Exhibit 1 WASH RACK PLATFORM SCOPE OF WORK.pdf

PDF 121 KB Posted

Attached to
ESB Shady Wash Rack Platform
Solicitation number
S-73000-00011611
Issued by
Deschutes County, Oregon

About this file

This document is a Scope of Work for the Oregon Department of Transportation (ODOT) Shady Maintenance Station Wash Rack Platform project. ODOT is seeking a qualified contractor to supply and install a pre-manufactured Wash Rack Platform at the ODOT Shady Maintenance Station site. The contractor will provide all materials and labor for a complete installation, and must remove all unused materials from the site following installation. Prospective bidders must verify design elements in the plans prior to construction of the platform. The Wash Rack Platform must be of galvanized steel construction, comply with all applicable safety codes, and include stairs, guard rails, and structural and installation components. The successful bidder must submit complete shop drawings and calculations for review and acceptance prior to approval of the system. Work must be completed within 45 days of the Notice to Proceed, and liquidated damages of $300 per day will be assessed for late completion.

The document does not provide any details on pricing terms, set asides, incumbents, funding requirements and sources, or other salient financial information.

View the file

Other files

File Type Posted
RFCQ_ESB Shady Wash Rack.docx DOCX document
Reference Drawings Shady_wash_plans.pdf PDF
RFCQ_ESB Shady Wash Rack~1.docx DOCX document
2024-91 Notice of Intent to Award- signed.pdf PDF
Exhibit 2 Plans~15.pdf PDF
Preliminary Results~87.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work Oregon Department of Transportation

Shady Maintenance Station Wash Rack Platform

The Oregon Department of Transportation is looking for a qualified contractor to supply and install a pre-manufactured Wash Rack Platform at the ODOT Shady Maintenance Station site.

Contractor will provide all materials and labor for a complete installation of the Wash Rack Platform. Contractor will remove all unused materials from site following installation.

Prospective bidders must verify design elements in the plans prior to construction of the platform.

The Wash Rack Platform shall be of galvanized steel construction and comply with all applicable safety codes and be a complete assembly with stairs, guard rails on each side of stair and walkway, structural and installation components.

Wash Rack Platforms may be the products of Warner Specialty Products or Erectastep Prefab Stairs and Platforms or approved equal.

Successful bidder shall submit complete shop drawings and calculations for review, and acceptance, prior to approval of system.

Work will be done during the work week, Monday – Friday 7:00 – 5:00 unless special provisions are approved by the Construction Project Manager.

Final Completion: 45 days following NTP

Liquidated Damages are assessed daily at 300.00 per day.

Construction Project Manager:

Mike Schweizer mike.SCHWEIZER@odot.oregon.gov 541.602.5705 mailto:mike.SCHWEIZER@odot.oregon.gov