Exhibit 2 Deliverable Schedule.pdf
PDF 170 KB Posted
- Solicitation number
- 693JJ320R000023
About this file
This document outlines deliverables and submission requirements for a federal contract to develop a Structural Health Monitoring Web Manual. Key deliverables include draft and final reports on current SHM practices, an ROI tool, workshop plans and reports, draft and final components of the SHM Web Manual, a draft and final technical brief, and a webinar. Deliverables must meet Section 508 accessibility standards and are to be submitted electronically in Word or software format to the Contracting Officer's Representative according to the schedule, which spans from one to thirty months from the effective contract date. The related federal contract opportunity is a solicitation issued by the Department of Transportation Federal Highway Administration seeking proposals for the contract, with a response due date of July 23, 0900 EDT, to investigate current SHM practices and policies and develop the comprehensive SHM Web Manual.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QandA_SHM_07.14.2020.pdf | ||
| 693JJ320R000023_0001.pdf | ||
| QandA_SHM_07.10.2020.pdf | ||
| Exhibit 1_Peformance Requirements Summary.pdf | ||
| 693JJ320R000023_SHM.pdf | ||
| Attachment 1 QASP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT 2
DELIVERABLES SCHEDULE
This technical exhibit lists any reports or documentation that is required as a deliverable to include the frequency, # of copies, medium/format and who/where it is to be submitted. A deliverable is anything that can be physically delivered but may include non-physical things such as meeting minutes.
Deliverables
508 Complaint Frequency # of Copies Medium/Format Submit to
Summary of Kickoff Meeting (3.5.1)
No Once within 1 month from effective date of the contract
1 Word file COR
Task 1 Draft Synthesis Report (1.3.1)
Yes Once within 6 months from effective date of the contract
Word file
COR
Task 2 Draft Report (1.3.2)
Yes Once within 12 months from effective date of
Word
ROI Tool (1.3.2)
Yes Once within 12 months from effective date of
Software Code
Task 3 Draft Report (1.3.3)
Yes Once within 14 months weeks from effective date of the contract
Task 4 Draft Report (1.3.4)
Yes Once within 16 months from effective date of
SHM Draft Two-day Workshop Plan (1.3.5)
Yes Once within 16 months from effective date of the contract
1 Word COR
SHM Final Two-day Workshop Plan (1.3.5)
Yes Once, 15 days prior to scheduled SHM Two-day Workshop
SHM Two-day Workshop (1.3.5)
Yes Once within 17 months from effective date of
Workshop
Draft SHM Workshop Report (1.3.5)
Yes Once within months from effective date of
Word COR
Draft Component List for User Input and System Output Module of the SHM Web Manual (1.3.6 Task 6a)
Yes Once within 19 months from effective date of
Draft SHM Web Manual Document for each Component (1.3.6 Task 6b)
Yes Once within 24 months from effective date of
Final component list for user input and system output module of the SHM Web Manual (Task 6a)
Yes Once within 26 months from effective date of
Final SHM Web Manual Document for each Component (1.3.6 Task 6b)
Yes Once within 2 weeks final comments on Draft SHM Web Manual Document
Draft Final Report (1.3.7)
Yes Once within 28 months from effective date of
Draft TechBrief (1.3.7)
Yes Once within 28 months from effective date of the contract
1 Word COR
Final Report (1.3.7)
Yes Once within 30 months from effective date of
Final Technical Brief
Yes Once within 30 months from effective date of
A Webinar
Yes Once within 30 months from effective date of
1 PPT COR