Exhibit 1_MCTC Trailer Specifications.pdf
PDF 978 KB Posted
- Attached to
- Procurement of Custom Semi-Trailer Laboratory for Mobile Concrete Technology Center (MCTC)
- Solicitation number
- 693JJ322Q000027
About this file
This document outlines specifications for a procurement solicitation seeking the design, manufacture, supply, delivery and warranty of a custom mobile concrete laboratory trailer. Key requirements include a 53-foot trailer with separate office, main and back rooms; structural and safety features meeting motor vehicle standards; electrical, plumbing, HVAC and security systems; and transfer of existing testing equipment. Interior elements comprise workspaces, storage, sinks, countertops and furniture. Exterior elements include lighting, graphics, awning and hydraulic systems. The solicitation seeks a firm fixed price contract awarded using simplified acquisition procedures and includes delivery to FHWA's Turner-Fairbank Highway Research Center.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA_MCTC_08.23.2022.pdf | ||
| 693JJ322Q000027_0003.pdf | ||
| QA_MCTC_08.22.2022.pdf | ||
| 693JJ322Q000027_0002.pdf | ||
| 693JJ322Q000027_0001.pdf | ||
| Exhibit 2_Schedule of Deliverables.pdf | ||
| 693JJ322Q000027.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit 1 – MCTC Trailer Specifications
1.0 Objective
The purpose of this contract is to procure a state-of-the-art, turn-key functional, mobile concrete laboratory trailer that will be used by FHWA to demonstrate new technologies on active project sites around the United States. The trailer will replace an existing trailer for the continued support of the FHWA’s Mobile Concrete Technology Center (MCTC) Program. The priority of the MCTC program is to focus on assisting State highway agencies and their industry partners with their needs by providing technical assistance, guidance, and training materials to design, produce, and construct longer-lasting concrete pavements. The trailer shall be designed so that it facilitates workflow, enhances safety features, increases the efficiency of operation of the MCTC testing and training activities. The layout of the new trailer shall also be designed in such a way that it is conducive to conduct open houses, demonstrations, and meetings.
The Contractor shall be responsible for the design, construction, delivery, and warranty (against manufacturing defects and installation) of a mobile concrete laboratory trailer that meets or exceeds the scope of work herein. The trailer and components shall be fabricated from all new materials and be of the current production year and model.
During performance of this contract, the Government encourages the contractor to make use of efficient and effective methods/processes in the design, build, and outfitting of the mobile trailer for the MCTC. The trailer must conform to all applicable Federal Motor Vehicle Safety Standards.
2.0 Major Design Elements
The following major design elements, although not intended to be exhaustive, shall be incorporated in the MCTC Trailer.
2.1 Size Limitations
The dimensions of the MCTC trailer shall meet Federal Motor Carrier Safety Code for non-oversized semi-trailers (53’L (including generator and HVAC units) x 8.6’W x 13.6’H). Overall height of the laboratory shall not exceed 13.6’H as measured from the ground to the top of the trailer. The MCTC trailer shall be built in such a way that no oversize permits are required.
2.2 Design Layout of the Trailer
Like the current trailer, the new MCTC trailer shall be designed to have three separate sections or rooms: the Office Area; the Main Room; and the Back Room. Attachment 1 shows the interior plan view of the new MCTC trailer, which along with the legend, shows other elements and the location of various equipment required in the new MCTC trailer.
• The Office Area. This section houses workspace for two staff members and storage for books, equipment, microwave, refrigerator, and cabinets. The dimensions shall be 10’L x 8.6’W.
• The Main Room. This section shall be 34’ long (minus the separation walls between the
Office Area and the Back Room). The section will be used to perform testing of concrete, such as compressive and flexural strengths. This room will also be used to store concrete cylinders in two large curing tanks. This is a major design change from the existing trailer where the curing tanks are in the Back Room.
This main room will also serve as the place to conduct demonstrations and open houses.
To provide adequate space during open houses and field visits, this area shall be designed to have a 5’ extension built on the street side of the trailer (this feature does not exist in the current trailer). The section shall also include a built-in collapsible workspace (street side) that serves as an office area for two people and a removable workspace (curbside) that serves as a workspace for one person.
• The Back Room. This section shall be 6’L x 8.6’W. This section will house several pieces of equipment including a concrete saw, a high temperature oven and a fume hood. This room shall also house six lockers for the MCTC staff. The back room shall have a full-height door that can be used to exit the trailer. A hydraulic lift shall be located next to the back door to bring in heavy samples and equipment to the inside of the lab (this feature does not exist in the current trailer).
Figure 1. A photo of exterior of the current MCTC Trailer
3.0 Key Features of the New MCTC
3.1 Structural
The trailer must confirm to all engineering / safety standards of all 50 states and federal requirements.
3.1.1 Body Construction
Appropriate occupancy live loading shall be considered for floor design of 120 psf minimum. As shown in Attachment 1, in the area of the compression machine, the floor rigidity shall be increased to consider a design to accommodate live loading of 150 psf minimum.
The trailer frame shall be constructed from tubular steel shapes conforming to ASTM designation for A-500 grade "b" steel with a minimum yield strength of 46,000 psi. Additional cross members shall be installed over 5th wheel and suspension to prevent twisting during leveling process using hydraulic jacks.
Chassis, walls, and roof to be constructed in accordance with American National Standards Institute (ANSI), Society of Automotive Engineers (SAE)., and appropriate industrial design and construction codes. All chassis members to be coated with anti-rust paint or constructed of heavy gage aluminum. The exterior skin of the trailer shall be constructed of heavy gage aluminum and fastened with aluminum fasteners.
The Contractor shall provide and install a 4" x 4" steel rear bumper.
Note: Body Filler products shall not be utilized in any weight or stress-bearing component of the aluminum body.
3.1.2 Frame Structure
The Contractor shall ensure weather-tight construction; seal and caulk all duct work, vents, stacks, windows, and seams. Twenty (20) gage, minimum, galvanized steel underbelly to protect all exposed insulation surfaces.
3.1.3 Trailer Axles
The Contractor shall provide heavy duty, spread axle with dump valve wired into wiring harness with heavy duty drums and heavy duty, commercial grade, 8-bolt hubs. Include wiring for second dump valve for spread axle. Spread axle to be set up based on California requirements. Provide heavy-duty, antilock air brake system with full backing plate dust covers. Provide axle and air ride suspension systems capable of supporting a Gross Vehicle Weight (GVW) of 50,000 pounds. The Contractor shall also provide dump valves for the air suspension that are operable from the cab of the tractor. Approximate weight of fully constructed trailer meeting specifications shall be 22,000lbs, allowing approximately 58,000lbs in equipment and accessories. Body and chassis shall be in compliance with legal weight limits and transportation regulations on all public highways in the United States. No special permits shall be required for travel on any public highway in the United States.
3.1.4 Trailer Tires
The Contractor shall provide as required by axle ratings, proper size, speed ratings, load carrying capacity rated, RADIAL tires (8 tires total) with one-piece slotted aluminum ALCOA wheels and outboard aluminum hubs. (Example: Accuride wheels 71/2 x 22.5 Michelin 255/70 R22.5 Tires).
3.1.5 Trailer Hitch
The Contractor shall provide a standard 30-inch King Pin setting for fifth wheel. The pin loading shall be approximately twenty five percent (25%) of the gross trailer weight.
3.1.6 Tie Downs
The Contractor shall provide four (4) 1/4" Outer Diameter cables with hooks and eyes with anchorage hardware at upper corners of trailer, 16' lengths.
3.1.7 Exterior Storage Units (Belly Hatches)
The Contractor shall ensure weather-tight construction for all exterior storage units and shall be constructed of heavy gage aluminum to eliminate corrosion. Bay floors shall be of “sweep-out” construction, with no raised edges to pool water or obstruct loading. Bay interior to be obstruction-free with the exception of 1” steel tube supports, which shall be in line with the exterior dividers between the bay doors. The bay doors shall be held in the “open” position by means of gas charged struts; the geometrical positioning of which shall aid in both opening and closing. Four (the last two on either side) of the bays should have pull-outs for ease of access.
3.2 OTHER EXTERIOR FEATURES
3.2.1 Retractable Awning
A built-in electric retractable awning on the curbside shall be provided to shade during sampling/testing operations and open houses. The length of the awning shall be a minimum of 20’ (length). Refer to Figure 2 for location of the awning. Other awning designs proposed by the contractor will be considered.
Figure 2. Retractable Awning
3.2.2 Roof
The Contractor shall provide a one–piece heavy-gauge aluminum siding exterior face rolled over edge of roof (3 inch minimum). Rafters shall be constructed using metal rust proof frame members.
Roof shall have rain drip moldings along each edge.
Additional Specs:
• Aluminum roof rail
• .040" Aluminum roof skin
• .080" Aluminum side sheeting
• .190" Aluminum sub floor plating
3.2.3 Landing Gear and Leveling Jacks
The Contractor shall provide four (4) hydraulic leveling jacks (four point leveling system) to be powered from DC power source (refer Electrical Work). Vertical lifting capacity must be sufficient to completely lift the MCTC Trailer off its wheels for leveling purposes. Leveling jacks shall be located near outside edges of the trailer.
3.2.4 Exterior Doors
All exterior doors (2 curbside and 1 rear) shall be of 30” wide, stainless-steel construction and be designed with safety features to prevent it from slamming due to winds and make it easier for users with mobility challenges. The doors shall also be designed as egress doors in case of an emergency.
Position of awning
• Two doors shall be located on the curb side of the MCTC trailer at locations like the current MCTC configuration (Figure 1) and as shown in Attachment 1.
• A standard size door shall be located in the middle of the rear end of the MCTC (back door). This door would be used to access the back room of the trailer (Attachment 1).
3.2.5 Hydraulic Lift (Liftgate)
A hydraulic lift/lift gate shall be built-in at the back of the trailer to help with bringing the equipment and samples inside. The lift gate shall also function as a wheelchair lift with handrails or other accommodations to be accessible for people with mobility challenges. The handrails shall be removable when not needed. The width of the gate shall be approximately the same as the width of the back door. The lift gate shall be foldable (against the back of the trailer or retract into a space under the trailer floor) when not in use and it shall be able to lift up to 1,000 lbs.
3.2.6 Hydraulic Staircases
The contractor shall provide expanded aluminum self-storing stairs, mounted at each side entry door, with a minimum width of three (3) feet, and removable hand rails. Stairs shall be sturdy and shall include leveling feet at each corner. Both stairs shall be operated hydraulically for efficiency (existing trailer stairs are manually operated). The flat surface of the steps shall not trap footwear nor cause any tripping hazard. The surface shall be of skid resistant nonskid material and comply with OSHA Standards.
Figure 3. Photos of existing stairs (these stairs are non-hydraulic)
The contractor shall provide a removable (or retractable) staircase at the rear door. This staircase shall be attached to the hydraulic lift (when the lift is engaged and at the same level as the MCTC floor) at the back door.
3.2.7 Windows
The MCTC shall have a total of eight windows (four each on the curb and street side) similar in location to the existing trailer (Figure 1). The Back Room shall not have any windows. The curb side doors shall also have small windows and the Back-Room door shall not have any windows.
3.2.8 Ladder
A built-in ladder at the rear for the MCTC trailer to allow access to roof for cleaning (snow or leaves), fix the awnings, or perform HVAC system repairs.
3.3 MCTC Trailer Interior Requirements
Main Room
3.3.1 Extension / Bin the Main-Room
The MCTC will focus on interactions with agency and industry personnel, in addition to testing.
Due to this, there will be significant number of people visiting the MCTC. The new trailer shall have adequate space designated for this purpose. To address this issue, the new MCTC shall have a 5’ extension on the street side along the full length of the main room of the trailer (refer to Attachment 1).
3.3.2 Countertops
The contractor shall provide two countertops on the street side (29” deep) and curb side (26”) of the main room (height of countertop: 36”). The countertop on the street side shall be attached to the extension and move along with it (when the extension is engaged). When the extension is not engaged, it shall appear as it is in the current MCTC trailer. The graphics below show the new trailer when the extension is not engaged (Figure 4) and when it is engaged (Figure 5). As can be seen in the graphics below, when the extension is engaged, the counter tops, TV and the foldable work area (refer to FWS2 below) move outwards along with the extension.
3.3.3 Curing Tanks
The contractor shall provide two curing tanks that are made of aluminum (tanks used to store lime water and concrete specimens) under both the countertops. Size of the existing curing tanks are provided in Attachment 1. Curing tanks shall be redesigned so the volume remains the same as the existing tanks and fit under the countertops in the Main Room. Curing tanks should be located towards the end of the counter tops (Attachment 1). When the extension on the street side is engaged, the curing tank shall remain stationary (Figure 4 and 5) This is required since the curing tank with concrete specimens would be too heavy to move along with the extension. The top of the street side curing tank should be designed in such a way that it can be used as a display island to showcase equipment or MCTC related literature. The curing tanks shall be designed to be watertight (when lids are closed) so water does not leak during the transport of the MCTC trailer. Additional information on the curing tanks is provided in the compression and flexural equipment section.
Figure 4: MCTC plan when the Extension is not Engaged
Figure 5: MCTC plan when the Extension is Engaged
3.3.4 Compression and Flexural Equipment
Concrete compression and flexural equipment (Figure 6) shall be installed in the Main Room of the MCTC on the curb side like the images below. The flexural machine should be next to the compression machine (approximate dimensions: 4’w x 6’h x 3’d and weighs approximately 3000 lbs) since the same display is used for both the units. The flexural machine shall be bolted to the countertop. The section of the countertop where the flexural machine will be placed need to have additional reinforcement for 300 pound load (flexural machine). The compression machine is a
Extensionn
50' 6'
Co
C Top 1Curing Tank
Saw
CAB
WS
FWS2
WS
10'
Main RoomBack Room
Office
C Top 2 Fx
TV
LCK
FH PH
FWS1 RFCT2
50' 6'
Co
Curing Tank
Saw
CAB
WS
WS
10'
Main RoomBack Room
Office
C Top 2FxLCK
FH PH
Extension
FWS1 RF
C Top 1FWS2
CT2
standalone unit and shall be rigidly mounted to the floor of the MCTC to reduce shock and vibration during transportation of the MCTC. The compression and flexural equipment from the existing MCTC will be repurposed and used in the new MCTC.
Figure 6: Photos of the Flexural and Compression Equipment.
Curing Tank on the curb side shall be located next to the flexural machine under the countertop.
The countertop section immediately above this curing tank shall be foldable to access the concrete samples in the curing tank.
3.3.5 Removable Workspace on the Curb Side
There shall be a removable workspace for one person on the curb side next to the front door (shown in Figure 7). The height of this workspace shall be approximately 28” from the floor.
Figure 7: Inside of the Main Room of the Current MCTC.
Flexural Equipment Compression Equipment
3.3.6 Foldable Workspace on the Street Side (FWS2)
A 6’ long foldable desk space shall be designed on the street side (beyond the countertop) where two people can comfortable sit and work. The foldable workspace shall be 28” from the floor.
The location of the FWS2 is shown in Attachment 1.
3.3.7 Sink and Sink Drain
A stainless-steel sink with a faucet shall be built on the curb side countertop in the main room (Figure 7) (additional details under plumbing). The sink shall also come with a cover for use of the space during open houses. The water from the sink may be drained directly underneath the trailer.
3.3.8 Built-in TV Display and Speaker System
Fixtures to hold television (TV) displays (a total of three (two 40” (street side and curb side) and one 32” (separation wall between Main Room and Back Room) and associated wiring (HDMI, power, etc.), a speaker system (four speakers) and a mic shall be installed. The TVs, speakers and microphones shall be connected to an audio video system. FHWA will be providing the TVs.
TV locations are shown in Attachment 1. The TVs shall be mounted so that they are adjustable for viewing. The Contractor shall provide 1" conduit lines for computer/equipment interface wiring.
Office Area
3.3.9 Fixed Workspace (WS1 and WS2)
An L shaped fixed workspace (WS1 and WS2) shall be provided in the office area of the new MCTC trailer to serve as desk space for two people. The top of the workspace should be 32” from the floor. Supply two metal drawer file cabinets underneath the desk space. Overhead cabinets shall be provided throughout the office. The workspace shall have two big drawers for putting stationery.
3.3.10 Full-Length Cabinet
A full-height cabinet (CAB) from floor to ceiling shall be installed on the street side of the office area. This space will be used for keeping books, routers, project laptops etc. One section of the cabinet shall also be designed to accommodate coats and hangers.
3.3.11 Refrigerator and Microwave
The vendor shall provide and install a RV style refrigerator (7 cu ft minimum, 12V/120V) and
1.6 cu ft microwave oven (120V) on the curb side in the office area. These shall be stacked together and installed next to the Fixed Workspace 2 (WS2). The refrigerator shall be connected to the MCTC inverter / battery so that it works even when the MCTC trailer generator is not working.
Back Room The Back Room will primarily serve as a storge and testing area. It houses three equipment (below) and a locker facility. The Back Room shall have counter tops, overhead and floor cabinets similar to the rest of the MCTC.
3.3.12 Fume Hood and a High Temperature Oven
On the street side of the Back Room, a fume hood (Figure 9) (47" W x 22" D x 48" H) and a high temperature oven shall be installed on the countertop. Both the units shall be connected to an exhaust on the street side of the MCTC. These units will be repurposed from the existing trailer.
Figure 8. Fume Hood
3.3.13 Saw Cut Assembly and Lockers
The curb side counter top shall house a saw assembly (repurposed from the existing MCTC) and a locker facility (minimum six lockers) for storing staff apparel and safety gear (safety vests, hard hats, etc.).
Transfer of Equipment from the existing MCTC to the new MCTC: The contractor shall remove four of the equipment listed in the Attachment (2) (compression machine, flexural machine, fume hood and Saw Assembly) from the existing MCTC and install in the new MCTC. The existing MCTC will be brought to the contractor facility for this purpose.
Features Relevant to All Three Rooms Refer to Figure 8 for photo of cabinets, countertops, and ceiling in the existing MCTC.
3.3.14 Specific Interior Requirements
• All the walls and main floor inside the MCTC trailer shall be Poly-foam sprayed.
• Ceiling shall be insulated with 1” Styrofoam.
3.3.15 Cabinets
The Contractor shall furnish 16 gage aluminum constructed cabinets. Appropriate hardware for adjustable shelves and positive latching to prevent opening during transportation from location to location. Floor cabinets shall be installed under the countertops and overhead cabinets along the celling of the MCTC in all three rooms. The color of the cabinets shall similar to the current trailer (Figure 7). The cabinetry shall be aluminum throughout. The lower cabinet bases shall be of aluminum and stainless construction
3.3.16 Countertops
The Contractor shall furnish 16 gage stainless-steel counter tops with a 6" stainless steel backsplash at counters. Back splashes are required for protection from physical damage to the walls (from equipment and testing) and water damage (many of the tests that are performed at wet).
3.3.17 Flooring
The Contractor shall furnish aluminum lug flooring of sufficient thickness to prevent sagging under specified live loads. Provide continuous vapor barrier, batt-type roll fiberglass insulation (R- 19 minimum). Floor joists shall be of rust proof metal construction. The floor shall have durable rubber raised DOT flooring.
3.3.18 Windows
All exterior glass (doors, windows) shall be coated with double reflective tinting to reduce interior heat buildup from sunlight.
3.3.19 Ceiling
The ceiling shall consist of 1/8" fiberglass sheeting panels with light reflective factory finish.
Provide continuous vapor barrier and batt-type roll fiberglass insulation (R-11 minimum).
3.3.20 Walls
The walls shall be fabricated using 1/8" smooth fiberglass sheeting panels with gloss or semi-gloss finish. Provide continuous vapor barrier, batt-type roll fiberglass insulation (R-11 minimum).
Frame to be of metal rust proof construction.
3.3.21 Separation walls and Interior Doors
The Office, Main and Back rooms should be separated by separation walls with access doors.
3.3.22. Weather Station Mount
A weather station shall be mounted on the backside of the trailer. To accommodate the weather station, a wall mount (Figure 10) that can hold a pipe of an external diameter of 1.25” shall be provided.
Figure 9: Weather Station Wall Mount of the Existing Trailer
3.4 MCTC Trailer Electrical, Heating, Air Conditioning, and Other Requirements
3.4.1 Electrical System
3.4.1.1 Generator and External Power.
The contractor shall provide a 30 KW, 115/230 VAC, 1-phase, diesel powered generator to operate the MCTC trailer. The trailer shall also be able to directly tie-in with a local commercial power source utilizing existing cables rated for 100 amp 220 volt single phase service. The contractor shall install the associated AC and DC distribution system, and the installation of all electrical equipment and wiring including a sealed wiring harness. The generator (along with the HVAC) shall be installed in the nose of the trailer and shall be contained within a large sound enclosure (Figure 10).
• All wiring shall be copper conductors installed in concealed EMT conduit. All equipment and devices shall be new, NEMA rated, UL-approved and all wiring and equipment shall be installed in strict accordance with Article 551 of the National Electrical Code (NEC), and all other applicable NEC requirements.
• The AC, circuit-breaker type distribution panel shall feature a main circuit breaker with the necessary number of 1-pole branch circuit breakers (100 amp, 220 VAC breaker panel with a minimum of 24 breaker circuits).
• Electrical Outlets, Switches and Fixtures: Electrical outlets shall be provided throughout the trailer at the countertop level. A minimum of 25 120V outlets, five 230V outlets (two in the back room and three in the main room close to the compression machine) and two 12V outlets shall be provided. Exact locations and mounting heights of all electrical outlets, switches, and fixtures shall be determined during the design of the MCTC trailer and final arrangement of the interior. All work stations shall have power outlets and internet connections for an internal network.
• Outside Outlets: Five110-120V outlets (GFI) on the outside (two on the curb side, one back side and two on the street side) of the MCTC trailer. One 230V outlet shall be provided in the back side.
• Grounding of the technical equipment within the vehicle shall follow standard grounding practices.
• Low Voltage System. Integrate a 12V DC system.
o Power Source for 12V DC shall be two (2) Group 31 deep cycle batteries to be housed in a vented, anti-corrosive enclosure. The DC distribution system must be fully fused and provide power.
o Interior lighting activated by a mechanical timer located at personnel door such that interior DC powered devices will not be unintentionally left running.
o The strike or set-up lighting system.
o Lighting in belly storage bays.
o Lighting in the full-height cabinet in the office area.
o Drive the hydraulic system for the self-leveling jacks.
• Inverter/Charger Provide and integrate a power inverter/charger system that is rated at 2000W at 120VAC, 80 Amp DC charge. It shall power selected interior and exterior lighting.
3.4.2 HVAC
The Contractor shall supply and install a wall mounted central AC/heat unit with 60,000 BTU and 10KW emergency heat strips. Three 240V baseboard heaters shall also be provided.
Heating and air conditioning units to be controlled by wall mounted thermostats. Air plenums shall be designed and installed to provide redundancy should one air conditioning unit fail.
Vents shall be located throughout the trailer so that air is distributed throughout the trailer. The locations of the generator and HVAC/heating units should be in the front (nose) of the trailer similar to the current trailer configuration (Figure 10). Easy access shall be provided to service the generator and HVAC unit. The trailer and the HVAC unit together shall be within the specified 53’.
Figure 10. Generator and HVAC Location
3.4.3 Plumbing
The Contractor shall provide an insulated water tank system with a minimum capacity of ninety
(90) gallons under the sink with an additional sixty (60) gallons between the axles in the belly hatches. The water tank system shall include a 115 V/AC on-demand electrical water pump and water level gauge with a direct connection from trailer exterior to water tank. Provide an adjustable line pressure of 0 to 40 psi with a 3.3 gallon per minute (minimum) flow. The tank system shall have the fill opening installed in the belly hatch on the street side and drains at the bottom of the tanks for draining prior to transport. All fittings must be standard sizes (garden hose).
The Contractor shall provide a stainless steel sink with running water, a spray nozzle and a faucet which operate independently, and drain plumbed through floor to exterior of trailer. Hot and cold water ledge faucet with an 8" minimum goose-neck shall have a spout at sink with spray nozzle adaptor with 4’ of hose. Provide 1/2" outer diameter poly-butylene conduit water service line, with "pressurized" shut-off valves located below the sinks. Water lines must be capable of self-draining through floor (gravity-type). The sink faucet shall also have the option of directly connecting to an external water supply source (in addition to the water tank system of the MCTC).
The Contractor shall provide a six (6) gallon capacity hot water heater; 12,000 BTU and 110 VAC. All plumbing must be accessible through cabinet area, NOT through walls.
3.4.4 Security System
The Contractor shall provide a burglar alarm system with: outside siren and flashing lights, interior motion detectors, and sensors on all doors, windows, and storage units. The system shall be key-pad controlled from the interior of the Lab (code must be changeable). Alarm must be automatically switchable from trailer’s AC voltage to trailer’s DC voltage, with internal battery power backup.
3.4.5 Fire Extinguisher
The Contractor shall provide two (2) rechargeable ten (10) pound minimum ABC with BC rating, multipurpose, stored pressure, dry chemical type fire extinguisher mounted in easily accessible locations, near each side entry door.
3.4.6 Solar Panels
The trailer shall be installed with solar panels sufficient to charge a 12V DC system that will be used to run hydraulic lift, interior lighting (courtesy lights), and lighting in the belly hatches. The solar panels shall be located on the roof of the trailer and can be designed to be detachable or removable during trailer transport. Other solar panel location options proposed by the contractor will be considered
3.4.7 Backup Camera
Rear view backup cameras and sensors shall be installed on the rear and sides of the trailer to eliminate blind spots.
3.4.8 Design for Network and Internet Access
The trailer shall be networked so that all the computers are connected and facilitates data storage and management. A total of eight network outlets are required (two in the Office, five in the Main Room and one in the Back Room). A CAT5 computer connection is required (at the rear of the trailer) for connectivity to the internet when trailer is parked at home location.
3.4.9 Energy Regulations
The refrigerator, microwave ovens, light fixtures, exhaust fans, doors and windows, etc. shall be energy star rated and energy efficient.
4.0 MCTC Exterior and Lighting Requirements
4.1 Exterior Finish
• Smooth seamless rivet-less automotive look
• Full preparation shall consist of caulking, trimming, sanding, etching and all necessary steps to ensure overall aesthetic “as-new” quality for functional life of vehicle with proper on-going maintenance.
• All steel attach points shall be treated with anti-corrosion agent and isolated from all aluminum surfaces
• 2 coats primer and 1 coat white Aircraft-Grade Polyurethane paint with anti-corrosive properties.
• Body to be undercoated with anti-corrosion agent.
• Full graphics wrap to include FHWA’s art specifications, per Figure 11. The design graphic template will be provided by FHWA to the Contractor. 661 212 2321-
Figure 11. MCTC Graphics Wrap
5.0 Lighting
Provide permanently mounted and circuited LED lights and reflectors to conform to DOT Regulations and in accordance with industry standards.
• Exterior Lighting o Clearance Lighting. Install clearance lights as required by DOT Regulations.
Two amber strobe lights on trailer rear (needed feature when trailer is entering active construction zones) o Scene Lighting. Exterior flood lights are required to provide sufficient lighting for outdoor work during night projects to provide a safer working environment.
Two flood lights on the curb side, one in the back and one on the streetside.
Installation of these requires the construction of a recess so that light remains flush with exterior wall and wiring.
• Interior Lighting o Interior Lighting in all three rooms (will provide a basic drawing)
MCTC Trailer Delivery (f.o.b. destination)
The trailer shall be delivered, serviced, and ready to use, to the location specified below.
Delivery of the MCTC trailer shall at the MCTC’s official duty station, between the working hours of 6:30 AM and 3:30 PM. The Contractor shall alert the COR of the expected delivery time within 5 days of delivery so that security clearance to access Turner-Fairbank Highway Research Center can be obtained.
6.0 Attachments
6.1 Layout of New MCTC Trailer
6.2 List of Equipment Provided by FHWA
Attachment 1 Layout for the New MCTC Trailer (Not to scale)
8.6'
50' Generator and Heating / Cooling units
6'
Co
C Top 1Curing Tank
Saw
CAB
WS
FWS2
WS
10'
Trailer FrontTrailer Rear
Street Side
Curb Side
Main RoomBack Room
Office
C TOP 2FX
TV
LCK
FH PH
Extension
FWS1
Curing Tank under the countertop
RF
BD
D2 D1
W W
W W
CT2
LEGEND
FH – Fume Hood Saw-Saw Cutting Assembly (will be transferred from existing trailer) PH-High Temperature Oven (will be transferred from existing trailer) FWS2-Foldable Workstation for two W- Axle (Wheels of the Trailer) CO –Compression Machine (will be transferred from existing trailer) FX – Flexural Machine (will be transferred from existing trailer) C Top 1 – Countertop 1 (street side) C Top 2 – Countertop 2 (curb side) Curing Tank – Curing Tank (street side) CT2 – Curing Tank 2 (curbside) FWS1 – Foldable Workstation for one CAB – Full Length Cabinet (Floor to ceiling for storing computers, electronic command center) WS1-Fixed Workspace 1 WS2 – Fixed Workspace 2 RF – Refrigerator TV-TV monitors (three of them – at the locations identified in red) D1 – First Door on the Curbside D2 – Second Door on the Curbside BD – Back Door LCK –Locker
Attachment 2
Dimensions, Location, and Other Information of Equipment Inside the MCTC Trailer
Description Dimensions Location Voltage
Location in Current Trailer
Location in New Trailer
Comment
Compression Machine
34" W X 20 1/2" D, X 65" H Counter 220v Main Room Main Room Existing Unit
Repurposed
Flexural Machine
27" W X 13" D X 33" H Counter 220v Main Room Main Room Existing Unit
Repurposed
Fume Hood 47" W X 25 1/2" D X 54" H Counter 110v Main Room Back Room Existing Unit
Repurposed
Curing Tank (#1)
69" W X 29 1/2" D X 28 1/2" H Floor nill Back Room Main Room New Unit / New
Dimensions
Curing Tank (#2)
40 1/2" W X 29 1/2" D X 28" H Floor nill Back Room Main Room New Unit / New
Dimensions
Saw 24" W X 40" D X 32 1/2" H Counter 220v Back Room Back Room Existing Unit
Repurposed
Phoenix Oven 27 1/2" W X 25" D X 16 1/2" H Counter 220v Back Room Back Room Existing Unit
Repurposed
Printer 20" W X 18" D X 13" H Counter 110v Office Office Existing Unit
Repurposed
Fridge 21" W X 26" D X 30" H Floor 110v Office Office New unit, larger capacity
Microwave 24" W X 18.5" D X 13.5" H Cabinet Main Room Office New unit
| 2.0 Major Design Elements |
| 2.1 Size Limitations |
| 3.0 Key Features of the New MCTC |