This document appears to be an exhibit containing project specifications for an instrumentation and control system upgrade to the HVAC system at the Athens East Leroy Elementary School in Athens, Michigan. The project involves upgrading the variable frequency drives (VFDs) for the HVAC system, providing new control features and functionality, and adding monitoring capabilities. The specifications detail the requirements for the VFD features, control sequences, alarms, and electrical connections. The project also includes the installation of new automatic control dampers, air flow monitoring devices, and wall modules for temperature indication. The work is part of a larger mechanical system upgrade project for the Athens East Leroy Elementary School, which is overseen by the Athens Area Schools.
The specifications indicate that the project is limited to a single existing facility, the Athens East Leroy Elementary School, and does not mention any set-asides, incumbent contractors, or funding sources. Pricing terms are not specified, but the project requires the use of specific manufacturers or approved equals for the VFDs, control dampers, and other equipment. The project timeline is not explicitly stated, but the document is dated December 7, 2023, suggesting the work will be completed by that date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO. 22186.10 INSTRUMENTATION AND CONTROL FOR HVAC
ATHENS EAST LEROY ELEMENTARY MECHANICAL UPGRADE 23 0900 - 31
ATHENS AREA SCHOOLS DECEMBER 7, 2023
[Copyright] 2023 Tower Pinkster Titus Associates - All Rights Reserved
c. The display shall indicate VFD status (RUN motor rotation, READY, STOP, ALARM, and FAULT), and shall indicate the VFD current control source (DDC input signal, keypad, or field bus control). In addition to the alphanumeric display, the display unit shall have three pilot lights to annunciate when the power is on (green), when the drive is running (green, blinks when stopping and ramping down), and when the drive was shut down due to a detected fault (red, fault condition presented on the alphanumeric display).
6. Programmable Features
a. The variable frequency drive shall have separate pre-loaded user-programmable applications which can be modified using a personal computer-based commissioning tool with an optional software package, or an alpha-numeric LCD user interface.
Aforementioned application functionality shall include but not be limited to:
1) Basic Functionality Application providing the following:
a) Control I/O signals (two (2) analog inputs, one (1) digital input, and one (1) analog output) are fixed
b) One (1) programmable digital input and one (1) programmable digital output
c) All parameters have default values,
2) Expanded Functionality Application providing all capabilities in the previous application as well as the following:
a) One (1) programmable digital input and all outputs are programmable
b) Frequency limit and prohibit capability
c) Programmable start/stop and reversing logic
d) Automatic restart
e) Programmable actions for motor thermal and stall protection
f) DC brake at stop
3) Application that provides all previously mentioned capability as well as enabling the use of two different control and frequency sources. Each source must be programmable.
4) Application which provides all functionality from the Expanded Functionality Application as well as accommodates multiple, required fixed speed references.
5) PID Control Application – Uses internal PID control loop to control motor frequency as well as providing:
6) Input and output phase supervision
7) Programmable capability for three (3) digital inputs and all outputs
8) Sleep function
9) Multi-purpose Control Application – The frequency reference can be selected from analog inputs, joystick control, motor potentiometer, or a mathematical function of the analog inputs.
10) Application specifically designed to control one leading variable speed drive and up to 3 auxiliary drives.
7. Alarms/Faults
a. Three types of faults shall be monitored, “FAULT” shall shut the motor down, “FAULT Auto-reset” shall shut the motor down and try to restart it for a programmable number of tries, and “FAULT Trip” shall shut the motor down after a FAULT Auto-reset fails to restart the motor. Coded faults shall be automatically displayed for the following faults:
1) Over current
2) Over voltage
3) Earth ground
4) Emergency stop
5) System (component failure)
ATHENS EAST LEROY ELEMENTARY MECHANICAL UPGRADE 23 0900 - 32
6) Under voltage
7) Phase missing
8) Heat sink under temperature
9) Heat sink over temperature
10) Motor stalled
11) Motor over temperature
12) Motor underload
13) Cooling fan failure
14) Inverter bridge over temperature
15) Analog input control under current
16) Keypad failure
17) Other product unique monitored conditions
b. In addition to annunciating faults, at the time of fault occurrence the VFD shall capture and make available to the user certain system data for subsequent analysis during fault trouble shooting, including duration of operation (days, hours, minutes, seconds),output frequency, motor current, motor voltage, motor power, motor torque, DC voltage, unit temperature, run status, rotation direction, and any warnings. The last 10 fault occurrences shall be retained as well as the fault data listed in the previous sentence of each fault. New faults beyond 10 shall overwrite the oldest faults.
8.
9. Electrical Disconnect – Lockable non fused.
10. Acceptable manufacturers – check with the owner for what manufacturer and model preferences they have. If they don’t have a preference here are acceptable manufacturers:
a. ABB
b. Honeywell
c. Square D
d. Danfoss
e. Rockwell
O. Any automatic control dampers not specified to be integral with other equipment. Frames shall not be less than 0.094 inch(2.39 mm) galvanized steel. Blades shall not be over 8 inches(200 mm) wide nor less than
0.063 inch(1.52 mm) galvanized steel roll formed. Bearings shall be oilite, ball-bearing or nylon with steel shafts. Side seals shall be stainless steel of the tight-seal spring type. Dampers and seals shall be suitable for temperature ranges of -40 to 200 deg F(-40 to 93 deg C).
1. Individual damper sections shall have a maximum of 16 sq. ft.(1.49 sq. m) of damper surface and each individual damper section to have its own damper operator.
2. All proportional control dampers shall be opposed blade type and all two-position dampers shall be parallel blade types.
3. Dampers shall be sized to meet ductwork or opening size.
4. Dampers shall be ultra-low leakage dampers and the blade edges shall be fitted with replaceable, snap-on, inflatable seals to limit damper leakage to 6 CFM per square foot for dampers in excess of sixteen inches square at 1-inch wg(250 Pa).
P. Thermally Isolated Dampers: Ruskin Model CDT150 or equivalent extruded aluminum thermally isolated control dampers with insulated air-foil shaped blades.
Q. Digital Wall Module: Each wall module shall provide temperature indication to the digital controller.
ATHENS EAST LEROY ELEMENTARY MECHANICAL UPGRADE 23 0900 - 33
1. Provide software-limited set point adjustment and occupied/unoccupied override capability where indicated.
2. Module mounted adjustments shall use buttons, no slides or wheels.
R. Water Flow Meters: Water flow meters shall be axial turbine style flow meters which translate liquid motion into electronic output signals proportional to the flow sensed. Flow sensing turbine rotors shall be non-metallic and not impaired by magnetic drag. Flow meters shall be ‘insertion’ type complete with ‘hot-tap’ isolation valves to enable sensor removal without water supply system shutdown. Accuracy shall be + 2% of actual reading from 0.4 to 20 feet per second(0.12 to 6.1 meters per second) flow velocities.
S. Duct smoke detectors shall be furnished and connected to the building fire alarm under Division 28.
Contacts shall be provided for the BMS contractor to connect for fan shutdown as specified in the Sequence of Operations.
T. Carbon Dioxide sensors shall be 0-10 Vdc analog output type, with corrosion free gold-plated Non-dispersive Infrared sensing, designed for duct mounting. Sensor shall incorporate internal diagnostics for power, sensor, analog and output checking, and Automatic Background Calibration algorithm for reduced maintenance. Sensor range shall be 0-3000 PPM with +/- 5% and +/- 50 PPM accuracy.
PART 3 - EXECUTION
3.1 GENERAL
A. The BMS shall be designed, installed, and commissioned in a turnkey operational manner; including all labor not noted in Work by Others paragraph of PART I of this section of these specifications, and not noted in other sections of these specifications.
B. Where control devices are installed on insulated piping or ductwork, provide standoff brackets or thermowells sized to clear insulation thickness. Provide extended sensing elements, actuator linkages, and other accessories as required.
3.2 SEQUENCE OF OPERATION
A. Refer to Mechanical Control drawings.
3.3 INSTALLATION
A. All controls Installer work shall be installed, wired, circuit tested and calibrated by factory certified technicians qualified for this work.
B. Line and low voltage electrical connections to control equipment shall be provided by the controls Installer in accordance with these specifications.
C. All control devices mounted on the face of control panels shall be clearly identified as to function and system served with permanently engraved phenolic labels.
D. All wiring and tubing shall be properly supported and run in a neat and workmanlike manner. All wiring and tubing exposed and in equipment rooms shall run parallel to or at right angles to the building structure.
ATHENS EAST LEROY ELEMENTARY MECHANICAL UPGRADE 23 0900 - 34
All tubing and wiring within enclosures shall be neatly bundled and anchored to prevent obstruction to devices and terminals. All wiring shall be in accordance with all local and national codes. All line voltage wiring, all wiring exposed, and all wiring in equipment rooms shall be installed in conduit in accordance to the electrical specifications. All electronic wiring shall be #18 AWG minimum THHN and shielded if required, except standard network (Ethernet, LonWorks, etc.) cabling shall be as tested and recommended in lieu of #18 gauge twisted, #22 or #24 gauge is acceptable if used as a part of an engineered structured cabling system. The control manufacturer must submit technical and application documentation demonstrating that this cabling system has been tested and approved for use by the manufacturer of both the control system and the engineered structured cabling system.
1. Low voltage system cables shall be neatly routed and independently supported with cable rings to the nearest cable tray, technology closet, conduit run or equipment connection.
2. All wiring in ceiling plenums shall be plenum rated.
E. This contractor shall provide all sensing, control, and interlock wiring and tubing for the following unless shown or specified elsewhere by others:
1. Boiler interlocks.
2. Condensing units interlocks.
3. Hydronic piping pressure sensors.
4. CO2 sensors.
5.
6. Smoke detection devices and HVAC equipment shut-down devices.
F. The controls contractor shall install all software and enter all computer data into the network area controllers, hardware, and related computers including all control programs, initial approved parameters and settings, and graphics.
G. Verify location of thermostats, humidistats, and other exposed control sensors with Drawings and room details before installation. Install wall-mounting devices in electrical outlet boxes at heights to match lighting controls.
H. For airflow monitoring devices, perform the following field tests and inspections and prepare test reports:
1. Operational Test: After substantial completion of airflow system, start units to confirm proper operation and readings. Remove and replace malfunctioning units and retest.
2. Test calibration to confirm proper operation and readings.
I. Install VFCs with tops at uniform height and with disconnect operating handles not higher than 79 inches (2000 mm) above finished floor unless otherwise indicated, and by bolting units to wall or mounting on freestanding lightweight racks bolted to wall or floor. Do not mount to vibrating equipment.
J. Connect to electrical power monitor at main power service entrance disconnect to measure whole facility electrical usage.
3.4 ACCEPTANCE
A. The BMS contractor shall completely check out, calibrate and test all connected hardware and software to insure that the system performs in accordance with the approved specifications and sequences of operations.
ATHENS EAST LEROY ELEMENTARY MECHANICAL UPGRADE 23 0900 - 35
1. Coordinate with other Installers the checkout of each controlled system
B. The controls Installer shall perform tests to verify proper performance of components, routines, and points.
Repeat tests until proper performance results. This testing shall include a point-by-point log to validate 100% of the input and output points of the DDC system operation.
C. Upon completion of the performance tests described above, repeat these tests, point by point as described in the validation log above in presence of Owner's Representative, as required. Properly schedule these tests so testing is complete at a time directed by the Owner's Representative. Do not delay tests so as to prevent delay of occupancy permits or building occupancy.
D. System Acceptance: Satisfactory completion is when the controls Installer has performed successfully all the required testing to show performance compliance with the requirements of the Contract Documents to the satisfaction of the Owner’s Representative. System acceptance shall be contingent upon completion and review of all corrected deficiencies.
3.5 TRAINING
A. All training shall be by the BMS Installer and shall utilize operators’ manuals and as-built documentation.
B. The controls Installer shall provide 40 hours of instruction to the Owner's designated personnel on the operation of the BMS and describe its intended use with respect to the programmed functions specified.
Operator orientation of the BMS shall include, but not be limited to; device programming software, graphical development software, graphical user interface, the overall operation program, equipment functions (both individually and as part of the total integrated system), commands, systems generation, advisories, and appropriate operator intervention required in responding to the System's operation.
C. The training shall be in three sessions as follows:
1. Initial Training: One day session (8 hours) after system is started up and at least one week before first acceptance test. Manual shall have been submitted at least two weeks prior to training so that the Owners' personnel can start to familiarize themselves with the system before training begins.
2. Follow-Up Training: Two one day sessions (8 hours each) after initial training, and before Formal Acceptance. These sessions will deal with more advanced topics and answer questions.
3. Warranty Follow Up: Two one day sessions (8 hours each) to be scheduled at the request of the Owner during the one year warranty period. These sessions shall cover topics as requested by the owner such as; how to add additional points, create and gather data for trends, graphic screen generation or modification of control routines.
D. On-Line Service: Include 40 hours of on-line service assistance to include but not be limited to:
1. Programming changes or modifications, including changes and adjustments to control algorithms
2. Graphic changes or modifications as requested by the Owner or consulting engineer.
3. Operator assistance to include short (1 hour or less) refresh training on system diagnostics and operation, i.e., geothermal optimization, scheduling, trending or operator setup.
4. Consulting engineer assistance to include assistance on control system optimization.
ATHENS EAST LEROY ELEMENTARY MECHANICAL UPGRADE 23 0900 - 36
3.6 POINTS LIST
A. Refer to Controls Drawing for points list. Provide all additional points as required to accomplish all BMS sequences indicated in the drawings and specifications.
END OF SECTION 23 0900
PROJECT NO. 22186.10 FACILITY NATURAL GAS PIPING
ATHENS EAST LEROY ELEMENTARY MECHANICAL UPGRADE 23 1123 - 1
SECTION 23 1123 - FACILITY NATURAL GAS PIPING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Pipes, tubes, and fittings.
2. Piping specialties.
3. Piping and tubing joining materials.
4. Valves.
5. Pressure regulators.
6. Mechanical sleeve seals.
1.2 DEFINITIONS
A. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe and duct shafts, unheated spaces immediately below roof, spaces above ceilings, unexcavated spaces, crawlspaces, and tunnels.
B. Exposed, Interior Installations: Exposed to view indoors. Examples include finished occupied spaces and mechanical equipment rooms.
C. Exposed, Exterior Installations: Exposed to view outdoors or subject to outdoor ambient temperatures and weather conditions. Examples include rooftop locations.
1.3 PERFORMANCE REQUIREMENTS
A. Minimum Operating-Pressure Ratings:
1. Piping and Valves: 100 psig(690 kPa) minimum unless otherwise indicated.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of the following:
1. Piping specialties.
2. Valves. Include pressure rating, capacity, settings, and electrical connection data of selected models.
3. Pressure regulators. Indicate pressure ratings and capacities.
1.5 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For pressure regulators to include in emergency, operation, and maintenance manuals.
ATHENS EAST LEROY ELEMENTARY MECHANICAL UPGRADE 23 1123 - 2
1.6 DELIVERY, STORAGE, AND HANDLING
A. Deliver pipes and tubes with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe end damage and to prevent entrance of dirt, debris, and moisture.
B. Store and handle pipes and tubes having factory-applied protective coatings to avoid damaging coating, and protect from direct sunlight.
C. Protect stored PE pipes and valves from direct sunlight.
1.7 PROJECT CONDITIONS
A. Interruption of Existing Natural-Gas Service: Do not interrupt natural-gas service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide purging and startup of natural-gas supply according to requirements indicated:
1. Notify Construction Manager no fewer than two days in advance of proposed interruption of natural-gas service.
2. Do not proceed with interruption of natural-gas service without Construction Manager's written permission.
PART 2 - PRODUCTS
2.1 PIPES, TUBES, AND FITTINGS
A. Steel Pipe: ASTM A 53/A 53M, black steel, Schedule 40, Type E or S, Grade B.
1. Malleable-Iron Threaded Fittings: ASME B16.3, Class 150, standard pattern.
2. Wrought-Steel Welding Fittings: ASTM A 234/A 234M for butt welding and socket welding.
3. Unions: ASME B16.39, Class 150, malleable iron with brass-to-iron seat, ground joint, and threaded ends.
4. Forged-Steel Flanges and Flanged Fittings: ASME B16.5, minimum Class 150, including bolts, nuts, and gaskets of the following material group, end connections, and facings:
a. Material Group: 1.1.
b. End Connections: Threaded or butt welding to match pipe.
c. Face: Lapped.
d. Gasket Materials: ASME B16.20, metallic, flat, asbestos free, aluminum o-rings, and spiral-wound metal gaskets.
e. Bolts and Nuts: ASME B18.2.1, carbon steel.
B. PE Pipe: ASTM D 2513, SDR 11.
1. PE Fittings: ASTM D 2683, socket-fusion type or ASTM D 3261, butt-fusion type with dimensions matching PE pipe.
2. PE Transition Fittings: Factory-fabricated fittings with PE pipe complying with ASTM D 2513, SDR 11; and steel pipe complying with ASTM A 53/A 53M, black steel, Schedule 40, Type E or S, Grade B.
3. Transition Service-Line Risers: Factory fabricated and leak tested.
ATHENS EAST LEROY ELEMENTARY MECHANICAL UPGRADE 23 1123 - 3
a. Underground Portion: PE pipe complying with ASTM D 2513, SDR 11 inlet connected to steel pipe complying with ASTM A 53/A 53M, Schedule 40, Type E or S, Grade B, with corrosion-protective coating for aboveground outlet.
b. Outlet shall be threaded or flanged or suitable for welded connection.
c. Bridging sleeve over mechanical coupling.
d. Factory-connected anode.
e. Tracer wire connection.
f. Ultraviolet shield.
g. Stake supports with factory finish to match steel pipe casing or carrier pipe.
2.2 PIPING SPECIALTIES
A. Appliance Flexible Connectors:
1. Indoor, Fixed-Appliance Flexible Connectors: Comply with ANSI Z21.24.
2. Indoor, Movable-Appliance Flexible Connectors: Comply with ANSI Z21.69.
3. Outdoor, Appliance Flexible Connectors: Comply with ANSI Z21.75.
4. Corrugated stainless-steel tubing with polymer coating.
5. Operating-Pressure Rating: 0.5 psig(3.45 kPa).
6. End Fittings: Zinc-coated steel.
7. Threaded Ends: Comply with ASME B1.20.1.
8. Maximum Length: 72 inches(1830 mm).
B. Y-Pattern Strainers:
1. Body: ASTM A 126, Class B, cast iron with bolted cover and bottom drain connection.
2. End Connections: Threaded ends for NPS 2(DN 50) and smaller; flanged ends for NPS 2-
1/2(DN 65) and larger.
3. Strainer Screen: 40-mesh startup strainer, and perforated stainless-steel basket with 50 percent free area.
4. CWP Rating: 125 psig(862 kPa).
C. Weatherproof Vent Cap: Cast- or malleable-iron increaser fitting with corrosion-resistant wire screen, with free area at least equal to cross-sectional area of connecting pipe and threaded-end connection.
2.3 JOINING MATERIALS
A. Joint Compound and Tape: Suitable for natural gas.
B. Welding Filler Metals: Comply with AWS D10.12/D10.12M for welding materials appropriate for wall thickness and chemical analysis of steel pipe being welded.
2.4 MANUAL GAS SHUTOFF VALVES
A. See "Manual Gas Shutoff Valve Schedules" below for where each valve type is applied in various services.
B. General Requirements for Metallic Valves, NPS 2(DN 50) and Smaller: Comply with ASME B16.33.
ATHENS EAST LEROY ELEMENTARY MECHANICAL UPGRADE 23 1123 - 4
1. CWP Rating: 125 psig(862 kPa).
2. Threaded Ends: Comply with ASME B1.20.1.
3. Tamperproof Feature: Locking feature for valves indicated in "Manual Gas Shutoff Valve
Schedule" Articles.
4. Listing: Listed and labeled by an NRTL acceptable to authorities having jurisdiction for valves 1 inch(25 mm) and smaller.
5. Service Mark: Valves 1-1/4 inches(32 mm) to NPS 2(DN 50) shall have initials "WOG" permanently marked on valve body.
C. General Requirements for Metallic Valves, NPS 2-1/2(DN 65) and Larger: Comply with ASME B16.38.
1. CWP Rating: 125 psig(862 kPa).
2. Threaded Ends: Comply with ASME B1.20.1.
3. Flanged Ends: Comply with ASME B16.5.
4. Tamperproof Feature: Locking feature for valves indicated in "Manual Gas Shutoff Valve
Schedule" Articles.
5. Service Mark: Initials "WOG" shall be permanently marked on valve body.
D. Two-Piece, Full-Port, Bronze Ball Valves with Bronze Trim: MSS SP-110.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. BrassCraft Manufacturing Company; a Masco company.
b. Conbraco Industries, Inc.; Apollo Div.
c. Lyall, R. W. & Company, Inc.
d. McDonald, A. Y. Mfg. Co.
e. Perfection Corporation; a subsidiary of American Meter Company.
2. Body: Bronze, complying with ASTM B 584.
3. Ball: Chrome-plated bronze.
4. Stem: Bronze; blowout proof.
5. Seats: Reinforced TFE; blowout proof.
6. Packing: Threaded-body packnut design with adjustable-stem packing.
7. Ends: Threaded.
8. CWP Rating: 600 psig(4140 kPa).
9. Listing: Valves NPS 1(DN 25) and smaller shall be listed and labeled by an NRTL acceptable to authorities having jurisdiction.
10. Service: Suitable for natural-gas service with "WOG" indicated on valve body.
E. Bronze Plug Valves: MSS SP-78.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Lee Brass Company.
b. McDonald, A. Y. Mfg. Co.
2. Body: Bronze, complying with ASTM B 584.
3. Plug: Bronze.
4. Ends: Threaded or flanged.
5. Operator: Square head or lug type with tamperproof feature where indicated.
6. Pressure Class: 125 psig(862 kPa).
7. Listing: Valves NPS 1(DN 25) and smaller shall be listed and labeled by an NRTL acceptable to authorities having jurisdiction.
ATHENS EAST LEROY ELEMENTARY MECHANICAL UPGRADE 23 1123 - 5
8. Service: Suitable for natural-gas service with "WOG" indicated on valve body.
F. Cast-Iron, Nonlubricated Plug Valves: MSS SP-78.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. McDonald, A. Y. Mfg. Co.
b. Mueller Co.; Gas Products Div.
c. Xomox Corporation; a Crane company.
2. Body: Cast iron, complying with ASTM A 126, Class B.
3. Plug: Bronze or nickel-plated cast iron.
4. Seat: Coated with thermoplastic.
5. Stem Seal: Compatible with natural gas.
6. Ends: Threaded or flanged.
7. Operator: Square head or lug type with tamperproof feature where indicated.
8. Pressure Class: 125 psig(862 kPa).
9. Listing: Valves NPS 1(DN 25) and smaller shall be listed and labeled by an NRTL acceptable to authorities having jurisdiction.
10. Service: Suitable for natural-gas service with "WOG" indicated on valve body.
2.5 PRESSURE REGULATORS
A. General Requirements:
1. Single stage and suitable for natural gas.
2. Steel jacket and corrosion-resistant components.
3. Elevation compensator.
4. End Connections: Threaded for regulators NPS 2(DN 50) and smaller; flanged for regulators
NPS 2-1/2(DN 65) and larger.
B. Line Pressure Regulators: Comply with ANSI Z21.80.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Actaris.
b. American Meter Company.
c. Eclipse Combustion, Inc.
d. Fisher Control Valves and Regulators; Division of Emerson Process Management.
e. Invensys.
f. Maxitrol Company.
g. Richards Industries; Jordan Valve Div.
2. Body and Diaphragm Case: Cast iron or die-cast aluminum.
3. Springs: Zinc-plated steel; interchangeable.
4. Diaphragm Plate: Zinc-plated steel.
5. Seat Disc: Nitrile rubber resistant to gas impurities, abrasion, and deformation at the valve port.
6. Orifice: Aluminum; interchangeable.
7. Seal Plug: Ultraviolet-stabilized, mineral-filled nylon.
8. Single-port, self-contained regulator with orifice no larger than required at maximum pressure inlet, and no pressure sensing piping external to the regulator.
ATHENS EAST LEROY ELEMENTARY MECHANICAL UPGRADE 23 1123 - 6
9. Pressure regulator shall maintain discharge pressure setting downstream, and not exceed 150 percent of design discharge pressure at shutoff.
10. Overpressure Protection Device: Factory mounted on pressure regulator.
11. Atmospheric Vent: Factory- or field-installed, stainless-steel screen in opening if not connected to vent piping.
12. Maximum Inlet Pressure: 5 psig(34.5 kPa).
C. Appliance Pressure Regulators: Comply with ANSI Z21.18.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Canadian Meter Company Inc.
b. Eaton Corporation; Controls Div.
c. Harper Wyman Co.
d. Maxitrol Company.
e. SCP, Inc.
2. Body and Diaphragm Case: Die-cast aluminum.
3. Springs: Zinc-plated steel; interchangeable.
4. Diaphragm Plate: Zinc-plated steel.
5. Seat Disc: Nitrile rubber.
6. Seal Plug: Ultraviolet-stabilized, mineral-filled nylon.
7. Factory-Applied Finish: Minimum three-layer polyester and polyurethane paint finish.
8. Regulator may include vent limiting device, instead of vent connection, if approved by authorities having jurisdiction.
9. Maximum Inlet Pressure: 5 psig(34.5 kPa).
2.6 DIELECTRIC FITTINGS
A. Dielectric Unions:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Capitol Manufacturing Company.
b. Central Plastics Company.
c. Hart Industries International, Inc.
d. McDonald, A. Y. Mfg. Co.
e. Watts Regulator Co.; Division of Watts Water Technologies, Inc.
f. Wilkins; Zurn Plumbing Products Group.
2. Minimum Operating-Pressure Rating: 150 psig(1034 kPa).
3. Combination fitting of copper alloy and ferrous materials.
4. Insulating materials suitable for natural gas.
5. Combination fitting of copper alloy and ferrous materials with threaded, brazed-joint, plain, or welded end connections that match piping system materials.
B. Dielectric Flanges:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Capitol Manufacturing Company.
b. Central Plastics Company.
c. Watts Regulator Co.; Division of Watts Water Technologies, Inc.
ATHENS EAST LEROY ELEMENTARY MECHANICAL UPGRADE 23 1123 - 7
d. Wilkins; Zurn Plumbing Products Group.
2. Minimum Operating-Pressure Rating: 150 psig(1034 kPa).
3. Combination fitting of copper alloy and ferrous materials.
4. Insulating materials suitable for natural gas.
5. Combination fitting of copper alloy and ferrous materials with threaded, brazed-joint, plain, or welded end connections that match piping system materials.
C. Dielectric-Flange Kits:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Advance Products & Systems, Inc.
b. Calpico Inc.
c. Central Plastics Company.
d. Pipeline Seal and Insulator, Inc.
2. Minimum Operating-Pressure Rating: 150 psig(1034 kPa).
3. Companion-flange assembly for field assembly.
4. Include flanges, full-face- or ring-type neoprene or phenolic gasket, phenolic or PE bolt sleeves, phenolic washers, and steel backing washers.
5. Insulating materials suitable for natural gas.
6. Combination fitting of copper alloy and ferrous materials with threaded, brazed-joint, plain, or welded end connections that match piping system materials.
2.7 SLEEVES
A. Steel Pipe Sleeves: ASTM A 53/A 53M, Type E, Grade B, Schedule 40, galvanized steel, plain ends.
2.8 MECHANICAL SLEEVE SEALS
A. Description: Modular sealing element unit, designed for field assembly, to fill annular space between pipe and sleeve.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Advance Products & Systems, Inc.
b. Calpico Inc.
c. Metraflex Company (The).
d. Pipeline Seal and Insulator, Inc.
2. Sealing Elements: EPDM interlocking links shaped to fit surface of pipe. Include type and number required for pipe material and size of pipe and sleeve.
3. Pressure Plates: Plastic.
4. Connecting Bolts and Nuts: Carbon steel with corrosion-resistant coating of length required to secure pressure plates to sealing elements. Include one nut and bolt for each sealing element.
2.9 ESCUTCHEONS
A. General Requirements for Escutcheons: Manufactured wall and ceiling escutcheons and floor plates, with ID to fit around pipe or tube, and OD that completely covers opening.
ATHENS EAST LEROY ELEMENTARY MECHANICAL UPGRADE 23 1123 - 8
B. One-Piece, Deep-Pattern Escutcheons: Deep-drawn, box-shaped brass with polished chrome-plated finish.
C. One-Piece, Cast-Brass Escutcheons: With set screw.
1. Finish: Polished chrome-plated or rough brass.
D. Split-Casting, Cast-Brass Escutcheons: With concealed hinge and set screw.
1. Finish: Polished chrome-plated.
E. One-Piece, Floor-Plate Escutcheons: Cast-iron floor plate.
F. Split-Casting, Floor-Plate Escutcheons: Cast brass with concealed hinge and set screw.
2.10 LABELING AND IDENTIFYING
A. Detectable Warning Tape: Acid- and alkali-resistant, PE film warning tape manufactured for marking and identifying underground utilities, a minimum of 6 inches(150 mm) wide and 4 mils(0.1 mm) thick, continuously inscribed with a description of utility, with metallic core encased in a protective jacket for corrosion protection, detectable by metal detector when tape is buried up to 30 inches(750 mm) deep;
colored yellow.
PART 3 - EXECUTION
3.1 PREPARATION
A. Close equipment shutoff valves before turning off natural gas to premises or piping section.
B. Inspect natural-gas piping according to the International Fuel Gas Code to determine that natural-gas utilization devices are turned off in piping section affected.
C. Comply with the International Fuel Gas Code requirements for prevention of accidental ignition.
3.2 OUTDOOR PIPING INSTALLATION
A. Comply with the International Fuel Gas Code for installation and purging of natural-gas piping.
B. Install underground, natural-gas piping buried at least 36 inches(900 mm) below finished grade. Comply with requirements in Division 31 Section "Earth Moving" for excavating, trenching, and backfilling.
C. Install underground, PE, natural-gas piping according to ASTM D 2774.
D. Install fittings for changes in direction and branch connections.
E. Aboveground, Exterior-Wall Pipe Penetrations: Seal penetrations using sleeves and mechanical sleeve seals. Select sleeve size to allow for 1-inch(25-mm) annular clear space between pipe and sleeve for installing mechanical sleeve seals.
ATHENS EAST LEROY ELEMENTARY MECHANICAL UPGRADE 23 1123 - 9
1. Install steel pipe for sleeves smaller than 6 inches(150 mm) in diameter.
2. Install cast-iron "wall pipes" for sleeves 6 inches(150 mm) and larger in diameter.
F. Mechanical Sleeve Seal Installation: Select type and number of sealing elements required for pipe material and size. Position pipe in center of sleeve. Assemble mechanical sleeve seals and install in annular space between pipe and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make watertight seal.
G. Install pressure gage downstream from each service regulator. Pressure gages are specified in Division 23 Section "Meters and Gages for HVAC Piping."
3.3 INDOOR PIPING INSTALLATION
A. Comply with the International Fuel Gas Code for installation and purging of natural-gas piping.
B. Drawing plans, schematics, and diagrams indicate general location and arrangement of piping systems.
Indicated locations and arrangements are used to size pipe and calculate friction loss, expansion, and other design considerations. Install piping as indicated unless deviations to layout are approved on Coordination Drawings.
C. Arrange for pipe spaces, chases, slots, sleeves, and openings in building structure during progress of construction, to allow for mechanical installations.
D. Install piping in concealed locations unless otherwise indicated and except in equipment rooms and service areas.
E. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.
F. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal.
G. Locate valves for easy access.
H. Install piping free of sags and bends.
I. Install fittings for changes in direction and branch connections.
J. Install escutcheons at penetrations of interior walls, ceilings, and floors.
1. New Piping:
a. Piping with Fitting or Sleeve Protruding from Wall: One-piece, deep-pattern type.
b. Piping at Wall and Floor Penetrations in Finished Spaces: One-piece, cast-brass type with polished chrome-plated finish.
c. Piping at Ceiling Penetrations in Finished Spaces: One-piece or split-casting, cast-brass type with polished chrome-plated finish.
d. Piping in Unfinished Service Spaces: One-piece, cast-brass type with polished chrome-plated finish.
e. Piping in Equipment Rooms: One-piece, cast-brass type.
f. Piping at Floor Penetrations in Equipment Rooms: One-piece, floor-plate type.
2. Existing Piping:
ATHENS EAST LEROY ELEMENTARY MECHANICAL UPGRADE 23 1123 - 10
a. Piping at Wall and Floor Penetrations in Finished Spaces: Split-casting, cast-brass type with chrome-plated finish.
b. Piping at Ceiling Penetrations in Finished Spaces: Split-casting, cast-brass type with chrome-plated finish.
c. Piping in Unfinished Service Spaces: Split-casting, cast-brass type with polished chrome-plated finish.
d. Piping in Equipment Rooms: Split-casting, cast-brass type.
e. Piping at Floor Penetrations in Equipment Rooms: Split-casting, floor-plate type.
K. Fire-Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with firestop materials. Comply with requirements in Division 07 Section "Penetration Firestopping."
L. Verify final equipment locations for roughing-in.
M. Comply with requirements in Sections specifying gas-fired appliances and equipment for roughing-in requirements.
N. Drips and Sediment Traps: Install drips at points where condensate may collect, including service-meter outlets. Locate where accessible to permit cleaning and emptying. Do not install where condensate is subject to freezing.
1. Construct drips and sediment traps using tee fitting with bottom outlet plugged or capped. Use nipple a minimum length of 3 pipe diameters, but not less than 3 inches(75 mm) long and same size as connected pipe. Install with space below bottom of drip to remove plug or cap.
O. Extend relief vent connections for line regulators, and overpressure protection devices to outdoors and terminate with weatherproof vent cap.
P. Conceal pipe installations in walls, pipe spaces, utility spaces, above ceilings, unless indicated to be exposed to view.
Q. Concealed Location Installations: Except as specified below, install concealed natural-gas piping and piping installed under the building in containment conduit. Install a vent pipe from containment conduit to outdoors and terminate with weatherproof vent cap.
1. Above Accessible Ceilings: Natural-gas piping, fittings, valves, and regulators may be installed in accessible spaces without containment conduit.
2. Underground Piping Beneath Buildings: Install underground piping beneath buildings encased in a code approved conduit designed to withstand superimposed loads and the same pressure as the pipe.
3. Prohibited Locations:
a. Do not install natural-gas piping in or through circulating air ducts, clothes or trash chutes, chimneys or gas vents (flues), ventilating ducts, or dumbwaiter or elevator shafts.
b. Do not install natural-gas piping in solid walls or partitions.
R. Use eccentric reducer fittings to make reductions in pipe sizes. Install fittings with level side down.
S. Connect branch piping from top or side of horizontal piping.
ATHENS EAST LEROY ELEMENTARY MECHANICAL UPGRADE 23 1123 - 11
T. Install unions in pipes NPS 2(DN 50) and smaller, adjacent to each valve, at final connection to each piece of equipment. Unions are not required at flanged connections.
U. Do not use natural-gas piping as grounding electrode.
V. Install strainer on inlet of each line-pressure regulator and automatic or electrically operated valve.
W. Install pressure gage upstream and downstream from each line regulator. Pressure gages are specified in Division 23 Section "Meters and Gages for HVAC Piping."
3.4 VALVE INSTALLATION
A. Install manual gas shutoff valve at each gas-fired piece of equipment.
B. Install regulators and overpressure protection devices with maintenance access space adequate for servicing and testing.
3.5 PIPING JOINT CONSTRUCTION
A. Ream ends of pipes and tubes and remove burrs.
B. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.
C. Threaded Joints:
1. Thread pipe with tapered pipe threads complying with ASME B1.20.1.
2. Cut threads full and clean using sharp dies.
3. Ream threaded pipe ends to remove burrs and restore full inside diameter of pipe.
4. Apply appropriate tape or thread compound to external pipe threads unless dryseal threading is specified.
5. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged.
Do not use pipe sections that have cracked or open welds.
D. Welded Joints:
1. Construct joints according to AWS D10.12/D10.12M, using qualified processes and welding operators.
2. Bevel plain ends of steel pipe.
E. Flanged Joints: Install gasket material, size, type, and thickness appropriate for natural-gas service.
Install gasket concentrically positioned.
F. PE Piping Heat-Fusion Joints: Clean and dry joining surfaces by wiping with clean cloth or paper towels.
Join according to ASTM D 2657.
1. Plain-End Pipe and Fittings: Use butt fusion.
2. Plain-End Pipe and Socket Fittings: Use socket fusion.
ATHENS EAST LEROY ELEMENTARY MECHANICAL UPGRADE 23 1123 - 12
3.6 HANGER AND SUPPORT INSTALLATION
A. Comply with requirements for pipe hangers and supports specified in Division 23 Section "Hangers and Supports for HVAC Piping and Equipment."
B. Install hangers for horizontal steel piping with the following maximum spacing and minimum rod sizes:
1. NPS 1(DN 25) and Smaller: Maximum span, 96 inches(2438 mm); minimum rod size, 3/8 inch(10 mm).
2. NPS 1-1/4(DN 32): Maximum span, 108 inches(2743 mm); minimum rod size, 3/8 inch(10 mm).
3. NPS 1-1/2 and NPS 2(DN 40 and DN 50): Maximum span, 108 inches(2743 mm); minimum rod size, 3/8 inch(10 mm).
4. NPS 2-1/2 to NPS 3-1/2(DN 65 to DN 90): Maximum span, 10 feet(3 m); minimum rod size, 1/2 inch(13 mm).
5. NPS 4(DN 100) and Larger: Maximum span, 10 feet(3 m); minimum rod size, 5/8 inch(15.8 mm).
3.7 CONNECTIONS
A. Install piping adjacent to appliances to allow service and maintenance of appliances.
B. Connect piping to appliances using manual gas shutoff valves and unions. Install valve within 72 inches(1800 mm) of each gas-fired appliance and equipment. Install union between valve and appliances or equipment.
1. Install pressure regulator at connection to gas-fired appliance and equipment as required to meet maximum gas pressure requirements of that particular device.
C. Sediment Traps: Install tee fitting with capped nipple in bottom to form drip, as close as practical to inlet of each appliance.
3.8 LABELING AND IDENTIFYING
A. Comply with requirements in Division 23 Section "Identification for HVAC Piping and Equipment" for piping and valve identification.
B. Install detectable warning tape directly above gas piping, 12 inches(300 mm) below finished grade, except 6 inches(150 mm) below subgrade under pavements and slabs.
3.9 PAINTING
A. Comply with requirements in Division 09 painting Sections for painting interior and exterior natural-gas piping.
B. Paint exposed, exterior metal piping, valves, and piping specialties, except components with factory-applied paint or protective coating.
1. Color to be color to match building background color.
ATHENS EAST LEROY ELEMENTARY MECHANICAL UPGRADE 23 1123 - 13
C. Paint interior exposed metal piping, valves, and piping specialties, except components with factory-applied paint or protective coating.
1. Color to be safety yellow for exposed piping in mechanical rooms.
2. Color to match building wall/ceiling color for exposed piping in finished spaces.
3.10 FIELD QUALITY CONTROL
A. Perform tests and inspections.
B. Tests and Inspections:
1. Test, inspect, and purge natural gas according to the International Fuel Gas Code and authorities having jurisdiction.
C. Natural-gas piping will be considered defective if it does not pass tests and inspections.
D. Prepare test and inspection reports.
3.11 OUTDOOR PIPING SCHEDULE
A. Underground natural-gas piping shall be the following:
1. PE pipe and fittings joined by heat fusion; terminated in an accessible location.
B. Aboveground natural-gas piping shall be the following:
1. For NPS 2(DN 50) and smaller, use steel pipe with malleable-iron fittings and threaded joints.
2. For NPS 2-1/2(DN 65) and larger, use steel pipe with wrought-steel fittings and welded joints.
3.12 INDOOR PIPING SCHEDULE
1. Steel pipe with malleable-iron fittings and threaded joints.
B. Aboveground, distribution piping shall be one of the following:
1. For NPS 2(DN 50) and smaller, use steel pipe with malleable-iron fittings and threaded joints.
2. For NPS 2-1/2(DN 65) and larger, use steel pipe with wrought-steel fittings and welded joints.
C. Underground, below building, piping shall be the following:
1. For NPS 2(DN 50) and smaller, use steel pipe with malleable-iron fittings and threaded joints with containment conduit.
2. For NPS 2-1/2(DN 65) and larger, use steel pipe with wrought-steel fittings and welded joints with containment conduit.
D. Underground Containment Conduit: Code approved conduit designed to withstand superimposed loads and the same pressure as the pipe.
ATHENS EAST LEROY ELEMENTARY MECHANICAL UPGRADE 23 1123 - 14
E. Containment Conduit Vent Piping: Steel pipe with malleable-iron fittings and threaded or wrought-steel fittings with welded joints. Coat underground pipe and fittings with protective coating.
3.13 ABOVEGROUND MANUAL GAS SHUTOFF VALVE SCHEDULE
A. Distribution piping valves for pipe sizes NPS 2(DN 50) and smaller shall be one of the following:
1. Two-piece, full-port, bronze ball valves with bronze trim.
2. Bronze plug valve.
B. Distribution piping valves for pipe sizes NPS 2-1/2(DN 65) and larger shall be one of the following:
1. Bronze plug valve.
2. Cast-iron, nonlubricated plug valve.
C. Valves in branch piping for single appliance shall be one of the following:
1. Two-piece, full-port, bronze ball valves with bronze trim.
2. Bronze plug valve.
END OF SECTION 23 1123
PROJECT NO. 22186.10 HYDRONIC PIPING
ATHENS EAST LEROY ELEMENTARY MECHANICAL UPGRADE 23 2113 - 1
SECTION 23 2113 - HYDRONIC PIPING
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes pipe and fitting materials, joining methods, special-duty valves, and specialties for the following:
1. Hot-water heating piping.
2. Makeup-water piping.
3. Condensate-drain piping.
4. Blowdown-drain piping.
5. Air-vent piping.
6. Safety-valve-inlet and -outlet piping.
B. Related Sections include the following:
1. Division 23 Section "Hydronic Pumps" for pumps, motors, and accessories for hydronic piping.
2. Division 23 Section "Common Work Results for HVAC" for general piping materials and installation requirements.
3. Division 23 Section "Expansion Fittings and Loops for HVAC Piping" for pipe expansion compensating devices for hydronic piping systems.
4. Division 23 Section "Meters and Gages for HVAC Piping" for thermometers and pressure gages.
5. Division 23 Section "General Duty Valves for HVAC Piping" for general-duty ball, butterfly, and check valves.
6. Division 23 Section "Hangers and Supports for HVAC Equipment" for pipe supports, product descriptions, and installation requirements. Hanger and support spacing is specified in this Section.
7. Division 23 Section "Identification for HVAC Piping and Equipment" for labeling and identifying hydronic piping.
8. Division 23 Section "Instrumentation and Control for HVAC" for temperature-control valves and sensors.
9. Division 23 Section "HVAC Water Treatment" for pipe cleaning and water treatment for HVAC systems.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of the following:
1. Pressure-seal fittings.
2. Calibrated Balancing Valves: Include flow and pressure drop curves based on manufacturer's testing for calibrated-orifice balancing valves.
3. Air control devices.
4. Hydronic specialties.
ATHENS EAST LEROY ELEMENTARY MECHANICAL UPGRADE 23 2113 - 2
1.3 CLOSEOUT SUBMITTALS
A. Operation and maintenance data.
1.4 QUALITY ASSURANCE
A. Installer Qualifications:
1. Installers of Pressure-Sealed Joints: Installers shall be certified by the pressure-seal joint manufacturer as having been trained and qualified to join piping with pressure-seal pipe couplings and fittings.
B. ASME Compliance: Comply with ASME B31.9, "Building Services Piping," for materials, products, and installation. Safety valves and pressure vessels shall bear the appropriate ASME label. Fabricate and stamp air separators and expansion tanks to comply with ASME Boiler and Pressure Vessel Code:
Section VIII, Division 01.
C. Comply with the provisions of the following:
1. Michigan Mechanical Code
PART 2 - PRODUCTS
2.1 COPPER TUBE AND FITTINGS
A. Drawn-Temper Copper Tubing: ASTM B 88, Type L(ASTM B 88M, Type B).
B. Annealed-Temper Copper Tubing: ASTM B 88, Type K(ASTM B 88M, Type A).
C. Wrought-Copper Fittings: ASME B16.22.
D. Copper or Bronze Pressure-Seal Fittings:
1. Manufacturers: Subject to compliance with requirements, provide products by the following:
a. Viega.
b. NIPCO Press.
c. Apollo “Xpress”
2. Housing: Copper.
3. O-Rings and Pipe Stops: EPDM.
4. Tools: Manufacturer's special tools.
5. Minimum 200-psig(1379-kPa) working-pressure rating at 250 deg F(121 deg C).
E. Wrought-Copper Unions: ASME B16.22.
ATHENS EAST LEROY ELEMENTARY MECHANICAL UPGRADE 23 2113 - 3
2.2 STEEL PIPE AND FITTINGS
A. Steel Pipe: ASTM A 53/A 53M, black steel with plain ends; type, grade, and wall thickness as indicated in Part 3 "Piping Applications" Article.
B. Cast-Iron Threaded Fittings: ASME B16.4; Classes 125.
C. Malleable-Iron Threaded Fittings: ASME B16.3, Classes 150.
D. Malleable-Iron Unions: ASME B16.39; Classes 150.
E. Cast-Iron Pipe Flanges and Flanged Fittings: ASME B16.1, Classes 125, raised ground face, and bolt holes spot faced as indicated in Part 3 "Piping Applications" Article.
F. Wrought-Steel Fittings: ASTM A 234/A 234M, wall thickness to match adjoining pipe.
G. Wrought Cast- and Forged-Steel Flanges and Flanged Fittings: ASME B16.5, including bolts, nuts, and gaskets of the following material group, end connections, and facings:
1. Material Group: 1.1.
2. End Connections: Slip-on or butt welded.
3. Facings: Raised face.
H. Grooved Mechanical-Joint Fittings and Couplings:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Anvil International, Inc.
b. Victaulic Company of America.
c. Tyco/Grinnell.
2. Joint Fittings: ASTM A 536, Grade 65-45-12 ductile iron; ASTM A 47/A 47M, Grade 32510 malleable iron; ASTM A 53/A 53M, Type F, E, or S, Grade B fabricated steel; or ASTM A 106, Grade B steel fittings with grooves or shoulders constructed to accept grooved-end couplings; with nuts, bolts, locking pin, locking toggle, or lugs to secure grooved pipe and fittings.
3. Couplings: Ductile- or malleable-iron housing and synthetic rubber gasket of central cavity pressure-responsive design; with nuts, bolts, locking pin, locking toggle, or lugs to secure grooved pipe and fittings.
4. Refer to Division 23 Section “Hydronic Pumps” for allowable mechanical joint pump accessories.
I. Steel Pipe Nipples: ASTM A 733, made of same materials and wall thicknesses as pipe in which they are installed.
2.3 JOINING MATERIALS
A. Pipe-Flange Gasket Materials: Suitable for chemical and thermal conditions of piping system contents.
1. ASME B16.21, nonmetallic, flat, asbestos free, 1/8-inch(3.2-mm) maximum thickness unless thickness or specific material is indicated.
a. Full-Face Type: For flat-face, Class 125, cast-iron and cast-bronze flanges.
b. Narrow-Face Type: For raised-face, Class 250, cast-iron and steel flanges.
ATHENS EAST LEROY ELEMENTARY MECHANICAL UPGRADE 23 2113 - 4
B. Flange Bolts and Nuts: ASME B18.2.1, carbon steel, unless otherwise indicated.
C. Solder Filler Metals: ASTM B 32, lead-free alloys. Include water-flushable flux according to ASTM B 813.
D. Brazing Filler Metals: AWS A5.8, BCuP Series, copper-phosphorus alloys for joining copper with copper;
or BAg-1, silver alloy for joining copper with bronze or steel.
E. Welding Filler Metals: Comply with AWS D10.12/D10.12M for welding materials appropriate for wall thickness and chemical analysis of steel pipe being welded.
F. Gasket Material: Thickness, material, and type suitable for fluid to be handled and working temperatures and pressures.
2.4 DIELECTRIC FITTINGS
A. Refer to Division 23 Section "Common Work Results for HVAC" for dielectric fittings.
2.5 VALVES
A. Butterfly, Check, and Ball Valves: Comply with requirements specified in Division 23 Section "General- Duty Valves…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .