Exhibit_1_-_Satellite_Buildings_Janitorial_Services_Mapbook.pdf

PDF 14 MB Posted

Attached to
LDB Direct Procurement for Satellite Buildings Janitorial Maintenance Services
Solicitation number
26-540-ITN
Issued by
Orange County, Orlando City, Florida

About this file

This is a Janitorial Contract Summary Report and mapbook for satellite buildings at Orlando International Airport (MCO) and Orlando Executive Airport (ORL), prepared by the Greater Orlando Aviation Authority (GOAA). The document provides detailed janitorial service requirements across 31 satellite buildings totaling 453,784 square feet. The buildings include administrative offices, maintenance facilities, fire stations, checkpoints, parking administration, and specialized facilities such as the USDA Inspection Building, IT facility, and cargo handling buildings. The contract encompasses all labor, supervision, equipment, janitorial cleaning supplies, paper products (excluding certain items), feminine hygiene products, uniforms, and related materials necessary for maintaining these facilities. The mapbook identifies specific cleaning frequencies, including daily policing and cleaning cycles for most occupied spaces, with quarterly floor care schedules and varying trash pickup frequencies ranging from 1 to 7 times per week depending on space function.

The solicitation is designated as a direct procurement for a Local Developing Business (LDB) with principal place of business in Orange, Osceola, Lake, or Seminole Counties as defined in the GOAA's Policy 1200.01. The detailed summary report categorizes spaces by function (offices, restrooms, corridors, storage areas, maintenance bays, etc.) and specifies flooring types including carpet, concrete, vinyl, porcelain tile, ceramic tile, and various specialty surfaces. The report indicates that cleaning and policing requirements vary significantly by space type and occupancy level, with conference rooms, offices, and common areas requiring 3-5 times per week cleaning cycles and some specialized areas designated as "TBD" (to be determined). The contractor will be responsible for sourcing all necessary materials and providing comprehensive facility maintenance services across multiple building types and zones, with performance requirements detailed in separate zone-level documentation for each facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X

X

X

X X X X X X X X

XXXXXXXX

X

X

X

XX

X X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X

X X

X

X X

X

X X

X

XX

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X X

X

X

X X X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

XXX

X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X X

X X X X X X

X X X X

X

X

X

X

X X X

X

X X

X

X

X

X X

X

X X X

X

X X X

X

X

X

X

X

X

X

XX

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

XX

X

X

X

X

X

X

X

X

X XX X X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X

X X

X

X

X X

X

X

X

X X

X

X

X

X X

X X

X

X X

X

X X

X X

X

X X

X

X

X X

X

X X

X X

X X

X

X

X

X X

X

X

X

X

X X

X

X

X X

XX

X

X

X

X

X

X

X

X

XXX

X

X

X

X

X

X

X X

X

X

X

X

X X

X

X

XXX

XX

X

X

X

XX

X X X X X XXXXX

X

X

XX

X

X

X

X

XXXX

X

X

XX

X X

X X X X

X X

X

X

X X

X X

X X

X

X

X X

X

X

X

XX

X

X

X

X

X

X

X X

X

X

XX

X

X

X

X X

X X

X

X

X

X

XX

X X

X

X

XXXXX

X

X

X XX

X

X

X X

X

X

X

X

X

X

X X

X X

X X

X X

X

X

X

X

X

X X

X

X X

X

X

X

X

X X

X X

X

X

X X

X

X

X

X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X X X

X

X

X

X

X

X

XX

X

X

X X

X

X

X

X

X

X

X

X

X X

X X

X

X

X

X

XXXX

X

X

X

X

X X

X

X X

X X

X X

X

X

X X X

X

X

X

X X

X

XX

X

X

X X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X

X

XX

X X

X X X X X X X

X

X

X

X X

X

X

X

X X

X X

X

X

X

X

X

X X X

X

X

X X X

X

X

X

X

X

X

X X

X X

X X

X X

X

X

X

XX

X

X

X X

X X X

XXXX

X

X

X

X

X

X

X

XXXX

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X X

X

X

X X

X X

X

X

X X X

X X

X X

X X

X X

X

XXX

X

X X

X

X

X X

X X

X X

X X

X

X

X

X

X X

X X X

X

X X

X

X

X

X

X X

X

X X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X X

X

X X

X

X

X X

X

X

X

X

X

XX

X

X X

XX

X X

X X

X X

X

X

X X

X

X

X

X

X

X X X X

X

X

X

X

X

X

X X X

X

X

X X X X X X

X

X

X X

X

X

X

X X

X X X

X

X X X X X X X X

X

X X

X

X X

X

X

X X

X

X

X

X

XXX

X X

X X

X X

X

XX

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

XX

X

X

X

X

X X

X X

X

X X

X

X

X X X

X

X X

X X

X X

X

X X

X X

X

X

X X

X

X

X

XX

X

X X

X

X XX

X

X X

X

X

X

X

X X

X X

X X

X X

X X

X

X X X

X X

X X

X X

XX

X

X

X X

X X

X

X

X

X

X X

X X

X

X

X

X

X

X X

X

X X

X X

X

X X

X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X X

SLOW5 MPH

SLOW 5 MPH

SLOW5 MPH

SLOW5 MPH

SLOW 5 MPH

SLOW 5 MPHSLOW 5 MPH

SLOW5 MPH

SLOW5 MPH

SLOW5 MPH

SLOW5 MPH

SLOW 5 MPH

SLOW 5 MPH

SLOW 5 MPH

SLOW5 MPH

SLOW 5 MPH

SLOW5 MPH

Pl ot te d

By : k ei th

.a dd is on

T:

\P ro gr am s\

Ja ni to ria l\S at el lit e_ bl dg \C

AD

\C

O

VE

R _2

6.

dw g

O ct

,2

- 1 :2

1p m

INDEX OF SHEETS

SHEET

NO. REPORT DESCRIPTION

SUMMARY JANITORIAL SUMMARY REPORT PART I

SUMMARY JANITORIAL SUMMARY REPORT PART II

01 REPORT 1 BLDG. #0446, U.S.D.A. INSPECTION BLDG.

02 REPORT 2 BLDG. #0455, GOAA OPERATIONS

03 REPORT 3 BLDG. #0761, EAST CARGO BUILDING

04 REPORT 4 BLDG. #0805, INFORMATION TECHNOLOGY

05 REPORT 5 BLDG. #0806, CEF BUILDING SOUTH

06 REPORT 6 BLDG. #0810, MAINTENANCE ADMIN BLDG.

07 REPORT 7 BLDG. #0811, PLANNING/MATERIAL CONTROL

08 REPORT 8 BLDG. #0812, MAINTENANCE BUILDING

09 REPORT 9 BLDG. #0814, SECURITY/K-9 BUILDING

10 REPORT 10BLDG. #0824, PARKING ADMINISTRATION

11 REPORT 11BLDG. #0830, RSF BUILDING

12 REPORT 12 BLDG. #0854, GOAA OFFICE ANNEX

13 REPORT 13 BLDG. #0858, GOAA MULTI-TENANT BLDG.

14 REPORT 14 BLDG. #1400, HBJ BUILDING

15 REPORT 15 BLDG. #0762,0763,0857, GUARD SHACKS

16 REPORT 16 BLDG. #0449, GOAA WESTFIELD ARFF

17 REPORT 17 BLDG. #0815, FLEET MAINTENANCE

SHEET

NO. REPORT DESCRIPTION

18 REPORT 18 BLDG. #0907, GOAA EASTFIELD ARFF

19 REPORT 19 BLDG. #1000, GOAA CENTERFIELD ARFF

20 REPORT 20 BLDG. #1023, CENTERFIELD ARFF ADMIN.

21 REPORT 21 BLDG. #0529, CHECKPOINT ALPHA

22 REPORT 22 BLDG. #0837, CHECKPOINT CHARLIE

23 REPORT 23 BLDG. #1039, CHECKPOINT DELTA

24 REPORT 24 BLDG. #0618, NORTH PARK PLACE

25 REPORT 25 BLDG. #1004, TAXI/BUS HOLD LOT BLDG.

26 REPORT 26 BLDG. #0765, NORTH CELL LOT RESTROOM

27 REPORT 27 BLDG. #1041, MIDFIELD EPG

28 REPORT 28 BLDG. #0411, 18R/36L ELECTRICAL VAULT

29 REPORT 29 BLDG. #0153, OEA ADMINISTRATION

30 REPORT 30 BLDG. #0152, OEA MAINTENANCE SHOPS

31 REPORT 31 BLDG. #1077, SOUTH EMP. GUARD SHACK

Orlando International Airport Satellite Buildings Janitorial Services

Year 2026

CHIEF EXECUTIVE OFFICER

LANCE LYTTLE

BOARD MEMBERS

STEPHANIE KOPELOUSOS, CHAIR

JOE NUNZIATA, VICE CHAIR

DAN GIORDANO, TREASURER

THE HONORABLE BUDDY DYER

THE HONORABLE JERRY DEMMINGS

CARSON GOOD

JASON JAMES

LAST REVISED: 2026-10-16

AutoCAD SHX Text

16CM16

AutoCAD SHX Text

16CM16

AutoCAD SHX Text 35L-17R

AutoCAD SHX Text 35L-17R

AutoCAD SHX Text 18R-36L

AutoCAD SHX Text 18R-36L

AutoCAD SHX Text 36L-18R

AutoCAD SHX Text

ILS

AutoCAD SHX Text 36L-18R

AutoCAD SHX Text

ILS

AutoCAD SHX Text 18L-36R

AutoCAD SHX Text 18L-36R

AutoCAD SHX Text 36R-18L

AutoCAD SHX Text 36R-18L

AutoCAD SHX Text 18L-36R

AutoCAD SHX Text 36R-18L

AutoCAD SHX Text 36R-18L

AutoCAD SHX Text 18L-36R

AutoCAD SHX Text 18L-36R

AutoCAD SHX Text

ILS

AutoCAD SHX Text

ILS

AutoCAD SHX Text 36L-18R

AutoCAD SHX Text 36L-18R

AutoCAD SHX Text 18R-36L

AutoCAD SHX Text 18R-36L

AutoCAD SHX Text 36L-18R

AutoCAD SHX Text 36L-18R

AutoCAD SHX Text 18R-36L

AutoCAD SHX Text 18R-36L

AutoCAD SHX Text 36R-18L

AutoCAD SHX Text 36R-18L

AutoCAD SHX Text 18L-36R

AutoCAD SHX Text 18L-36R

AutoCAD SHX Text 36R-18L

AutoCAD SHX Text 36R-18L

AutoCAD SHX Text 18L-36R

AutoCAD SHX Text 18L-36R

AutoCAD SHX Text 36R-18L

AutoCAD SHX Text 36R-18L

AutoCAD SHX Text 18L-36R

AutoCAD SHX Text 18L-36R

AutoCAD SHX Text 36R-18L

AutoCAD SHX Text 36R-18L

AutoCAD SHX Text 18L-36R

AutoCAD SHX Text 18L-36R

AutoCAD SHX Text 18R-36L

AutoCAD SHX Text 18R-36L

AutoCAD SHX Text 18R-36L

AutoCAD SHX Text 18R-36L

AutoCAD SHX Text 18R-36L

AutoCAD SHX Text 18R-36L

AutoCAD SHX Text 36L-18R

AutoCAD SHX Text 36L-18R

AutoCAD SHX Text 36L-18R

AutoCAD SHX Text 36L-18R

AutoCAD SHX Text

ILS

AutoCAD SHX Text

ILS

AutoCAD SHX Text 36R-18L

AutoCAD SHX Text 36R-18L

AutoCAD SHX Text 36R-18L

AutoCAD SHX Text 36R-18L

AutoCAD SHX Text B5

AutoCAD SHX Text B6“

AutoCAD SHX Text B5“

AutoCAD SHX Text B6“

AutoCAD SHX Text B5“

AutoCAD SHX Text 36R-18L

AutoCAD SHX Text 36R-18L

AutoCAD SHX Text B6

AutoCAD SHX Text 35L

AutoCAD SHX Text 35L

AutoCAD SHX Text 17L-35R

AutoCAD SHX Text 35L-17R

AutoCAD SHX Text 35L-17R

AutoCAD SHX Text 17R-35L

AutoCAD SHX Text 17R-35L

AutoCAD SHX Text 17R-35L7R-35L

AutoCAD SHX Text 17R-35L

AutoCAD SHX Text 17R-35L7R-35L

AutoCAD SHX Text 17R-35L

AutoCAD SHX Text 17R-35L7R-35L

AutoCAD SHX Text 17R-35L

AutoCAD SHX Text 17R-35L7R-35L

AutoCAD SHX Text 17R-35L

AutoCAD SHX Text 17R-35L

AutoCAD SHX Text 17R-35L

AutoCAD SHX Text 17R-35L

AutoCAD SHX Text 17R-35L

AutoCAD SHX Text 17R-35L

AutoCAD SHX Text 17R-35L

AutoCAD SHX Text 17R-35L

AutoCAD SHX Text 17R-35L

AutoCAD SHX Text 17R-35L

AutoCAD SHX Text 17R-35L

AutoCAD SHX Text 36L-18R

AutoCAD SHX Text 36L-18R

AutoCAD SHX Text

ILS

AutoCAD SHX Text

ILS

AutoCAD SHX Text 35L-17R

AutoCAD SHX Text 35L-17R

AutoCAD SHX Text 17L

AutoCAD SHX Text 17L

AutoCAD SHX Text 35R

AutoCAD SHX Text 35R

AutoCAD SHX Text 17L-35R

AutoCAD SHX Text 17L-35R

AutoCAD SHX Text 17L-35R

AutoCAD SHX Text 17L-35R

AutoCAD SHX Text 17L-35R

AutoCAD SHX Text 17L-35R

AutoCAD SHX Text 17L-35R

AutoCAD SHX Text 17L-35R

AutoCAD SHX Text 17L-35R

AutoCAD SHX Text 17L-35R

AutoCAD SHX Text 17L-35R

AutoCAD SHX Text 18L-36R

AutoCAD SHX Text

AutoCAD SHX Text L

Janitorial Contract Summary Report Part I (Satellite Buildings) Building

Number

Carpet Concrete Metal Rubber Vinyl Total Sq

Ft

Marble/

Limestone

Epoxy

Flooring

Clay Paver Mosaic

Tile

Porcelain

Tile

TerrazoAsphalt Brick Ceramic

Tile

Grass Marble

Tile

Rubber

Tile

Stainless

Steel

Static

Control

Resilient

Flooring

Clay TileBuilding Quarry

Tile

0152 393 393OEA Facilities Building

0153 1,284 194 6,961 9,149GOAA Admin 711

0411 3,370 3,370RWY 18R/36L Vault

0446 5,391 6,267 374 13,4031,372USDA Inspection Building

0449 1,056 3,064 594 6,038GOAA ARFF West Field Fire Sta 1,324

0455 7,079 1,526 860 9,937GOAA Operations 472

0529 32245 277Guard Post-3 Alpha Checkpoint

0618 90 90AMB Parking Services/North Par

0761 3,784 2,580 6,364East Cargo Building

0762 28 28Guard Post-1 Bravo Checkpoint (

0763 131 131Guard Shack Gate (E-31)

0765 216 1,297North Cell Lot Bathroom Building

0805 6,261 232 218 6,711GOAA Information Technology

0806 10,558 2,431 580 13,729161GOAA CEF

0810 5,390 295 952 6,636GOAA Facilities Administration

0811 3,807 14,152 81 957 19,256259GOAA Planning & Env. / Material

0812 1,820 4,810 7,988 14,927254 54GOAA Facilities Shops

Janitorial Contract Summary Report Part I (Satellite Buildings)Friday, October 16, 2026

Building

Number

Carpet Concrete Metal Rubber Vinyl Total Sq

Ft

Marble/

Limestone

Epoxy

Flooring

Clay Paver Mosaic

Tile

Porcelain

Tile

TerrazoAsphalt Brick Ceramic

Tile

Grass Marble

Tile

Rubber

Tile

Stainless

Steel

Static

Control

Resilient

Flooring

Clay TileBuilding Quarry

Tile

0814 1,537 37 179 1,972219GOAA Security/K-9

0815 9,229 323 2,798 12,672Fleet Maintenance 322

0824 103 1,405 1,926418Parking Administration

0830 27,129 27,129Sort, LLC

0837 107 1,085 1,193Vehicle Checkpoint Charlie (E-45

0854 40,645 11,931 4,629 58,9911,786GOAA Office Annex

0857 60 155 215Guard Shack Employee Lot

0858 1,968 193 4,308300GOAA Building 858 (Multi-tenant 1,498 350

0907 547 5,123 1,472 7,906357GOAA ARFF East Field Fire Stat 406

1000 4,574 9,737 1,937 19,3211,492GOAA ARFF Center Field Fire St 1,583

1004 3,295Taxi/Bus Hold Facility/South Par

1023 1,752 264 1,671 4,068Centerfield ARFF Administration 381

1039 944 1,193Checkpoint Delta Guard Post 52 15541

1041 235STC Emergency Power Generati 235

1077 117 163South Employee Parking Lot Gu 47

1400 24,138 169,873 204 2,385 197,419819East Warehouse

122,756 270,789 608 39,868 453,784Grand Totals

5,631 2,1796,983 350 41 155

Janitorial Contract Summary Report Part I (Satellite Buildings)Friday, October 16, 2026

Janitorial Contract Summary Report Part II (Satellite Buildings)

Baggage Make-up Circulation

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0830 OUT 01 15,427 15,427

15,427Record Count: 1 Sub Total Sq Ft:

Break Room

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0152 OUT 01 280 280

0153 OUT 01 178 4,165 4,342

0455 OUT 01 238 238

0761 OUT 01 223 980 1,202

0810 OUT 01 141 141

0811 OUT 01 304 304

0814 OUT 01 179 179

0815 OUT 02 415 415

0830 OUT 01 1,649 1,649

0854 OUT 01 325 325

0854 OUT 03 189 189

0854 OUT 02 122 122

0907 OUT 01 416 341 812 1,568

1000 OUT 01 1,295 1,295

1023 OUT 01 105 105

1400 OUT 01 918 918

1400 OUT 02 260 260

13,532Record Count: 26 Sub Total Sq Ft:

Common Area

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0854 OUT 02 678 678

0858 OUT 01 1,284 1,633350

2,311Record Count: 4 Sub Total Sq Ft:

Computer Room

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0761 OUT 01 129 129

1041 OUT 01 176176

305Record Count: 2 Sub Total Sq Ft:

Computer/TER

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

1023 OUT 01 174 174

174Record Count: 1 Sub Total Sq Ft:

Conference Room

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0153 OUT 01 613 136 749

0455 OUT 01 704 704

0805 OUT 01 138 138

0806 OUT 01 550 550

0810 OUT 01 551 551

0854 OUT 02 1,003 1,003

0854 OUT 03 459 459

1023 OUT 01 383 383

4,537Record Count: 13 Sub Total Sq Ft:

Control Room

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0411 OUT 01 79 79

79Record Count: 1 Sub Total Sq Ft:

Copy Room

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

1023 OUT 01 128 128

128Record Count: 1 Sub Total Sq Ft:

Corridor

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0153 OUT 01 703 703

0446 OUT 01 360 374 734

0449 OUT 01 616616

0455 OUT 01 1,518 1,518

0761 OUT 01 293 81 374

0805 OUT 01 1,471 1,471

0806 OUT 01 1,867 1,867

0810 OUT 01 1,399 1,399

0812 OUT 01 630 630

Friday, October 16, 2026 Page 1 of 7

Corridor

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0830 OUT 01 1,838 1,838

0854 OUT 03 3,244 3,244

0854 OUT 01 2,048 2,048

0854 OUT 02 1,931 1,931

0857 OUT 01 43 43

0858 OUT 01 193 550357

0907 OUT 01 307 307

1000 OUT 01 284 1,288 1,571

1023 OUT 01 1,013 1,013

1400 OUT 01 1,351 1,351

23,209Record Count: 37 Sub Total Sq Ft:

Electrical Equipment Room

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0411 OUT 01 2,330 2,330

0449 OUT 01 83 83

0765 OUT 01 81

0806 OUT 01 13 13

0810 OUT 01 76 76

0830 OUT 01 88 88

0837 OUT 01 65 65

0854 OUT 01 125 125

0854 OUT 02 101 101

0854 OUT 03 90 90

0907 OUT 01 91 91

1000 OUT 01 318 116 434

1004 OUT 01 81

1039 OUT 01 8989

3,748Record Count: 18 Sub Total Sq Ft:

Elevator - Public

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0854 OUT 01 77 77

0854 OUT 02 77 77

1400 OUT 02 48 48

202Record Count: 5 Sub Total Sq Ft:

Elevator - Service

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

1400 OUT 01 48 48

48Record Count: 1 Sub Total Sq Ft:

Entrance and/or Vestibule

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0153 OUT 01 106 106

0446 OUT 01 3,632 4,125494

0455 OUT 01 860 860

0761 OUT 01 211 211

0765 OUT 01 111

0810 OUT 01 449 449

0811 OUT 01 101 101

0812 OUT 01 1,546 1,546

0814 OUT 01 610 610

0830 OUT 01 450 450

0854 OUT 03 59 59

0854 OUT 02 59 59

0854 OUT 01 59 306247

0858 OUT 01 300300

1004 OUT 01 111

9,402Record Count: 22 Sub Total Sq Ft:

First Aid Room

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0449 OUT 01 136 136

136Record Count: 1 Sub Total Sq Ft:

Garage

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0449 OUT 01 2,568 2,568

0907 OUT 01 4,009 4,009

1000 OUT 01 8,203 8,203

14,780Record Count: 3 Sub Total Sq Ft:

Generator

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

Friday, October 16, 2026 Page 2 of 7

Generator

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0411 OUT 01 592 592

592Record Count: 1 Sub Total Sq Ft:

GOAA Communications Room

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0152 OUT 01 14 14

0153 OUT 01 119 119

0455 OUT 01 134 134

0765 OUT 01 81

0805 OUT 01 173 173

0810 OUT 01 65 65

0854 OUT 03 907 907

0854 OUT 01 91 91

0854 OUT 02 81 81

1004 OUT 01 81

1023 OUT 01 99 99

1400 OUT 01 81 81

1400 OUT 02 343 343

2,267Record Count: 14 Sub Total Sq Ft:

Janitorial Closet

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0153 OUT 01 39 39

0411 OUT 01 51 51

0446 OUT 01 50 50

0455 OUT 01 33 33

0761 OUT 01 20 19 39

0765 OUT 01 81

0806 OUT 01 116 116

0810 OUT 01 21 21

0814 OUT 01 19 19

0830 OUT 01 178 178

0854 OUT 02 45 45

0854 OUT 03 60 60

0854 OUT 01 92 92

1004 OUT 01 81

1023 OUT 01 64 64

1039 OUT 01 4141

1400 OUT 01 120 120

Janitorial Closet

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

1,129Record Count: 19 Sub Total Sq Ft:

Kitchen

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0449 OUT 01 228 416188

0858 OUT 01 368368

1000 OUT 01 446446

1,229Record Count: 4 Sub Total Sq Ft:

Loading Dock

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

1400 OUT 01 7,421 7,421

7,421Record Count: 1 Sub Total Sq Ft:

Locker Room

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0449 OUT 01 649 649

0455 OUT 01 183 183

0824 OUT 01 271271

0907 OUT 01 137137

1000 OUT 01 204 1,634 2,118281

3,358Record Count: 12 Sub Total Sq Ft:

Maintenance Bay

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0815 OUT 01 7,970 7,970

7,970Record Count: 1 Sub Total Sq Ft:

Mechanical Chase

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0449 OUT 01 23 23

1023 OUT 01 57 57

79Record Count: 2 Sub Total Sq Ft:

Friday, October 16, 2026 Page 3 of 7

Mechanical Equipment Room

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0152 OUT 01 9 9

0153 OUT 01 151 151

0449 OUT 01 136 136

0806 OUT 01 630 630

0810 OUT 01 153 153

0815 OUT 01 17 17

0815 OUT 02 25 25

0830 OUT 01 235 235

0837 OUT 01 43 43

0854 OUT 03 768 768

0854 OUT 01 659 659

0854 OUT 02 525 525

0907 OUT 01 585 585

1000 OUT 01 584 584

1023 OUT 01 144 144

4,662Record Count: 25 Sub Total Sq Ft:

Mixed Use

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0449 OUT 01 109 109

0824 OUT 01 1,308 1,308

1,417Record Count: 2 Sub Total Sq Ft:

Multi Purpose Utility Room

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0449 OUT 01 61 61

0765 OUT 01 216 216

0907 OUT 01 98 42 140

1000 OUT 01 9898

514Record Count: 6 Sub Total Sq Ft:

Office

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0153 OUT 01 494 1,604 2,098

0446 OUT 01 4,827 2,635 7,462

0449 OUT 01 407 96 503

0455 OUT 01 2,694 2,694

Office

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0529 OUT 01 277 277

0761 OUT 01 2,267 930 3,197

0805 OUT 01 3,992 3,992

0806 OUT 01 8,142 141 8,283

0810 OUT 01 2,992 222 3,214

0811 OUT 01 3,707 412 4,118

0814 OUT 01 922 922

0815 OUT 01 160 723 883

0815 OUT 02 1,270 1,270

0824 OUT 01 103 97 200

0830 OUT 01 4,800 4,800

0837 OUT 01 336 336

0854 OUT 01 7,891 1,350 9,241

0854 OUT 02 9,636 9,636

0854 OUT 03 9,210 122 9,332

0858 OUT 01 684 1,457773

0907 OUT 01 132 52 184

1000 OUT 01 1,202 1,202

1023 OUT 01 1,195 1,195

1039 OUT 01 288 288

1077 OUT 01 117 117

1400 OUT 01 10,081 10,081

1400 OUT 02 12,295 12,295

99,276Record Count: 385 Sub Total Sq Ft:

Plumbing Room

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0765 OUT 01 101

1004 OUT 01 101

203Record Count: 2 Sub Total Sq Ft:

Reception Area

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0761 OUT 01 165 165

0907 OUT 01 210 210

1023 OUT 01 192192

567Record Count: 3 Sub Total Sq Ft:

Friday, October 16, 2026 Page 4 of 7

Rest Rooms

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0152 OUT 01 90 90

0153 OUT 01 711711

0446 OUT 01 878878

0449 OUT 01 486486

0455 OUT 01 54 54

0618 OUT 01 90 90

0761 OUT 01 362 308 670

0763 OUT 01 52 52

0805 OUT 01 218 218

0806 OUT 01 300 460161

0810 OUT 01 382 382

0811 OUT 01 259259

0812 OUT 01 54 125 433254

0814 OUT 01 219219

0815 OUT 01 322322

0830 OUT 01 1,090 1,090

0854 OUT 02 478478

0854 OUT 01 584584

0854 OUT 03 478478

0857 OUT 01 41 41

0907 OUT 01 169169

1000 OUT 01 759759

1023 OUT 01 189189

1041 OUT 01 5959

1400 OUT 01 72 891819

1400 OUT 02 496 496

10,555Record Count: 86 Sub Total Sq Ft:

Restroom Men

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0765 OUT 01 313

0824 OUT 01 4040

1004 OUT 01 313

666Record Count: 3 Sub Total Sq Ft:

Restroom Unisex

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0455 OUT 01 236236

0529 OUT 01 4545

Restroom Unisex

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0837 OUT 01 54 54

1039 OUT 01 5252

1077 OUT 01 47

433Record Count: 5 Sub Total Sq Ft:

Restroom Women

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0455 OUT 01 236236

0765 OUT 01 313

0824 OUT 01 4040

1004 OUT 01 313

902Record Count: 4 Sub Total Sq Ft:

Security Checkpoint

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0763 OUT 01 79 79

0857 OUT 01 60 71 131

210Record Count: 4 Sub Total Sq Ft:

Security Screening Area

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0455 OUT 01 90 90

0837 OUT 01 581 581

1039 OUT 01 614 614

1,285Record Count: 3 Sub Total Sq Ft:

Shops

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0812 OUT 01 1,820 4,810 5,688 12,318

12,318Record Count: 35 Sub Total Sq Ft:

Shower

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0449 OUT 01 3434

Friday, October 16, 2026 Page 5 of 7

Shower

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0824 OUT 01 6767

0907 OUT 01 3030

132Record Count: 6 Sub Total Sq Ft:

Sidewalk

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0805 OUT 01 232 232

0806 OUT 01 1,801 1,801

0854 OUT 01 6,837 6,837

1000 OUT 01 64 64

8,933Record Count: 6 Sub Total Sq Ft:

Stair and Landing

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0811 OUT 01 81 81

0815 OUT 02 323 342 666

0830 OUT 01 65 65

0854 OUT 02 414 414

0854 OUT 01 414 414

0854 OUT 03 414 414

1400 OUT 02 21 174 54 249

1400 OUT 01 342 30 372

2,673Record Count: 19 Sub Total Sq Ft:

Storage Room

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0153 OUT 01 43 90 133

0411 OUT 01 319 319

0449 OUT 01 118 100 217

0455 OUT 01 631 1,526 2,157

0761 OUT 01 262 262

0806 OUT 01 10 10

0810 OUT 01 186 186

0811 OUT 01 132 241 373

0814 OUT 01 5 17 23

0815 OUT 02 47 47

0815 OUT 01 1,058 1,058

Storage Room

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0830 OUT 01 70 70

0854 OUT 02 725 406 1,131

0854 OUT 03 130 528 658

0854 OUT 01 54 1,219 1,273

0907 OUT 01 50 12171

1000 OUT 01 128 632 124 883

1023 OUT 01 327 327

1039 OUT 01 43 43

1400 OUT 01 65 65

9,354Record Count: 61 Sub Total Sq Ft:

Storage/Warehouse

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0811 OUT 01 14,020 14,020

0830 OUT 01 695 695

1400 OUT 01 162,380 162,380

177,094Record Count: 7 Sub Total Sq Ft:

TBD

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0762 OUT 01 28 28

0805 OUT 01 486 486

514Record Count: 4 Sub Total Sq Ft:

Telephone Equipment Room

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0837 OUT 01 115 115

1039 OUT 01 6666

181Record Count: 2 Sub Total Sq Ft:

Tenant Communications Room

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0761 OUT 01 115 115

115Record Count: 1 Sub Total Sq Ft:

Friday, October 16, 2026 Page 6 of 7

Training Center

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0455 OUT 01 800 800

0830 OUT 01 544 544

0854 OUT 03 610 610

0907 OUT 01 357 357

1000 OUT 01 1,666 1,666

3,977Record Count: 7 Sub Total Sq Ft:

Waiting Area

BLDG ZONE LV Carpet Clay

Paver

Concrete Metal RubberMosaic

Tile

Vinyl Total Sq FtTerrazoMarble/

Limestone

Porcelain

Tile

Wood

Floor

Static

Control

Resilient

Flooring

Ceramic

Tile

Quarry

Tile

0446 OUT 01 154 154

0854 OUT 01 1,920 1,920

0854 OUT 02 1,451 1,451

1004 OUT 01 2,215

5,740Record Count: 7 Sub Total Sq Ft:

453,784873 Sq Ft:Grand Totals: Record Count:

Friday, October 16, 2026 Page 7 of 7

Janitorial Contract Detail Report (Satellite Buildings) - USDA Inspection Building

0446 01Level -Bldg -

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Corridor

Floor Care Days Cycle Cleaning Trash Pickup

1265 360.1Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1283 373.7Vinyl 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (2 detail records) Total 734

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Entrance and/or Vestibule

Floor Care Days Cycle Cleaning Trash Pickup

1253 493.5Porcelain Tile 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1301 1779.8Concrete 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1340 1851.7Concrete 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (3 detail records) Total 4,125

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Janitorial Closet

Floor Care Days Cycle Cleaning Trash Pickup

1295 49.9Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (1 detail record) Total 50

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Office

Floor Care Days Cycle Cleaning Trash Pickup

1256 171.6Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1266 16.7Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1268 1373.9Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1271 205.1Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1274 119.2Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1277 1064.3Carpet 1 x Daily0 x Day Quarterly 7 x per week Quarterly N/A

1280 563.4Concrete 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1286 239.4Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1289 205.2Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1304 220.6Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1307 406.2Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1310 334.7Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1313 142Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1316 122.7Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1319 2072Concrete 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1325 102.2Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1337 103Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (17 detail records) Total 7,462

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Rest Rooms

Floor Care Days Cycle Cleaning Trash Pickup

1259 305.1Porcelain Tile 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

0446 01Level -Bldg -

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Rest Rooms

Floor Care Days Cycle Cleaning Trash Pickup

1262 218.8Porcelain Tile 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1290 31.4Porcelain Tile 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1292 138.1Porcelain Tile 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1298 184.9Porcelain Tile 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (5 detail records) Total 878

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Waiting Area

Floor Care Days Cycle Cleaning Trash Pickup

1250 153.7Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (1 detail record) Total 154

Total 13,403Summary for Level: 01, Zone: OUT (29 detail records)

Grand Total 13,403Summary for Bldg: 0446 (29 detail records)

Friday, October 16, 2026 0446 01Level -Bldg -

Janitorial Contract Detail Report (Satellite Buildings)

Janitorial Contract Detail Report (Satellite Buildings) - GOAA Operations

0455 01Level -Bldg -

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Break Room

Floor Care Days Cycle Cleaning Trash Pickup

1045 237.6Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (1 detail record) Total 238

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Conference Room

Floor Care Days Cycle Cleaning Trash Pickup

1036 704Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (1 detail record) Total 704

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Corridor

Floor Care Days Cycle Cleaning Trash Pickup

1030 1518.3Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (1 detail record) Total 1,518

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Entrance and/or Vestibule

Floor Care Days Cycle Cleaning Trash Pickup

1012 260Vinyl 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1078 599.8Vinyl 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (2 detail records) Total 860

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

GOAA Communications Room

Floor Care Days Cycle Cleaning Trash Pickup

1042 133.9Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (1 detail record) Total 134

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Janitorial Closet

Floor Care Days Cycle Cleaning Trash Pickup

1069 33Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (1 detail record) Total 33

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Locker Room

Floor Care Days Cycle Cleaning Trash Pickup

1033 94.1Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1072 89Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (2 detail records) Total 183

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Office

Floor Care Days Cycle Cleaning Trash Pickup

1006 207.3Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1009 494.9Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1018 66Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1021 364.7Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1039 95.9Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

0455 01Level -Bldg -

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Office

Floor Care Days Cycle Cleaning Trash Pickup

1057 95.8Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1081 58.4Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1084 282.7Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1087 138.8Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1090 161.2Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1093 150.9Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1096 148.4Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1099 148.4Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1102 151Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1105 129.7Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (15 detail records) Total 2,694

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Rest Rooms

Floor Care Days Cycle Cleaning Trash Pickup

1015 54.2Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (1 detail record) Total 54

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Restroom Unisex

Floor Care Days Cycle Cleaning Trash Pickup

1054 235.7Ceramic Tile 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (1 detail record) Total 236

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Restroom Women

Floor Care Days Cycle Cleaning Trash Pickup

1051 235.8Ceramic Tile 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (1 detail record) Total 236

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Security Screening Area

Floor Care Days Cycle Cleaning Trash Pickup

1075 90.4Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (1 detail record) Total 90

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Storage Room

Floor Care Days Cycle Cleaning Trash Pickup

1003 1526Concrete 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1024 275.1Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1027 207.3Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1060 65.8Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1063 82.5Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (5 detail records) Total 2,157

Friday, October 16, 2026

Janitorial Contract Detail Report (Satellite Buildings) - GOAA Operations

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Training Center

Floor Care Days Cycle Cleaning Trash Pickup

1048 237.6Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1066 562.3Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (2 detail records) Total 800

Total 9,937Summary for Level: 01, Zone: OUT (35 detail records)

Grand Total 9,937Summary for Bldg: 0455 (35 detail records)

Friday, October 16, 2026

Janitorial Contract Detail Report (Satellite Buildings) - East Cargo Building

0761 01Level -Bldg -

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Break Room

Floor Care Days Cycle Cleaning Trash Pickup

1397 251.2Vinyl 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1419 565.2Vinyl 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1460 163.1Vinyl 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1508 222.5Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (4 detail records) Total 1,202

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Computer Room

Floor Care Days Cycle Cleaning Trash Pickup

1496 129Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (1 detail record) Total 129

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Corridor

Floor Care Days Cycle Cleaning Trash Pickup

1414 81Vinyl 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1463 47.3Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1484 245.9Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (3 detail records) Total 374

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Entrance and/or Vestibule

Floor Care Days Cycle Cleaning Trash Pickup

1448 211.2Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (1 detail record) Total 211

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Janitorial Closet

Floor Care Days Cycle Cleaning Trash Pickup

1420 19.4Vinyl 1 x Daily0 x Day Quarterly 7 x per week Quarterly N/A

1490 19.8Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (2 detail records) Total 39

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Office

Floor Care Days Cycle Cleaning Trash Pickup

1382 122.4Vinyl 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1385 229.3Vinyl 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1391 206.9Vinyl 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1416 100.7Vinyl 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1417 100Vinyl 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1418 170.3Vinyl 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1427 406.8Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1430 79.5Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1433 248Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1451 165.9Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

0761 01Level -Bldg -

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Office

Floor Care Days Cycle Cleaning Trash Pickup

1481 561.8Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1499 130Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1502 131Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1505 416.4Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1511 127.5Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (15 detail records) Total 3,197

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Reception Area

Floor Care Days Cycle Cleaning Trash Pickup

1478 164.8Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (1 detail record) Total 165

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Rest Rooms

Floor Care Days Cycle Cleaning Trash Pickup

1406 74.8Vinyl 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1409 76.2Vinyl 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1422 47.6Vinyl 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1423 47.2Vinyl 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1436 80.3Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1439 82.3Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1454 31.1Vinyl 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1457 31.5Vinyl 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1487 103.8Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1493 95.4Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (10 detail records) Total 670

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Storage Room

Floor Care Days Cycle Cleaning Trash Pickup

1388 69Vinyl 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1403 79.9Vinyl 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

1507 112.7Vinyl 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (3 detail records) Total 262

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Tenant Communications Room

Floor Care Days Cycle Cleaning Trash Pickup

1424 115.1Carpet 1 x Daily0 x Day Quarterly 5 x per week Quarterly N/A

Record Count (1 detail record) Total 115

Total 6,364Summary for Level: 01, Zone: OUT (41 detail records)

Grand Total 6,364Summary for Bldg: 0761 (41 detail records)

Friday, October 16, 2026 0761 01Level -Bldg -

Janitorial Contract Detail Report (Satellite Buildings) - GOAA Information Technology

0805 01Level -Bldg -

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Conference Room

Floor Care Days Cycle Cleaning Trash Pickup

1320 137.7Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

Record Count (1 detail record) Total 138

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Corridor

Floor Care Days Cycle Cleaning Trash Pickup

1284 356.6Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1304 476.5Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1316 638.2Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

Record Count (3 detail records) Total 1,471

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

GOAA Communications Room

Floor Care Days Cycle Cleaning Trash Pickup

1325 173.2Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

Record Count (1 detail record) Total 173

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Office

Floor Care Days Cycle Cleaning Trash Pickup

1250 155Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1253 151.3Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1256 87.2Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1259 116.6Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1262 150.1Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1265 148.6Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1268 124.6Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1271 107.1Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1274 135.5Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1277 95.8Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1280 227.9Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1283 132.5Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1286 153.2Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1289 323.8Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1292 106.5Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1301 6.9Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1317 134.3Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1319 5.3Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1328 231.9Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1329 172.2Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1331 107.3Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1334 134Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1337 158.7Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

0805 01Level -Bldg -

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Office

Floor Care Days Cycle Cleaning Trash Pickup

1340 113.8Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1343 107.8Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1346 141.2Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1349 148.6Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1352 130.8Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1355 183.7Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

Record Count (29 detail records) Total 3,992

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Rest Rooms

Floor Care Days Cycle Cleaning Trash Pickup

1295 47.1Vinyl 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1298 65.1Vinyl 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1310 51.7Vinyl 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1313 54.2Vinyl 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

Record Count (4 detail records) Total 218

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Sidewalk

Floor Care Days Cycle Cleaning Trash Pickup

1361 116.1Concrete 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1364 115.8Concrete 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

Record Count (2 detail records) Total 232

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

TBD

Floor Care Days Cycle Cleaning Trash Pickup

1293 123.3Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1307 151.9Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1322 211Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

Record Count (3 detail records) Total 486

Total 6,711Summary for Level: 01, Zone: OUT (43 detail records)

Grand Total 6,711Summary for Bldg: 0805 (43 detail records)

Friday, October 16, 2026 0805 01Level -Bldg -

Janitorial Contract Detail Report (Satellite Buildings) - GOAA CEF

0806 01Level -Bldg -

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Conference Room

Floor Care Days Cycle Cleaning Trash Pickup

1301 550Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

Record Count (1 detail record) Total 550

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Corridor

Floor Care Days Cycle Cleaning Trash Pickup

1304 1866.6Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

Record Count (1 detail record) Total 1,867

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Electrical Equipment Room

Floor Care Days Cycle Cleaning Trash Pickup

1253 13.3Vinyl 0 x Daily0 x Day 0 x Year 7 x per week 1 x Year N/A

Record Count (1 detail record) Total 13

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Janitorial Closet

Floor Care Days Cycle Cleaning Trash Pickup

1307 49Vinyl 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1352 66.7Vinyl 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

Record Count (2 detail records) Total 116

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Mechanical Equipment Room

Floor Care Days Cycle Cleaning Trash Pickup

1289 144Concrete TBDTBD TBD TBD Quarterly TBD

1325 274.3Concrete TBDTBD TBD TBD Quarterly TBD

1364 123.4Concrete TBDTBD TBD TBD Quarterly TBD

1367 87.9Concrete TBDTBD TBD TBD Quarterly TBD

Record Count (4 detail records) Total 630

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Office

Floor Care Days Cycle Cleaning Trash Pickup

1250 192Carpet TBDTBD TBD TBD Quarterly TBD

1259 141.1Vinyl TBDTBD TBD TBD Quarterly TBD

1262 119.3Carpet TBDTBD TBD 1 x per week Quarterly TBD

1265 150.4Carpet TBDTBD TBD 1 x per week Quarterly TBD

1268 168Carpet TBDTBD TBD 1 x per week Quarterly TBD

1271 192Carpet TBDTBD TBD 1 x per week Quarterly TBD

1274 120Carpet TBDTBD TBD 1 x per week Quarterly TBD

1277 1038.9Carpet TBDTBD TBD TBD Quarterly TBD

1280 147.1Carpet TBDTBD TBD TBD Quarterly TBD

1283 197.3Carpet TBDTBD TBD TBD Quarterly TBD

1286 244.5Carpet TBDTBD TBD TBD Quarterly TBD

1292 144Carpet TBDTBD TBD TBD Quarterly TBD

0806 01Level -Bldg -

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Office

Floor Care Days Cycle Cleaning Trash Pickup

1294 169.2Carpet TBDTBD TBD TBD Quarterly TBD

1295 592.6Carpet TBDTBD TBD TBD Quarterly TBD

1298 275.2Carpet TBDTBD TBD TBD Quarterly TBD

1310 407.9Carpet TBDTBD TBD TBD Quarterly TBD

1313 120Carpet TBDTBD TBD TBD Quarterly TBD

1316 144Carpet TBDTBD TBD TBD Quarterly TBD

1328 120Carpet TBDTBD TBD TBD Quarterly TBD

1331 169.5Carpet TBDTBD TBD TBD Quarterly TBD

1334 144Carpet TBDTBD TBD TBD Quarterly TBD

1337 186.5Carpet TBDTBD TBD TBD Quarterly TBD

1340 144Carpet TBDTBD TBD TBD Quarterly TBD

1343 226.7Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1346 195.4Carpet TBDTBD TBD TBD Quarterly TBD

1349 130.7Carpet TBDTBD TBD TBD Quarterly TBD

1361 114.6Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1370 45Carpet TBDTBD TBD TBD Quarterly TBD

1373 204.9Carpet TBDTBD TBD TBD Quarterly TBD

1376 192Carpet TBDTBD TBD TBD Quarterly TBD

1379 156Carpet TBDTBD TBD TBD Quarterly TBD

1382 156Carpet TBDTBD TBD TBD Quarterly TBD

1385 156Carpet TBDTBD TBD TBD Quarterly TBD

1388 156Carpet TBDTBD TBD TBD Quarterly TBD

1391 156Carpet TBDTBD TBD TBD Quarterly TBD

1394 249.8Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1397 156Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1400 156Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1403 156Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1406 156Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1409 192Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

Record Count (41 detail records) Total 8,283

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Rest Rooms

Floor Care Days Cycle Cleaning Trash Pickup

1319 150.1Vinyl 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1322 80.3Porcelain Tile TBDTBD TBD TBD Quarterly TBD

1355 149.7Vinyl 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

1358 80.2Porcelain Tile TBDTBD TBD TBD Quarterly TBD

Record Count (4 detail records) Total 460

Friday, October 16, 2026

Janitorial Contract Detail Report (Satellite Buildings) - GOAA CEF

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Sidewalk

Floor Care Days Cycle Cleaning Trash Pickup

1247 1801.3Concrete 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

Record Count (1 detail record) Total 1,801

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Storage Room

Floor Care Days Cycle Cleaning Trash Pickup

1256 10Vinyl 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

Record Count (1 detail record) Total 10

Total 13,729Summary for Level: 01, Zone: OUT (56 detail records)

Grand Total 13,729Summary for Bldg: 0806 (56 detail records)

Friday, October 16, 2026

Janitorial Contract Detail Report (Satellite Buildings) - GOAA Facilities Administration

0810 01Level -Bldg -

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Break Room

Floor Care Days Cycle Cleaning Trash Pickup

1268 140.7Vinyl 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

Record Count (1 detail record) Total 141

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Conference Room

Floor Care Days Cycle Cleaning Trash Pickup

1322 550.5Carpet 1 x Daily0 x Day Quarterly 3 x per week Quarterly 2 x Weekly

Record Count (1 detail record) Total 551

Categorized by Function:

FlooringSpace ID Sq FtPolicing Cleaning

Corridor

Floor Care Days Cycle…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .