This document is a Project Manual for the Athens Area Schools 2020 Sinking Fund Project Series 2 Release 1 - East Leroy Elementary Mechanical Improvements project located in East Leroy, Michigan. The project involves mechanical system upgrades at the East Leroy Elementary School, including replacing boilers, pumps, piping, and controls. The bid packages include Painting, HVAC, and Electrical Improvements. A mandatory pre-bid conference will be held on December 11, 2023, and sealed bids are due by 2:00 PM on December 21, 2023 at the Athens Area Schools Administration Building. The construction is expected to begin on June 3, 2024.

The bid shall be a lump sum amount, and bidders must provide performance and payment bonds. Prevailing wage rates apply. An allowance has been set for miscellaneous touch-up painting. Alternate pricing is requested for retaining one existing boiler and adding a new boiler. Contractors must be pre-qualified by the construction manager prior to award and provide background checks for all on-site employees.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

12/08/2023

AAS 2020 Sinking Fund Projects

4320 K Drive

East Leroy, MI 49097

Series 2 Release 1 East Leroy Elementary

Mechanical Improvements

CONSTRUCTION MANAGER

120 E. Prairie Street, Suite C

Vicksburg, MI 49097

Phone: 269.349.8428

Fax: 269.475.5239 frederickconstruction.com

ARCHITECTS/ENGINEERS

242 E. Kalamazoo Avenue Suite 200

Kalamazoo, MI 49007

Phone: 269-343-6133

Fax: 269-343-6633 towerpinkster.com

SECTION 000110

TABLE OF CONTENTS

AAS 2020 Sinking Fund Project No. 22-0315 000100-1

Series No. 2; 2023 Bid Release No. 1 – East Leroy Elementary – Mechanical Improvements

Section 000110 – Table of Contents

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

INTRODUCTORY INFORMATION

000101 PROJECT MANUAL

000110 TABLE OF CONTENTS

BIDDING REQUIREMENTS

001100 ADVERTISEMENT/INVITATION FOR BIDS

002113 INSTRUCTIONS TO BIDDERS

002413 SCOPE OF WORK – GENERAL NOTES

002416 SCOPE OF WORK - BID CATEGORY SPECIFIC NOTES

003113 PROJECT MILESTONE SCHEDULE

004126 BID PROPOSAL FORM

CONTRACTING REQUIREMENTS

005216 AGREEMENT FORM

006113 PERFORMANCE AND PAYMENT BOND

006200 CERTIFICATES AND OTHER FORMS

007216 GENERAL CONDITIONS

007300 SUPPLEMENTAL CONDITIONS

007316 INSURANCE REQUIREMENTS

DIVISION 01 – GENERAL REQUIREMENTS

012100 ALLOWANCES

012200 UNIT PRICES

012300 ALTERNATES

012600 CONTRACT MODIFICATION PROCEDURES

012900 PAYMENT PROCEDURES

012973 SCHEDULE OF VALUES

013119 PROJECT MEETINGS

013323 SHOP DRAWINGS, PROJECT DATA AND SAMPLES

013529 HEALTH, SAFETY AND EMERGENCY RESPONSE PROCEDURES

014516 FIELD QUALITY CONTROL PROCEDURES

014517 NON-CONFORMANCE PROCEDURE

015000 TEMPORARY FACILITIES AND CONTROLS

Section 000110 – Table of Contents

DIVISION 01 – GENERAL REQUIREMENTS (CONTINUED)

015300 JOBSITE ENVIRONMENTAL MANAGEMENT

017123 FIELD ENGINEERING

017329 CUTTING AND PATCHING

017700 CLOSEOUT PROCEDURES

017823 OPERATION AND MAINTENANCE DATA

017839 PROJECT RECORD DOCUMENTS

SPECIFICATIONS FROM TOWER PINKSTER DATED 12/07/2023

DIVISION 00 – PROCUREMENT

00 3100 - AVAILABLE PROJECT INFORMATION

00 6323 - CADD FILE TRANSFER WAIVER

00 6324 - BIM TRANSFER WAIVER

00 6325 - SUBSTITUTION DURING CONSTRUCTION REQUEST FORM

00 7300 - SUPPLEMENTARY CONDITIONS

DIVISION 01 – GENERAL REQUIREMENTS

01 2300 - ALTERNATES

01 2500 - SUBSTITUTION PROCEDURES

01 2600 - CONTRACT MODIFICATION PROCEDURES

01 2900 - PAYMENT PROCEDURES

01 3100 - PROJECT MANAGEMENT AND COORDINATION

01 3300 - SUBMITTAL PROCEDURES

01 4000 - QUALITY REQUIREMENTS

01 4200 - REFERENCES

01 6000 - PRODUCT REQUIREMENTS

01 7300 - EXECUTION

01 7700 - CLOSEOUT PROCEDURES

01 7823 - OPERATION AND MAINTENANCE DATA

01 7839 - PROJECT RECORD DOCUMENTS

01 7900 - DEMONSTRATION AND TRAINING

DIVISION 02 – EXISTING CONDITIONS

02 4119 - SELECTIVE DEMOLITION

DIVISION 03 – CONCRETE

03 3000 - CAST-IN-PLACE CONCRETE

DIVISION 04 – MASONRY

04 2200 - CONCRETE UNIT MASONRY

Section 000110 – Table of Contents

DIVISION 05 – METALS

05 4000 - COLD-FORMED METAL FRAMING sf0

05 5000 - METAL FABRICATIONS

05 7500 - DECORATIVE FORMED METAL

DIVISION 06 – WOOD, PLASTICS & COMPOSITES

06 1000 - ROUGH CARPENTRY sf0

06 1600 - SHEATHING sf0

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 0150.19 - PREPARATION FOR REROOFING

07 5323 - ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING sf0

07 7100 - ROOF SPECIALTIES

07 8413 - PENETRATION FIRESTOPPING

07 8443 - JOINT FIRESTOPPING

07 9200 - JOINT SEALANTS sf0

DIVISION 08 – OPENINGS

08 1113 - HOLLOW METAL DOORS AND FRAMES sf0

08 7100 - DOOR HARDWARE

DIVISION 09 – FINISHES

09 2900 - GYPSUM BOARD

09 9123 - INTERIOR PAINTING

DIVISION 10 – SPECIALTIES

NOT USED

DIVISION 11 – EQUIPMENT

DIVISION 12 – FURNISHINGS

DIVISION 13 – SPECIALTIES

DIVISION 14 – CONVEYING EQUIPMENT

DIVISION 21 – FIRE SUPPRESSION

Section 000110 – Table of Contents

DIVISION 22 – PLUMBING

22 1119 - DOMESTIC WATER PIPING SPECIALTIES

DIVISION 23 – HEATING VENTALATING & AIR CONDITIONING

23 0500 - COMMON WORK RESULTS FOR HVAC

23 0513 - COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

23 0516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

23 0519 - METERS AND GAGES FOR HVAC PIPING

23 0523 - GENERAL DUTY VALVES FOR HVAC PIPING

23 0529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

23 0553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

23 0593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 0700 - HVAC INSULATION

23 0800 - MINIMUM COMMISSIONING OF HVAC

23 0900 - INSTRUMENTATION AND CONTROL FOR HVAC

23 1123 - FACILITY NATURAL GAS PIPING

23 2113 - HYDRONIC PIPING

23 2123 - HYDRONIC PUMPS

23 2500 - HVAC WATER TREATMENT

23 3113 - METAL DUCTS

23 3115 - HVAC AIR-DISTRIBUTION SYSTEM CLEANING

23 3300 - AIR DUCT ACCESSORIES

23 3713 - DIFFUSERS, REGISTERS, AND GRILLES

23 3723 - HVAC GRAVITY VENTILATORS

23 5216 - CONDENSING BOILERS (Knight XL)

23 8113 - PACKAGED TERMINAL AIR-CONDITIONERS

23 8223 - UNIT VENTILATORS

23 8233 - CONVECTORS

23 8239 - UNIT HEATERS

DIVISION 25 – INTEGRATED AUTOMATION

DIVISION 26 – ELECTRICAL

26 0500 - COMMON WORK RESULTS FOR ELECTRICAL

26 0519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

26 0533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

26 0544 - SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND

CABLING

26 0553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS

26 2416 - PANELBOARDS

26 2726 - WIRING DEVICES

26 2813 - FUSES

Section 000110 – Table of Contents

26 2913 - ENCLOSED CONTROLLERS

26 2923 - VARIABLE FREQUENCY MOTOR CONTROLLERS

DIVISION 27 – COMMUNICATIONS

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

DIVISION 31 - EARTHWORK

DIVISION 32 – EXTERIOR IMPROVEMENTS

DIVISION 33 THROUGH DIVISION 48

END OF SECTION

Athens Area Schools Sinking Fund Projects Project No. 22-0315 001100-1

Series No. 2; 2023 Bid Release No. 1 – AAS East Leroy Elementary School - Mechanical Improvements

Section 001100 – Advertisement / Invitation For Bids

PROJECT: Athens Area Schools 2020 Sinking Fund

FC PROJECT NO.: 22-0315

SERIES NO.: 2

BID RELEASE NO.: 01

DESCRIPTION: Athens Public Schools

East Leroy Elementary School - Mechanical Improvements

OWNER: Athens Area Schools

East Leroy, MI 49051

ARCHITECT: Tower-Pinkster

242 E. Kalamazoo Avenue

Kalamazoo, MI 49007

CONSTRUCTION MANAGER: Frederick Construction, Inc.

120 E. Prairie Street, Suite C

Vicksburg, MI 49097

PROJECT MANAGER: Chad Kandow

EMAIL: c.kandow@frederickconstruction.com

PHONE: 269-349-8428 ext. 7101

Mobile: 269-779-1289

1. PRE-BID CONFERENCE AND SITE WALK-THRU

1.1 A Mandatory pre-bid conference will be held for the following bid packages at the dates and locations noted below: (see section 3)

Monday December 11, 2023, at 3:30 PM: East Leroy Elementary School

4320K Drive

Contractors will meet at the main entrance of East Leroy Elementary School. Once the pre-bid meeting introduction and discussion has been completed, contractors will be allowed to walk the project area at

East Leroy Elementary School. All potential bidders MUST attend the pre-bid conference and SIGN the attendance sheet.

2. BID PROPOSAL DUE DATE/LOCATION

2.1 Sealed bids will be accepted from qualified contractors by Athens Area Schools. They shall be delivered to the Superintendent’s office at Athens Area Schools Administration Building /East Leroy Elementary, 4320 K Drive East Leroy, MI 49051 and are to be addressed to the attention of Mr. Joe Hupenbecker.

NO faxed or emailed bids will be accepted. Envelopes are to be clearly marked with Project Name and

Number and Bid Release Name and Number. Bids will be publicly opened and read aloud December 21, 2023, 2:00 pm in the conference room at the administrative building. Bids must be delivered no later than 2:00 pm on December 21, 2023. Bids received after this specified date and time will not be accepted and will be returned unopened.

Athens Area Schools Sinking Fund Projects Project No. 22-0315 001100-1

2.2 BID SECURITY: Bid bond or certified check of not less than 5% of the bid amount MUST be submitted with bid and made payable to Athens Area Schools.

2.3 FAMILIAL RELATIONSHIP DISCLOSURE: All proposals shall be accompanied by a sworn and notarized statement disclosing any familial relationship (or lack of a relationship) that exists between the owner or any employee of the bidder and any member of the Board of Education of the Athens Public

Schools or the Superintendent of the School District. The district shall not accept a bid that does not include a sworn and notarized disclosure statement.

2.4 TYPE OF CONTRACT: The base bid shall be a lump sum amount, for the work as set forth in the bid documents.

2.5 CONTRACT SECURITY: Performance and Payment Bonds in the amount of 100% of the proposed cost will be required for all contracts. The cost of a Performance and Payment Bond shall be included within the contractor’s base bid price.

2.6 BID WITHDRAWAL: No bids may be withdrawn for at least sixty (60) consecutive calendar days following the bid opening.

2.7 RIGHTS RESERVED: The Owner reserves the right to accept or reject any and all bids, alternates, or proposals, and to accept bids, alternates, or proposals that, in its judgment, serve its best interests.

3. BID PACKAGES

Bid Package 09.2 – Miscellaneous Architectural Items

Bid Package 09.9 – Painting

Bid Package 23.1 – HVAC

Bid Package 26.1 – Electrical Improvements

4. BID DOCUMENT AVAILABILITY

4.1 Bid Documents, drawings and specifications will be available, electronic format only, on December 08, 2023 at the following location:

Frederick Construction, Inc.

Contact: Chad Kandow c.kandow@frederickconstruction.com

4.2 Documents will also be made available for review at the following locations:

• Builder’s Exchange – Kalamazoo, Grand Rapids and Lansing

• Construction Association of Michigan

4.3 Bid Documents will be available in electronic format only.

5. BID PROPOSAL REQUIREMENTS

5.1 All questions during the bidding period shall be directed to Frederick Construction, Inc.

via fax or email to:

Athens Area Schools Sinking Fund Projects Project No. 22-0315 001100-3

CONTACT: Chad Kandow

FAX: 269-475-5239

EMAIL: c.kandow@frederickconstruction.com

5.2 Bidders are required to be pre-qualified by Frederick Construction, Inc. prior to award of Contract

(NOT prior to bidding) per qualifications form in “Certificates and Other Forms”.

6. INTENT TO BID FORM

6.1 An Intent to Bid Form will need to be filled out and returned to Frederick Construction, Inc. Bidders returning the form will be notified of issued addenda. Please see Form under Section 006200

Certificates and Other Forms.

7. PREVAILING WAGE RATES ARE REQUIRED

8. BIDDING SCHEDULE

8.1 Request for Bid Proposal Distributed: December 1, 2023

Bid Documents available to Contractors December 8, 2023

Pre-Bid Conference and Site Walk-Thru: December 11, 2023, at 3:30 PM

Deadline for submittal of Pre-Bid RFI’s: December 13, 2023, by 12:00 pm

Final Addendum Issued: December 15, 2023, by 12:00 pm

Bids Due December 21, 2023, at 2:00 pm

Athens Area Schools Superintendent Office

Public Bid Opening: December 21, 2023

Immediately following receipt of bids

Athens Area Schools Superintendent Office

9. CONSTRUCTION SCHEDULE

9.1 Construction will take place beginning June 3, 2024 - Schedule will be provided in CM Manual

SECTION 002113

INSTRUCTIONS TO BIDDERS

AAS 2020 Sinking Fund Project No. 22-0315 002113-1

Series No. 2; 2023 Bid Release No. 1 – East Leroy Elementary Mechanical Improvements

Section 002113 – Instruction to Bidders

1.1 DOCUMENT

A. American Institute of Architects Document A101-2007, Instructions to

Bidders, Forms, forms a part of the Bidding Documents and by reference is incorporated herein as fully as if repeated at length.

1.2 RELATED REQUIREMENTS

A. Document 001100 Advertisement / Invitation for Bids.

B. Frederick Construction specifications and documents

C. Forms:

1. Bid Form

2. Familial Disclosure Affidavit

3. Bid Request For Information (BRFI)

4. Bidders Checklist

5. Intent to Bid Form

6. Sealed Bid Label

7. Iran Sanction Act Form

1. Background Checks will be required by Contractors for each and every employee that will work on this project through Michigan State Police’s ICHAT website at:

https://apps.michigan.gov The cost associated with this is the responsibility of each bidder.

1.3 SUPPLEMENTS

A. The following supplements modify, delete from, or add to the Instructions to

Bidders referenced above.

B. Where provisions of the Instructions to Bidders are modified, unaltered provisions remain in effect.

C. Article 3 - Bidding Documents:

1. NOT BEING USED

D. Article 4 - Bidding Procedures:

SECTION 002113

AAS 2020 Sinking Fund Project No. 22-0315 002113-1

Series No. 2; 2023 Bid Release No.1 – East Leroy Elementary Improvements

Section 002113 – Instruction to Bidders

E. Article 5 - Consideration of Bids:

END OF DOCUMENT

SECTION 002416

SCOPE OF WORK – ALL BID CATEGORIES

AAS 2020 Sinking Fund Project No. 22-0315 002416-1

Series No. 2; 2023 Bid Release No. 1 – East Leroy Elementary Improvements

Section 002416 – Scope of Work – Bid Category Specific Notes

Scope of Work

For All Bid Categories

PART 1 – Definitions

1.1 A Bid Category Description outlines the Scope of Work for each Bid Category included in these documents, one or more of which will be included in a Bid Proposal and identified as work in Owner/Contractor Agreement. The Scope of Work outlined in the Bid Category Description and in pertinent Standard Work Items will take precedence over any other language on drawings and/or in the Technical

Specifications, which may directly or inadvertently imply Scope of Work.

1.2 Tower-Pinkster Technical Specifications include Divisions 00, 01, 02, 03, 04, 05, 07, 08, 09, 22, 23, 26, 28 and all plan pages as provided by Frederick Construction.

PART 2 - General

2.1 The Scope of Work in each Technical Specification Section may be subdivided and assigned to more than one Bid Category. Likewise, the Work of one Bid Category may include items from more than one Technical Specification Section.

PART 3 – Standard Work Items

3.1 The following described work items and responsibilities are to be included, where applicable, in the Work of ALL Bid Categories.

a. Supervisory personnel to direct and schedule Work of the Bid Category in accordance with the Contract Documents and the Construction Schedule established by the Construction Manager.

b. It is noted that all bidders must assume that asbestos and lead paint is present in the building. Bidders are required to initiate, maintain, and supervise a safety program and precautions for the Work including the recent silica MIOSHA requirements.

c. Initiate, maintain and supervise a safety program and precautions for the Work.

Refer to Section 01 35 29 – Trade Contractor Health and Safety.

d. Layout of alignment and elevations required to install the Work of the Bid

Category using the surveying control established for the Project, and to interface properly with Work of other Bid Categories.

e. Familiarity with the Scope of Work of all Bid Categories included in the Contract

Documents, and particularly the interface of the Bid Categories. Advise the

Construction Manager of any difficulties in interfacing the Work with that installed under other Bid Categories.

AAS 2020 Sinking Fund Project No. 22-0315 002416-2

f. Obtaining and paying for all applicable fees, permits, inspections, tests and reports as required by state and local codes and/or the Specifications. Provide coordination and scheduling with local utility companies as may be required for the Work of a particular Bid Category. The Building Permit will be obtained by the Construction Manager and paid for by the owner.

g. Furnishing and use of all required labor, installation equipment, scaffolding, small tools and supplies necessary to perform the Work of a particular Bid Category.

h. Timing and placement of field office and storage trailers as well as location of equipment and material storage in accordance with the directions of the

Construction Manager.

i. Providing temporary electrical power hook up required for Contractor's temporary facilities (if any) from power source provided by the Owner, and as approved by the Construction Manager.

j. Furnishing electrical extension cords and water hoses required to extend temporary power and water to work areas; furnishing special lighting in excess of the temporary lighting being provided.

k. Receiving, unloading, handling, storage and protection of equipment and/or materials furnished by others but installed as part of the Bid Category.

l. Re-handling of "on-site" stored materials which interfere with the Owner's operations or the Work of other Contractors.

m. Arranging for materials and/or equipment furnished by the Bid Category but installed by others to be shipped with proper identification and packaged to facilitate handling without damage. Alerting the receiver/installer and

Construction Manager of delivery schedules and times for such materials and/or equipment.

n. Protection and identification of materials and equipment required for the Bid

Category and stored on-site.

o. Securing permission from Construction Manager to store materials within the building.

p. Saw-cutting, sleeving, coring and patching of existing construction required for

Work of the Bid Category, unless noted otherwise in the Bid Category description. Patching shall comply with the Technical Specification requirements for the surface being patched.

q. Provision of, and later closure of any openings required in the Work of a particular Bid Category for the access or passage of Work by others as indicated on Drawings or in Specifications.

r. Unless otherwise noted in the Bid Category descriptions, cutting any openings in roof decks required for Work in the Bid Category and protecting such openings for safety of personnel on the project; providing weather protection for such openings.

s. Providing any temporary bracing, shoring, underpinning or protection reasonably required for completion of the Work in the Bid Category and to maintain safe conditions to avoid accidents and property damage.

AAS 2020 Sinking Fund Project No. 22-0315 002416-3

t. Providing barricades, warnings, proper operating equipment, etc., as required for the safety of Contractor's employees and others in the Work area.

u. Clean up and removal of all debris and surplus materials.

v. Cleaning and protection of completed Work in the Bid Category until the area is occupied by the Owner, including final cleaning immediately before punch listing of any and all items installed under the Bid Category.

w. Repair or replacement of damage caused to existing finished areas or Work of other Contractors, including repair or replacement of installed ceiling tiles which become damaged or stained.

x. Field touch-up of prime or finish paint coats on materials and/or equipment installed under the Bid Category.

y. Hoisting and placement of all materials and equipment required for the Bid

Category in the Work areas, except as noted in the General Requirements.

z. Providing temporary heat and weather protection as required for the Work of a particular Bid Category prior to enclosure of the space in which the Work is being conducted. After enclosure of the particular area, the Owner/Construction

Manager will provide general temporary heat.

aa. Provide and install any equipment pads or bases, including grouting of bases, not specifically shown on Drawings or called for in the Specifications, but required for the proper installation of the work of a particular Bid Category.

bb. Furnishing and installation of all fasteners, anchor bolts, inserts, anchor plates, supplementary support members required for installation of the Work of a particular Bid Category whether or not indicated on Drawings or Specifications.

cc. Shop drawings, erection drawings, manufacturer’s specifications, samples, instruction manuals, parts manuals, maintenance instructions, warranties and affidavits as required by the Technical Specifications.

dd. Furnishing of information, sketches and descriptions, on a current basis as work progresses, to the Construction Manager for maintenance of record drawings.

ee. Furnishing of written construction progress and manpower information on a daily basis to the Construction Manager.

SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES

BID PACKAGE 9.9- PAINTING

AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-1 Series No. 02; Bid Release No. 01 – East Leroy Elementary – Mechanical Improvements Section 002416 – Scope of Work - Bid Package 9.9- Painting

Bid Package 9.9

Painting Athens Area Schools 2020 Sinking Fund

General work items:

The scope of work includes, but shall not be limited to the following:

1. Review Frederick Construction General Scope requirements as they outline additional expectations the contractor must act by.

2. Provide furnish full time supervision. Protect the work scheduled to remain and, if damaged, repair to an acceptable condition.

3. Submit to Frederick Construction for review a Site-Specific Safety Work Plan.

4. This bid package is to abide by all current Covid-19 regulations dictated by the CDC, FDA, Local Health Department, Frederick Construction and Athens Area Schools current approved policies.

5. This bid package is responsible for the scope of work indicated in the contract documents. To include but not limited to Division 00, 01, 02, 03, 07, 08, 09 and 10.

It is expected that regardless, if it is noted or not in the plans, specification, and CM Manual, this Bid Package will provide a complete and operational system that meets the intent of the Contract Documents.

6. Bidder is required to have all on-site employees that work on Athens Area Schools 2020 Sinking Fund Projects, undergo a criminal background check. Bidder is required to utilize Michigan State Police’s ICHAT website at:

https://apps.michigan.gov Once performed, an affidavit (form supplied by CM), attesting that background checks have been completed is required to be submitted to the CM prior to the start of construction. This bid package is responsible for all costs associated with performing these employee background checks.

7. Furnish and abide by all means of OSHA and MIOSHA regulations that pertain to this bid packages work. This includes, but not limited to, all personal protective equipment, training and certifications, life safety systems (fall arrest, silica, respiratory, etc.), and all other applicable OSHA or MIOSHA regulations.

8. This bid package is responsible to furnish and install all means of Fall Protection equipment/system to abide by OSHA and MIOSHA regulations for their work.

SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES

BID PACKAGE 9.9- PAINTING

AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-2 Series No. 02; Bid Release No. 01 – East Leroy Elementary – Mechanical Improvements Section 002416 – Scope of Work - Bid Package 9.9- Painting

9. NO Smoking or Chewing of Tobacco Products are allowed on site Except in areas

Designated by the CM.

10. NO open flames, torch cutting, grinding, or welding is allowed without an approved

Frederick Construction completed hot work permit.

11. Do not park in or disturb/damage the existing lawns or plantings. Any repairs and or replacement of damage caused by this bid package will be paid for by this bid package. The owner reserves the right to demand replacement in lieu of patching.

12. Provide sidewalk protection, if necessary, to prevent damage to them. Any repairs and or replacement of damage caused by this bid package will be paid for by this bid

13. Storage Containers, Trailers, Dumpsters, equipment, and staged materials placed on parking lots, drives or green space will be placed on suitable protective materials such as plywood and planks to existing surfaces from damage. Any repairs and or

14. Bidder is required to furnish and install all temporary barricades and dust protection as required to prevent entry to their work area and dust and debris from leaving the work area.

15. Any cutting/grinding, in masonry or concrete substrates are to be done with a wet saw, or equipment fitted with HEPA filtration Dust Collection Devices that meet current OSHA Silica standards. All Slurry/Dust from cutting operations must be cleaned immediately and properly disposed of at time of cutting operations.

Surrounding areas are to be protected from slurry/dust during cutting operations.

This Bid Package is responsible for the cleaning of all slurry/Dust generated from the work of this contractor.

16. Bidder is required to maintain a clean job site. Do not permit any accumulation of debris on site. Excess materials and debris are to be disposed of daily in provided waste dumpsters.

17. Furnish and install all caulk and sealants directly related to the work associated with this Bid Package.

18. Coordinate closely with bid packages: 23.1 & 26.1.

SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES

BID PACKAGE 9.9- PAINTING

AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-3 Series No. 02; Bid Release No. 01 – East Leroy Elementary – Mechanical Improvements

Specific Work Items:

1. The Goal of Athens Area Schools is to Recycle non-hazardous waste generated by construction projects. Therefore, the Owner WILL provide recycling and non-hazardous waste containers for the project. Any Hazardous Waste such as light ballasts etc., remains the Responsibility of the Contractor to dispose of properly.

Provide manifest documentation for any hazardous waste generated by this Bid Package.

2. This Bid Package is responsible for floor protection (Ram Board or Equivalent) when/where it is directly related to your work area. It is the responsibility of this Bid Package to Install, Maintain, remove and Dispose floor protection installed by this Bid Package.

3. Protection of any surfaces (walls furnishings etc.) not receiving paint and that are not already protected are the responsibility of this Bid Package.

4. This bid package will supply all soft barricading and signage when/where necessary to separate and protect your work areas from other trades, public and staff.

5. This Bid Package is responsible to Caulk all wall to wall, wall to ceiling, wall to floor joints, and all hollow metal frames before painting. Supply and install all necessary backer rod to complete this work.

6. Inspect all substrates for any imperfections and integrity concerns. If the substrate does not meet the project specifications immediately report any concerns to the Construction Manager. It is understood that upon the onset of installation, this Bid Package has accepted the substrate. All costs associated with potential re-installation will be paid for by this Bid Package.

7. All minor wall patching, prep, and repairs are the responsibility of this bid package.

8. This Bid Package is responsible to Paint all new interior surfaces and repair areas indicated in the Contract Drawings including but not limited to: New Hollow Metal Doors and Frames, Gypsum transom in-fills and Gypsum wall repairs, new Vertical Pipe enclosures, and Metal Fabrications at Ceiling Relief Vent repair locations.

9. This Bid Package is responsible to apply block filler prior to installation of new paint systems on any new masonry wall repairs.

10. An allowance (see schedule of values) has been set for Miscellaneous touch-ups not shown in the drawings. It is the responsibility of this Bid Package to confirm with Frederick Construction Supervision areas where touch-up to walls/surfaces are needed. Where items were removed for renovation and new construction is installed, the intent is to match specified or existing colors. This includes but is not limited to:

Existing drywall/plaster, Metal Ceiling Decks, Masonry, ECT.

SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES

BID PACKAGE 9.9- PAINTING

AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-4 Series No. 02; Bid Release No. 01 – East Leroy Elementary – Mechanical Improvements

11. This Bid Package is responsible to perform periodic and a final cleaning of your work areas during and at the completion of your work .

12. Include all related drawing notes and specifications indicated within the contract documents as part of your Bid Package.

Exclusions

1. Building permit is by owner.

2. Moving of Owner Furnishings

Allowances – As indicated in Section 01 2000:

See Schedule of Values Below

Unit Prices – As indicated in Section 01 2200: Not Applicable

Alternates – As indicated in Section 01 2300:

Schedule of Values: Provide the following bid breakdown as a schedule of values:

Temporary protection of Owner equipment and Furnishings $

Caulking and Minor Surface Repairs $

Painting of Base Bid Scheduled Surfaces $

Touch-Up Painting Allowance Budget $ 750.00

Final Cleaning $

Performance & Payment Bond $

Base Bid $

Related specification sections and submittal items

SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES

BID PACKAGE 9.9- PAINTING

AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-5 Series No. 02; Bid Release No. 01 – East Leroy Elementary – Mechanical Improvements Section 002416 – Scope of Work - Bid Package 9.9- Painting

It is the responsibility of this bid package to adhere to the specifications developed by Tower-

Pinkster. Submittal requirements are set forth within those specifications. Below is a list of specification sections, but not limited to, for this bid package.

All submittals and shop drawings are to be electronically submitted. Upon receipt of final approved submittal, submit three (3) hard copies and one (1) electronic copy to Frederick

Construction.

ALL OF DIVISION 00

ALL OF DIVISION 01

07 9200 - JOINT SEALANTS

09 9123 - INTERIOR PAINTING

END OF BID PACKAGE 9.9 - Painting

SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES

BID PACKAGE 23.1- MECHANICAL & PLUMBING IMPROVEMENTS

AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-1 Series No. 02; Bid Release No. 01 – East Leroy – Mechanical Improvements Section 002416 – Scope of Work - Bid Package 23.1- Mechanical & Piping Improvements

Bid Package 23.1

Mechanical & Piping Improvements documents. To include but not limited to Division 00, 01, 02, 07, 22 and 23. It is expected that regardless, if it is noted or not in the plans, specification, and CM required to utilize Michigan State Police’s ICHAT website at:

https://apps.michigan.gov Once performed, an affidavit (form supplied by CM), attesting that background checks have been completed is required to be submitted to the CM prior to the start of

SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES

BID PACKAGE 23.1- MECHANICAL & PLUMBING IMPROVEMENTS

AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-2 Series No. 02; Bid Release No. 01 – East Leroy – Mechanical Improvements Section 002416 – Scope of Work - Bid Package 23.1- Mechanical & Piping Improvements as plywood and planks to existing surfaces from damage. Any repairs and or current OSHA Silica standards. All Slurry/Dust from cutting operations must be cleaned immediately and properly disposed of at time of cutting operations.

Surrounding areas are to be protected from slurry/dust during cutting operations.

18. Furnish and install all fire/smoke caulking of all existing penetrations/conduits, etc.

required through new fire/smoke rated wall/ceiling assemblies.

19. Furnish and install all required (if any) concrete or non-concrete exterior or interior equipment pads for any item(s) installed by this bid package.

SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES

BID PACKAGE 23.1- MECHANICAL & PLUMBING IMPROVEMENTS

AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-3

20. Coordinate closely with bid packages: 9.9 & 26.1.

1. Permits/Fees directly related to this Bid Package are the responsibility of this Bid

2. The Goal of Athens Area Schools is to Recycle non-hazardous waste generated by hazardous waste containers for the project. Any Hazardous Waste such as light ballasts etc., remains the Responsibility of the Contractor to dispose of properly.

3. This Bid Package is responsible to Furnish/Install/Remove/Dispose any temporary construction to protect the owner’s equipment and furnishings from Dust, Debris, Weather, and other items generated as a result of work performed by this Bid Package. These areas must be cleaned up daily to the satisfaction of the Frederick Construction Superintendent.

4. This Bid Package is responsible for floor protection (Ram Board or Equivalent) when/where it is directly related to your work area and access paths. It is the responsibility of this Bid Package to Install, Maintain, Remove, and Dispose of floor protection installed by this Bid Package

5. Protection of any surfaces (walls furnishings etc.) where work is occurring by this Bid

Package that are not already protected are the responsibility of this Bid Package.

6. This Bid Package is responsible to demo, dispose, salvage, re-install and or abandon in place all Architectural and Mechanical key noted items indicated on Sheet(s) AD 101A, 101B, 101C, AD 102 and Sheet(s) MD 101A and MD 101B/C, Items include but are not limited to: HVAC Equipment, Concrete Equipment pads, Pumps, Piping, T-Stats, Pipe Enclosures, Doors, Acoustical Ceilings, Book Case Shelving, Glass Transom, Masonry Transom, Bulletin Boards, Roof Decking and Roof Materials, Etc.

Coordinate with Bid Package 26.1 for electrical service Disconnect/Reconnect needs.

7. This Bid Package shall furnish and install All mechanical support equipment shown in the contract drawings. This bid package is responsible for but not limited to, structural steel, design when requested or required, miscellaneous steel fabrications, mechanical equipment supports and stands, vibration equipment necessary for units on top of steel or equipment pads, roof accessories, interior and exterior concrete and non-concrete equipment pads. When applicable patch to match existing surfaces including any wall, floor, roof penetrations and modifications as required. This Bid Package is responsible to protect the roof openings per OSHA requirements.

SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES

BID PACKAGE 23.1- MECHANICAL & PLUMBING IMPROVEMENTS

AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-4

3. Unless it is specifically noted in the General Exclusions Section of this Bid Package, this Bid Package is responsible for all Shoring, Cutting, Patching, Furnishing and Installation of Structural Steel and Reinforcement for Roof Decking Removal, Roof Membrane Removals, Roof System Patching, Masonry Walls, Non-Masonry Walls, Metal Panels, Concrete, Cored Holes and Core Patching of removed equipment and material for the following but not limited to:

• Hydronic Piping

• Mechanical Equipment and associated Penetrations

• HUV’s

• Motorized Relief Dampers

• Unit Heaters

• PTAC’s

• Fin Tubes

• Doors

4. This Bid Package is responsible to Coordinate and Provide Lay-Out as well as any required weather tight roof accessories for new any new Mechanical equipment that penetrate the roof system.

5. This Bid Package is responsible to remove roof decking where necessary and furnish and install roof/ceiling deck patches as indicated by the detail noted as “Long-Span Roof Deck Penetration without Support Framing Detail” in the contract drawings.

Painting of the interior Ceiling deck patch is by Bid Package 9.9.

6. Roof Repairs are the responsibility of this Bid Package. The existing Carlisle EPDM roofing system at East Leroy Elementary was recently replaced in 2020. To maintain manufacturer’s warranty this Bid Package is required to secure a Certified Carlisle roofing contractor that utilizes only Carlisle approved roofing products when making any roof repairs. Repairs are to be made with systems that match existing systems to maintain warranty. Qualifications to be verified through the submittal process.

8. This Bid Package is responsible to Coordinate and Provide Lay-Out for new hydronic and gas piping. When necessary, where piping passes through existing walls, penetrations through these walls are by this Bid Package. Penetrations through Masonry walls are required to be cored.

9. Where penetration/modification Cut and Patch work is occurring by this Bid Package, it is the responsibility of this Bid Package to temporarily Furnish/Install/Remove and Dispose, ½-inch Plywood as Additional Floor Protection directly where Cut and Patch operations are being performed by this Bid Package.

10. This Bid Package is responsible hang all new hydronic piping where exposed structural metal ceilings exist, as tight to existing ceiling as possible. Bottom of Pipe insulation shall not be lower than 8’-0” from finished floor to allow for future

SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES

BID PACKAGE 23.1- MECHANICAL & PLUMBING IMPROVEMENTS

AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-5 Series No. 02; Bid Release No. 01 – East Leroy – Mechanical Improvements Section 002416 – Scope of Work - Bid Package 23.1- Mechanical & Piping Improvements

Acoustical Ceilings to be installed at a minimum of 7’-10” from finish floor. If an obstruction is encountered that does not allow this 8’-0” bottom of pipe insulation dimension to be achieved, it is to be brought to the immediate attention and in writing to Frederick Construction management.

11. Regardless, if it is shown or not shown in the Contract Documents, Any Hydronic Piping modifications, extensions, relocation and/or reconnects required to provide a functioning system are the responsibility of this Bid Package.

12. This Bid Package is responsible to furnish and install all Mechanical equipment, ducting, piping, insulation, and controls as shown in the contract drawings, as well as any ancillary items that may not be shown to provide a complete system.

13. Furnish and install any equipment controls, frequency drives and any related disconnects specified to be provided by the equipment manufacturer for equipment furnished or installed by this Bid Package. Coordinate final electrical connection needs with Bid Package 26.1

14. This bid package shall furnish and install new automated web based BMS controls per the Contract Drawings. The required control contractor is Control Net, Contact Marc Dreyer at (616) 777-0037 or email at mdreyer@controlnet.com. All costs are to be included in the Base Bid of this Bid Package.

15. This Bid Package is responsible to furnish and install all insulation directly related to

16. This Bid Package is responsible to furnish and install and ensure any fluid or process service lines are clearly labeled with industry standard labels to indicate material and flow direction.

17. Furnish, install and or salvage/re-install any Louvers, Grills, Vents or Blank-Off Panels indicated in the drawings or removed for convenience during associated work with this bid package.

18. Furnish any access doors, where necessary, to meet any code and maintenance requirements.

19. Where required by code or where shown in the drawings, this Bid Package is Responsible to furnish and install Smoke/Fire Dampers.

20. Concrete and Non-Concrete equipment pads are the responsibility of this Bid

21. This Bid Package is responsible to Furnish, Fabricate and install all metal pipe enclosures where indicated in the contract drawings.

SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES

BID PACKAGE 23.1- MECHANICAL & PLUMBING IMPROVEMENTS

AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-6 Series No. 02; Bid Release No. 01 – East Leroy – Mechanical Improvements Section 002416 – Scope of Work - Bid Package 23.1- Mechanical & Piping Improvements

22. This Bid Package is responsible to furnish and install new hollow metal doors and frames at the Boiler Room where indicated in the contract drawings. Painting of these hollow metal doors and Frames is by Bid Package 9.9.

23. It is the responsibility of this Bid Package to furnish and install new rated wall assemblies at door transom locations indicated in the plans.

24. Any masonry modification or repairs required to perform the work associated with this Bid Package are the responsibility of this Bid Package.

25. Gypsum wall assemblies & repairs such as at Door Transoms and at the East Vestibule in Unit A are the responsibility of this Bid Package.

26. It is the responsibility of this Bid Package to temporarily remove, modify and re-install items such as bookshelves, tack boards, fixed casework etc. to facilitate the installation of new HVAC equipment, piping and pipe enclosures.

27. It is the responsibility of this Bid Package to furnish and install complete fire safety/caulking of penetrations, new rated assemblies etc. made or required by this Bid Package through existing rated walls assemblies and roof deck systems.

28. Coordinate any final electrical connections to new equipment/fixtures being installed by this Bid Package with Bid Package 26.1.

29. This Bid Package is required to provide Alternate Pricing for Alternate 1 “Boiler Room”.(See Alternate section in this Bid Package).

30. It is the responsibility of this Bid Package to schedule, provide testing final inspections, reports to the Owner of any required/applicable equipment such as Boilers and Pumps.

31. It is the responsibility of this Bid Package to perform Test and Balancing and

Commissioning services for newly installed or modified HVAC systems.

32. Include all related drawing notes and specifications indicated within the contract

General Exclusions

1. Building permit is by Owner.

2. Dumpsters are provided by Owner.

3. Moving of Owner Loose Furnishings.

SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES

BID PACKAGE 23.1- MECHANICAL & PLUMBING IMPROVEMENTS

AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-7 Series No. 02; Bid Release No. 01 – East Leroy – Mechanical Improvements

4. Abatement of ACM Piping Materials

5. Painting of Architectural Items that have been cut and patched.

Allowances – As indicated in Section 01 2000: Not Applicable

Unit Prices – As indicated in Section 01 2200: Not Applicable

Alternates – As indicated in Section 01 2300:

Alternate No. 1: Existing Boilers to Remain with One New Boiler Added

1. Base Bid: Replace all (3) existing boilers with (3) new boilers

2. Alternate No. 1: Three existing boilers to remain. Add (1) additional new boiler with new maintenance pad.

Mechanical & Boiler Permit(s) $

Architectural Items scheduled for Demolition $

Carlisle Certified Roof Repairs $

Piping and Mechanical Equipment Demolition $

Hydronic Piping Installations & Modifications $

Mechanical Equipment Installations $

Metal Pipe Enclosures $

Automated Controls $

Gypsum Wall Assemblies & Repairs $

Installation of New Hollow Metal Doors & Frames $

Shelving, Casework, Tackboard Modifications $

Test/Balance & Commissioning $

Alternate 1 – Boiler Room Alternate $

Total Bid $

SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES

BID PACKAGE 23.1- MECHANICAL & PLUMBING IMPROVEMENTS

AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-8

It is the responsibility of this bid package to adhere to the specifications developed by Tower-

Pinkster Submittal requirements are set forth within those specifications. Below is a list of specification sections, but not limited to, for this bid package.

All submittals and shop drawings are to be electronically submitted. Upon receipt of final

All of Division 00 All of Division 01

02 4119 - SELECTIVE DEMOLITION

03 3000 - CAST-IN-PLACE CONCRETE sf1 04 2200 - CONCRETE UNIT MASONRY sf0 05 4000 - COLD-FORMED METAL FRAMING sf0

05 5000 - METAL FABRICATIONS

05 7500 - DECORATIVE FORMED METAL

07 0150.19 - PREPARATION FOR REROOFING

07 5323 - ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING sf0

07 7100 - ROOF SPECIALTIES

07 8413 - PENETRATION FIRESTOPPING

07 8443 - JOINT FIRESTOPPING

07 9200 - JOINT SEALANTS sf0 08 1113 - HOLLOW METAL DOORS AND FRAMES sf0

08 7100 - DOOR HARDWARE

09 2900 - GYPSUM BOARD

22 1119 - DOMESTIC WATER PIPING SPECIALTIES

23 0500 - COMMON WORK RESULTS FOR HVAC

23 0513 - COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

23 0516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

23 0519 - METERS AND GAGES FOR HVAC PIPING

23 0523 - GENERAL DUTY VALVES FOR HVAC PIPING

23 0529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

23 0553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

23 0593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 0700 - HVAC INSULATION

23 0800 - MINIMUM COMMISSIONING OF HVAC

23 0900 - INSTRUMENTATION AND CONTROL FOR HVAC

23 1123 - FACILITY NATURAL GAS PIPING

23 2113 - HYDRONIC PIPING

23 2123 - HYDRONIC PUMPS

23 2500 - HVAC WATER TREATMENT

23 3113 - METAL DUCTS

23 3115 - HVAC AIR-DISTRIBUTION SYSTEM CLEANING

SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES

BID PACKAGE 23.1- MECHANICAL & PLUMBING IMPROVEMENTS

AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-9 Series No. 02; Bid Release No. 01 – East Leroy – Mechanical Improvements Section 002416 – Scope of Work - Bid Package 23.1- Mechanical & Piping Improvements

23 3300 - AIR DUCT ACCESSORIES

23 3713 - DIFFUSERS, REGISTERS, AND GRILLES

23 3723 - HVAC GRAVITY VENTILATORS

23 5216 - CONDENSING BOILERS (Knight XL)

23 8113 - PACKAGED TERMINAL AIR-CONDITIONERS

23 8223 - UNIT VENTILATORS

23 8233 - CONVECTORS

23 8239 - UNIT HEATERS

END OF BID PACKAGE 23.1 Mechanical & Piping Improvements

SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES

BID PACKAGE 26.1- ELECTRICAL IMPROVEMENTS

AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-1 Series No. 02; Bid Release No. 01 – East Leroy Elementary – Electrical Improvements Section 002416 – Scope of Work - Bid Package 26.1- Electrical Improvements

Bid Package 26.1

Electrical Improvements documents. To include but not limited to Division 00, 01, 02, 07, 26, and 28. It is expected that regardless, if it is noted or not in the plans, specification, and CM required to utilize Michigan State Police’s ICHAT website at:

https://apps.michigan.gov Once performed, an affidavit (form supplied by CM), attesting that background checks have been completed is required to be submitted to the CM prior to the start of

SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES

BID PACKAGE 26.1- ELECTRICAL IMPROVEMENTS

AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-2 Series No. 02; Bid Release No. 01 – East Leroy Elementary – Electrical Improvements Section 002416 – Scope of Work - Bid Package 26.1- Electrical Improvements as plywood and planks to existing surfaces from damage. Any repairs and or current OSHA Silica standards. All Slurry/Dust from cutting operations must be cleaned immediately and properly disposed of at time of cutting operations.

Surrounding areas are to be protected from slurry/dust during cutting operations.

18. Furnish and install all fire/smoke caulking of all existing penetrations/conduits, etc.

required through new fire/smoke rated wall/ceiling assemblies.

19. Furnish and install all required (if any) concrete or non-concrete exterior or interior

SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES

BID PACKAGE 26.1- ELECTRICAL IMPROVEMENTS

AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-3 Series No. 02; Bid Release No. 01 – East Leroy Elementary – Electrical Improvements Section 002416 – Scope of Work - Bid Package 26.1- Electrical Improvements

20. Furnish and install rough-ins where necessary, including but not limited to conduit, boxes, raceways, Etc.

21. Furnish and install all support systems/racks/platforms/hangers that may be required and/or shown to carry items installed within this Bid Package. Provide proper engineering and shop drawings for review if required.

22. Remove and reinstall any acoustic ceiling tile needed to accommodate the work of this Bid Package. Replace any tile damaged or soiled by this Bid Package’s workmen during the performance of the work of this Bid Package.

23. Furnish and install all required (if any) concrete or non-concrete exterior or interior

24. Coordinate closely with bid packages: 9.9 & 23.1.

1. Permits/Fees directly related to this Bid Package are the responsibility of this Bid

2. The Goal of Athens Area Schools is to Recycle non-hazardous waste generated by hazardous waste containers for the project. Any Hazardous Waste such as light ballasts etc., remains the Responsibility of the Contractor to dispose of properly.

3. This Bid Package is responsible to Furnish/Install/Remove/Dispose any temporary construction to protect the owner’s equipment and furnishings from Dust, Debris, Weather, and other items generated as a result of work performed by this Bid Package. These areas must be cleaned up daily to the satisfaction of the Frederick Construction Superintendent.

4. This Bid Package is responsible for floor protection (Ram Board or Equivalent) when/where it is directly related to your work area and access paths. It is the responsibility of this Bid Package to Install, Maintain, Remove, and Dispose of floor protection installed by this Bid Package

5. Protection of any surfaces (walls furnishings etc.) where work is occurring by this Bid Package that are not already protected are the responsibility of this Bid Package.

6. Where penetration/modification Cut and Patch work is occurring by this Bid Package, it is the responsibility of this Bid Package to temporarily Furnish/Install/Remove and

SCOPE OF WORK – BID CATEGORY SPECIFIC NOTES

BID PACKAGE 26.1- ELECTRICAL IMPROVEMENTS

AAS 2020 Sinking Fund Projects Project No. 22-0315 002416-4 Series No. 02; Bid Release No. 01 – East Leroy Elementary – Electrical Improvements Section 002416 – Scope of Work - Bid Package 26.1- Electrical Improvements

Dispose, ½-inch Plywood as Additional Floor Protection directly where Cut and Patch operations are being performed by this Bid Package.

7. This Bid Package is responsible to disconnect, demo, dispose, abandon and or salvage all electrical items indicated on Sheet(s) ED101A, ED 101B and ED 101C. Items include but are not limited to equipment panels, receptacles, wiring, conduit, junction boxes, wire mold, etc.

8. It is the expectation of this Bid Package to temporarily secure and utilize an adequate quantity of existing lights to serve as temporary lighting (i.e. in the boiler room).

This temporary lighting will be maintained by this Bid Package to MIOSHA requirements during the demolition and construction process. These temporary lights are to be replaced with the specified new lighting as construction progresses.

9. This Bid Package is responsible to provide any electrical disconnect needs for Mechanical Equipment being removed by Bid Packages 23.1. Coordinate with Bid Package 23.1 for specific needs and schedule.

10. If or where coring through an existing masonry wall is required to allow for conduit/raceway installation, it is the responsibility of this Bid Package.

11. This Bid Package is responsible to furnish and install all Electrical…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .