This document is a photographic and technical specification file for a federal repair and renovation project at Building 8401 (PX Building), Project Number BMH-EXC-B0519-6P.
The project scope encompasses comprehensive door and emergency exit repairs to achieve NFPA 101 Life Safety Code compliance. Primary deliverables include: replacing multiple escape doors (currently lockable, non-compliant) with new doors that cannot be locked; installing a new gate with integrated door at the delivery entrance (north side) to replace the existing gate; repairing and widening pavements and walkways at multiple exit points to eliminate steps and level changes; replacing deteriorated external stairs; constructing temporary stairs with structural calculations at two locations; closing wall and ceiling penetrations in fire-rated stairwell walls and mechanical rooms with fire-rated materials; removing and masking a large window opening (approximately 3.00m x 2.20m); upgrading the fire alarm detection system to provide full room coverage; adding fire-rated drywall with door around the fire alarm control panel; modifying door hardware (changing half-cylinder to standard cylinder on Door #29 for emergency access); and conducting extensive plaster, paint, and ceiling tile repairs throughout the facility. The document includes detailed photographs showing current conditions, sample reference images of desired solutions (such as modular stair systems and integrated gate doors), and floor plans identifying penetrations and work areas on both the 1st and 2nd floors. A certified designer is required to produce final design drawings. The work must comply with NFPA 101 requirements and accommodate existing building systems including electrical, mechanical, and fire safety infrastructure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project-No.: BMH- EXC-B0519-6P, Repair Doors PX Bldg. 8401
Typical escape door currently installed (photo shows door #1):
Currently the doors can be locked, this does not meet NFPA 101 requirements.
Photo shows door #12 from the storage to the outside
#36 subway
Stair room number 201, toilet doors #15 and #16. Escape door in the middle #13
Existing gate at delivery entrance on north side:
Sample photo for new gate with integrated door:
Integrated door/ Schlupftür
Sample photo of partial plaster and paint repair around a new door:
Walkway and trench cover must be made on north side (doors #2 and #3):
East side store emergency exit, correct the pavement height (door #1):
Step is not allowed according to NFPA 101.
East side walkway, exit from subway and mechanical room. Pavement must be raised and widened (door # 34 and #35):
Photos of current stair that shall be replaced (door #12 1st floor):
Material is in a very bad condition.
Sample photo of a temporary stair made of individual elements with structural calculation for the system (Systemstatik) (doors # 14 and #25)
Windows and panels that shall be removed and closed with masonry. Size opening appr.
3,00m x 2,20m:
Fire Alarm System, current scope of detectors. Add sufficient number of detectors to every room for full coverage.
Certified designer must do the design described in the contract.
Add fire rated drywall with door in corner where fire alarm system is located:
Prepare wall, remove loose plaster, move outlets, move or remove cable ducts.
Door #29 is currently not accessible from outside. Change half cylinder to a standard cylinder so that fire department can open that door in case of an emergency. Change/ replace covers if needed. Cylinder shall be part of the locking system.
Door #29, detailed view from inside.
Plaster at south side of façade (opposite side of Telekom shop) needs repair of plaster.
Penetrations in stairwell wall and fire rated walls according to marking in floor plan
There are some single cable penetrations and some single small holes in the walls that are not shown on the photos.
For the bid it can be assumed that almost all ceiling tiles along the staircase walls must be removed to get access to the wall penetrations.
Replace all dirty or broken ceiling tiles.
Wall penetrations in the 1st floor storage and mechanical rooms can be seen on site during the pre-bid site visit, no photos are provided.
1st floor
2nd floor
Close ceiling opening to attic
Close penetration/ hole in ceiling.
Replace broken ceiling tiles