This quality assurance surveillance plan (QASP) outlines performance monitoring for a contract to develop a structural health monitoring (SHM) current practice investigation and web manual. The Office of Infrastructure Research and Development will use surveillance methods like 100% inspection of deliverables and periodic reviews to evaluate timeliness, quality, and comprehensiveness of contract deliverables against acceptable quality levels. The contracting officer's representative will document monitoring using forms, meet with the contractor to discuss performance, and provide monthly reports. The contractor is responsible for quality control and self-inspection to measure performance standards in the PWS. The government will oversee the contractor's quality management and determine incentives based on metrics to ensure desired outcomes are achieved.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QandA_SHM_07.14.2020.pdf | ||
| 693JJ320R000023_0001.pdf | ||
| QandA_SHM_07.10.2020.pdf | ||
| Exhibit 2 Deliverable Schedule.pdf | ||
| Exhibit 1_Peformance Requirements Summary.pdf | ||
| 693JJ320R000023_SHM.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Office of Infrastructure Research & Development
Quality Assurance Surveillance Plan
(QASP)
For
SHM Current Practice and Web Manual
06/23/2020
TABLE OF CONTENTS
1 INTRODUCTION
1.1 Purpose
1.2 Performance Management Approach
1.3 Performance Management Strategy
2 ROLES AND RESPONSIBILITIES
2.1 The Contracting Officer
2.2 The Contracting Officer’s Representative
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
4.2 Acceptable Quality Levels
5 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
5.2 Monitoring Forms
6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
6.1 Determining Performance
6.2 Reporting
6.3 Reviews and Resolution
ATTACHMENT 1: Sample Quality Assurance Monitoring Form
QUALITY ASSURANCE SURVEILLANCE PLAN
(QASP)
1 INTRODUCTION
This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled SHM Current Practice and Web Manual. This plan sets forth the procedures and guidelines the Office of Infrastructure Research and Development (HRDI) will use in ensuring the required performance standards or services levels are achieved by the contractor.
1.1 Purpose
1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.
1.1.2 This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
1.2 Performance Management Approach
1.2.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by HRDI to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved.
Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.
1.2.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.
1.3 Performance Management Strategy
1.3.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.
1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determination regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
2 ROLES AND RESPONSIBILITIES
2.1 The Contracting Officer
The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the contracting officer's representative (COR) and the contractor. The CO will designate one full-time COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.
2.2 The Contracting Officer’s Representative
The COR is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter (provided following award). The COR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
The required performance standards and/or quality levels are included in the PWS and in Exhibit 1, “Performance Requirements Summary.” If the contractor meets the required service or performance level, it will be paid the amount agreed on in the contract. Failure to meet the required service or performance level may result in a deduction from the amount.
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are:
100% Inspection – Each month, the COR shall review the generated documentation and enter summary results into the Surveillance Activity Checklist.
Periodic Inspection – COR typically performs the periodic inspection on a monthly basis.
4.2 Acceptable Quality Levels
The acceptable quality levels (AQLs) included as an exhibit to the PWS, Performance Requirements Summary, for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For certain critical activities such as those involving the Final Report, the desired performance level is established at 100 percent.
Other levels of performance are keyed to the relative importance of the task to the overall mission performance at HRDI.
5 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
The performance management feedback loop begins with the communication of expected outcomes.
Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques established in the PWS.
5.2 Monitoring Forms
The government’s QA surveillance, accomplished by the COR, will be reported using the monitoring forms in Attachments 1. The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required results are being achieved.
5.2.1 The COR will retain a copy of all completed QA surveillance forms.
6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
6.1 Determining Performance
6.1.1 Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.
6.2 Reporting
6.2.1 At the end of each month, the COR will prepare a written report summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the completed quality assurance monitoring forms (Attachment 1), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
6.3 Reviews and Resolution
6.3.1 The COR may require the contractor’s project manager, or a designated alternate, to meet with the CO, COR, and other government personnel as deemed necessary to discuss performance evaluation.
The COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the COR as often as required or per the contractor’s request. The agenda of the reviews may include:
Monthly performance assessment data and trend analysis
Issues and concerns of both parties
Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis
Recommendations for improved efficiency and/or effectiveness
6.3.2 The COR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
6.3.3 The COR and contractor should jointly formulate tactical and long-term courses of action.
Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented.
Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the CO.
ATTACHMENT 1: Sample Quality Assurance Monitoring Form Required Service
Method of Surveillan ce
Date Accomplish ed
Where Accomplish ed
Exception al (5)
Very Goo d (4)
SA
T
(3)
Margin al (2)
UNSA
T
(1)
Contract Deliverables Timeliness Summary kickoff meeting
100% inspection of deliverables
5 4 3 2 1
Draft Synthesis Report
100% inspection of deliverables
Draft Report 100% inspection of deliverables
ROI Tool 100% inspection of deliverables
Periodic reviews of work-in-progress
Task 3 Draft Report
100% inspection of deliverables
Task 4 Draft Report
100% inspection of deliverables
SHM Draft 2-day Workshop Plan
100% inspection of deliverables
SHM Final Two-day Workshop Plan
100% inspection of deliverables
SHM Two-day Workshop
100% inspection of deliverables
Draft SHM Workshop Report
100% inspection of deliverables
Draft Component List for User Input and System Output Module of the SHM Web Manual
100% inspection of deliverables
Draft SHM Web Manual Document for each Component
100% inspection of deliverables
Final component list for user input and system output module of the SHM Web Manual
100%
Final SHM Web Manual Document for each Component
100%
Draft Final Report
100%
Draft TechBrief 100%
Final Report 100%
Final Technical Brief
100%
A Webinar
Contract Deliverables Quality (Comprehensiv e, Complete, and Accurate)
Summary kickoff meeting
100%
Draft Synthesis
100%
Draft Report 100%
ROI Tool 100% deliverables
Periodic reviews of work-in-progress
Task 3 Draft
100%
Task 4 Draft
100%
SHM Draft 2-day Workshop Plan
100%
SHM Final Two-day Workshop Plan
100%
SHM Two-day Workshop
100%
Draft SHM Workshop Report
100%
Draft Component List for User Input and System Output Module of the SHM Web Manual
100%
Draft SHM Web Manual Document for each Component
100%
Final component list for user input and system output module of the SHM Web Manual
100%
Final SHM Web Manual Document for each Component
100%
Draft Final
100%
Draft TechBrief 100%
Final Report 100%
Final Technical Brief
A Webinar
Excellent
Very Good
SAT
Marginal UNSAT
TOTAL SCORE
(Sum the number of scores in each column multiplied by the applicable rating )
CONTRACTOR'S OVERALL SCORE
Calculate score by adding the sum of each column and dividing by 5.
Quality Rating
(31 – 38) Exceptional
(23 – 30) Very Good (16 – 22)
Satisfactory (9 – 15)
Unsatisfactory (1 – 8)
COR: Date:
| 1 INTRODUCTION |
| 1.1 Purpose |
| 1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the... |
| 1.1.2 This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality a... |
| 1.2 Performance Management Approach |
| 1.2.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by... |
| 1.2.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach mi... |
| 1.3 Performance Management Strategy |
| 1.3.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under ... |
| 2 ROLES AND RESPONSIBILITIES |
| 2.1 The Contracting Officer |
| 2.2 The Contracting Officer’s Representative |
| 3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS |
| 4 METHODOLOGIES TO MONITOR PERFORMANCE |
| 4.1 Surveillance Techniques |
| 4.2 Acceptable Quality Levels |
| 5 QUALITY ASSURANCE DOCUMENTATION |
| 5.1 The Performance Management Feedback Loop |
| 5.2 Monitoring Forms |
| 5.2.1 The COR will retain a copy of all completed QA surveillance forms. |
| 6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT |
| 6.1 Determining Performance |
| 6.1.1 Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to sh... |
| 6.2 Reporting |
| 6.2.1 At the end of each month, the COR will prepare a written report summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the completed quality assurance monitoring... |
| 6.3 Reviews and Resolution |
| 6.3.1 The COR may require the contractor’s project manager, or a designated alternate, to meet with the CO, COR, and other government personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews ... |
| 6.3.2 The COR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance. |
| 6.3.3 The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will... |
ATTACHMENT 2: Sample Quality Assurance Monitoring Form
File details come from the government source that posted it. Updated .