This document is a Project Manual for the Athens Area Schools 2020 Sinking Fund Project Series 2 Release 1 - East Leroy Elementary Mechanical Improvements project located in East Leroy, Michigan. The project involves mechanical system upgrades at the East Leroy Elementary School, including replacing boilers, pumps, piping, and controls. The bid packages include Painting, HVAC, and Electrical Improvements. A mandatory pre-bid conference will be held on December 11, 2023, and sealed bids are due by 2:00 PM on December 21, 2023 at the Athens Area Schools Administration Building. The construction is expected to begin on June 3, 2024.
The bid shall be a lump sum amount, and bidders must provide performance and payment bonds. Prevailing wage rates apply. An allowance has been set for miscellaneous touch-up painting. Alternate pricing is requested for retaining one existing boiler and adding a new boiler. Contractors must be pre-qualified by the construction manager prior to award and provide background checks for all on-site employees.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
12/08/2023
AAS 2020 Sinking Fund Projects
4320 K Drive
East Leroy, MI 49097
Series 2 Release 1 East Leroy Elementary
Mechanical Improvements
CONSTRUCTION MANAGER
120 E. Prairie Street, Suite C
Vicksburg, MI 49097
Phone: 269.349.8428
Fax: 269.475.5239 frederickconstruction.com
ARCHITECTS/ENGINEERS
242 E. Kalamazoo Avenue Suite 200
Kalamazoo, MI 49007
Phone: 269-343-6133
Fax: 269-343-6633 towerpinkster.com
SECTION 000110
TABLE OF CONTENTS
AAS 2020 Sinking Fund Project No. 22-0315 000100-1
Series No. 2; 2023 Bid Release No. 1 – East Leroy Elementary – Mechanical Improvements
Section 000110 – Table of Contents
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
INTRODUCTORY INFORMATION
000101 PROJECT MANUAL
000110 TABLE OF CONTENTS
BIDDING REQUIREMENTS
001100 ADVERTISEMENT/INVITATION FOR BIDS
002113 INSTRUCTIONS TO BIDDERS
002413 SCOPE OF WORK – GENERAL NOTES
002416 SCOPE OF WORK - BID CATEGORY SPECIFIC NOTES
003113 PROJECT MILESTONE SCHEDULE
004126 BID PROPOSAL FORM
CONTRACTING REQUIREMENTS
005216 AGREEMENT FORM
006113 PERFORMANCE AND PAYMENT BOND
006200 CERTIFICATES AND OTHER FORMS
007216 GENERAL CONDITIONS
007300 SUPPLEMENTAL CONDITIONS
007316 INSURANCE REQUIREMENTS
DIVISION 01 – GENERAL REQUIREMENTS
012100 ALLOWANCES
012200 UNIT PRICES
012300 ALTERNATES
012600 CONTRACT MODIFICATION PROCEDURES
012900 PAYMENT PROCEDURES
012973 SCHEDULE OF VALUES
013119 PROJECT MEETINGS
013323 SHOP DRAWINGS, PROJECT DATA AND SAMPLES
013529 HEALTH, SAFETY AND EMERGENCY RESPONSE PROCEDURES
014516 FIELD QUALITY CONTROL PROCEDURES
014517 NON-CONFORMANCE PROCEDURE
015000 TEMPORARY FACILITIES AND CONTROLS
Section 000110 – Table of Contents
DIVISION 01 – GENERAL REQUIREMENTS (CONTINUED)
015300 JOBSITE ENVIRONMENTAL MANAGEMENT
017123 FIELD ENGINEERING
017329 CUTTING AND PATCHING
017700 CLOSEOUT PROCEDURES
017823 OPERATION AND MAINTENANCE DATA
017839 PROJECT RECORD DOCUMENTS
SPECIFICATIONS FROM TOWER PINKSTER DATED 12/07/2023
DIVISION 00 – PROCUREMENT
00 3100 - AVAILABLE PROJECT INFORMATION
00 6323 - CADD FILE TRANSFER WAIVER
00 6324 - BIM TRANSFER WAIVER
00 6325 - SUBSTITUTION DURING CONSTRUCTION REQUEST FORM
00 7300 - SUPPLEMENTARY CONDITIONS
DIVISION 01 – GENERAL REQUIREMENTS
01 2300 - ALTERNATES
01 2500 - SUBSTITUTION PROCEDURES
01 2600 - CONTRACT MODIFICATION PROCEDURES
01 2900 - PAYMENT PROCEDURES
01 3100 - PROJECT MANAGEMENT AND COORDINATION
01 3300 - SUBMITTAL PROCEDURES
01 4000 - QUALITY REQUIREMENTS
01 4200 - REFERENCES
01 6000 - PRODUCT REQUIREMENTS
01 7300 - EXECUTION
01 7700 - CLOSEOUT PROCEDURES
01 7823 - OPERATION AND MAINTENANCE DATA
01 7839 - PROJECT RECORD DOCUMENTS
01 7900 - DEMONSTRATION AND TRAINING
DIVISION 02 – EXISTING CONDITIONS
02 4119 - SELECTIVE DEMOLITION
DIVISION 03 – CONCRETE
03 3000 - CAST-IN-PLACE CONCRETE
DIVISION 04 – MASONRY
04 2200 - CONCRETE UNIT MASONRY
Section 000110 – Table of Contents
DIVISION 05 – METALS
05 4000 - COLD-FORMED METAL FRAMING sf0
05 5000 - METAL FABRICATIONS
05 7500 - DECORATIVE FORMED METAL
DIVISION 06 – WOOD, PLASTICS & COMPOSITES
06 1000 - ROUGH CARPENTRY sf0
06 1600 - SHEATHING sf0
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 0150.19 - PREPARATION FOR REROOFING
07 5323 - ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING sf0
07 7100 - ROOF SPECIALTIES
07 8413 - PENETRATION FIRESTOPPING
07 8443 - JOINT FIRESTOPPING
07 9200 - JOINT SEALANTS sf0
DIVISION 08 – OPENINGS
08 1113 - HOLLOW METAL DOORS AND FRAMES sf0
08 7100 - DOOR HARDWARE
DIVISION 09 – FINISHES
09 2900 - GYPSUM BOARD
09 9123 - INTERIOR PAINTING
DIVISION 10 – SPECIALTIES
NOT USED
DIVISION 11 – EQUIPMENT
DIVISION 12 – FURNISHINGS
DIVISION 13 – SPECIALTIES
DIVISION 14 – CONVEYING EQUIPMENT
DIVISION 21 – FIRE SUPPRESSION
Section 000110 – Table of Contents
DIVISION 22 – PLUMBING
22 1119 - DOMESTIC WATER PIPING SPECIALTIES
DIVISION 23 – HEATING VENTALATING & AIR CONDITIONING
23 0500 - COMMON WORK RESULTS FOR HVAC
23 0513 - COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
23 0516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING
23 0519 - METERS AND GAGES FOR HVAC PIPING
23 0523 - GENERAL DUTY VALVES FOR HVAC PIPING
23 0529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
23 0553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
23 0593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 0700 - HVAC INSULATION
23 0800 - MINIMUM COMMISSIONING OF HVAC
23 0900 - INSTRUMENTATION AND CONTROL FOR HVAC
23 1123 - FACILITY NATURAL GAS PIPING
23 2113 - HYDRONIC PIPING
23 2123 - HYDRONIC PUMPS
23 2500 - HVAC WATER TREATMENT
23 3113 - METAL DUCTS
23 3115 - HVAC AIR-DISTRIBUTION SYSTEM CLEANING
23 3300 - AIR DUCT ACCESSORIES
23 3713 - DIFFUSERS, REGISTERS, AND GRILLES
23 3723 - HVAC GRAVITY VENTILATORS
23 5216 - CONDENSING BOILERS (Knight XL)
23 8113 - PACKAGED TERMINAL AIR-CONDITIONERS
23 8223 - UNIT VENTILATORS
23 8233 - CONVECTORS
23 8239 - UNIT HEATERS
DIVISION 25 – INTEGRATED AUTOMATION
DIVISION 26 – ELECTRICAL
26 0500 - COMMON WORK RESULTS FOR ELECTRICAL
26 0519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26 0533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
26 0544 - SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND
CABLING
26 0553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 2416 - PANELBOARDS
26 2726 - WIRING DEVICES
26 2813 - FUSES
Section 000110 – Table of Contents
26 2913 - ENCLOSED CONTROLLERS
26 2923 - VARIABLE FREQUENCY MOTOR CONTROLLERS
DIVISION 27 – COMMUNICATIONS
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
DIVISION 31 - EARTHWORK
DIVISION 32 – EXTERIOR IMPROVEMENTS
DIVISION 33 THROUGH DIVISION 48
END OF SECTION
Athens Area Schools Sinking Fund Projects Project No. 22-0315 001100-1
Series No. 2; 2023 Bid Release No. 1 – AAS East Leroy Elementary School - Mechanical Improvements
Section 001100 – Advertisement / Invitation For Bids
PROJECT: Athens Area Schools 2020 Sinking Fund
FC PROJECT NO.: 22-0315
SERIES NO.: 2
BID RELEASE NO.: 01
DESCRIPTION: Athens Public Schools
East Leroy Elementary School - Mechanical Improvements
OWNER: Athens Area Schools
East Leroy, MI 49051
ARCHITECT: Tower-Pinkster
242 E. Kalamazoo Avenue
Kalamazoo, MI 49007
CONSTRUCTION MANAGER: Frederick Construction, Inc.
120 E. Prairie Street, Suite C
Vicksburg, MI 49097
PROJECT MANAGER: Chad Kandow
EMAIL: c.kandow@frederickconstruction.com
PHONE: 269-349-8428 ext. 7101
Mobile: 269-779-1289
1. PRE-BID CONFERENCE AND SITE WALK-THRU
1.1 A Mandatory pre-bid conference will be held for the following bid packages at the dates and locations noted below: (see section 3)
Monday December 11, 2023, at 3:30 PM: East Leroy Elementary School
4320K Drive
Contractors will meet at the main entrance of East Leroy Elementary School. Once the pre-bid meeting introduction and discussion has been completed, contractors will be allowed to walk the project area at
East Leroy Elementary School. All potential bidders MUST attend the pre-bid conference and SIGN the attendance sheet.
2. BID PROPOSAL DUE DATE/LOCATION
2.1 Sealed bids will be accepted from qualified contractors by Athens Area Schools. They shall be delivered to the Superintendent’s office at Athens Area Schools Administration Building /East Leroy Elementary, 4320 K Drive East Leroy, MI 49051 and are to be addressed to the attention of Mr. Joe Hupenbecker.
NO faxed or emailed bids will be accepted. Envelopes are to be clearly marked with Project Name and
Number and Bid Release Name and Number. Bids will be publicly opened and read aloud December 21, 2023, 2:00 pm in the conference room at the administrative building. Bids must be delivered no later than 2:00 pm on December 21, 2023. Bids received after this specified date and time will not be accepted and will be returned unopened.
Athens Area Schools Sinking Fund Projects Project No. 22-0315 001100-1
2.2 BID SECURITY: Bid bond or certified check of not less than 5% of the bid amount MUST be submitted with bid and made payable to Athens Area Schools.
2.3 FAMILIAL RELATIONSHIP DISCLOSURE: All proposals shall be accompanied by a sworn and notarized statement disclosing any familial relationship (or lack of a relationship) that exists between the owner or any employee of the bidder and any member of the Board of Education of the Athens Public
Schools or the Superintendent of the School District. The district shall not accept a bid that does not include a sworn and notarized disclosure statement.
2.4 TYPE OF CONTRACT: The base bid shall be a lump sum amount, for the work as set forth in the bid documents.
2.5 CONTRACT SECURITY: Performance and Payment Bonds in the amount of 100% of the proposed cost will be required for all contracts. The cost of a Performance and Payment Bond shall be included within the contractor’s base bid price.
2.6 BID WITHDRAWAL: No bids may be withdrawn for at least sixty (60) consecutive calendar days following the bid opening.
2.7 RIGHTS RESERVED: The Owner reserves the right to accept or reject any and all bids, alternates, or proposals, and to accept bids, alternates, or proposals that, in its judgment, serve its best interests.
3. BID PACKAGES
Bid Package 09.2 – Miscellaneous Architectural Items
Bid Package 09.9 – Painting
Bid Package 23.1 – HVAC
Bid Package 26.1 – Electrical Improvements
4. BID DOCUMENT AVAILABILITY
4.1 Bid Documents, drawings and specifications will be available, electronic format only, on December 08, 2023 at the following location:
Frederick Construction, Inc.
Contact: Chad Kandow c.kandow@frederickconstruction.com
4.2 Documents will also be made available for review at the following locations:
• Builder’s Exchange – Kalamazoo, Grand Rapids and Lansing
• Construction Association of Michigan
4.3 Bid Documents will be available in electronic format only.
5. BID PROPOSAL REQUIREMENTS
5.1 All questions during the bidding period shall be directed to Frederick Construction, Inc.
via fax or email to:
Athens Area Schools Sinking Fund Projects Project No. 22-0315 001100-3
CONTACT: Chad Kandow
FAX: 269-475-5239
EMAIL: c.kandow@frederickconstruction.com
5.2 Bidders are required to be pre-qualified by Frederick Construction, Inc. prior to award of Contract
(NOT prior to bidding) per qualifications form in “Certificates and Other Forms”.
6. INTENT TO BID FORM
6.1 An Intent to Bid Form will need to be filled out and returned to Frederick Construction, Inc. Bidders returning the form will be notified of issued addenda. Please see Form under Section 006200
Certificates and Other Forms.
7. PREVAILING WAGE RATES ARE REQUIRED
8. BIDDING SCHEDULE
8.1 Request for Bid Proposal Distributed: December 1, 2023
Bid Documents available to Contractors December 8, 2023
Pre-Bid Conference and Site Walk-Thru: December 11, 2023, at 3:30 PM
Deadline for submittal of Pre-Bid RFI’s: December 13, 2023, by 12:00 pm
Final Addendum Issued: December 15, 2023, by 12:00 pm
Bids Due December 21, 2023, at 2:00 pm
Athens Area Schools Superintendent Office
Public Bid Opening: December 21, 2023
Immediately following receipt of bids
Athens Area Schools Superintendent Office
9. CONSTRUCTION SCHEDULE
9.1 Construction will take place beginning June 3, 2024 - Schedule will be provided in CM Manual
SECTION 002113
INSTRUCTIONS TO BIDDERS
AAS 2020 Sinking Fund Project No. 22-0315 002113-1
Series No. 2; 2023 Bid Release No. 1 – East Leroy Elementary Mechanical Improvements
Section 002113 – Instruction to Bidders
1.1 DOCUMENT
A. American Institute of Architects Document A101-2007, Instructions to
Bidders, Forms, forms a part of the Bidding Documents and by reference is incorporated herein as fully as if repeated at length.
1.2 RELATED REQUIREMENTS
A. Document 001100 Advertisement / Invitation for Bids.
B. Frederick Construction specifications and documents
C. Forms:
1. Bid Form
2. Familial Disclosure Affidavit
3. Bid Request For Information (BRFI)
4. Bidders Checklist
5. Intent to Bid Form
6. Sealed Bid Label
7. Iran Sanction Act Form
1. Background Checks will be required by Contractors for each and every employee that will work on this project through Michigan State Police’s ICHAT website at:
https://apps.michigan.gov The cost associated with this is the responsibility of each bidder.
1.3 SUPPLEMENTS
A. The following supplements modify, delete from, or add to the Instructions to
Bidders referenced above.
B. Where provisions of the Instructions to Bidders are modified, unaltered provisions remain in effect.
C. Article 3 - Bidding Documents:
1. NOT BEING USED
D. Article 4 - Bidding Procedures:
SECTION 002113
AAS 2020 Sinking Fund Project No. 22-0315 002113-1
Series No. 2; 2023 Bid Release No.1 – East Leroy Elementary Improvements
Section 002113 – Instruction to Bidders
E. Article 5 - Consideration of Bids:
END OF DOCUMENT
SECTION 002416
SCOPE OF WORK – ALL BID CATEGORIES
AAS 2020 Sinking Fund Project No. 22-0315 002416-1
Series No. 2; 2023 Bid Release No. 1 – East Leroy Elementary Improvements
Section 002416 – Scope of Work – Bid Category Specific Notes
Scope of Work
For All Bid Categories
PART 1 – Definitions
1.1 A Bid Category Description outlines the Scope of Work for each Bid Category included in these documents, one or more of which will be included in a Bid Proposal and identified as work in Owner/Contractor Agreement. The Scope of Work outlined in the Bid Category Description and in pertinent Standard Work Items will take precedence over any other language on drawings and/or in the Technical
Specifications, which may directly or inadvertently imply Scope of Work.
1.2 Tower-Pinkster Technical Specifications include Divisions 00, 01, 02, 03, 04, 05, 07, 08, 09, 22, 23, 26, 28 and all plan pages as provided by Frederick Construction.
PART 2 - General
2.1 The Scope of Work in each Technical Specification Section may be subdivided and assigned to more than one Bid Category. Likewise, the Work of one Bid Category may include items from more than one Technical Specification Section.
PART 3 – Standard Work Items
3.1 The following described work items and responsibilities are to be included, where applicable, in the Work of ALL Bid Categories.
a. Supervisory personnel to direct and schedule Work of the Bid Category in accordance with the Contract Documents and the Construction Schedule established by the Construction Manager.
b. It is noted that all bidders must assume that asbestos and lead paint is present in the building. Bidders are required to initiate, maintain, and supervise a safety program and precautions for the Work including the recent silica MIOSHA requirements.
c. Initiate, maintain and supervise a safety program and precautions for the Work.
Refer to Section 01 35 29 – Trade Contractor Health and Safety.
d. Layout of alignment and elevations required to install the Work of the Bid
Category using the surveying control established for the Project, and to interface properly with Work of other Bid Categories.
e. Familiarity with the Scope of Work of all Bid Categories included in the Contract
Documents, and particularly the interface of the Bid Categories. Advise the
Construction Manager of any difficulties in interfacing the Work with that installed under other Bid Categories.
AAS 2020 Sinking Fund Project No. 22-0315 002416-2
f. Obtaining and paying for all applicable fees, permits, inspections, tests and reports as required by state and local codes and/or the Specifications. Provide coordination and scheduling with local utility companies as may be required for the Work of a particular Bid Category. The Building Permit will be obtained by the Construction Manager and paid for by the owner.
g. Furnishing and use of all required labor, installation equipment, scaffolding, small tools and supplies necessary to perform the Work of a particular Bid Category.
h. Timing and placement of field office and storage trailers as well as location of equipment and material storage in accordance with the directions of the
Construction Manager.
i. Providing temporary electrical power hook up required for Contractor's temporary facilities (if any) from power source provided by the Owner, and as approved by the Construction Manager.
j. Furnishing electrical extension cords and water hoses required to extend temporary power and water to work areas; furnishing special lighting in excess of the temporary lighting being provided.
k. Receiving, unloading, handling, storage and protection of equipment and/or materials furnished by others but installed as part of the Bid Category.
l. Re-handling of "on-site" stored materials which interfere with the Owner's operations or the Work of other Contractors.
m. Arranging for materials and/or equipment furnished by the Bid Category but installed by others to be shipped with proper identification and packaged to facilitate handling without damage. Alerting the receiver/installer and
Construction Manager of delivery schedules and times for such materials and/or equipment.
n. Protection and identification of materials and equipment required for the Bid
Category and stored on-site.
o. Securing permission from Construction Manager to store materials within the building.
p. Saw-cutting, sleeving, coring and patching of existing construction required for
Work of the Bid Category, unless noted otherwise in the Bid Category description. Patching shall comply with the Technical Specification requirements for the surface being patched.
q. Provision of, and later closure of any openings required in the Work of a particular Bid Category for the access or passage of Work by others as indicated on Drawings or in Specifications.
r. Unless otherwise noted in the Bid Category descriptions, cutting any openings in roof decks required for Work in the Bid Category and protecting such openings for safety of personnel on the project; providing weather protection for such openings.
s. Providing any temporary bracing, shoring, underpinning or protection reasonably required for completion of the Work in the Bid Category and to maintain safe conditions to avoid accidents and property damage.
AAS 2020 Sinking Fund Project No. 22-0315 002416-3
t. Providing barricades, warnings, proper operating equipment, etc., as required for the safety of Contractor's employees and others in the Work area.
u. Clean up and removal of all debris and surplus materials.
v. Cleaning and protection of completed Work in the Bid Category until the area is occupied by the Owner, including final cleaning immediately before punch listing of any and all items installed under the Bid Category.
w. Repair or replacement of damage caused to existing finished areas or Work of other Contractors, including repair or replacement of installed ceiling tiles which become damaged or stained.
x. Field touch-up of prime or finish paint coats on materials and/or equipment installed under the Bid Category.
y. Hoisting and placement of all materials and equipment required for the Bid
Category in the Work areas, except as noted in the General Requirements.
z. Providing temporary heat and weather protection as required for the Work of a particular Bid Category prior to enclosure of the space in which the Work is being conducted. After enclosure of the particular area, the Owner/Construction
Manager will provide general temporary heat.
aa. Provide and install any equipment pads or bases, including grouting of bases, not specifically shown on Drawings or called for in the Specifications, but required for the proper installation of the work of a particular Bid Category.
bb. Furnishing and installation of all fasteners, anchor bolts, inserts, anchor plates, supplementary support members required for installation of the Work of a particular Bid Category whether or not indicated on Drawings or Specifications.
cc. Shop drawings, erection drawings, manufacturer’s specifications, samples, instruction manuals, parts manuals, maintenance instructions, warranties and affidavits as required by the Technical Specifications.
dd. Furnishing of information, sketches and descriptions, on a current basis as work progresses, to the Construction Manager for maintenance of record drawings.
ee. Furnishing of written construction progress and manpower information on a daily basis to the Construction Manager.
SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES
BID PACKAGE 9.9- PAINTING
AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-1 Series No. 02; Bid Release No. 01 – East Leroy Elementary – Mechanical Improvements Section 002416 – Scope of Work - Bid Package 9.9- Painting
Bid Package 9.9
Painting Athens Area Schools 2020 Sinking Fund
General work items:
The scope of work includes, but shall not be limited to the following:
1. Review Frederick Construction General Scope requirements as they outline additional expectations the contractor must act by.
2. Provide furnish full time supervision. Protect the work scheduled to remain and, if damaged, repair to an acceptable condition.
3. Submit to Frederick Construction for review a Site-Specific Safety Work Plan.
4. This bid package is to abide by all current Covid-19 regulations dictated by the CDC, FDA, Local Health Department, Frederick Construction and Athens Area Schools current approved policies.
5. This bid package is responsible for the scope of work indicated in the contract documents. To include but not limited to Division 00, 01, 02, 03, 07, 08, 09 and 10.
It is expected that regardless, if it is noted or not in the plans, specification, and CM Manual, this Bid Package will provide a complete and operational system that meets the intent of the Contract Documents.
6. Bidder is required to have all on-site employees that work on Athens Area Schools 2020 Sinking Fund Projects, undergo a criminal background check. Bidder is required to utilize Michigan State Police’s ICHAT website at:
https://apps.michigan.gov Once performed, an affidavit (form supplied by CM), attesting that background checks have been completed is required to be submitted to the CM prior to the start of construction. This bid package is responsible for all costs associated with performing these employee background checks.
7. Furnish and abide by all means of OSHA and MIOSHA regulations that pertain to this bid packages work. This includes, but not limited to, all personal protective equipment, training and certifications, life safety systems (fall arrest, silica, respiratory, etc.), and all other applicable OSHA or MIOSHA regulations.
8. This bid package is responsible to furnish and install all means of Fall Protection equipment/system to abide by OSHA and MIOSHA regulations for their work.
SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES
BID PACKAGE 9.9- PAINTING
AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-2 Series No. 02; Bid Release No. 01 – East Leroy Elementary – Mechanical Improvements Section 002416 – Scope of Work - Bid Package 9.9- Painting
9. NO Smoking or Chewing of Tobacco Products are allowed on site Except in areas
Designated by the CM.
10. NO open flames, torch cutting, grinding, or welding is allowed without an approved
Frederick Construction completed hot work permit.
11. Do not park in or disturb/damage the existing lawns or plantings. Any repairs and or replacement of damage caused by this bid package will be paid for by this bid package. The owner reserves the right to demand replacement in lieu of patching.
12. Provide sidewalk protection, if necessary, to prevent damage to them. Any repairs and or replacement of damage caused by this bid package will be paid for by this bid
13. Storage Containers, Trailers, Dumpsters, equipment, and staged materials placed on parking lots, drives or green space will be placed on suitable protective materials such as plywood and planks to existing surfaces from damage. Any repairs and or
14. Bidder is required to furnish and install all temporary barricades and dust protection as required to prevent entry to their work area and dust and debris from leaving the work area.
15. Any cutting/grinding, in masonry or concrete substrates are to be done with a wet saw, or equipment fitted with HEPA filtration Dust Collection Devices that meet current OSHA Silica standards. All Slurry/Dust from cutting operations must be cleaned immediately and properly disposed of at time of cutting operations.
Surrounding areas are to be protected from slurry/dust during cutting operations.
This Bid Package is responsible for the cleaning of all slurry/Dust generated from the work of this contractor.
16. Bidder is required to maintain a clean job site. Do not permit any accumulation of debris on site. Excess materials and debris are to be disposed of daily in provided waste dumpsters.
17. Furnish and install all caulk and sealants directly related to the work associated with this Bid Package.
18. Coordinate closely with bid packages: 23.1 & 26.1.
SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES
BID PACKAGE 9.9- PAINTING
AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-3 Series No. 02; Bid Release No. 01 – East Leroy Elementary – Mechanical Improvements
Specific Work Items:
1. The Goal of Athens Area Schools is to Recycle non-hazardous waste generated by construction projects. Therefore, the Owner WILL provide recycling and non-hazardous waste containers for the project. Any Hazardous Waste such as light ballasts etc., remains the Responsibility of the Contractor to dispose of properly.
Provide manifest documentation for any hazardous waste generated by this Bid Package.
2. This Bid Package is responsible for floor protection (Ram Board or Equivalent) when/where it is directly related to your work area. It is the responsibility of this Bid Package to Install, Maintain, remove and Dispose floor protection installed by this Bid Package.
3. Protection of any surfaces (walls furnishings etc.) not receiving paint and that are not already protected are the responsibility of this Bid Package.
4. This bid package will supply all soft barricading and signage when/where necessary to separate and protect your work areas from other trades, public and staff.
5. This Bid Package is responsible to Caulk all wall to wall, wall to ceiling, wall to floor joints, and all hollow metal frames before painting. Supply and install all necessary backer rod to complete this work.
6. Inspect all substrates for any imperfections and integrity concerns. If the substrate does not meet the project specifications immediately report any concerns to the Construction Manager. It is understood that upon the onset of installation, this Bid Package has accepted the substrate. All costs associated with potential re-installation will be paid for by this Bid Package.
7. All minor wall patching, prep, and repairs are the responsibility of this bid package.
8. This Bid Package is responsible to Paint all new interior surfaces and repair areas indicated in the Contract Drawings including but not limited to: New Hollow Metal Doors and Frames, Gypsum transom in-fills and Gypsum wall repairs, new Vertical Pipe enclosures, and Metal Fabrications at Ceiling Relief Vent repair locations.
9. This Bid Package is responsible to apply block filler prior to installation of new paint systems on any new masonry wall repairs.
10. An allowance (see schedule of values) has been set for Miscellaneous touch-ups not shown in the drawings. It is the responsibility of this Bid Package to confirm with Frederick Construction Supervision areas where touch-up to walls/surfaces are needed. Where items were removed for renovation and new construction is installed, the intent is to match specified or existing colors. This includes but is not limited to:
Existing drywall/plaster, Metal Ceiling Decks, Masonry, ECT.
SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES
BID PACKAGE 9.9- PAINTING
AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-4 Series No. 02; Bid Release No. 01 – East Leroy Elementary – Mechanical Improvements
11. This Bid Package is responsible to perform periodic and a final cleaning of your work areas during and at the completion of your work .
12. Include all related drawing notes and specifications indicated within the contract documents as part of your Bid Package.
Exclusions
1. Building permit is by owner.
2. Moving of Owner Furnishings
Allowances – As indicated in Section 01 2000:
See Schedule of Values Below
Unit Prices – As indicated in Section 01 2200: Not Applicable
Alternates – As indicated in Section 01 2300:
Schedule of Values: Provide the following bid breakdown as a schedule of values:
Temporary protection of Owner equipment and Furnishings $
Caulking and Minor Surface Repairs $
Painting of Base Bid Scheduled Surfaces $
Touch-Up Painting Allowance Budget $ 750.00
Final Cleaning $
Performance & Payment Bond $
Base Bid $
Related specification sections and submittal items
SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES
BID PACKAGE 9.9- PAINTING
AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-5 Series No. 02; Bid Release No. 01 – East Leroy Elementary – Mechanical Improvements Section 002416 – Scope of Work - Bid Package 9.9- Painting
It is the responsibility of this bid package to adhere to the specifications developed by Tower-
Pinkster. Submittal requirements are set forth within those specifications. Below is a list of specification sections, but not limited to, for this bid package.
All submittals and shop drawings are to be electronically submitted. Upon receipt of final approved submittal, submit three (3) hard copies and one (1) electronic copy to Frederick
Construction.
ALL OF DIVISION 00
ALL OF DIVISION 01
07 9200 - JOINT SEALANTS
09 9123 - INTERIOR PAINTING
END OF BID PACKAGE 9.9 - Painting
SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES
BID PACKAGE 23.1- MECHANICAL & PLUMBING IMPROVEMENTS
AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-1 Series No. 02; Bid Release No. 01 – East Leroy – Mechanical Improvements Section 002416 – Scope of Work - Bid Package 23.1- Mechanical & Piping Improvements
Bid Package 23.1
Mechanical & Piping Improvements documents. To include but not limited to Division 00, 01, 02, 07, 22 and 23. It is expected that regardless, if it is noted or not in the plans, specification, and CM required to utilize Michigan State Police’s ICHAT website at:
https://apps.michigan.gov Once performed, an affidavit (form supplied by CM), attesting that background checks have been completed is required to be submitted to the CM prior to the start of
SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES
BID PACKAGE 23.1- MECHANICAL & PLUMBING IMPROVEMENTS
AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-2 Series No. 02; Bid Release No. 01 – East Leroy – Mechanical Improvements Section 002416 – Scope of Work - Bid Package 23.1- Mechanical & Piping Improvements as plywood and planks to existing surfaces from damage. Any repairs and or current OSHA Silica standards. All Slurry/Dust from cutting operations must be cleaned immediately and properly disposed of at time of cutting operations.
Surrounding areas are to be protected from slurry/dust during cutting operations.
18. Furnish and install all fire/smoke caulking of all existing penetrations/conduits, etc.
required through new fire/smoke rated wall/ceiling assemblies.
19. Furnish and install all required (if any) concrete or non-concrete exterior or interior equipment pads for any item(s) installed by this bid package.
SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES
BID PACKAGE 23.1- MECHANICAL & PLUMBING IMPROVEMENTS
AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-3
20. Coordinate closely with bid packages: 9.9 & 26.1.
1. Permits/Fees directly related to this Bid Package are the responsibility of this Bid
2. The Goal of Athens Area Schools is to Recycle non-hazardous waste generated by hazardous waste containers for the project. Any Hazardous Waste such as light ballasts etc., remains the Responsibility of the Contractor to dispose of properly.
3. This Bid Package is responsible to Furnish/Install/Remove/Dispose any temporary construction to protect the owner’s equipment and furnishings from Dust, Debris, Weather, and other items generated as a result of work performed by this Bid Package. These areas must be cleaned up daily to the satisfaction of the Frederick Construction Superintendent.
4. This Bid Package is responsible for floor protection (Ram Board or Equivalent) when/where it is directly related to your work area and access paths. It is the responsibility of this Bid Package to Install, Maintain, Remove, and Dispose of floor protection installed by this Bid Package
5. Protection of any surfaces (walls furnishings etc.) where work is occurring by this Bid
Package that are not already protected are the responsibility of this Bid Package.
6. This Bid Package is responsible to demo, dispose, salvage, re-install and or abandon in place all Architectural and Mechanical key noted items indicated on Sheet(s) AD 101A, 101B, 101C, AD 102 and Sheet(s) MD 101A and MD 101B/C, Items include but are not limited to: HVAC Equipment, Concrete Equipment pads, Pumps, Piping, T-Stats, Pipe Enclosures, Doors, Acoustical Ceilings, Book Case Shelving, Glass Transom, Masonry Transom, Bulletin Boards, Roof Decking and Roof Materials, Etc.
Coordinate with Bid Package 26.1 for electrical service Disconnect/Reconnect needs.
7. This Bid Package shall furnish and install All mechanical support equipment shown in the contract drawings. This bid package is responsible for but not limited to, structural steel, design when requested or required, miscellaneous steel fabrications, mechanical equipment supports and stands, vibration equipment necessary for units on top of steel or equipment pads, roof accessories, interior and exterior concrete and non-concrete equipment pads. When applicable patch to match existing surfaces including any wall, floor, roof penetrations and modifications as required. This Bid Package is responsible to protect the roof openings per OSHA requirements.
SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES
BID PACKAGE 23.1- MECHANICAL & PLUMBING IMPROVEMENTS
AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-4
3. Unless it is specifically noted in the General Exclusions Section of this Bid Package, this Bid Package is responsible for all Shoring, Cutting, Patching, Furnishing and Installation of Structural Steel and Reinforcement for Roof Decking Removal, Roof Membrane Removals, Roof System Patching, Masonry Walls, Non-Masonry Walls, Metal Panels, Concrete, Cored Holes and Core Patching of removed equipment and material for the following but not limited to:
• Hydronic Piping
• Mechanical Equipment and associated Penetrations
• HUV’s
• Motorized Relief Dampers
• Unit Heaters
• PTAC’s
• Fin Tubes
• Doors
4. This Bid Package is responsible to Coordinate and Provide Lay-Out as well as any required weather tight roof accessories for new any new Mechanical equipment that penetrate the roof system.
5. This Bid Package is responsible to remove roof decking where necessary and furnish and install roof/ceiling deck patches as indicated by the detail noted as “Long-Span Roof Deck Penetration without Support Framing Detail” in the contract drawings.
Painting of the interior Ceiling deck patch is by Bid Package 9.9.
6. Roof Repairs are the responsibility of this Bid Package. The existing Carlisle EPDM roofing system at East Leroy Elementary was recently replaced in 2020. To maintain manufacturer’s warranty this Bid Package is required to secure a Certified Carlisle roofing contractor that utilizes only Carlisle approved roofing products when making any roof repairs. Repairs are to be made with systems that match existing systems to maintain warranty. Qualifications to be verified through the submittal process.
8. This Bid Package is responsible to Coordinate and Provide Lay-Out for new hydronic and gas piping. When necessary, where piping passes through existing walls, penetrations through these walls are by this Bid Package. Penetrations through Masonry walls are required to be cored.
9. Where penetration/modification Cut and Patch work is occurring by this Bid Package, it is the responsibility of this Bid Package to temporarily Furnish/Install/Remove and Dispose, ½-inch Plywood as Additional Floor Protection directly where Cut and Patch operations are being performed by this Bid Package.
10. This Bid Package is responsible hang all new hydronic piping where exposed structural metal ceilings exist, as tight to existing ceiling as possible. Bottom of Pipe insulation shall not be lower than 8’-0” from finished floor to allow for future
SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES
BID PACKAGE 23.1- MECHANICAL & PLUMBING IMPROVEMENTS
AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-5 Series No. 02; Bid Release No. 01 – East Leroy – Mechanical Improvements Section 002416 – Scope of Work - Bid Package 23.1- Mechanical & Piping Improvements
Acoustical Ceilings to be installed at a minimum of 7’-10” from finish floor. If an obstruction is encountered that does not allow this 8’-0” bottom of pipe insulation dimension to be achieved, it is to be brought to the immediate attention and in writing to Frederick Construction management.
11. Regardless, if it is shown or not shown in the Contract Documents, Any Hydronic Piping modifications, extensions, relocation and/or reconnects required to provide a functioning system are the responsibility of this Bid Package.
12. This Bid Package is responsible to furnish and install all Mechanical equipment, ducting, piping, insulation, and controls as shown in the contract drawings, as well as any ancillary items that may not be shown to provide a complete system.
13. Furnish and install any equipment controls, frequency drives and any related disconnects specified to be provided by the equipment manufacturer for equipment furnished or installed by this Bid Package. Coordinate final electrical connection needs with Bid Package 26.1
14. This bid package shall furnish and install new automated web based BMS controls per the Contract Drawings. The required control contractor is Control Net, Contact Marc Dreyer at (616) 777-0037 or email at mdreyer@controlnet.com. All costs are to be included in the Base Bid of this Bid Package.
15. This Bid Package is responsible to furnish and install all insulation directly related to
16. This Bid Package is responsible to furnish and install and ensure any fluid or process service lines are clearly labeled with industry standard labels to indicate material and flow direction.
17. Furnish, install and or salvage/re-install any Louvers, Grills, Vents or Blank-Off Panels indicated in the drawings or removed for convenience during associated work with this bid package.
18. Furnish any access doors, where necessary, to meet any code and maintenance requirements.
19. Where required by code or where shown in the drawings, this Bid Package is Responsible to furnish and install Smoke/Fire Dampers.
20. Concrete and Non-Concrete equipment pads are the responsibility of this Bid
21. This Bid Package is responsible to Furnish, Fabricate and install all metal pipe enclosures where indicated in the contract drawings.
SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES
BID PACKAGE 23.1- MECHANICAL & PLUMBING IMPROVEMENTS
AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-6 Series No. 02; Bid Release No. 01 – East Leroy – Mechanical Improvements Section 002416 – Scope of Work - Bid Package 23.1- Mechanical & Piping Improvements
22. This Bid Package is responsible to furnish and install new hollow metal doors and frames at the Boiler Room where indicated in the contract drawings. Painting of these hollow metal doors and Frames is by Bid Package 9.9.
23. It is the responsibility of this Bid Package to furnish and install new rated wall assemblies at door transom locations indicated in the plans.
24. Any masonry modification or repairs required to perform the work associated with this Bid Package are the responsibility of this Bid Package.
25. Gypsum wall assemblies & repairs such as at Door Transoms and at the East Vestibule in Unit A are the responsibility of this Bid Package.
26. It is the responsibility of this Bid Package to temporarily remove, modify and re-install items such as bookshelves, tack boards, fixed casework etc. to facilitate the installation of new HVAC equipment, piping and pipe enclosures.
27. It is the responsibility of this Bid Package to furnish and install complete fire safety/caulking of penetrations, new rated assemblies etc. made or required by this Bid Package through existing rated walls assemblies and roof deck systems.
28. Coordinate any final electrical connections to new equipment/fixtures being installed by this Bid Package with Bid Package 26.1.
29. This Bid Package is required to provide Alternate Pricing for Alternate 1 “Boiler Room”.(See Alternate section in this Bid Package).
30. It is the responsibility of this Bid Package to schedule, provide testing final inspections, reports to the Owner of any required/applicable equipment such as Boilers and Pumps.
31. It is the responsibility of this Bid Package to perform Test and Balancing and
Commissioning services for newly installed or modified HVAC systems.
32. Include all related drawing notes and specifications indicated within the contract
General Exclusions
1. Building permit is by Owner.
2. Dumpsters are provided by Owner.
3. Moving of Owner Loose Furnishings.
SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES
BID PACKAGE 23.1- MECHANICAL & PLUMBING IMPROVEMENTS
AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-7 Series No. 02; Bid Release No. 01 – East Leroy – Mechanical Improvements
4. Abatement of ACM Piping Materials
5. Painting of Architectural Items that have been cut and patched.
Allowances – As indicated in Section 01 2000: Not Applicable
Unit Prices – As indicated in Section 01 2200: Not Applicable
Alternates – As indicated in Section 01 2300:
Alternate No. 1: Existing Boilers to Remain with One New Boiler Added
1. Base Bid: Replace all (3) existing boilers with (3) new boilers
2. Alternate No. 1: Three existing boilers to remain. Add (1) additional new boiler with new maintenance pad.
Mechanical & Boiler Permit(s) $
Architectural Items scheduled for Demolition $
Carlisle Certified Roof Repairs $
Piping and Mechanical Equipment Demolition $
Hydronic Piping Installations & Modifications $
Mechanical Equipment Installations $
Metal Pipe Enclosures $
Automated Controls $
Gypsum Wall Assemblies & Repairs $
Installation of New Hollow Metal Doors & Frames $
Shelving, Casework, Tackboard Modifications $
Test/Balance & Commissioning $
Alternate 1 – Boiler Room Alternate $
Total Bid $
SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES
BID PACKAGE 23.1- MECHANICAL & PLUMBING IMPROVEMENTS
AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-8
It is the responsibility of this bid package to adhere to the specifications developed by Tower-
Pinkster Submittal requirements are set forth within those specifications. Below is a list of specification sections, but not limited to, for this bid package.
All submittals and shop drawings are to be electronically submitted. Upon receipt of final
All of Division 00 All of Division 01
02 4119 - SELECTIVE DEMOLITION
03 3000 - CAST-IN-PLACE CONCRETE sf1 04 2200 - CONCRETE UNIT MASONRY sf0 05 4000 - COLD-FORMED METAL FRAMING sf0
05 5000 - METAL FABRICATIONS
05 7500 - DECORATIVE FORMED METAL
07 0150.19 - PREPARATION FOR REROOFING
07 5323 - ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING sf0
07 7100 - ROOF SPECIALTIES
07 8413 - PENETRATION FIRESTOPPING
07 8443 - JOINT FIRESTOPPING
07 9200 - JOINT SEALANTS sf0 08 1113 - HOLLOW METAL DOORS AND FRAMES sf0
08 7100 - DOOR HARDWARE
09 2900 - GYPSUM BOARD
22 1119 - DOMESTIC WATER PIPING SPECIALTIES
23 0500 - COMMON WORK RESULTS FOR HVAC
23 0513 - COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
23 0516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING
23 0519 - METERS AND GAGES FOR HVAC PIPING
23 0523 - GENERAL DUTY VALVES FOR HVAC PIPING
23 0529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
23 0553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
23 0593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 0700 - HVAC INSULATION
23 0800 - MINIMUM COMMISSIONING OF HVAC
23 0900 - INSTRUMENTATION AND CONTROL FOR HVAC
23 1123 - FACILITY NATURAL GAS PIPING
23 2113 - HYDRONIC PIPING
23 2123 - HYDRONIC PUMPS
23 2500 - HVAC WATER TREATMENT
23 3113 - METAL DUCTS
23 3115 - HVAC AIR-DISTRIBUTION SYSTEM CLEANING
SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES
BID PACKAGE 23.1- MECHANICAL & PLUMBING IMPROVEMENTS
AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-9 Series No. 02; Bid Release No. 01 – East Leroy – Mechanical Improvements Section 002416 – Scope of Work - Bid Package 23.1- Mechanical & Piping Improvements
23 3300 - AIR DUCT ACCESSORIES
23 3713 - DIFFUSERS, REGISTERS, AND GRILLES
23 3723 - HVAC GRAVITY VENTILATORS
23 5216 - CONDENSING BOILERS (Knight XL)
23 8113 - PACKAGED TERMINAL AIR-CONDITIONERS
23 8223 - UNIT VENTILATORS
23 8233 - CONVECTORS
23 8239 - UNIT HEATERS
END OF BID PACKAGE 23.1 Mechanical & Piping Improvements
SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES
BID PACKAGE 26.1- ELECTRICAL IMPROVEMENTS
AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-1 Series No. 02; Bid Release No. 01 – East Leroy Elementary – Electrical Improvements Section 002416 – Scope of Work - Bid Package 26.1- Electrical Improvements
Bid Package 26.1
Electrical Improvements documents. To include but not limited to Division 00, 01, 02, 07, 26, and 28. It is expected that regardless, if it is noted or not in the plans, specification, and CM required to utilize Michigan State Police’s ICHAT website at:
https://apps.michigan.gov Once performed, an affidavit (form supplied by CM), attesting that background checks have been completed is required to be submitted to the CM prior to the start of
SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES
BID PACKAGE 26.1- ELECTRICAL IMPROVEMENTS
AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-2 Series No. 02; Bid Release No. 01 – East Leroy Elementary – Electrical Improvements Section 002416 – Scope of Work - Bid Package 26.1- Electrical Improvements as plywood and planks to existing surfaces from damage. Any repairs and or current OSHA Silica standards. All Slurry/Dust from cutting operations must be cleaned immediately and properly disposed of at time of cutting operations.
Surrounding areas are to be protected from slurry/dust during cutting operations.
18. Furnish and install all fire/smoke caulking of all existing penetrations/conduits, etc.
required through new fire/smoke rated wall/ceiling assemblies.
19. Furnish and install all required (if any) concrete or non-concrete exterior or interior
SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES
BID PACKAGE 26.1- ELECTRICAL IMPROVEMENTS
AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-3 Series No. 02; Bid Release No. 01 – East Leroy Elementary – Electrical Improvements Section 002416 – Scope of Work - Bid Package 26.1- Electrical Improvements
20. Furnish and install rough-ins where necessary, including but not limited to conduit, boxes, raceways, Etc.
21. Furnish and install all support systems/racks/platforms/hangers that may be required and/or shown to carry items installed within this Bid Package. Provide proper engineering and shop drawings for review if required.
22. Remove and reinstall any acoustic ceiling tile needed to accommodate the work of this Bid Package. Replace any tile damaged or soiled by this Bid Package’s workmen during the performance of the work of this Bid Package.
23. Furnish and install all required (if any) concrete or non-concrete exterior or interior
24. Coordinate closely with bid packages: 9.9 & 23.1.
1. Permits/Fees directly related to this Bid Package are the responsibility of this Bid
2. The Goal of Athens Area Schools is to Recycle non-hazardous waste generated by hazardous waste containers for the project. Any Hazardous Waste such as light ballasts etc., remains the Responsibility of the Contractor to dispose of properly.
3. This Bid Package is responsible to Furnish/Install/Remove/Dispose any temporary construction to protect the owner’s equipment and furnishings from Dust, Debris, Weather, and other items generated as a result of work performed by this Bid Package. These areas must be cleaned up daily to the satisfaction of the Frederick Construction Superintendent.
4. This Bid Package is responsible for floor protection (Ram Board or Equivalent) when/where it is directly related to your work area and access paths. It is the responsibility of this Bid Package to Install, Maintain, Remove, and Dispose of floor protection installed by this Bid Package
5. Protection of any surfaces (walls furnishings etc.) where work is occurring by this Bid Package that are not already protected are the responsibility of this Bid Package.
6. Where penetration/modification Cut and Patch work is occurring by this Bid Package, it is the responsibility of this Bid Package to temporarily Furnish/Install/Remove and
SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES
BID PACKAGE 26.1- ELECTRICAL IMPROVEMENTS
AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-4 Series No. 02; Bid Release No. 01 – East Leroy Elementary – Electrical Improvements Section 002416 – Scope of Work - Bid Package 26.1- Electrical Improvements
Dispose, ½-inch Plywood as Additional Floor Protection directly where Cut and Patch operations are being performed by this Bid Package.
7. This Bid Package is responsible to disconnect, demo, dispose, abandon and or salvage all electrical items indicated on Sheet(s) ED101A, ED 101B and ED 101C. Items include but are not limited to equipment panels, receptacles, wiring, conduit, junction boxes, wire mold, etc.
8. It is the expectation of this Bid Package to temporarily secure and utilize an adequate quantity of existing lights to serve as temporary lighting (i.e. in the boiler room).
This temporary lighting will be maintained by this Bid Package to MIOSHA requirements during the demolition and construction process. These temporary lights are to be replaced with the specified new lighting as construction progresses.
9. This Bid Package is responsible to provide any electrical disconnect needs for Mechanical Equipment being removed by Bid Packages 23.1. Coordinate with Bid Package 23.1 for specific needs and schedule.
10. If or where coring through an existing masonry wall is required to allow for conduit/raceway installation, it is the responsibility of this Bid Package.
11. This Bid Package is responsible to furnish and install all Electrical…