Exhibit 1 - Special Provisions~3.pdf

PDF 3 MB Posted

Attached to
ESB OR8 EB at MP 11. 12 Bus Pad
Solicitation number
S-73000-00012560
Issued by
Multnomah County, Oregon

About this file

This document is a Special Provisions file from the Oregon Department of Transportation (ODOT) for a concrete bus pad construction project on Tualatin Valley Highway in Washington County. The project involves constructing one bus pad at ESB OR 8 EB at MP 11.12, including furnishing and installing all construction materials, temporary pavement markings, permanent striping, and traffic control. The work must be completed by May 15, 2025, with substantial completion required by April 30, 2025. The concrete bus pad portion must be completed within a 4-day window, starting on a Thursday at 9 AM and ending the following Monday at 5 AM.

The project specifications include requirements for high-performance concrete (Class HES4000) designed to attain 3,000 psi strength within 72 hours, aggregate base compacted to 95% minimum compaction, and specific requirements for reinforcement placement and joint construction. The bus pad dimensions are 18 feet wide by 100 feet long. The contractor must provide quality control testing and comply with the 2024 Oregon Standard Specifications for Construction. The project includes coordination requirements with Trimet and various notification requirements for traffic control and lane closures. The work must account for potential delays due to camp cleanups, which will be coordinated by ODOT.

View the file

Other files

File Type Posted
00012560_ESB_RFCQ_Attachments.docx DOCX document
00012560 Q and A One.docx DOCX document
00012560 Pre Bid Meeting Agenda.docx DOCX document
00012560 Q and A Two.docx DOCX document
00012560 RFCQ Addendum.docx DOCX document
Revised Exhibit 1 - Special Provisions.pdf PDF
00012560_Request for Competetive Quotes.docx DOCX document
00012560 Pre-Bid Conference Sign In Sheet.pdf PDF
Revised 00012560_RFCQ.docx DOCX document
Preliminary Bid Results~31.xlsx XLSX spreadsheet
COBID Notice S-10700-00012561.docx DOCX document
SupplierBidResponse~2.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIAL PROVISIONS

FOR MAINTENANCE HIGHWAY CONSTRUCTION

OREGON DEPARTMENT OF TRANSPORTATION

SALEM, OREGON

CONCRETE BUS PAD

ESB OR 8 EB AT MP 11.12 BUS PAD

TUALATIN VALLEY HIGHWAY

WASHINGTON COUNTY

JANUARY 2025

SPECIAL PROVISIONS 2

DESCRIPTION OF WORK

TUALATIN VALLEY HIGHWAY

WASHINGTON COUNTY

Scope- Contract requires Contractor furnish and install all construction material required to construct one bus pad, furnish and install temporary pavement markings, furnish and install permanent striping, and provide traffic control. Comply with the 2024 Oregon Standard Specifications for Construction.

HWY DIRECTION LANE MP WIDTH LENGTH

OR 8 EB Shoulder and C 11.12 18 FT 100 FT

COMPLETION TIME LIMIT

Complete all Work to be done under the Contract not later than May 15, 2025. Substantially complete all work to be done under the Contract not later than April 30, 2025. Substantial completion includes all work under the contract except for any punch list items. Contractor will complete the concrete bus pad portion of the project starting on a Thursday morning at 9 am and ending on the following Monday Morning at 5 am.

APPLICABLE SPECFICATIONS

The 2024 Oregon Standard Specifications for Construction (“Standard Specifications”) include detailed technical specifications in Sections 00200 and beyond that apply to this ITB and any resulting Contract. Some sections of the technical specifications may be identified and modified in the Plans and Special Provisions. Sections of the technical specifications not identified in the Plans and Special Provisions remain applicable to the Contract according to their original terms.

Sections in Part 00100 of the Standard Specifications (General Conditions) are not applicable to the Contract unless they are specifically identified in the Plans and Special Provisions as being applicable. However, if a Part 00100 section that has been identified as being applicable references another section in Part 00100, or a technical specification (Parts 00200 and beyond) references a section from Part 00100, that section from Part 00100 applies to the Contract for purposes of supporting and giving full effect to the specification that referenced it. Bidders can access the Standard Specifications online at:

http://www.oregon.gov/ODOT/Business/Pages/Standard_Specifications.aspx

All number references in these Special Provisions shall be understood to refer to the Sections and subsections of the Standard Specifications bearing like numbers and to Sections and subsections contained in these Special Provisions in their entirety.

CLASS OF PROJECT

This is a State Project.

SPECIAL PROVISIONS 3

TABLE OF CONTENTS FOR SPECIAL PROVISIONS

SECTION 00210 - MOBILIZATION

SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC

SECTION 00221 - COMMON PROVISIONS FOR WORK ZONE TRAFFIC CONTROL

SECTION 00222 – TEMPORARY TRAFFIC CONTROL SIGNS

SECTION 00223 - WORK ZONE TRAFFIC CONTROL LABOR AND VEHICLES

SECTION 00224 - TEMPORARY TRAFFIC CHANNELIZING DEVICES

SECTION 00225 - TEMPORARY PAVEMENT MARKINGS

SECTION 00280 - EROSION AND SEDIMENT CONTROL

SECTION 00290 - ENVIRONMENTAL PROTECTION

SECTION 00310 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS

SECTION 00331 - SUBGRADE STABILIZATION

SECTION 00440 - COMMERCIAL GRADE CONCRETE

SECTION 00490 - WORK ON EXISTING SEWERS AND STRUCTURES

SECTION 00759 - MISCELLANEOUS PORTLAND CEMENT CONCRETE

STRUCTURES

SECTION 00850 - COMMON PROVISIONS FOR PAVEMENT MARKINGS

SECTION 00865 - LONGITUDINAL PAVEMENT MARKINGS - DURABLE

SECTION 00867 - TRANSVERSE PAVEMENT MARKINGS - LEGENDS AND BARS

SECTION 02001 - CONCRETE

SECTION 02050 – CURING MATERIALS

SECTION 02320 - GEOSYNTHETICS

SECTION 02440 - JOINT MATERIALS

SECTION 02510 – REINFORCEMENT

SUPPLEMENTAL SPECIAL PROVISIONS

GUIDELINE FOR PAVEMENT RESTORATION OF DEFECTIVE WORK IN ODOT RIGHT-OF-

WAY

SUPPLEMENTAL SPECIAL PROVISIONS

PLANS

STANDARD DRAWINGS

SPECIAL PROVISIONS 4

SECTION 00210 - MOBILIZATION

Comply with Section 00210 of the Standard Specifications.

SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC

Comply with Section 00220 of the Standard Specifications modified as follows:

00220.02(a) General Requirements - Add the following bullet to the end of the bullet list:

• When an abrupt edge is created by excavation, protect traffic according to the "Excavation Abrupt Edge" and the "Typical Abrupt Edge Delineation" configurations shown on the Standard Drawings.

00220.40(e-1) Closed Lanes - Replace this subsection, except for the subsection number and title, with the following:

One or more Traffic Lanes may be closed on the Tualatin Valley Highway (OR 8) when allowed, shown, or directed during the following periods of time except as indicated in 00220.40(e-2):

Single Lane Closures – One Traffic Lane on Tualatin Valley Highway (OR 8) may be closed during the following times:

• Thursday at 9:00 a.m. through Monday at 5:00 a.m.

00220.60(A)(1) Contractor Responsibility – Add the following to the end of the first bullet list:

• Keep the surfaces being used by bicycles free of all dirt, mud, gravel and other harmful material. The surface includes bike paths, bike lanes, roadway shoulders or the outside 6 feet of the roadway. Roadways shall be free of barricades or other objects and all lanes opened to traffic during all the non-restrictive timeframes.

SECTION 00221 - COMMON PROVISIONS FOR WORK ZONE TRAFFIC CONTROL

Comply with Section 00221 of the Standard Specifications modified as follows:

00221.06 Traffic Control Plan – Replace this subsection, except for the subsection number and title, with the following:

00221.06 Traffic Control Plan –

(a) Traffic Control Plan – Submit the following, 7 Calendar Days before the preconstruction conference:

SPECIAL PROVISIONS 5

The Contractor will use a TCP developed by the Contractor and submit Unstamped Working Drawings that include the proposed TCP showing all TCM and quantities of TCD, and the following:

• A temporary pedestrian accessible route plan that includes:

o Details and features used to provide pedestrian accessibility.

o Pedestrian staging Plans at a scale no smaller than 1 inch = 50 feet.

o Temporary alternate facilities or detour routes for pedestrian traffic.

• Staging sequences and details for Work affecting vehicular, pedestrian, and bicycle traffic.

• Proposed order and duration of the TCM.

• A detailed temporary striping plan if the existing striping is affected.

Once a TCP has been accepted by the Engineer, any additional modifications must be submitted by the Contractor for Agency review following the procedure described above.

The Engineer is not obligated to consider additional modifications to a previously approved TCP.

00221.88 Measurement, Method “B” – Under this method, no measurement of quantities will be made.

00221.98 Payment, Method “B” – Lump Sum Basis – Work zone traffic control will be paid for at the Contract Lump Sum amount for the item “Temporary Work Zone Traffic Control, Complete”.

Payment will be payment in full for furnishing, installing, moving, operating, maintaining, inspecting and removing Materials and TCD, and for furnishing all Equipment, labor and Incidentals necessary to complete the Work as specified.

SECTION 00222 – TEMPORARY TRAFFIC CONTROL SIGNS

Comply with Section 00222 of the Standard Specifications modified as follows:

00222.40(e) Temporary Sign Placement - Add the following to the end of the bullet list:

• At least ten Calendar Days before closing a pedestrian pathway at Tualatin Valley Highway MP 11.12, place a “SIDEWALK CLOSED, Full Time” (CW11-4) sign in advance of each future closure point. Locate the sign so it is legible from the nearest alternate pedestrian pathway facing incoming pedestrian traffic. The sign may be mounted between the panels of a Type II barricade or on a single-post TSS. Do not place the sign or sign support such that it narrows the pedestrian pathway to a width of less than 4 feet.

• Before opening the TPAR, place TPAR signing and other TCM as shown, or as directed.

Maintain the “SIDEWALK CLOSED, Full Time” (CW11-4) signs while the TPAR is open to pedestrian traffic.

• When construction requires bicycles to use the Traffic Lanes, install a "Bicycle ON

ROADWAY" (CW11-1) symbol sign on 1/2 mile spacing through the affected area. Keep the signs in place until completion of the Shoulder or bikeway final surface.

SPECIAL PROVISIONS 6

• Install a 72 by 24-inch "CONSTRUCTION VEHICLE DO NOT FOLLOW" (CW23-14) sign on rigid substrate on the back of all material or Equipment delivery vehicles.

00222.45(b) Portable Changeable Message Signs - Add the following bullet to the end of this subsection:

• At least seven Calendar Days before the Tualatin Valley Highway Lane closure, place one or more PCMS displaying the following message as shown, or as directed:

Panel 1 Panel 2 (Name/# of highway) CLOSURE (Location) (Time Frame) CLOSURE (Time Frame)

00222.80 Measurement - Replace this subsection, except for the subsection number and title, with the following:

No measurement will be made for this work.

00222.90 Payment - Add the following paragraph after the paragraph that begins “No separate or additional payment…”:

No separate or additional payment will be made for this work.

SECTION 00223 - WORK ZONE TRAFFIC CONTROL LABOR AND VEHICLES

Comply with Section 00223 of the Standard Specifications.

SECTION 00224 - TEMPORARY TRAFFIC CHANNELIZING DEVICES

Comply with Section 00224 of the Standard Specifications.

SECTION 00225 - TEMPORARY PAVEMENT MARKINGS

Comply with Section 00225 of the Standard Specifications.

SECTION 00280 - EROSION AND SEDIMENT CONTROL

Comply with Section 00280 of the Standard Specifications modified as follows:

00280.00 Scope - Replace the paragraph that begins "This Work also consists of providing temporary …" with the following paragraph:

SPECIAL PROVISIONS 7

This Work also consists of providing temporary erosion and sediment control (ESC) measures and furnishing, installing, moving, operating, maintaining, inspecting, and removing ESC throughout the Project area according to the Standard Drawings, the erosion and sediment control plan (ESCP), the Specifications, or as directed, until the site is permanently stabilized. Included also is the monitoring of weather, of stormwater and receiving waters, the reporting of monitoring observations, the reporting of corrective actions (when necessary) and the updates and revisions of the ESCP, including ESCP cover sheet, necessary to keep it representative of current site conditions and compliant with the 1200-CA permit if applicable.

Delete the paragraph that begins “When contaminants, pollutants or hazardous materials…”.

00280.06 Erosion and Sediment Control Manager - Delete this subsection.

Add the following paragraph to the end of this subsection:

The Agency’s NPDES 1200-CA permit is not applicable to this Project. Comply with all applicable conditions of this Section.

00280.04 Erosion and Sediment Control Plan on Agency Controlled Lands - Replace the bullet that begins “Information required under 1200-CA…” with the following bullet:

• Information required under 1200-CA permit, if applicable.

00280.06 Erosion and Sediment Control Manager - Delete this subsection.

00280.80 Measurement - Replace this subsection, except for the subsection number and title, with the following:

No extra measurement will be made for this work.

00280.90 Payment – Replace this subsection, except for the subsection number and title, with the following:

No separate or additional payment will be made for erosion and sediment control.

SECTION 00290 - ENVIRONMENTAL PROTECTION

Comply with Section 00290 of the Standard Specifications modified as follows:

00290.90 Payment – Replace this subsection, except for the subsection number and title, with the following:

No separate or additional payment will be made for environmental protection.

SECTION 00310 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS

SPECIAL PROVISIONS 8

Comply with Section 00310 of the Standard Specifications modified as follows:

00310.80 Measurement – Add to the end of this section:

The quantities of asphalt pavement saw cutting will not be measured and will be considered incidental to the bid items.

00310.92 Separate Item Basis – Add to the end of this section:

No separate or additional payment will be made for asphalt pavement saw cutting.

SECTION 00331 - SUBGRADE STABILIZATION

Comply with Section 00331 of the Standard Specifications.

SECTION 00440 - COMMERCIAL GRADE CONCRETE

Comply with Section 00440 of the Standard Specifications.

SECTION 00490 - WORK ON EXISTING SEWERS AND STRUCTURES

Comply with Section 00490 of the Standard Specifications.

SECTION 00759 - MISCELLANEOUS PORTLAND CEMENT CONCRETE STRUCTURES

Comply with Section 00759 of the Standard Specifications modified as follows:

00759.11 Aggregate Base - Replace this subsection, except for the subsection number and title, with the following:

Furnish Aggregate Base Materials for Base, foundation courses, Leveling courses, or bedding meeting the requirements of 00640.10 or dense graded Base Aggregate in 00641.10 as appropriate and included in the Special Provisions.

SPECIAL PROVISIONS 9

SECTION 00850 - COMMON PROVISIONS FOR PAVEMENT MARKINGS

Comply with Section 00850 of the Standard Specifications modified as follows:

00850.30 Manufacturer’s Representative - Replace this subsection, except for the subsection number and title, with the following:

For Sections referencing 00850.30, the services of a manufacturer’s representative are not required. Place Pavement markings only when the Pavement is ready for the Pavement marking material according to the manufacturer’s installation instructions.

SECTION 00865 - LONGITUDINAL PAVEMENT MARKINGS - DURABLE

Comply with Section 00865 of the Standard Specifications.

SECTION 00867 - TRANSVERSE PAVEMENT MARKINGS - LEGENDS AND BARS

Comply with Section 00867 of the Standard Specifications.

SECTION 02001 - CONCRETE

Comply with Section 02001 of the Standard Specifications.

SECTION 02050 – CURING MATERIALS

Comply with Section 02050 of the Standard Specifications modified as follows:

02050.10 Liquid Compounds – Replace the paragraph that begins “Furnish liquid membrane-forming curing …” with the following:

Furnish liquid membrane-forming curing compounds from the QPL and meeting the requirements of ASTM C309. Before use, submit two, one quart samples from each lot for testing. Samples will be tested according to ODOT TM 721. Samples are not required for curing compounds used on Commercial Grade Concrete.

SECTION 02320 - GEOSYNTHETICS

Comply with Section 02320 of the Standard Specifications modified as follows:

SPECIAL PROVISIONS 10

02320.20 Geotextile Property Values – Replace Table 02320-3 with the following table:

Table 02320-3 Geotextile Property Values for Sediment Fence 1

Geotextile Property ASTM Test Method Unit

Geotextile Property Requirements

Woven and Nonwoven

Grab Tensile Strength (minimum) Machine and Cross Machine Directions D 4632 lb 120

Apparent Opening Size (AOS) (maximum) U.S. Standard Sieve

D 4751 — 30

Permittivity (minimum) D 4491 sec-1 0.05 Ultraviolet Stability Retained Strength (minimum)

D 4355 (at 500 hours) % 70

1 All geotextile properties are Minimum Average Roll Values (MARV). The test results for any sampled roll in a lot shall meet or exceed the values shown in the table.

SECTION 02440 - JOINT MATERIALS

Comply with Section 02440 of the Standard Specifications.

SECTION 02510 – REINFORCEMENT

Comply with Section 02510 of the Standard Specifications modified as follows:

02510.11(c) Coated Reinforcement Ties and Supports - Delete this subsection.

02510.11(d) Epoxy Coating Repair - Delete this subsection.

02510.30(d) Ties and Support - Delete this subsection.

02510.60 Wire Reinforcement - Replace this subsection with the following subsection:

02510.60 Ties and Supports - Provide tie wire and supports according to CRSI Manual of Standard Practice.

(a) Coated Reinforcement Ties and Supports – Provide nonmetallic coated ties and supports for coated reinforcement, including ties for coated-to-uncoated reinforcement connections.

(b) Uncoated Reinforcement Ties and Supports - Tie all mats of galvanized steel bars with galvanized ties. Provide precast concrete blocks with galvanized ties that support galvanized reinforcement.

SPECIAL PROVISIONS 11

SUPPLEMENTAL SPECIAL PROVISIONS

1. The quantities in the bid item list are intended to serve only as guide to bidders, and are not to be construed as a guarantee. All quantities are estimated, and are for bid purposes only. The quantity for each bid item includes all labor, equipment and materials for all activities associated with this project. The Oregon Department of transportation (ODOT) reserves the right to adjust quantities and add or delete, as needed.

2. Contractor will be responsible for traffic control measures for all closures, based on their approved traffic control plan (TCP).

3. Contractor shall monitor and maintain all traffic control in place 24 hours a day for the duration of the closure.

4. The total number of PCMS required for the project will be determined by the Contractor’s

TCP.

5. Contractor to contact the Owner’s Authorized Representative and schedule the Pre-- Construction Meeting within the timeframe required in the Contract and must be held at least Fourteen (14) days prior to the start of work.

6. Contractor shall provide weigh slips for each load of concrete material placed in performance of Work under the Contract.

7. Changes to the scope and/or limits of work are to be requested in writing to the Owners Authorized Representative. The Owners Authorized Representative will respond in writing with approval or denial of the change(s). ADA ramp upgrades that are triggered due to unauthorized changes to the scope and/or limits of work are the Contractors responsibility to remedy. Contractor, or their designated representative, will design and construct the ADA ramp upgrades per ODOT standards at no expense to the Agency. ADA ramp upgrades must follow the triggering activity in a timely manner.

8. Any camp clean-up required prior to the start of work will be coordinated by ODOT. The Contractor shall notify the Project Manager 10 working days before the scheduled start date to allow for the clean-up to be posted and completed. Contractor to account for this time in their schedule. Contractor shall occupy the site and begin work immediately following the camp clean-up. If there is evidence that additional cleanups will be required based on camper presence or personal property found at the site, notify the Project Manager so it can be scheduled. Clean ups can occur daily once the site has been posted.

Contractor may not move or remove any personal property from the site. No monetary compensation will be considered for any camp clean-up delay.

9. Any camp clean-up required after the start of work will be coordinated by ODOT. The Contractor shall notify the Project Manager to allow for the clean-up to be posted and completed. Contractor shall occupy the site and continue work immediately following the camp clean-up. If there is evidence that additional cleanups will be required based on camper presence or personal property found at the site, notify the Project Manager so it can be scheduled. Clean ups can occur daily once the site has been posted. Contractor

SPECIAL PROVISIONS 12

may not move or remove any personal property from the site. Any time delay caused by campers occupying the site after the start of work, when they had not been present prior to the start of work, will be added to the end of the contract. No monetary compensation will be considered for any camp clean-up delay.

10. When backfill of the bus pad area cannot be achieved by the end of a work shift use temporary steel plating to close the excavated area.

11. Contractor shall notify Trimet at least 14 calendar days before the work is to begin, informing them of the work to be performed. Provide the Project Manager with documentation of the notice. Trimet Contact information:

a. Field Ops Coordinator 503-962-4949 foc@trimet.org

12. Contractor’s employees and their subcontractors may not wear clothing, hats, vests, etc.

that have the ODOT name or “flying T” symbol.

13. There is public interest in the work. Contractor is advised to use courtesy and respect in any work site interaction with the public and to refer all public relations matters to the ODOT Owner’s Authorized Representative.

14. Contractor shall implement safety policies, procedures and practices in conformance with all applicable local, state and federal laws, rules and regulations including but not limited to:

a. Applicable OSHA safety regulations

b. ANSI Z 133.1 Safety standards agreed upon by ODOT and local jurisdiction The

Manual of Uniform Traffic Control Devices (MUTCD)

c. Any other applicable safety laws, regulations and codes.

15. Contractor is responsible for placing all new lines, legends and markers in the same location and configuration as all existing lines. Cost to control work to meet this responsibility is incidental to the bid items.

16. All equipment utilized during this contract shall be in good and serviceable condition.

17. In addition to the notifications required under the standard specifications and special provisions, contractor will also:

a. At least 72 hours prior to executing lane shifts and/or complete roadway closures on Tualatin Valley Highway (OR 8) notify:

a. The ODOT Project Manager: 971-673-1343

b. Tualatin Valley Fire and Rescue: Lyessa Duncan 503-259-1100

b. At the time of lane shifts and/or complete roadway closures and again when the lane and/or complete roadway is opened on Tualatin Valley Highway (OR 8) notify:

SPECIAL PROVISIONS 13

a. ODOT Traffic Management Operations Center (TMOC): 503-283-5859

18. Defective pavement will be repaired, at no additional cost to the State, according to the ODOT District 2B: Guideline for Pavement Restoration of Defective Work.

19. See modified DET 1610 for Bus Pad Requirements.

20. Lubricate all dowels with grease.

21. Aggregate base to be compacted to a minimum 95% compaction per Test Method T-99 A. Contractor will provide quality control testing.

22. Longitudinal reinforcement should stop 3 inches from edges of the slab and should stop 3 inches before and resume 3 inches after the contracted joint. Also transverse reinforcement should stop 3 inches from the edges of the slab.

23. Do not operate construction equipment or allow public traffic on newly placed concrete until the following requirements are met:

a. The concrete attains compressive strength of at least 3,000 psi as determined by testing at least two cylinders cured according to AASHTO T 23 (field cure) and tested according to AASHTO T 22.

b. Approval is given by the Owner’s Authorized Representative.

24. Concrete pavement smoothness will be tested with a contractor provided 12 foot straight edge. The surface shall not deviate by more than ¼ inch longitudinally or transversely.

The surface will be checked prior to applying the tined textured surface.

25. Apply white pigmented cure compound to the finished concrete surface from the Qualified Products List (QPL).

26. A concrete vibrator or similar approved mechanical device shall be used to consolidate concrete for the bus pads.

27. Furnish hot-melt loop sealant from the QPL.

28. Due to the high volumes of daily traffic at the project location, we are requiring the bus pad to be completed in no more than 4 calendar days to reduce the impact to the traveling public.

29. Since the timeframe designated for opening traffic is less than 72 hours after concrete placement, the contractor will need to provide the following:

a. Provide ODOT approved Class HES4000—1½” aggregate concrete designed to attain a minimum average compressive strength of 3,000 psi in 72 hours.

Contractor will provide quality control testing. Minimum six test cylinders are required, two for testing before opening to traffic (See Special Provision 16), three for 28-day strength test and at least one additional in case one broke does not meet strength requirements.

SPECIAL PROVISIONS 14

Contractor shall prepare and submit either a new mix design or current mix design for the class of concrete required, according to Section 02001 of the Standard Specifications.

Acceptance of the plastic concrete will be based on the tests performed by the Contractor's QCT, according to the tolerances and limits of Section 02001.

For projects requiring Class HES concrete, mobile mixers may be used if the mixers conform to the following (otherwise use truck mixers to transport concrete):

• The mixer is self-propelled and carries sufficient unmixed dry bulk cement, sand, coarse aggregate, admixtures, and water to produce a minimum of 6 cubic yards of concrete on site.

• The mixer provides positive measurement of cement being introduced into the mix by meter or counter.

• The mixer provides positive control of the flow of water into the mixing chamber. Water flow is readily adjustable to provide for minor variations in aggregate moisture.

• Each mixer is calibrated to automatically proportion and blend all components according to the mix design on a continuous or intermittent basis as required by the placing operation.

Perform a calibration and yield test on each mixer prior to the first placement to accurately proportion the specified mix. Use a written calibration procedure from the mixer manufacturer, a procedure provided by the agency or other written procedure acceptable to the agency. The calibration process may be witnessed by the Owners Authorized Representative. Provide the Owners Authorized Representative with information about the scheduled date, time and place for the calibration. Perform a new calibration when the source of materials changes, when the mixer undergoes a major repair, or when requested by the Owners Authorized Representative.

b. Sawcut all transverse contraction joints at the earliest possible time following placement of the concrete to prevent uncontrolled cracking without damaging the pavement or joint. Repair any damage to the curing material during the sawing operations immediately after the sawing is completed.

c. Construct construction joints when there is an interruption of 30 minutes in the concrete placing operations.

The new concrete placed against the joint shall conform closely to the proportions and consistency of the previously placed concrete except vibrate and consolidate it to a greater degree and with more care than normal. Unless otherwise shown, do not construct construction joints within 10 feet of a transverse expansion or contraction joint. If sufficient concrete has not been mixed at the time of interruption to form a slab at least 10 feet long, remove the concrete back to the last joint and dispose of as directed.

SPECIAL PROVISIONS 15

30. Correspondence for the project is required to have the project name “ESB OR 8 EB at

MP 11.12 Bus Pad” in the subject line and copy Amythest Lee:

Amythest.M.Lee@odot.oregon.gov . Correspondence without the project name in the subject line will not be addressed.

31. Do not combine correspondence for multiple contracts, all correspondence needs to be kept separated.

32. The invoices, certified payrolls (if applicable) and project submittals are to be submitted via email to the Owner’s Authorized Representative.

33. Certified Payroll Report file names are to include the project name, contractor or sub-contractor name and week ending date for the report period.

34. Invoices are to have the contract name and contract number listed on them and the following billing address:

ODOT District 2B 9200 SE Lawnfield Rd Clackamas OR 97015

Updated 11/9/2020

Region 1 Maintenance Guidelines for Pavement Restoration or Defective Work

This guideline applies anytime the asphalt saw cut does not fall at a lane line, striping is removed and not replaced in the same location or when defective paving has to be replaced.

Base Objective: Motorist cannot feel the repaired pavement. Prolong the working life of the asphalt pavement and reduce future maintenance costs.

Repair Guidelines:

1. Pavement condition new or like new (1‐3 years old): Complete a 2” grind and inlay with the same Level of ACP required in the contract (Level 3 minimum) for an area that covers the entire lane width of every lane affected by 100 foot long. The length to be centered on the defective/saw cut area if the defective area is small. If the area is larger than 100 feet then complete a 2” grind and inlay with the same Level of ACP required in the contract for an area that covers the entire lane width of every lane affected by the entire length of the defective/saw cut area.

2. Pavement condition anything less than new (3 years or older): Complete a 2” grind and inlay with the same Level of ACP required in the contract (Level 3 minimum) for an area that covers the entire lane width of every lane affected by 50 foot long. The length to be centered on the defective/saw cut area if the defective area is small. If the area is larger than 50 feet then complete a 2” grind and inlay with the same Level of ACP required in the contract for an area that covers the entire lane width of every lane affected by the entire length of the defective area.

3. When there are several smaller areas that are within a short distance of each other complete one continuous repair.

4. The District Manager or their designated representative will determine the limits of the repair based on these guidelines.

hwym17i Text Box ESB OR 8 EB MP 6.68 Bus Pad 14 ft x 85ft hwym17i Line hwym17i Text Box North N.T.S.

hwym17i Text Box 14 ft x 85 ft Bus Pad (From edge of pavement to Fog Line) hwym17i Line

Hwym17i

J

Hwym17i Text Box J

Hwym17i Text Box

Hwym17i Text Box

Hwym17i Text Box

4. Loop Sealer to be Hot-Melt Loop Sealant from the Qualified Products List (QPL)

Hwym17i Text Box (loop sealer)

Hwym17i Text Box 12"

Hwym17i Text Box Modified

Hwym17i

10" the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: December 1, 2024 - May 31, 2025

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

Standard Drawing, while

The selection and use of this

RD1010

TYPE 2, 3, 6, 7, 10 AND 11

INLET PROTECTION

R D

.d g n

REMOVED CALC BOOK NUMBERS01-2021

20-JAN-2021N/A

J A

N

01-2021 MOVED NOTES UP FROM OVERLAPPING THE SHEET BORDER

20" min. 20" min.

Flow Flow

Drainage grate

Flo w

Flow water

Filtered water

Filtered

NOT TO SCALE

NOT TO SCALE NOT TO SCALE

NOT TO SCALE

NOT TO SCALE

NOT TO SCALE

COMPOST FILTER SOCK OR WATTLE - TYPE 7

GEOTEXTILE/WIRE MESH/AGGREGATE - TYPE 2 PREFABRICATED FILTER INSERT - TYPE 3

SOD PROTECTION - TYPE 6

CURB INLET SEDIMENT DAM - TYPE 10 WATTLE BARRIER WITH FILTER INSERT - TYPE 11

CURB INLET PERSPECTIVE VIEW

AREA DRAIN PERSPECTIVE VIEW

AREA DRAIN PLAN

compost filter socks

Sandbags are not necessary for sandbags to hold wattles in place.

Compost filter sock or wattle. Use

Flo w

Wire tied (Typ.)

grate

Drainage

(Typ.)

Surface flow

3' mi n.

F lo w

Flow

Flow

Curb face inlet

3' mi n.

curb inlet opening to scale to show

Straw wattle not drawn

Insert -Type 3, (not shown)

Prefabricated Filter

Overflow spillway

Catch basin

F lo w

Curb face inlet

Flow vertical bars

Zip-tie to

Flow

Zip-ties over inlet mouth) dam (fit snugly

Curb inlet sediment

Va

r. 3

6" to sediment dam

Curb inlet

3' OC to hold in place end of wattle and

Place a sandbag at each or wattle filter sock

Compost

Inside diameter

12" plans and notes wattle, size varies. See

Compost filter sock or flo w (typ

Su rface not feasible when staking is

Secure with zip-tie around inlet basin

Min. 6' of sodFlow

Flow

Flow

Flow

#5 Rebar

Geotextile insert overlap

Sewn 6"

#5 Rebar

Flow

Grate

Flow overlap

Sewn 6" aggregate

Open graded depth over inlet

Aggregate, 12" min.

Wire mesh

Geotextile at 3' OC in pavement areas

Hold in place with sandbags to prevent sock movement.

3' OC, typ. Tie sock at overlap

2"x2"x36" wooden stakes areas sandbags at 3' OC in pavement movement. Hold in place with

Tie sock at overlap to prevent sock

2"x2"x36" wooden stakes 3' OC, typ.

from entering the catch basin.

as needed to prevent sediment laden water

Adjust, replace or modify the inlet protection site.

filter insert or wattle prior to leaving the wattle to force storm water to flow through side of opening tight against curb. Adjust

Install wattles over opening and 36" to each detail.

Install prefabricated filter insert per Type 3

Type 11 - Wattle barrier with filter insert are combined at a catch basin.

where at-grade inlet grate and curb inlet required for use with inlet filter insert mouth. Curb inlet sediment dam is

Fit curb inlet sediment dam snugly into inlet

Type 10 - Curb inlet sediment dam installations.

use synthetic mesh socks for temporary used safely.

or areas where the larger socks can be

Use 12" to 18" dia sock in non-traffic areas

(Type 7 cont.)

12" compost filter socks necessary for

Sandbags are not hold wattles in place.

Use sandbags to

Sandbags (typ.).

areas.

Use 8" to 12" dia sock on curbside in traffic recommendations (12"min., 36" max.).

Overlap ends of sock per manufacturers of the sock.

6" into ground and flush with the top

Drive 2"x2" wood stakes a minimum of

Type 7 - Compost filter sock

Field fabricated inserts are not allowed.

entering project storm systems.

prevent the potential of sediments accompanied by additional BMP's to overflow are allowed only when

Prefabricated inserts with provisions for manufacturer recommendations.

to the plans, special provisions, and

Install prefabricated filter inserts according

Type 3 - Prefabricated filter inserts

Install aggregate over the geotextile fabric.

structure.

wire mesh and perimeter area around

Place sediment fence geotextile over the

Place the wire mesh over the grate.

Type 2 - Geotextile/wire mesh/aggregate

NOTES:

harvest of the sod of inlets within 36 hours of

Install sod around the perimeter

NOTE:

TM500

STANDARD DETAIL BLOCKS

PAVEMENT MARKING

T M

.d g n

Changed Min. widths for CH, TM, TM-40, and TS07-2020

07-01-2020N/A

DISABLED PARKING DETAIL (white)

4" white edge line

Edge of pavement

17'

1'

20'

4"

Direction of Traffic

36° 36°

3'

4'

36° 3'

4'

LL

L

L

LL

LL

L

LLL

LL

L

TS

LL

LL

L

L

LL

4'

Direc tion o f Tra ffic

36° 3'

L

9'

3'

8" white line

1'

20'

4'

4" 8 " white line

12'12'12'

L For traversable medianL

9'

3'

L

12'

LL

1'

' 6

1'

For Centerline

DLL DLL-2

36°

36° 3'

Direction of Traffic

BYLD

L E G E N D

36°

36°

Direction of Traffic

CH

For lane lines in drop lanes

LL

For lane lines in acceleration/deceleration lanes

40'

40'

40'

10'

10'

40'

For lane extensions and bike lane extensions For lane extensionsFor lane extensions

TM-40

30'10'

8'

40'

20'

30'

10'

40' 40'

30'

30'

(Typ.)

Wheel Stop

YD

NPL

YBWB

TWL

WD-2

NPR

ND

Direction of Traffic

YLD

TM

4 " space

NDW

Thru Traffic Side

WD

D

YW-2W

2'

4" space

36°

36°

L

4" space

4" space

4"

4"

30'

4" YELLOW LINE

4" WHITE BROKEN LINE

4" space

LL

L

L

LL

LL L

L

LL

8'8'

6'6' 6'

2'2'

8'

1' space

8'

4" YELLOW BROKEN LINE

8" WHITE LINE4" WHITE LINE

10'

40'40'

8'

2'

1'

1'

1'

8" WHITE DOTTED LANE LINE4" WHITE DOTTED LANE LINE

Yellow Line Narrow Double

Yellow Line Narrow Double

YIELD LINE (white) for field layout angle orientation for field layout angle orientation for field layout angle orientation striping plans

Lane line dimensions are shown on the Or Thru Traffic Side

Direction Of Traffic, Increasing Stationing

1' WHITE BARS AT 20' SPACING

CHEVRON BARS

BICYCLE YIELD LINE (white)

4" YELLOW LINES

NO-PASS RIGHT

Yellow Line Narrow Double for field layout angle orientation

4" white line

R o u te

A c c e s s ib le w h ite lin e

1' WHITE BARS AT 20' SPACING

TRANSVERSE SHOULDER BARS

4" YELLOW DOTTED LINE

4" white line

1' YELLOW BARS AT 40' SPACING

TRANSVERSE MEDIAN BARS

distance between left turn refuges exceeds 200' For use at painted medians where

Increasing Stationing Increasing Stationing

Yellow Line Narrow Double

2' (Typ.)

8" WHITE DOTTED LINE 4" WHITE DOTTED LINE

1' YELLOW BARS AT 20' SPACING

TRANSVERSE MEDIAN BARS

3' 5"

4" YELLOW LINES

NO-PASS LEFT

4" YELLOW LINES

TWO-WAY LEFT TURN

TWO 4" WHITE LINES

NARROW DOUBLE NO-LANE CHANGE

TWO 4" YELLOW LINES

DOUBLE NO-PASS

TWO 4" YELLOW LINES

NARROW DOUBLE NO-PASS

(thru traffic side )

HC

4.5' min.

min.

4.5' min.

4.5' min.

4.5' the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: December 1, 2024 - May 31, 2025

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

Standard Drawing, while

The selection and use of this

TM503

STANDARD DETAIL BLOCKS

PAVEMENT MARKING

T M

.d g n

Added note for measurement of Standard Crosswalk07-2022

07-08-2022N/A

BIKE LANE STANDARD STENCIL (white)

TWO 1' WHITE BARS

STANDARD CROSSWALK

6'

9'

For letter proportion details, see current version of Standard Highway Signs For letter proportion details, see current version of Standard Highway Signs For letter proportion details, see current version of Standard Highway Signs edge line Yellow to miss wheel tracks) (adjust spacing 3' min. to 5' max.

Install per Standard Drawing TM530 edge line White

P

12"

12"

ON-STREET PARKING DETAIL (white)

ONLY (white)

BUS

12"

SLM

X

24" 24"

4" white lines

1. Arrow, letter, and bike symbol dimensions nominal.

General Note:

SHARED LANE MARKING (white)

Install per Standard Drawing TM530

Pavement (EP) Edge of

EP

Install per Standard Drawing TM530

1' & 8" WHITE BARS

RAMP METER STOP BAR

For proportion details, see current version of Standard Highway Signs Center marking within lane width or as shown

2' WHITE BAR

STOP BAR - LARGE

Install per Standard Drawing TM530

2' WHITE BARS

STAGGERED CONTINENTAL CROSSWALK

1' WHITE BAR

STOP BAR

End Marking

For proportion details, see current version of Standard Highway Signs

For letter proportion details, see current version of Standard Highway Signs

Center marking within lane width

For proportion details, see current version of Standard Highway Signs

For letter proportion details, see current version of Standard Highway Signs

For letter proportion details, see current version of Standard Highway Signs

For proportion details, see current version of Standard Highway Signs

Center marking within lane width

Center marking within lane width Center marking within width of two lanes Center marking within width of two lanesCenter marking within lane width

Center marking within lane width Center marking within lane width

Center marking within lane width

4'

3'

6'6' 6' 6' 6'6' 6'

6"

BIKE RIGHT TURN STENCIL (white)

CW

BS

BIKE LEFT TURN STENCIL (white)

Varies

8'

6"

2'

Varies

BUS (white) SCHOOL - LARGE (white) CROSSING - LARGE (white)

1'

For multi-lane ramp meter applications

S S-2 S-RM

2'

1'

15'

8' 10' 10'

SCH

Direction of Travel

ON

8'

L E G E N D

6'

SCHOOL (white)

SCH-LG CRS-LG

XNG

X-ING (white)

8'

7'

Extend to EP if X<20' placement Verify loop detector (center within EP) 8" white bar

9'8" 19'8" 19'8"

CW-SC

GRN BLE-Gwidth of lane Color full between dotted lines Color full width of lane

3' 4"3' 4"3' 4"

3' 4" 3' 4"

4' 6"

6'

3' 4"

BIKE STENCIL (white)

B

SOLID LINE (green)

GREEN SUPPLEMENTAL BICYCLE LANE

DOTTED LINE EXTENSION (green)

GREEN SUPPLEMENTAL BICYCLE LANE

2'

4'

3'6"

BR BL

BD

2'

2"

6"

5" 6"

2"

BICYCLE DETECTOR MARKING (white)

3' 6"

9' 4"

Center marking within lane width Center marking within lane width

6' 6'

6"

BIKE RIGHT TURN STRAIGHT STENCIL (white)

3' 4"

For proportion details, see current version of Standard Highway SignsFor proportion details, see current version of Standard Highway Signs

BRS BLS

BIKE LEFT TURN STRAIGHT STENCIL (white)

6' 6"

3' 9"

6' 6'

6"

3' 4"

6' 6"

3' 9"

Used for Intersection Bicycle Box applications

Varies Varies

8" white

8" white

8" white

8" white

Place marking within bicycle box, ceneterd with motor vehicle lane width where bicycle acuates the traffic signal

PLace Bicycle Detector Pavement Marking in optimum loction

1'

1' marking to inside of marking

10' measured from inside of the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: December 1, 2024 - May 31, 2025

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

TM520

SURFACE INSTALLED PROFILED

METHOD 'A' & METHOD 'D'

DURABLE PAVEMENT MARKINGS

T M

.d g n

07-05-2013N/A

8'

4" or 8" as specified

3' stripe

12'

Plan

Bumps (1 req'd. per dotted line)

10" min. (both ends)

Bumps

2' stripe

PlanPlan

4" or 8" as specified

Profile

Bumps (5 req'd. per dotted lane line)

1" min. (both ends)

1" min. (both ends)

See Detail "A"

27"

Bumps (2 req'd. per dotted lane line)

10' stripe

4"

See Detail "A"

DETAIL "A"

Top of pvmt.

120 mils

DOTTED LINE

SOLID LINEBROKEN LINE

DOTTED LANE LINE

4" (Thermoplastic) 2" To 3" (Methyl Methacrylate)

Top of pvmt.Top of pvmt.

4" (Thermoplastic) 2" To 3" (Methyl Methacrylate)

Top of pvmt.

4" (Thermoplastic) 2" To 3" (Methyl Methacrylate)

Top of pvmt.

4" (Thermoplastic) 2" To 3" (Methyl Methacrylate)

See Detail "A" Profile

4" or 8" as specified

Plan

See Detail "A"

" (500 mils)2 the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: December 1, 2024 - May 31, 2025

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

TM800

PCMS DETAILS

TABLES, ABRUPT EDGE AND

T M

.d g n

12-JUL-2024N/A

J U

L

Freeway

Use aggregate wedge when abrupt edge is 2 inches or greater.

four feet wide protect longitudinal abrupt edge as shown.

When paved shoulders adjacent to excavations are less than

NOTES:

shoulder, as far as practical.

Place cart / generator / power supply off of the on 10' spacing.

Use six tubular markers in shoulder taper outside shoulder, where practical.

Install Flagger Station Lighting beyond the

2" or GreaterExtg. pavement aggregate base rock

Shoulder or message sign (PCMS)

Portable changeable

20'

100'

4' B(III)R

Temp. Plastic Drums

Lighting

Flagger Station

50'

10'

Markers

28" Tubular

Place roll-up signs in advance of barricades.

plaques to the sign face using hook and loop fasteners.

If roll-up signs are used, attach the correct (CW21-9) throughout excavation area at spacings shown.

Continue signing and other traffic control devices

"RIGHT" (CW21-8C) riders with "LEFT" (CW21-8A) riders.

8' B(III)R barricades with 8' B(III)L barricades and replace the

If the excavation is located on left side of traffic, replace the abrupt edges of 1 inch or greater.

or other roadway work. Use abrupt edge signing for longitudinal

Abrupt edges may be created by paving, operations, excavations

GENERAL NOTES FOR ALL TCP DRAWINGS:

for max. spacing.

See TCD Spacing Table

Temp. Plastic Drums for max. spacing.

See TCD Spacing Table

28" Tubular Markers

UNDER TRAFFIC

UNDER CONSTRUCTION

EXCAVATION ABRUPT EDGE SIGN (PCMS) INSTALLATION

PORTABLE CHANGEABLE MESSAGE

LIGHTING DELINEATION

FLAGGER STATION

Sl. 1:3

TAPER TYPES & FORMULAS

TEMPORARY BARRIER FLARE RATE TABLE

TAPER FORMULA

Merging (Lane Closure)

Shifting

Shoulder Closure

Flagging (See Drg. TM850)

Downstream (Termination)

"L"

"L"3 1"L"/3 or

50' - 100'

Varies (See Drawings)

"L"2 1"L"/2 or the Speed from the Tables below:

Use Pre-Construction Posted Speed to select

For Lane closures where W < 10', use "L" value for W = 10'.

Limit spacing adjustments to 30% of the "A" dimension for all speeds.

When necessary, sign spacing may be adjusted to fit site conditions.

Place traffic control devices on 10 ft. spacing for intersection and access radii.

NOTES:

SPEED (mph) MINIMUM FLARE RATE

M I N I M U M L E N G T H S T A B L E

"L" VALUE FOR TAPERS (ft) BUFFER "B" (ft)W = Lane or Shoulder Width being closed or shifted

20:1

19:1

18:1

16:1

14:1

12:1

10:1

9:1

8:1

FREEWAYS

SPEED (mph) W = 12 W = 14 W = 16

TRAFFIC CONTROL DEVICES (TCD) SPACING TABLE

20 - 30

35 - 40

45 - 55

60 - 70 700

100 100

15001000 2640

100 20

Device Spacing (ft)

Max. Channelizing Sign Spacing (ft) SPEED (mph)

A B C

CW21-8A

(As noted)

36x18

C W

(Mount on TSS)

(As needed)

42x18

CW21-8C

OR

C

W

Plaques

CW21-9

Abrupt edge

8' B(III)R 8' B(III)R

mi.4 1 mi.4

1 mi.4

EDGE

ABRUPT

RIGHT

LEFT

(Roll-up sign)

(As needed)

EDGE

ABRUPT 32x11

32x11

32x11

CENTER

RIGHT

LEFT

10≤ W

30≤

W/60, S = Speed, W=WidthS 45: L = WS, Speeds < 45: L = ≥ formula, for Speeds For Shoulder closures where W < 10', use "L" value for W = 10' or calculate "L" using

TYPICAL ABRUPT EDGE DELINEATION

Smart Work Zone Systems Portable Traffic Signals

Detail as shown is used for trailered and non-crashworthy components of:

barricade may be omitted when PCMS is placed behind a roadside barrier.

Use six drums in shoulder taper on 20' spacing. The drums and

Left shoulder, use Type B(III)L Right shoulder, use Type B(III)R Use the appropriate type of barricade panels for PCMS location.

Install PCMS beyond the outside shoulder, when possible.

To be accompanied by Dwg. Nos. TM820 & TM821.

divided highways or freeways when positive protection is not available, or as directed.

Provide a truck mounted attentuator (TMA) to protect the active work area on high speed

Flaggers, Traffic Control Measures, or as directed.

Coordinate and control pedestrian movements through a Temporary Accessible Route using

Combine drawing details to complete temporary traffic control for each work activity.

Do not locate sign supports in locations designated for bicycle or pedestrian traffic.

High speed highways have a pre-construction posted speed of 45 mph or higher.

Low speed highways have a pre-construction posted speed of 40 mph or less.

All other signs mounted on barrier sign supports shall not exceed 12 sq. ft. in total sign area.

All diamond shaped warning signs mounted on barrier sign supports shall be 36" by 36".

background of all temporary warning signs.

Use fluorescent orange sheeting for the All signs are 48" x 48" unless otherwise shown.

to indicate traffic movements.

Arrows shown in roadway are directional arrows sequential arrow boards.

Place a barricade approx. 20' ahead of all shown are the minimum required.

Signs and other Traffic Control Devices (TCD)

07-2022 Added a note for TPARs

07-2024 Added a note for TMAs the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: December 1, 2024 - May 31, 2025

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

TM821

TEMPORARY SIGN SUPPORTS

T M

.d g n

14-JUL-2023N/A

J U

L

4"x 4"x 12'

2 - 2"x 4" @ 45° angle

2"x 6"x 37"

36"

Sandbags per side (typ.)

lag screw

"x 3"8 31 -per side (typ.)

" dia. bolts8 32 -screw per side (typ.)

"x 3" lag 8 31 -per support (typ.)

"x 3" lag screws8 32 -

"x 37"2 1"x 54 sign (typ.)

48"x 48" sign area of 20 sq. ft. or less.

Use Double Post TSS for a total

NOTES:

per support (typ.)

2 - 3/8" dia. bolts per support (typ.)

2 - 3/8" dia. bolts

4 - 2"x 6"

40"

"2 12 - 4"x 4"x 5

NOTES:

2' - 8" Sandbags

2' - 6"

A

"4

" - 12 ga. PSST2

" - 12 ga. x 4" PSST Stub2

PSST Stub

" - 12 ga. x 4" 2 12 A

See DETAIL A

" - 12 ga. PSST4

" - 12 ga. PSST4 sign (typ.)

48"x 48" per support (typ.)

" dia. bolts8 3Two, support (typ.)

joining brace and

" dia. bolt 8

NOTES:

1 - 2"x 4"

1 - 4"x 4"x 4"

2 - 2"x 4"

1 - 4"x 4"x 4"

1- 2"x 4" 40"

Sandbags lag screws

"x 4"8 34 -

4"x 4"x 10'

"x 3" lag screws8 32 -

2"x 4"x35" @ 45° angle

2"x 4"x 6"

"x 3" lag screws8 32 -

"x 4" lag screws8 34 -

" dia. bolts8 31 -

" dia. bolts8 31 -

" dia. bolts8 32 -

" dia. bolts8 31 -sign (typ.)

36"x 36"

" dia. bolts8 32 -

TEMPORARY SIGN SUPPORT GENERAL NOTES:

Sheeting

Retroreflective

Sheeting

Retroreflective

" Sheeting

Retroreflective m in and Right sides)

Sheeting (Left

Retroreflective

NOTES:

SIGN POST REFLECTIVE SHEETING PLACEMENT

Sheeting

Retroreflective Sheeting

Retroreflective signs. Do not mount signs on Type II or III Barricades.

Use Single Post TSS for mounting "Business Access" (CG20-11)

Use Single Post TSS for a total sign area of 12 sq. ft. or less.

Sheeting may be applied directly to post material; or applied to a rigid, lightweight substrate, then securely attached to the posts.

for wood post TSS's. Use 2" wide sheeting for PSST TSS's.

Apply sign post retroreflectivity to each TSS post facing front; and to the left and right sides of the TSS, as shown. Use 3" wide sheeting and "DO NOT ENTER". For "STOP" and "DO NOT ENTER" signs, used red ANSI Type III or IV retroreflective sheeting on the TSS posts.

Apply fluorescent orange, ANSI Type VIII or IX retroreflective sheeting to TSS posts, as shown, for all temporary signs, except "STOP"

Use A325 Bolts or equivalent.

welding. Repair Galvanizing according to ASTM A780.

designation G90. Remove Galvanizing from steel before

Galvanize steel according to ASTM A653 with coating

All members shall have a minimum yield stress of 50 ksi.

Use PSST TSS's for a total sign area of 16 sq. ft. or less.

Society (AWS) D.1.1.

Weld steel according to American Welding

" - 12 ga. x 4" PSST Stub.2 1inside of the 2

" PSST4

1Do not use bolt to secure 2

" - 12 ga. x 4" PSST Stub.2 1inside of the 2

" - 12 ga. PSST to extend entire length 4

See Dwg. No. TM204 for flag board mounting detail.

(25 lb. max per bag) (min. 100 lbs per side of each TSS).

Place a minimum of 50 lbs of sandbags on each of the four TSS supports legs.

TSS posts.

away from traffic, or cover the sign. Do not cover reflective sheeting on the

When not in use, locate TSS as far from Public Traffic as practicable and turn

Do not place or stack ballast more than 24" above the ground.

See "Temporary Sign Placement" detail on TM822 for sign installation heights.

four sides (S4S) and free of heart center (FOHC).

For wooden TSS's, use either Douglas Fir or Hem Fir, which is surfaced

Do not locate TSS's in locations that block pedestrian or bicycle traffic.

Do not tip over TSS at any time.

Double Post Perforated Steel Square Tube (PSST) Single Post

DOUBLE POST DETAIL PERFORATED STEEL SQUARE TUBE (PSST) DETAIL SINGLE POST DETAIL

Front Right Left Front FrontRight Left Side

(No Scale)

DETAIL A

" - 12 ga. PSST 4

" - 12 ga. PSST2

A A

(No scale)

SECTION A-A

the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: December 1, 2024 - May 31, 2025

Professional Engineer.

This is the start of the file's text. The full file is on GovTribe.