MAINTENANCE AND SERVICE.
4. THE BLOWERS SHALL BE INSTALLED ON A FLAT AND LEVEL EQUIPMENT PAD SURFACE. IT MUST BE LEVEL TO WITHIN 0.5° IN ANY DIRECTION.
5. DUCT DAMPERS TO BE RUSKIN MODEL BDR2 ROUND BACKDRAFT DAMPER RATED FOR AT LEAST 180 DEG F TEMPERATURE.
6. ALL NEW BFVS ARE TO HAVE FLANGES CAST INTO VALVE BODY.
7. DUCT HANGER SUPPORTS NOT SHOWN BUT ARE REQUIRED. REFER TO SPECIFICATION 15881 FOR AIR DUCT SUPPORT REQUIREMENTS
8. ALL STAINLESS STEEL PIPING, FITTINGS, AND DAMPERS SHALL BE TYPE 316, SSH 105
9. CONTRACTOR TO MEASURE AND INCLUDE WITH SHOP A COMPLETE AIR PIPING LAYOUT OF EXISTING AND PROPOSED PIPE
3/8" = 1'-0"
PLAN
EX. CMU BUILDINGCUT AND CAP EX.
RECLAIMED WATER LINE
APPROX. 5' OUTSIDE
BUILDING REFER TO DETAIL
Job No.
Date:
Checked by:
Designed by:
Drawn by:
Sheet No.No. DateNo. Date Revision
THIS SHEET NOT VALID FOR CONSTRUCTION WITHOUT COMPLETE SET OF PLANS. SEE GENERAL NOTES FOR MASTER LEGEND.
Revision
B
ID
S E
T
O3153
OCTOBER 2025
BMF
RSS
DH / RBB
J:\O3153\Civil\DWG\_Current_Plan_Set\O3153 M-1 - BLOWER BUILDING IMPROVEMENTS PLAN.dwg, 11/21/2025 3:00:00 PM, Robert Luo, Convert - Cph Fullsize.stb
CITY OF ORLANDO / DEPARTMENT OF PUBLIC WORKS
WATER CONSERV II WRF
BNR SYSTEM BLOWER IMPROVEMENTS
www.cphcorp.com C 2025
1117 East Robinson Street Orlando, FL 32801 Ph: 407.425.0452
Plans Prepared By:
State of Florida Licenses:
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
Building Better Communities Together
DAVID ELTON MAHLER, P.E.
P.E. LIC. # 50041
BNR BLOWER BUILDING
IMPROVEMENTS - VIEW M-1
T/ EX. SLAB
98.50 ft
EX. 16" BFV
(TYP OF 2)
16" DOUBLE DOOR WAFER
CV, PROVIDED BY
BLOWER MANUFACTURER
(TYP OF 5)
16" S.S. 90° BEND
(TYP OF 5)
16"x12" S.S. DIFFUSER CONE, FLG
PROVIDED BY BLOWER MANUF. (TYP. OF 5)
16" PA
(TYP OF 5)
12" METAL FLEXIBLE JOINT
PROVIDED BY BLOWER MANUFACTURER
(TYP OF 5)
EX. 16" S.S.
SPOOL PIECE
(TYP OF 2)
EX. 30" PA-SST
11'-1" L X 5'-11" W 4" H
CONCRETE
EQUIPMENT PAD
(TYP OF 5) FILL EX. TRENCH W/ CONCRETE
REFER TO STRUCTURAL DWGS
EX. ELECTRICAL
CONDUIT RACK
INSTALL NEW BLOWER
(TYP OF 5)
INSTALL ANCHOR BOLTS
IN ACCORDANCE WITH
BLOWER MANUFACTURER
RECOMMENDATIONS
TO AERATION BASINS 5-10
10" SST AIR DUCT
20" SST AIR DUCT
10" SST AIR DUCT ON
MOTOR COOLING
EXHAUST OUTLET
16" BFV (TYP OF 2)
20" PA
10" SST AIR DUCT
DAMPER
(TYP OF 5)
16" PA
MATCH EX. PIPE CL
CL EL.= 110.92 ft
BLOWER 5 BLOWER 2
MATCH EX. PIPE CL
CL EL.= 110.21 ft
10" DUCT 90° BEND
10" DUCT 90° BEND
STANCHION PIPE SUPPORT
(TYP. OF 2)
20" SST 90° BEND, WJ
20" SST 90° BEND, WJ
INSTALL ROLLUP
SCREEN ON EXISTING
OPENING, REFER TO
ARCHITECTURAL
DWGS SHEET A5 (TYP
OF 3)
BLOWER MOTOR COOLING
AIR DISCHARGE PIPE
10" GOOSENECK EXHAUST
VENT WITH SS INSECT
SCREEN ON CONTROL
CENTER COOLING OUTLET
(TYP OF 5)
10" DUCT DAMPER
(TYP.)
PROCESS AIR PIPING TO
BUR TRAINS 1-4
INLET FILTER/ SILENCER BOX
PROVIDED BY BLOWER
MANUFACTURER (TYP OF 5)
3/8" = 1'-0" M-2
SECTION A
M-1
Job No.
Date:
Checked by:
Designed by:
Drawn by:
Sheet No.No. DateNo. Date Revision
THIS SHEET NOT VALID FOR CONSTRUCTION WITHOUT COMPLETE SET OF PLANS. SEE GENERAL NOTES FOR MASTER LEGEND.
Revision
B
ID
S E
T
O3153
OCTOBER 2025
BMF
RSS
DH / RBB
J:\O3153\Civil\DWG\_Current_Plan_Set\O3153 M-2 - BLOWER BUILDING IMPROVEMENTS SECTION.dwg, 11/21/2025 2:59:38 PM, Robert Luo, Convert - Cph Fullsize.stb
CITY OF ORLANDO / DEPARTMENT OF PUBLIC WORKS
WATER CONSERV II WRF
BNR SYSTEM BLOWER IMPROVEMENTS
www.cphcorp.com C 2025
1117 East Robinson Street Orlando, FL 32801 Ph: 407.425.0452
Plans Prepared By:
State of Florida Licenses:
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
Building Better Communities Together
DAVID ELTON MAHLER, P.E.
P.E. LIC. # 50041
BNR BLOWER BUILDING
IMPROVEMENTS -
SECTION AND DETAILS M-2
SCALE: M-5
2STANCHION PIPE SUPPORT W/ U-BOLT
N.T.S.
SCALE: M-5
1PIPE HANGER SUPPORT FROM CONCRETE CELING
N.T.S.
CORE 26" PENETRATION
THROUGH EX. PRE-CAST
DOUBLE TEE ROOF AND INSTALL
ALL NECESSARY FILLINGS &
COMPARTMENTS ON ROOFS
NEW
BLOWER
NO. 5
NEW
BLOWER
NO. 4
EX.
BLOWER
NO. 3
EX.
BLOWER
NO. 1
EX.
BLOWER
NO. 5
CONSTRUCTION SEQUENCE STEPS 1 & 2
SCALE: 3/8" = 1'-0"
EX.
BLOWER
NO. 4
EX.
BLOWER
NO. 2
16" FLANGED
BUTTERFLY VALVE
(TYP. OF 2)
TO BNR BASINS 5-10
INLET FILTER
SILENCER BOX
BY BLOWER
MANUFACTURER
(TYP.)
INSTALL NEW
BLOWER (TYP.)
16" SST 90 DEG BEND
FLG X WJ (TYP.)
DOUBLE DOOR WAFER
CHECK VALVE
PROVIDED BY BLOWER
MANUF. (TYP.)
10" SST GOOSENECK
EXHAUST VENT WITH SST
INSECT SCREEN ON
CONTROL CENTER
COOLING OUTLET (TYP.)
11'-1" L X 5'-11" W X 4" H
CONCRETE EQUIPMENT
PAD (TYP.)
DEMO
EXISTING
BLOWER
AND PIPING
(TYP.)
CUT EX. 16" SST AIR PIPE
8" FROM EX. FLANGE
(TYP.)
EX. 30" PA
24" SST AIR DUCT
24" SST AIR DUCT
INSTALL TEMPORARY
CAPS INSTALL TEMPORARY
CAPS
INSTALL TEMPORARY
CAPS
PIPE STANCHION SUPPORT
BLOWER MOTOR COOLING
AIR DISCHARGE DUCT
20" FLANGED
BUTTERFLY VALVE
INSTALL
PERMANENT
CAPS
INSTALL
PERMANENT
CAPS
A M-2
DEMO EXISTING
BLOWER AND
PIPING (TYP.)
EXISTING
ELECTRICAL
RACK
HANGER PIPE
SUPPORT
(2) 10" DUCT
90 BENDS
10" SST AIR
DUCT (TYP
OF 5)
DAMPER (TYP.
OF 5) SEE
SHEET M-1,
NOTE 5
10" SST DUCT
45° BEND (TYP
OF 5)
10" SST DUCT
90° BEND (TYP
OF 5)
DEMO EXISTING
BLOWER AND
PIPING (TYP.)
TO BNR BASINS 1-4
Job No.
Date:
Checked by:
Designed by:
Drawn by:
Sheet No.No. DateNo. Date Revision
THIS SHEET NOT VALID FOR CONSTRUCTION WITHOUT COMPLETE SET OF PLANS. SEE GENERAL NOTES FOR MASTER LEGEND.
Revision
B
ID
S E
T
O3153
OCTOBER 2025
BMF
RSS
DH / RBB
J:\O3153\Civil\DWG\_Current_Plan_Set\O3153 M-3 - CONSTRUCTION SEQUENCE STEPS 1 & 2.dwg, 11/21/2025 2:59:34 PM, Robert Luo, Convert - Cph Fullsize.stb
CITY OF ORLANDO / DEPARTMENT OF PUBLIC WORKS
WATER CONSERV II WRF
BNR SYSTEM BLOWER IMPROVEMENTS
www.cphcorp.com C 2025
1117 East Robinson Street Orlando, FL 32801 Ph: 407.425.0452
Plans Prepared By:
State of Florida Licenses:
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
Building Better Communities Together
DAVID ELTON MAHLER, P.E.
P.E. LIC. # 50041
CONSTRUCTION SEQUENCE
- STEPS 1 & 2 M-3
STEPS 1 & 2 CONSTRUCTION SEQUENCE:
STEP 1: CONNECT TO EXISTING 20" AIR HEADER W/ NEW 20" SST AIR HEADER PIPING AND 20" BFV.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .