Exh A H-1 TDMP Lot 7 ENG_ADMIN CDRLS DRAFT.docx
DOCX document 762 KB Posted
- Solicitation number
- N6134022R0030
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att 8 NPSI Datasets and DA.pdf | ||
| Att 6 GFI_GFS List H-1 Lot 7_8.xlsx | XLSX spreadsheet | |
| Att 2 PRF 20037A H-1 Lot 7_8.pdf | ||
| L-1 H1 Lot VII_VIII Question Form.xlsx | XLSX spreadsheet | |
| L-3 H-1 GFI Request and NDA Form.docx | DOCX document | |
| H1 Lot 7_8 RFP Final.pdf | ||
| Exh D H-1 TDMP Lot 8 Logistics CDRLs DRAFT.docx | DOCX document | |
| Att 1 SOW 210044 Rev A H-1.pdf | ||
| L-4 NPSI Sample Datasets and DA.pdf | ||
| Att 4 DIT Form.pdf | ||
| Exh E H-1 TDMP Lot 8 Tech Pubs CDRLs DRAFT.docx | DOCX document | |
| L-2 H1 Lot VII_VIII Industry Day QA_Final.xlsx | XLSX spreadsheet | |
| Exh C H-1 TDMP Lot 8 ENG_ADMIN CDRLS DRAFT.docx | DOCX document | |
| Att 7 H-1 GFI Request and NDA Form.docx | DOCX document | |
| Att 3 DD 254 H-1 LOT 7_8.pdf | ||
| Att 9 OT-22-20033 VSER.pdf | ||
| Att 5 GFP_GFE List H-1 LOT 7_8.xlsx | XLSX spreadsheet | |
| Exh B H-1 TDMP Lot 7 Logistic CDRLs DRAFT.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
H-1 Lot 7 Engineering & Admin CDRL Data Items Summary List
| CDRL # |
| H-1 Lot 7 DELIVERABLES |
| ABBREVIATION |
| AUTHORITY |
| A001, AA01, AG01. AN01, G001, N001, U001 |
| DOD RISK MANAGEMENT FRAMEWORK PACKAGE |
| RMF |
| DI-MGMT-82001A |
| A002 |
| SOFTWARE PRODUCT DESIGN |
| SPD |
| DI-SESS-82036 |
| A003, AA03, AG03. AN03, G003, N003, U003 |
| SOFTWARE PRODUCT PACKAGE |
| SPP |
| DI-IPSC-82090C |
| A004, AA04, AG04. AN04, G004, N004, U004 |
| TEST PROCEDURES |
| TP |
| DI-NDTI-80603A |
| A005, G005 |
| REQUIREMENTS TRACEABILITY VERIFICATION MATRIX |
| RTVM |
| DI-MGMT-82133 |
| A006 |
| SYSTEM/SUBSYSTEM DESIGN DESCRIPTION |
| SSDD |
| DI-IPSC-81432A |
| A007, AA07, AG07. AN07, G007, N007, U007 |
| TRAINER CRITERIA REPORT |
| TCR |
| DI-MISC-81281 |
| A008, AA08, AG08. AN08, G008, N008, U008 |
| TRAINER MATH MODEL REPORT |
| TMMR |
| DI-ILSS-81185 |
| A009 |
| REQUEST FOR VARIANCE (RFV) |
| RFV |
| DI-SESS-80640E |
| A00A |
| ENGINEERING CHANGE PROPOSAL (ECP) |
| ECP |
| DI-SESS-80639E |
| A00B, AA0B, AG0B. AN0B, G00B, N00B, U00B |
| VISUAL SYSTEMS TEST PROCEDURES |
| VS TP |
| DI-NDTI-80603A |
| A00C, AA0C, AG0C, AN0C, G00C, N00C, U00C |
| VISUAL SYSTEM ENGINEERING REPORT (VSER) |
| VSER |
| OT-21- |
| A00D |
| SYNTHETIC ENVIRONMENT DATABASE DESIGN DOCUMENT |
| SEDDD |
| DI-MSSM-82158 |
| A00E |
| NAVAIR PORTABLE SOURCE INITIATIVE (NPSI) DATASET DELIVERY |
| NPSI |
| DI- MGMT -82125 |
| B001 |
| CONTRACTOR’S PROGRESS, STATUS, AND MANAGEMENT REPORT |
| CPSMR |
| DI-MGMT-80227 |
| B002 |
| INTEGRATED PROGRAM MANAGEMENT REPORT(IPMR)/INTEGRATED MASTER SCHEDULE |
| IMS |
| DI-MGMT-81861C |
| B003 |
| CONFERENCE AGENDA |
| CNF AG |
| DI-ADMN-81249C |
| B004 |
| CONFERENCE MINUTES |
| CNF MIN |
| DI-ADMN-81250C |
| B005 |
| PRESENTATION MATERIAL |
| PM |
| DI-ADMN-81373 |
| DD FORM 1423-1, FEB 2001 | PREVIOUS EDITION MAY BE USED Page 18 of 62 |
| P |
C O N T R A C T D A T A R E Q U I R E M E N T S L I S T (1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT I |
| TDP _____ TM _____ OTHER MGMT |
D. SYSTEM/ITEM
(LOT VII) 2F197B-2 (AH-1Z)
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A001 |
| DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MGMT-82001A |
| SOW 210044 PARA 3.1.3.2 |
| NAVAIR PMA-205, H1 TRAINING |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 5TIMES |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| a. ADDRESSEE |
| b. COPIES |
Final
A
| N/A |
| SEE BLK 16 |
| draft |
| reg |
| repr |
16. REMARKS
1. BLK 4: TAILOR OUT PARAGRAPH 2 AND SUBSEQUENT PARAGRAPHS OF DI-MGMT-82001
2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE RFP: “ATTACHMENT XX_RMF_PACKAGE_FORMAT.XLSX”.
3. BLK 8: THE GOVERNMENT WILL HAVE TWENTYONE (21) BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.
4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 01 January 2021). Other requests shall be referred to PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547
5. BLK 12: SEE TABLE BELOW
| DMRT RMF PACKAGE ELEMENTS |
| DATE DUE |
· SYSTEM REGISTRATION TAB
EXCLUDE PROTOCOL AND PORTS IN THE DATA FLOW WORKSHEET
EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET
· REQUIREMENTS SELECTION TAB
FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR
6. BLK 13 – SEE TABLE BELOW
| RMF PACKAGE ELEMENTS |
| DATE DUE |
1. INVENTORY AND SYSTEM INFORMATION TAB
2. COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
3. COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
SECOND SUBMISSION DUE FORTY FIVE (45) BUSINESS DAYS AFTER CDR
1. SELF ASSESSMENT TAB
2. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)
3. DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)
THIRD SUBMISSION DUE FIFTEEN (15) BUSINESS DAYS PRIOR TO TRR
1. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)
2. FINAL CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)
FOURTH SUBMISSION DUE TWENTY (20) BUSINESS DAYS AFTER IT-C1
| 1. VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS) |
| FINAL SUBMISSION DUE AT FINAL PCA (FPCA) |
7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT . E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.
8. DELIVERY TO THE NAWCTSD ENGR AND PCO SHALL BE LETTER NOTIFICATION ONLY.
| NAWCTSD PCO |
| 0 |
| SEE |
BLK 16
| NAWCTSD ENGR |
| 0 |
| SEE |
| NAWCTSD ISSM |
| 1 |
| SEE |
| NAWCTSD ISEO-CP |
| 0 |
| SEE |
| 15. TOTAL |
| 1 |
| 0 |
| 2 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CATTIEN NGUYEN, NAWCTSD SW ENGR
S. COLN, PMA-205 DAPMTS
C O N T R A C T D A T A R E Q U I R E M E N T S L I S T (1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT V |
| TDP _____ TM _____ OTHER MGMT |
D. SYSTEM/ITEM
(LOT VII) 2F196B-3 (UH-1Y)
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| AA01 |
| DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MGMT-82001A |
| SOW 210044 PARA 3.1.3.2 |
| NAVAIR PMA-205, H1 TRAINING |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 5TIMES |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| a. ADDRESSEE |
| b. COPIES |
Final
A
| N/A |
| SEE BLK 16 |
| draft |
| reg |
| repr |
16. REMARKS
2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE RFP: “ATTACHMENT XX_RMF_PACKAGE_FORMAT.XLSX”.
3. BLK 8: THE GOVERNMENT WILL HAVE TWENTYONE (21) BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.
4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 01 January 2021). Other requests shall be referred to PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547
5. BLK 12: SEE TABLE BELOW
| DMRT RMF PACKAGE ELEMENTS |
| DATE DUE |
· SYSTEM REGISTRATION TAB
EXCLUDE PROTOCOL AND PORTS IN THE DATA FLOW WORKSHEET
EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET
FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR
| RMF PACKAGE ELEMENTS |
| DATE DUE |
1. INVENTORY AND SYSTEM INFORMATION TAB
2. COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
3. COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
SECOND SUBMISSION DUE FORTY FIVE (45) BUSINESS DAYS AFTER CDR
1. SELF ASSESSMENT TAB
2. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)
3. DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)
THIRD SUBMISSION DUE FIFTEEN (15) BUSINESS DAYS PRIOR TO TRR
1. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)
2. FINAL CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)
FOURTH SUBMISSION DUE TWENTY (20) BUSINESS DAYS AFTER IT-C1
| 1. VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS) |
| FINAL SUBMISSION DUE AT FINAL PCA (FPCA) |
7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT . E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.
| NAWCTSD PCO |
| 0 |
| SEE |
| NAWCTSD ENGR |
| 0 |
| SEE |
| NAWCTSD ISSM |
| 1 |
| SEE |
| NAWCTSD ISEO-CP |
| 0 |
| SEE |
| 15. TOTAL |
| 1 |
| 0 |
| 2 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CATTIEN NGUYEN, NAWCTSD SW ENGR
S. COLN, PMA-205 DAPMTS
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT VI |
| TDP _____ TM _____ OTHER MGMT |
D. SYSTEM/ITEM
(LOT VII) 2F226-2 (UH-1Y)
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| AG01 |
| DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MGMT-82001A |
| SOW 210044 PARA 3.1.3.2 |
| NAVAIR PMA-205, H1 TRAINING |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 5TIMES |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| a. ADDRESSEE |
| b. COPIES |
Final
A
| N/A |
| SEE BLK 16 |
| draft |
| reg |
| repr |
16. REMARKS
2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE RFP: “ATTACHMENT XX_RMF_PACKAGE_FORMAT.XLSX”.
3. BLK 8: THE GOVERNMENT WILL HAVE TWENTYONE (21) BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.
4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 01 January 2021). Other requests shall be referred to PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547
5. BLK 12: SEE TABLE BELOW
| DMRT RMF PACKAGE ELEMENTS |
| DATE DUE |
· SYSTEM REGISTRATION TAB
EXCLUDE PROTOCOL AND PORTS IN THE DATA FLOW WORKSHEET
EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET
FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR
| RMF PACKAGE ELEMENTS |
| DATE DUE |
1. INVENTORY AND SYSTEM INFORMATION TAB
2. COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
3. COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
SECOND SUBMISSION DUE FORTY FIVE (45) BUSINESS DAYS AFTER CDR
1. SELF ASSESSMENT TAB
2. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)
3. DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)
THIRD SUBMISSION DUE FIFTEEN (15) BUSINESS DAYS PRIOR TO TRR
1. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)
2. FINAL CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)
FOURTH SUBMISSION DUE TWENTY (20) BUSINESS DAYS AFTER IT-C1
| 1. VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS) |
| FINAL SUBMISSION DUE AT FINAL PCA (FPCA) |
7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT . E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.
| NAWCTSD PCO |
| 0 |
| SEE |
| NAWCTSD ENGR |
| 0 |
| SEE |
| NAWCTSD ISSM |
| 1 |
| SEE |
| NAWCTSD ISEO-CP |
| 0 |
| SEE |
| 15. TOTAL |
| 1 |
| 0 |
| 2 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CATTIEN NGUYEN, NAWCTSD SW ENGR
S. COLN, PMA-205 DAPMTS
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT VII |
| TDP _____ TM _____ OTHER MGMT |
D. SYSTEM/ITEM
(LOT VII) 2F196B-4 (UH-1Y)
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| AN01 |
| DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MGMT-82001A |
| SOW 210044 PARA 3.1.3.2 |
| NAVAIR PMA-205, H1 TRAINING |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 5TIMES |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| a. ADDRESSEE |
| b. COPIES |
Final
A
| N/A |
| SEE BLK 16 |
| draft |
| reg |
| repr |
16. REMARKS
2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE RFP: “ATTACHMENT XX_RMF_PACKAGE_FORMAT.XLSX”.
3. BLK 8: THE GOVERNMENT WILL HAVE TWENTYONE (21) BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.
4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 01 January 2021). Other requests shall be referred to PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547
5. BLK 12: SEE TABLE BELOW
| DMRT RMF PACKAGE ELEMENTS |
| DATE DUE |
· SYSTEM REGISTRATION TAB
EXCLUDE PROTOCOL AND PORTS IN THE DATA FLOW WORKSHEET
EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET
FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR
| RMF PACKAGE ELEMENTS |
| DATE DUE |
1. INVENTORY AND SYSTEM INFORMATION TAB
2. COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
3. COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
SECOND SUBMISSION DUE FORTY FIVE (45) BUSINESS DAYS AFTER CDR
1. SELF ASSESSMENT TAB
2. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)
3. DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)
THIRD SUBMISSION DUE FIFTEEN (15) BUSINESS DAYS PRIOR TO TRR
1. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)
2. FINAL CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)
FOURTH SUBMISSION DUE TWENTY (20) BUSINESS DAYS AFTER IT-C1
| 1. VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS) |
| FINAL SUBMISSION DUE AT FINAL PCA (FPCA) |
7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT . E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.
| NAWCTSD PCO |
| 0 |
| SEE |
| NAWCTSD ENGR |
| 0 |
| SEE |
| NAWCTSD ISSM |
| 1 |
| SEE |
| NAWCTSD ISEO-CP |
| 0 |
| SEE |
| 15. TOTAL |
| 1 |
| 0 |
| 2 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CATTIEN NGUYEN, NAWCTSD SW ENGR
S. COLN, PMA-205 DAPMTS
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT II |
| TDP _____ TM _____ OTHER MGMT |
D. SYSTEM/ITEM
(LOT VII) 2F196-1 (UH-1Y)
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| G001 |
| DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MGMT-82001A |
| SOW 210044 PARA 3.1.3.2 |
| NAVAIR PMA-205, H1 TRAINING |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 5TIMES |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| a. ADDRESSEE |
| b. COPIES |
Final
A
| N/A |
| SEE BLK 16 |
| draft |
| reg |
| repro |
16. REMARKS
2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE RFP: “ATTACHMENT XX_RMF_PACKAGE_FORMAT.XLSX”.
3. BLK 8: THE GOVERNMENT WILL HAVE TWENTYONE (21) BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.
4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 01 January 2021). Other requests shall be referred to PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547
5. BLK 12: SEE TABLE BELOW
| DMRT RMF PACKAGE ELEMENTS |
| DATE DUE |
· SYSTEM REGISTRATION TAB
EXCLUDE PROTOCOL AND PORTS IN THE DATA FLOW WORKSHEET
EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET
FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR
| RMF PACKAGE ELEMENTS |
| DATE DUE |
1. INVENTORY AND SYSTEM INFORMATION TAB
2. COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
3. COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
SECOND SUBMISSION DUE FORTY FIVE (45) BUSINESS DAYS AFTER CDR
1. SELF ASSESSMENT TAB
2. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)
3. DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)
THIRD SUBMISSION DUE FIFTEEN (15) BUSINESS DAYS PRIOR TO TRR
1. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)
2. FINAL CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)
FOURTH SUBMISSION DUE TWENTY (20) BUSINESS DAYS AFTER IT-C1
| 3. VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS) |
| FINAL SUBMISSION DUE AT FINAL PCA (FPCA) |
7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT . E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.
| NAWCTSD PCO |
| 0 |
| SEE |
| NAWCTSD ENGR |
| 0 |
| SEE |
| NAWCTSD ISSM |
| 1 |
| SEE |
| NAWCTSD ISEO-CP |
| 0 |
| SEE |
| 15. TOTAL |
| 1 |
| 0 |
| 2 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CATTIEN NGUYEN, NAWCTSD SW ENGR
S. COLN, PMA-205 DAPMTS
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT III |
| TDP _____ TM _____ OTHER MGMT |
D. SYSTEM/ITEM
(LOT VII) 2F226-1 (UH-1Y)
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| N001 |
| DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MGMT-82001A |
| SOW 210044 PARA 3.1.3.2 |
| NAVAIR PMA-205, H1 TRAINING |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 5TIMES |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| a. ADDRESSEE |
| b. COPIES |
Final
A
| N/A |
| SEE BLK 16 |
| draft |
| reg |
| repr |
16. REMARKS
2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE RFP: “ATTACHMENT XX_RMF_PACKAGE_FORMAT.XLSX”.
3. BLK 8: THE GOVERNMENT WILL HAVE TWENTYONE (21) BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.
4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 01 January 2021). Other requests shall be referred to PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547
5. BLK 12: SEE TABLE BELOW
| DMRT RMF PACKAGE ELEMENTS |
| DATE DUE |
· SYSTEM REGISTRATION TAB
EXCLUDE PROTOCOL AND PORTS IN THE DATA FLOW WORKSHEET
EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET
FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR
| RMF PACKAGE ELEMENTS |
| DATE DUE |
1. INVENTORY AND SYSTEM INFORMATION TAB
2. COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
3. COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
SECOND SUBMISSION DUE FORTY FIVE (45) BUSINESS DAYS AFTER CDR
1. SELF ASSESSMENT TAB
2. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)
3. DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)
THIRD SUBMISSION DUE FIFTEEN (15) BUSINESS DAYS PRIOR TO TRR
1. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)
2. FINAL CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)
FOURTH SUBMISSION DUE TWENTY (20) BUSINESS DAYS AFTER IT-C1
| 1. VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS) |
| FINAL SUBMISSION DUE AT FINAL PCA (FPCA) |
7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT . E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.
| NAWCTSD PCO |
| 0 |
| SEE |
| NAWCTSD ENGR |
| 0 |
| SEE |
| NAWCTSD ISSM |
| 1 |
| SEE |
| NAWCTSD ISEO-CP |
| 0 |
| SEE |
| 15. TOTAL |
| 1 |
| 0 |
| 2 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CATTIEN NGUYEN, NAWCTSD SW ENGR
S. COLN, PMA-205 DAPMTS
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT IV |
| TDP _____ TM _____ OTHER MGMT |
D. SYSTEM/ITEM
(LOT VII) 2F227-1 (AH-1Z)
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| U001 |
| DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MGMT-82001A |
| SOW 210044 PARA 3.1.3.2 |
| NAVAIR PMA-205, H1 TRAINING |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 5TIMES |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| a. ADDRESSEE |
| b. COPIES |
Final
A
| N/A |
| SEE BLK 16 |
| draft |
| reg |
| repr |
16. REMARKS
2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE RFP: “ATTACHMENT XX_RMF_PACKAGE_FORMAT.XLSX”.
3. BLK 8: THE GOVERNMENT WILL HAVE TWENTYONE (21) BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.
4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 01 January 2021). Other requests shall be referred to PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547
5. BLK 12: SEE TABLE BELOW
| DMRT RMF PACKAGE ELEMENTS |
| DATE DUE |
· SYSTEM REGISTRATION TAB
EXCLUDE PROTOCOL AND PORTS IN THE DATA FLOW WORKSHEET
EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET
FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR
| RMF PACKAGE ELEMENTS |
| DATE DUE |
1. INVENTORY AND SYSTEM INFORMATION TAB
2. COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
3. COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
SECOND SUBMISSION DUE FORTY FIVE (45) BUSINESS DAYS AFTER CDR
1. SELF ASSESSMENT TAB
2. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)
3. DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)
THIRD SUBMISSION DUE FIFTEEN (15) BUSINESS DAYS PRIOR TO TRR
1. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)
2. FINAL CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)
FOURTH SUBMISSION DUE TWENTY (20) BUSINESS DAYS AFTER IT-C1
| 1. VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS) |
| FINAL SUBMISSION DUE AT FINAL PCA (FPCA) |
7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT . E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.
| NAWCTSD PCO |
| 0 |
| SEE |
| NAWCTSD ENGR |
| 0 |
| SEE |
| NAWCTSD ISSM |
| 1 |
| SEE |
| NAWCTSD ISEO-CP |
| 0 |
| SEE |
| 15. TOTAL |
| 1 |
| 0 |
| 2 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CATTIEN NGUYEN, NAWCTSD SW ENGR
S. COLN, PMA-205 DAPMTS
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT I |
| TDP _____ TM _____ OTHER SESS |
D. SYSTEM/ITEM
ALL LOT VII TRAINING DEVICES
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A002 |
| SOFTWARE PRODUCT DESIGN (SPD) |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-SESS-82036 |
| SOW 210044 PARA 3.2.26, 3.2.2.7 |
| NAVAIR PMA-205, H1 TRAINING |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 3TIMES/R |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| a. ADDRESSEE |
| b. COPIES |
Final
A
| N/A |
| SEE BLK 16 |
| draft |
| reg |
| repr |
16. REMARKS
1. CONTRACTOR AND SUBCONTRACTOR SPD INFORMATION SHALL BE COMBINED INTO A SINGLE DOCUMENT.
2. BLK 8: THE GOVERNMENT WILL HAVE TWENTYONE (21) BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.
3. BLK 8: REVIEWING OFFICE IS NAWCTSD CODE GT 5.2.4
4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 01 January 2021). Other requests shall be referred to PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547.
5. BLK 12: FIRST SUBMISSION SHALL BE DUE 30 BUSINESS DAYS PRIOR TO PDR.
6. BLK 13: SECOND SUBMISSION SHALL BE DUE 30 BUSINESS DAYS PRIOR TO CDR.
7. BLK 13: THIRD (FINAL) SUBMISSION SHALL BE DUE 10 BUSINESS DAYS PRIOR TO IT-1 (IFI) AND SHALL INCLUDE ALL MEDIA FOR NON-COMMERCIAL ITEM SOFTWARE. CONTRACTOR SHALL MAKE THE COMMERCIAL ITEM SOFTWARE MEDIA AVAILABLE FOR GOVERNMENT USE WHILE PERFORMING THE COLD START AND INSTALLATION PROCEDURES.
8. BLK 13: REVISIONS SHALL BE DUE AS REQUIRED THROUGH THE END OF THE CONTRACT.
9. BLK 14: ALL REPRODUCIBLE SUBMISSIONS SHALL BE POSTED IAW THE SOW. ALL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN AN EDITABLE ELECTRONIC FORMAT IN MICROSOFT WORD 2016 COMPATIBLE FORMAT. ADDITIONALLY, FINAL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN ELECTRONIC FORMAT ON CD-ROM TO FOLLOWING ADDRESSEES: NAWCTSD SW ENGR, NAWCTSD ENGR AND NAWCTSD ISEO-CP.
10. BLK14: DELIVERY TO THE NAWCTSD PCO SHALL RECEIVE LETTER OF NOTIFICATION. EMAIL ADDRESS IS PROVIDED IN SECTION F OF THE CONTRACT.
| NAWCTSD SW ENGR |
| 1 |
| SEE |
| NAWCTSD ENGR |
| 1 |
| SEE |
| NAWCTSD ISEO-CP |
| 0 |
| SEE |
| NAWCTSD PCO |
| 0 |
| SEE |
| 15. TOTAL |
| 2 |
| 0 |
| 3 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CATTIEN NGUYEN, NAWCTSD SW ENGR
S. COLN, PMA-205 DAPMTS
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT I |
| TDP _____ TM _____ OTHER IPSC |
D. SYSTEM/ITEM
(LOT VII) 2F197B-2 (AH-1Z)
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A003 |
| SOFTWARE PRODUCT PACKAGE (SPP) |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-IPSC-82090C |
| SOW 210044 PARAS 3.2.2.10.1.2 |
& 3.2.8.13.5.2.1
NAVAIR PMA-205, H1 TRAINING
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 3 TIMES/R |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| a. ADDRESSEE |
| b. COPIES |
Final
A
| N/A |
| SEE BLK 16 |
| draft |
| reg |
| repr |
16. REMARKS
1. CONTRACTOR AND SUBCONTRACTOR SPP INFORMATION SHALL BE COMBINED INTO A SINGLE DOCUMENT.
2. BLK 8: THE GOVERNMENT WILL HAVE TWENTYONE (21) BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.
3. BLK 8: REVIEWING OFFICE IS NAWCTSD CODE GT 5.2.4
4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 01 January 2021). Other requests shall be referred to PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547
5. BLK 12: FIRST SUBMISSION SHALL BE DUE 10 BUSINESS DAYS PRIOR TO DT-1 (CPI) AND SHALL INCLUDE THE COLD START AND INSTALLATION PROCEDURES.
6. BLK 13: SECOND SUBMISSION SHALL BE DUE 10 BUSINESS DAYS PRIOR TO IT-1 (IPI) AND SHALL INCLUDE ALL MEDIA FOR NON-COMMERCIAL ITEM SOFTWARE. CONTRACTOR SHALL MAKE THE COMMERCIAL ITEM SOFTWARE MEDIA AVAILABLE FOR GOVERNMENT USE WHILE PERFORMING THE COLD START AND INSTALLATION PROCEDURES.
7. BLK 13: THIRD (FINAL) SUBMISSION SHALL BE DUE 10 BUSINESS DAYS PRIOR TO FINAL PCA AND SHALL INCLUDE THE DELIVERY OF ALL SOFTWARE CONFIGURATION ITEMS (INCLUDING DATABASES AND COMMERCIAL ITEM MEDIA) REQUIRED TO ACCOMPLISH THE TRAINER SYSTEM COLD START AND INSTALLATION PROCEDURES.
8. BLK 13: REVISIONS SHALL BE DUE AS REQUIRED THROUGH THE END OF THE CONTRACT.
9. BLK 14: ALL REPRODUCIBLE SUBMISSIONS SHALL BE POSTED IAW THE SOW. ALL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN AN EDITABLE ELECTRONIC FORMAT IN MICROSOFT WORD 2016 COMPATIBLE FORMAT. ADDITIONALLY, FINAL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN ELECTRONIC FORMAT ON CD-ROM TO FOLLOWING ADDRESSEES: NAWCTSD SW ENGR, NAWCTSD ENGR, NAWCTSD ISEO-CP AND NAWCTSD ILSM.
10. BLK14: DELIVERY TO THE NAWCTSD PCO SHALL RECEIVE LETTER OF NOTIFICATION. EMAIL ADDRESS IS PROVIDED IN SECTION F OF THE CONTRACT.
11. THE DELIVERABLE SHALL BE FREE OF ALL PROPRIETARY MARKINGS, WITH THE EXCEPTION OF MARKINGS ON COMMERCIAL ITEM SOFTWARE.
| NAWCTSD SW ENGR |
| 1 |
| SEE |
| NAWCTSD ENGR |
| 1 |
| SEE |
| NAWCTSD ISEO-CP |
| 0 |
| SEE |
| NAWCTSD ILSM |
| 0 |
| SEE |
| NAWCTSD PCO |
| 0 |
| SEE |
| 15. TOTAL |
| 2 |
| 0 |
| 4 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CATTIEN NGUYEN, NAWCTSD SW ENGR
S. COLN, PMA-205 DAPMTS
C O N T R A C T D A T R E Q U I R E M E N T S L I S T
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT V |
| TDP _____ TM _____ OTHER IPSC |
D. SYSTEM/ITEM
(LOT VII) 2F196B-3 (UH-1Y)
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| AA03 |
| SOFTWARE PRODUCT PACKAGE (SPP) |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-IPSC-82090C |
| SOW 210044 PARAS 3.2.2.10.1.2 |
NAVAIR PMA-205, H1 TRAINING
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 3 TIMES/R |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| a. ADDRESSEE |
| b. COPIES |
Final
A
| N/A |
| SEE BLK 16 |
| draft |
| reg |
| repr |
16. REMARKS
2. BLK 8: THE GOVERNMENT WILL HAVE TWENTYONE (21) BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.
3. BLK 8: REVIEWING OFFICE IS NAWCTSD CODE GT 5.2.4
4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 01 January 2021). Other requests shall be referred to PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547
5. BLK 12: FIRST SUBMISSION SHALL BE DUE 10 BUSINESS DAYS PRIOR TO DT-1 (CPI) AND SHALL INCLUDE THE COLD START AND INSTALLATION PROCEDURES.
6. BLK 13: SECOND SUBMISSION SHALL BE DUE 10 BUSINESS DAYS PRIOR TO IT-1 (IPI) AND SHALL INCLUDE ALL MEDIA FOR NON-COMMERCIAL ITEM SOFTWARE. CONTRACTOR SHALL MAKE THE COMMERCIAL ITEM SOFTWARE MEDIA AVAILABLE FOR GOVERNMENT USE WHILE PERFORMING THE COLD START AND INSTALLATION PROCEDURES.
7. BLK 13: THIRD (FINAL) SUBMISSION SHALL BE DUE 10 BUSINESS DAYS PRIOR TO FINAL PCA AND SHALL INCLUDE THE DELIVERY OF ALL SOFTWARE CONFIGURATION ITEMS (INCLUDING DATABASES AND COMMERCIAL ITEM MEDIA) REQUIRED TO ACCOMPLISH THE TRAINER SYSTEM COLD START AND INSTALLATION PROCEDURES.
8. BLK 13: REVISIONS SHALL BE DUE AS REQUIRED THROUGH THE END OF THE CONTRACT.
9. BLK 14: ALL REPRODUCIBLE SUBMISSIONS SHALL BE POSTED IAW THE SOW. ALL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN AN EDITABLE ELECTRONIC FORMAT IN MICROSOFT WORD 2016 COMPATIBLE FORMAT. ADDITIONALLY, FINAL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN ELECTRONIC FORMAT ON CD-ROM TO FOLLOWING ADDRESSEES: NAWCTSD SW ENGR, NAWCTSD ENGR, NAWCTSD ISEO-CP AND NAWCTSD ILSM.
10. BLK14: DELIVERY TO THE NAWCTSD PCO SHALL RECEIVE LETTER OF NOTIFICATION. EMAIL ADDRESS IS PROVIDED IN SECTION F OF THE CONTRACT.
11. THE DELIVERABLE SHALL BE FREE OF ALL PROPRIETARY MARKINGS, WITH THE EXCEPTION OF MARKINGS ON COMMERCIAL ITEM SOFTWARE.
| NAWCTSD SW ENGR |
| 1 |
| SEE |
| NAWCTSD ENGR |
| 1 |
| SEE |
| NAWCTSD ISEO-CP |
| 0 |
| SEE |
| NAWCTSD ILSM |
| 0 |
| SEE |
| NAWCTSD PCO |
| 0 |
| SEE |
| 15. TOTAL |
| 2 |
| 0 |
| 4 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CATTIEN NGUYEN, NAWCTSD SW ENGR
S. COLN, PMA-205 DAPMTS
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT VI |
| TDP _____ TM _____ OTHER IPSC |
D. SYSTEM/ITEM
(LOT VII) 2F226-2 (UH-1Y)
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| AG03 |
| SOFTWARE PRODUCT PACKAGE (SPP) |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-IPSC-82090C |
| SOW 210044 PARAS 3.2.2.10.1.2 |
NAVAIR PMA-205, H1 TRAINING
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 3 TIMES/R |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| a. ADDRESSEE |
| b. COPIES |
Final
A
| N/A |
| SEE BLK 16 |
| draft |
| reg |
| repr |
16. REMARKS
2. BLK 8: THE GOVERNMENT WILL HAVE TWENTYONE (21) BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.
3. BLK 8: REVIEWING OFFICE IS NAWCTSD CODE GT 5.2.4
4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 01 January 2021). Other requests shall be referred to PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547
5. BLK 12: FIRST SUBMISSION SHALL BE DUE 10 BUSINESS DAYS PRIOR TO DT-1 (CPI) AND SHALL INCLUDE THE COLD START AND INSTALLATION PROCEDURES.
6. BLK 13: SECOND SUBMISSION SHALL BE DUE 10 BUSINESS DAYS PRIOR TO IT-1 (IPI) AND SHALL INCLUDE ALL MEDIA FOR NON-COMMERCIAL ITEM SOFTWARE. CONTRACTOR SHALL MAKE THE COMMERCIAL ITEM SOFTWARE MEDIA AVAILABLE FOR GOVERNMENT USE WHILE PERFORMING THE COLD START AND INSTALLATION PROCEDURES.
7. BLK 13: THIRD (FINAL) SUBMISSION SHALL BE DUE 10 BUSINESS DAYS PRIOR TO FINAL PCA AND SHALL INCLUDE THE DELIVERY OF ALL SOFTWARE CONFIGURATION ITEMS (INCLUDING DATABASES AND COMMERCIAL ITEM MEDIA) REQUIRED TO ACCOMPLISH THE TRAINER SYSTEM COLD START AND INSTALLATION PROCEDURES.
8. BLK 13: REVISIONS SHALL BE DUE AS REQUIRED THROUGH THE END OF THE CONTRACT.
9. BLK 14: ALL REPRODUCIBLE SUBMISSIONS SHALL BE POSTED IAW THE SOW. ALL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN AN EDITABLE ELECTRONIC FORMAT IN MICROSOFT WORD 2016 COMPATIBLE FORMAT. ADDITIONALLY, FINAL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN ELECTRONIC FORMAT ON CD-ROM TO FOLLOWING ADDRESSEES: NAWCTSD SW ENGR, NAWCTSD ENGR, NAWCTSD ISEO-CP AND NAWCTSD ILSM.
10. BLK14: DELIVERY TO THE NAWCTSD PCO SHALL RECEIVE LETTER OF NOTIFICATION. EMAIL ADDRESS IS PROVIDED IN SECTION F OF THE CONTRACT.
11. THE DELIVERABLE SHALL BE FREE OF ALL PROPRIETARY MARKINGS, WITH THE EXCEPTION OF MARKINGS ON COMMERCIAL ITEM SOFTWARE.
| NAWCTSD SW ENGR |
| 1 |
| SEE |
| NAWCTSD ENGR |
| 1 |
| SEE |
| NAWCTSD ISEO-CP |
| 0 |
| SEE |
| NAWCTSD ILSM |
| 0 |
| SEE |
| NAWCTSD PCO |
| 0 |
| SEE |
| 15. TOTAL |
| 2 |
| 0 |
| 4 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CATTIEN NGUYEN, NAWCTSD SW ENGR
S. COLN, PMA-205 DAPMTS
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT VII |
| TDP _____ TM _____ OTHER IPSC |
D. SYSTEM/ITEM
(LOT VII) 2F196B-4 (UH-1Y)
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| AN03 |
| SOFTWARE PRODUCT PACKAGE (SPP) |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-IPSC-82090C |
| SOW 210044 PARAS 3.2.2.10.1.2 |
NAVAIR PMA-205, H1 TRAINING
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 3 TIMES/R |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| a. ADDRESSEE |
| b. COPIES |
Final
A
| N/A |
| SEE BLK 16 |
| draft |
| reg |
| repr |
16. REMARKS
2. BLK 8: THE GOVERNMENT WILL HAVE TWENTYONE (21) BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.
3. BLK 8: REVIEWING OFFICE IS NAWCTSD CODE GT 5.2.4
4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 01 January 2021). Other requests shall be referred to PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547
5. BLK 12: FIRST SUBMISSION SHALL BE DUE 10 BUSINESS DAYS PRIOR TO DT-1 (CPI) AND SHALL INCLUDE THE COLD START AND INSTALLATION PROCEDURES.
6. BLK 13: SECOND SUBMISSION SHALL BE DUE 10 BUSINESS DAYS PRIOR TO IT-1 (IPI) AND SHALL INCLUDE ALL MEDIA FOR NON-COMMERCIAL ITEM SOFTWARE. CONTRACTOR SHALL MAKE THE COMMERCIAL ITEM SOFTWARE MEDIA AVAILABLE FOR GOVERNMENT USE WHILE PERFORMING THE COLD START AND INSTALLATION PROCEDURES.
7. BLK 13: THIRD (FINAL) SUBMISSION SHALL BE DUE 10 BUSINESS DAYS PRIOR TO FINAL PCA AND SHALL INCLUDE THE DELIVERY OF ALL SOFTWARE CONFIGURATION ITEMS (INCLUDING DATABASES AND COMMERCIAL ITEM MEDIA) REQUIRED TO ACCOMPLISH THE TRAINER SYSTEM COLD START AND INSTALLATION PROCEDURES.
8. BLK 13: REVISIONS SHALL BE DUE AS REQUIRED THROUGH THE END OF THE CONTRACT.
9. BLK 14: ALL REPRODUCIBLE SUBMISSIONS SHALL BE POSTED IAW THE SOW. ALL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN AN EDITABLE ELECTRONIC FORMAT IN MICROSOFT WORD 2016 COMPATIBLE FORMAT. ADDITIONALLY, FINAL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN ELECTRONIC FORMAT ON CD-ROM TO FOLLOWING ADDRESSEES: NAWCTSD SW ENGR, NAWCTSD ENGR, NAWCTSD ISEO-CP AND NAWCTSD ILSM.
10. BLK14: DELIVERY TO THE NAWCTSD PCO SHALL RECEIVE LETTER OF NOTIFICATION. EMAIL ADDRESS IS PROVIDED IN SECTION F OF THE CONTRACT.
11. THE DELIVERABLE SHALL BE FREE OF ALL PROPRIETARY MARKINGS, WITH THE EXCEPTION OF MARKINGS ON COMMERCIAL ITEM SOFTWARE.
| NAWCTSD SW ENGR |
| 1 |
| SEE |
| NAWCTSD ENGR |
| 1 |
| SEE |
| NAWCTSD ISEO-CP |
| 0 |
| SEE |
| NAWCTSD ILSM |
| 0 |
| SEE |
| NAWCTSD PCO |
| 0 |
| SEE |
| 15. TOTAL |
| 2 |
| 0 |
| 4 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CATTIEN NGUYEN, NAWCTSD SW ENGR
S. COLN, PMA-205 DAPMTS
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT II |
| TDP _____ TM _____ OTHER IPSC |
D. SYSTEM/ITEM
(LOT VII) 2F196-1 (UH-1Y)
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .