Eastern Water Reclamation Facility (EWRF) Electrical and Mechanical Upgrades
Solicitation number
Y26-604
Issued by
Orange County, Orlando City, Florida

About this file

This is a proposal sheet from Ring Power Corporation Advanced Electrical Services for the Eastern Water Reclamation Facility (EWRF) Modernization project submitted to Orange County Wastewater Utilities in Orlando, Florida. The proposal encompasses a comprehensive PLC modernization and controls retrofit for project 36148, which includes removing existing 3.S Controllers and replacing them with Schneider Electric PLCs and PowerPlex II transducers operating on an ethernet communication network. The scope of work encompasses modernization of switchgear controls for four generator sections and tie systems, replacement of obsolete GE protective relays with modern SEL 700G and 751 multifunction relays, installation of new HMI workstation and remote server capabilities, replacement of two utility control lineups (GTA and GTB), addition of new 48 VDC battery systems with nickel-cadmium batteries, and preventative maintenance on medium-voltage breakers. The onsite work is estimated at twenty-six consecutive days during standard business hours and weekends, with the proposal valid for forty-five days from issuance. The project schedule is referenced in relation to the Orange County solicitation deadline of April 23, 2026, with sealed responses required via the OpenGov e-Procurement Platform.

The total project cost is $2,267,882.47 plus applicable taxes and fees, with freight included in the proposal on FOB Origin terms. The proposal includes optional adders for a Factory Witness Test and spare parts list, with an extended warranty option available extending coverage to 60 months for equipment and 66 months for labor upon annual preventative maintenance after year 2. Standard warranty coverage provides 12 months from startup completion for equipment and materials or 90 days from startup for onsite labor and workmanship. The proposal assumes retained settings and does not include a site coordination study or independent third-party testing, both of which would require separate proposals. Additional clarifications address responsibilities for emergency backup power, utility coordination, waste disposal, conduit and field wiring provision, site safety training, and COVID-19 restrictions, all of which are noted as not included unless separately proposed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ring Power Corporation

Advanced Electrical Services

EWRF Modernization Proposal

Customer Name: ORANGE COUNTY WASTEWATER UTILITIES FISCAL DIVISION 02/11/2026 Account: (004967) Site: EWRF Site Address: 1621 SOUTH ALAFAYA TRAIL. ORLANDO, FL 32828 Requestor: EDA Quote Expiration: 45 days – Subject to Price and availability refresh Switchgear Project total: $2,267,882.47+ applicable taxes and fees Reference Quote No. PSQ_106898

Proposed Switchgear Scope of Work:

This Proposal to Orange County Wastewater Utilities for a PLC Modernization and Controls Retrofit for project 36148 Orange County EWRF in Orlando, FL. Caterpillar Switchgear AES will remove existing 3.S Controllers and replace them with Schneider Electric PLCs and PowerPlex II transducers running on an ethernet communication network.

The site’s switchgear controls for the four generator sections and the tie will be modernized with new PLC Control and will be updated to the latest Advanced Graphics software. HMI workstation will be added around the corner from the existing switchgear location, to enable remote operation and data viewing from a safe distance from the 12.47kV equipment. This includes a new enclosure, touchscreen processor, monitor, and Factory Talk client software. A new M340 Data PLC will be provided for data interface with the site’s SCADA system. The obsolete GE 489 generator protection relays, and GE MIF II tie-breaker protection relay, are quoted to be replaced with five (5) modern SEL 700G’s and thirteen (13) 751 multifunction relays respectively. Replacements of GE B30 relays with four (4) 587Z Differential Relays are included. Additionally, two Siemens PAC 4200 Power Meters will be provided (one in each Utility section). A site coordination study is not included in this quotation, as it is assumed the settings will be retained, or supplied by the consulting engineer (Electrical Design Associates.

The site currently has two utility control lineups, labeled GTA and GTB, which are 12.47kV Eaton switchboards with Eaton controls. In addition to the modernization of the Cat/ISO switchboard, these two Eaton switchboards will have their controls removed and replaced with Schneider Electric PLCs and PowerPlex II transducers running on an ethernet communication network. The generators are to operate in close transition with the utility (Duke Power). A new Maintenance Mode will be added to the sequence of operations.

The existing 24VDC station battery systems will be removed (by others) and replaced with two (2) new 48 VDC battery systems including a rack, spill containment, and charger. Old battery removal and disposal are not included in this quotation.

Optional adders included in this proposal are a Factory Witness Test and Spare parts list per site Spec.

Onsite work is quoted for twenty-six (26) days onsite, to occur during standard business hours and throughout weekends. Caterpillar Switchgear will submit methods of procedure (MOPs) for review and acceptance prior to commencing onsite work. Formal submittal reviews will be provided and include General (G) and Field (F) drawings, along with device cut sheets. Upon completion of work, a full as-built drawing set and updated operations manual will be provided in electronic PDF format for dealership and site records. Onsite end-user training for up to two (2) eight (8) hour sessions is also included. An extended warranty is also included as an option.

Ring Power will replace the existing EMCP 3.3 panels with EMCP 4.3 units in conjunction with Switchgear system control replacement.

Ring Power will perform preventative maintenance on the existing medium-voltage breakers including: Insulation Resistance Testing, Contact resistance Testing (DLRO), Secondary Injection Testing, Vacuum Bottle Testing, Timing Testing, Min./Max Pickup/Dropout testing, and cleaning and lubricating

Sheets of new components, Automation and Communication drawings, Training Manual, and As-Built Drawings all provided after the completion of on-site work.

Due to the volatility of the supply chains budgetary proposals are not available. The proposal is valid for Forty- Five (45) days from the date of issuance. Caterpillar Switchgear reserves the right to modify this bill of materials to make use of available products at time of order. Please see the remaining pages for further details and clarifications regarding this proposal.

DEFINITION OF SERVICES:

In house:

1. Project Management - Communication, planning, scheduling

2. Engineering – Programming PLC’s, Hardware Design, drawing markups, testing, submittals, and workplan.

3. Graphics – Update and Create graphics using Lightning for HMI and test on an in-house simulator.

4. Logistics – Purchasing of materials/tools, shipping preparation.

5. CAD - Creation of production drawings, issue of field and updated As Built drawings.

6. Production-Wiring & Assembly Onsite:

Caterpillar Switchgear Engineers on site for up to Twenty-six (26) consecutive day(s) to do the following:

Remove the existing 3.S controllers and replace with Schneider Electric PLC processors & Powerplex II

Transducers Provide 2 new section power envelope for additional generator & load bank (to be installed by others) Remove the existing touchscreen and replace it with new widescreen touchscreen Provide Schneider M340 Data PLC for SCADA Interface Install new secondary remote HMI server in wall-mounted enclosure Provide new 48V Battery Systems to be installed by others.

Replace end of lifecycle Protective Relays Startup of switchgear expansion Add close transition & maintenance mode to sequence of operations System Testing End User Training (2 sessions not to exceed 8 hours each) Ring Power AES Technicians to remove and install Generator EMCP controls with EMCP 4.3 Ring Power AES Technicians to perform Medium-Voltage Breaker Preventative Maintenance including:

Insulation Resistance Testing, Contact resistance Testing (DLRO), Secondary Injection Testing, Vacuum Bottle Testing, Timing Testing, Min./Max Pickup/Dropout testing, and cleaning and lubricating

This quote is based on 7-day work weeks with 12-hour shifts.

Repairs and services to existing gensets/switchgear beyond the described scope will be quoted separately.

Ring Power is not responsible for maintaining Emergency Power in the facility for the duration of the upgrade.

CATERPILLAR WARRANTY INFORMATION

Equipment sold pursuant to this proposal shall be warranted to be free from defects in design, workmanship and material and such warranty shall be on the terms and conditions contained in the manufacturer’s standard end user warranty statement (SELF5731 and associated Warranty Bulletins) for such equipment subject to such changes to the warranty statement as may be necessary to include the equipment in coverage and for the duration set forth below.

Items Warranty Terms AES Services - Caterpillar Switchgear Aftermarket Services warranty period is the shorter of:

12 months from startup completion for equipment/materials provided. May be extended to 60 months upon ordering option along with performing preventative maintenance after year 2 annually.

90 days from startup completion for onsite labor and workmanship

- OR -

18 months from shipping equipment/materials provided. May be extended to 66 months upon ordering option along with performing preventative maintenance by Caterpillar Switchgear after year 2 annually.

Bill of Materials:

Three (3) EMCP 4.3 Generator Control panels

Conversion harness Local Annunciator MODBUS TCP/IP communication network output

One (1) Master Control Section:

Schneider Electric Processors (Ap1 & Ap2) M340 Data PLC/DTI Widescreen touchscreen Managed ethernet switch(es)

Four (4) Existing Generator Control Hardware & Protection Sections:

Schneider Electric PLC (1 per generator breaker) PowerPlex II Transducer Schweitzer SEL700G Multifunction protective relay Device 25 Sync Check Managed ethernet switch

Four (4) Tie Control, Hardware & Protection Section:

Schneider Electric PLC (1 per tie breaker) PowerPlex II Transducer Schweitzer 751 Multifunction Protection Relay Managed ethernet switch

Two (2) Utility Control Hardware & Protection Section (Eaton takeover):

Schneider Electric PLC (1 per utility breaker) PowerPlex II Transducer 86 Lockout Relay (LOR)

CPT’s Electroswitch CBCS SEL 751 Multifunction protective relay Device 25 Sync Check Managed ethernet switch

One (1) Remote HMI:

Floor-mounted NEMA 1 painted steel computer enclosure cabinet Remote touchscreen processor with monitor and FactoryTalk software Power supply Backup battery & surge protector Widescreen Touchscreen Managed Switch

Two (2) Expansion Generator/Load Bank Control Hardware and protection Sections (See New Structure drawing/power envelope & that bill of material further down):

Schneider Electric PLC (1 per generator breaker) PowerPlex II Transducer Schweitzer SEL700G Multifunction protective relay (1) Schweitzer SEL751 Multifunction protective relay (1) Device 25 Sync Check 86 Lockout Relay (LOR) Electro switch CBCS Managed ethernet switch

Additional Items:

Miscellaneous Hardware (wiring, cables, labels, etc.)

SEL 587 Differential Relays (3) Power Supply Station Batteries & Rack Door Plates

NEW STRUCTURES TO BE PLACED ON LEFT HAND SIDE OF PROJECT 36148:

Battery System:

NICKEL CADMIUM BATTERIES

QTY 2-ALCAD 48 VDC VANTEX NICKEL-CADMIUM BATTERIES EACH CONSISTING OF 40 CELLS RATED 140 AH AND SIZED TO PROVIDE A MINIMUM OF 130 AH AT THE EIGHT HOUR RATE TO 1.05 VOLTS PER CELL AT 45° F. EACH BATTERY WILL BE SUPPLIED WITH CONNECTING HARDWARE WITH INSULATING COVERS AND TERMINAL LUGS

IEEE 1106 BATTERY DISCHARGE TESTS

QTY 2-ALCAD IEEE 1106 FACTORY 5-HOUR BATTERY DISCHARGE TESTS BASED ON 100% SYSTEM AVERAGE, WITH

TEST REPORT

BATTERY RACKS

QTY 2-ALCAD TWO TIER, 54” LONG, NON-SEISMIC, BATTERY RACKS, CATALOG # PL1145L, EACH DESIGNED TO

SUPPORT 40 CELLS

SPILL CONTAINMENT SYSTEM (TWO RACKS PLACED

SPILL CONTAINMENT SYSTEM-ALCAD/ENVIROGUARD U.L. LINER TYPE SPILL CONTAINMENT SYSTEM, 29”W X 58”L

COMPLETE WITH NEUTRALIZING PILLOWS

BATTERY ACCESSORIES

QTY 1-16MM INSULATED SPANNER WRENCH FOR THE TERMINAL NUTS

INSULATED TORQUE WRENCH, DIGITAL MULTIMETER, INFRARED THERMOMETER.

BATTERY CHARGERS

(QTY 2) LAMARCHE 48 VDC FILTERED BATTERY CHARGERS EACH RATED 20 AMPS OUTPUT WITH 120/240/208

VAC, SINGLE PHASE, 60 HERTZ INPUT COMPLETE WITH THE FOLLOWING ACCESSORY:

DISCRETE ALARM CONTACTS

NOTE: THE CHARGER SIZING ASSUMES THE CONTINUOUS LOAD IS LESS THAN 11.83 AMPS. IF THE LOAD IS LESS

THAN 7.83 AMPS THEN 16 AMP CHARGERS COULD BE USED.

BEST BATTERY SELECTOR

LAMARCHE AUTOMATIC REDUNDANT BATTERY SELECTOR RATED 50 AMPS CONTINUOUS AND 500 AMPS FOR 30

SECONDS.

CLARIFICATIONS FOR BATTERY SYSTEM

12 TO 14 WEEKS FOR SHIPMENT AFTER RECEIPT OF THE ORDER

THE BATTERY WAS SIZED FOR THE MINIMUM REQUIREMENT OF 130 AH AT THE 8-HOUR RATE TO 42 VOLTS AT 45° F.

FLOAT AND EQUALIZE SETTINGS ARE MICROPROCESSOR ADJUSTABLE THROUGH THE FRONT PANEL, NOT BY

POTENTIOMETERS.

THE SPECIFIC GRAVITY SPECIFIED IS FOR LEAD ACID BATTERIES NOT NICKEL CADMIUM BATTERIES.

THE MINIMUM TEMPERATURE OF 45° F PER A.3.B. WAS USED NOT 13° C (55° F). CYCLING THE BATTERY PRIOR TO

SHIPMENT DOES NOT GUARANTEE RATED CAPACITY AT INSTALLATION.

THIS ITEM IS FOR A LEAD ACID BATTERY AND IS NOT INCLUDED. AN INFRARED THERMOMETER IS OFFERED IN

ITEM 5-BATTERY ACCESSORIES.

HYDROMETER IS FOR A LEAD ACID BATTERY AND IS NOT INCLUDED. THE SPECIFIC GRAVITY OF A NICKEL

CADMIUM BATTERY DOES NOT CHANGE WITH STATE OF CHARGE.

SOCKET WRENCH SET IS NOT INCLUDED. AN INSULATED BATTERY TERMINAL SPANNER WRENCH ALONG WITH

OTHER MAINTENANCE ITEMS ARE OFFERED IN ITEM 5-BATTERY ACCESSORIES.

Spare Parts Bill of Materials:

Generator PLC Other PLC (Data, Utility, or Tie) PowerPlex II Transducer Device 25 Sync Check Electro switch CBCS 86 Lockout Relay (LOR) 8-port managed switch Widescreen Touchscreen Touchscreen Processor Factory Talk Software Kepware Software SEL700G Protective Relay SEL 751G Protective Relay SEL 587Z Differential Relay

I hereby authorize the above repair work to be done along with the necessary materials. Ring Power Corporation and it's employees may operate above equipment for purposes of testing. Inspection or delivery at my risk. An expressed mechanics lien is acknowledged on equipment to secure the cost of all repairs thereto. Ring Power Corporation is not responsible for loss or damage to equipment in case of fire, theft, accident, or any other cause beyond our control. Replaced parts will be held for a period of ten days after work completion. The cost of labor and parts in determining any estimate shall be borne by the customer.

PO#: Authorized Name: (signature)

Date: (print)

THIS WORK ORDER IS SUBJECT TO THE FOLLOWING TERMS AND CONDITIONS:

1. AUTHORITY TO PERFORM REPAIRS It is understood that, "upon receipt" of any item of equipment for repair, maintenance or other work, Ring Power may examine the item of equipment as to work which Ring Power may suggest to be performed in addition to whatever work, if any, might have been requested by customer. All work (requested by customer or suggested by Ring Power) to be noted on a form as supplied by Ring Power.

a. Time and Material Work - Ring Power will proceed with the work agreed upon at current labor and parts prices.

b. Firm Price - If requested, a firm price in writing will be given to the customer for labor and/or parts to do specific repair.

Any agreed a upon repair order not covered by a firm written quotation will be billed at current time and material prices

c. Unforeseen Problems or Additional Repairs. In the event that during the course of the Work, additional repair work is found to be necessary pursuant to Ring Power's examination and inspection of the Equipment, then in such event Ring Power will attempt to communicate with the Customer as to the additional repair work; provided, however, that in the event Ring Power is unable to communicate with the Customer, then Ring Power, at its sole discretion, shall have the absolute right to cease any and all repairs on the Equipment until such time as the additional repairs are discussed with the Customer. In the event the Customer consents to the additional repairs, Ring Power shall have the right to proceed with the repair of the same without further communication with the Customer and any and all additional repairs will be charged to the Customer at current time and material prices.

2. HOLD HARMLESS AGREEMENT FOR CUSTOMER PARTICIPATION IN SERVICE WORK - In the event customer or customers' personnel assists our mechanics in performing service work, customer agrees to hold harmless and fully indemnify Ring Power for injuries or damages to anyone arising out of customer assisting Ring Power personnel in servicing or repairing customer's equipment.

3. WARRANTY INFORMATION - Ring Power warrants the work performed to be free from defects in material and workmanship for a period of ninety days. Ring Power's obligation under this warranty shall be limited to the repair or replacement at Ring Power's premises of those new parts previously installed or labor previously performed demonstrated to be defective. SUCH REMEDY SHALL CONSTITUTE CUSTOMER'S SOLE AND EXCLUSIVE REMEDY AND CUSTOMER HEREBY AGREES THAT NO OTHER REMEDY (INCLUDING, BUT NOT LIMITED TO CLAIMS FOR INCIDENTAL, CONSEQUENTIAL OR SPECIAL DAMAGES, OR ANY CAUSE, LOSS, ACTION, CLAIM OR DAMAGE, INCLUDING LOSS OF TIME, WHATSOEVER, OR INJURY TO PERSON OR PROPERTY OR ANY OTHER CONSEQUENTIAL DAMAGE OR INCIDENTAL OR ECONOMIC LOSS) SHALL BE AVAILABLE TO CUSTOMER. THIS WARRANTY IS EXPRESSLY IN LIEU OF ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING ANY WARRANTIES OR MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. SUBSTANDARD REPAIR WORK MAY BE PERFORMED UPON REQUEST OF CUSTOMER AND ACCORDING TO CUSTOMER'S INSTRUCTIONS BUT SUCH WORK WILL CARRY ABSOLUTELY NO WARRANTY WHATSOEVER. CUSTOMER FURTHER ACKNOWLEDGES AND AGREES THAT NO VERBAL CONTRACTS, AGREEMENTS OR WARRANTIES OTHER THAN WHAT IS SET FORTH HEREIN HAVE BEEN RECEIVED OR GIVEN.

4. PAYMENT - Customer will make payment for services rendered by Ring Power pursuant to this work order at such times and in such manner as may be prescribed by Ring Power. In the event of nonpayment by a customer, the cost incurred by Ring Power in collecting the indebtedness, including attorney's fees and expenses, both in the trial court and on any and all appeals, with interest at the maximum rate allowed by law from date of expenditure, shall be added to the principal amount of the indebtedness owed to Ring Power. These provisions are not exclusive and Ring Power may elect other remedies at law and at equity.

5. RISK OF LOSS - Ring Power carries an Equipment Floater Insurance Policy covering all risk (except war, wear and tear, etc.) for the current value (replacement cost less depreciation) on customer's equipment in Ring Power's custody or control.

All risk of loss and damage not covered in above policy shall be borne solely by its owner.

6. SEVERABILITY CLAUSE - Any provisions of this Agreement found to be prohibited by law shall be immediately ineffective to the extent of such prohibition without invalidating the rest of this Agreement.

7. APPLICABLE LAW - This Agreement shall be deemed to be governed by the laws of the State of Florida.

AES Services – Switchgear Controls Retrofit Clarifications:

1. This proposal assumes that all work will be performed in Twenty-six (26) consecutive days during normal business and throughout the weekend as needed. If additional time on site is required for reasons outside the control of Caterpillar Switchgear, those days will be billed per Caterpillar Switchgear published rates plus expenses. Travel and expenses are calculated by utilizing the closest geographical resources. If lead time will not permit this, additional travel expenses may be incurred.

2. Cancellation charges or rescheduling charges for onsite services, including but not limited to loss of utilization of assigned field service personnel and remobilization, may apply for startup schedule changes received within Four (4) weeks of the confirmed schedule.

3. Ring Power to provide a Certified technician for assistance with the retrofit, engine startup, alarm, shutdowns, tuning, and testing for the duration of the system upgrade.

4. End User is responsible to provide and maintain emergency backup power for the duration of work, if necessary. During this work, the system will remain capable of automatic operation, however, only one generator will be available. Emergency Loads are required to be minimized to the capability of one of the Caterpillar Generators.

5. During the removal and installation of the new components, the end user may need to operate the system manually. The system capacity will be reduced to one generator while the removal and replacement is ongoing. The single generator will be capable of automatic operation. However, if site load exceeds the capacity of one of the generators, manual operations of a temporary system may be necessary.

6. A load bank is included in the proposal for engine tuning and load sharing validation, if site load cannot be used. The minimum required load is 50% of the generator plant capacity. If the site load fulfills this requirement and can be affected, a load bank will not be necessary.

7. The End User is responsible for the disposal of all waste generated at the job site.

8. End User is responsible for coordinating with the local utility for switching orders, scheduling outages and to de-energize the electrical apparatus involved in this project, if required. This includes any utility fees associated with the service disconnection and reconnection.

9. Prior to the start of work, End User shall familiarize Caterpillar Switchgear personnel with their safety practices, regulations in effect at the jobsite, and any chemical and physical hazards, including process safety issues associated with the work environment. Caterpillar Switchgear shall be under no obligation to commence work unless safety practices are acceptable to Caterpillar Switchgear. As a safety precaution, prior to the commencement of work, access to a nearby telephone with the ability to call outside the facility will be provided by the end user, as well as telephone numbers for local emergency services.

10. The End User shall identify someone with site authority to allow the following - (A) switching and outages as required with safe lock out and tag out of equipment being worked upon, (B) free and clear access and egress to the work site, (C) provide communication and sanitation facilities, and (D) identify someone from maintenance to be able to control and shift loads and have that individual available to Caterpillar Switchgear during testing.

11. Conduit, field wiring, and/or fiber optic cabling, shall be provided by the End User or a contractor of the End User.

12. Unimpeded access to the system is required. All removal and replacement of any obstructions that may interfere with access to the existing equipment will be the responsibility of others, if necessary.

13. Multiple momentary Utility power outages will be required during the testing of the Sequence of Operation to properly test the emergency mode of operations.

14. Caterpillar Switchgear will procure all specified components and program in Alpharetta, GA. The PLC and HMI programming will be tested on a static simulation of the site system configuration prior to shipment to the project site for installation. Any changes to the Scope of Work or Bill of Material will require the proposal to be revised which may result in a price change and/or rescheduling of the work. Any changes to the Scope of Work or Bill of Material will require the proposal to be revised which may result in a price change and/or rescheduling of the work.

15. This proposal assumes that any components not explicitly listed in bill of materials is operational. Components found inoperable during upgrade testing and not covered under this proposal will be identified and quoted in a separate change order proposal for acceptance and authorization prior to procurement or repair.

16. This proposal includes submittals for approval (HFA) in electronic format consisting of G drawings (Informational drawing set consisting of power one line, automation one line, controls one line, elevation & conduit schedule), manufacturer data sheets related to the new components, and a basic project schedule. No work beyond creation of submittal will be performed on order until release for manufacturing is provided.

Lead-time for submittal drawings will be determined at time of order. Field Interconnect & Wiring drawing submittals will require additional time and revised proposal if necessary.

17. A work plan is included. This will be provided prior to mobilization of the Caterpillar Field Engineers for review and coordination.

18. Updated As Built Drawings, Operators Training Manual, and Manufacturer Data Sheets of replaced components, in electronic format will be provided following onsite work completion.

19. Caterpillar Switchgear is not responsible for any third-party software added, nor is the addition of third- party software advised, nor operating system updates be pushed to the TSP. Some software may conflict with HMI server and client programs. If software is added by persons other than Caterpillar Switchgear, Caterpillar Switchgear will not be held responsible for system performance. The interaction between the server and the client software is extremely sensitive, therefore it is STRONGLY advised the TSP is not connected to the site domain or network. Should it be required for the TSP to be on the sites network domain, additional hardware and software will be necessary to protect the integrity of the switchgear controls. A new proposal will be provided for the costs associated with this change.

20. No site safety training, background checks or drug screens are included in this proposal. If these are required, there will be a revision to this proposal to capture additional costs associated with expenses and detention.

21. No provisions for independent or third-party testing have been included in this proposal. Should this be required, pricing will be provided in a separate proposal at the standard Caterpillar Switchgear published field labor rates plus travel and expenses.

22. No warranty extension is expressed or implied for existing equipment. Caterpillar Switchgear AES Warranty covers only the components listed and the workmanship/labor involved with the installation of those components.

23. UL field certification is not included in our proposal. If a field certification is required, a separate proposal will be provided for this service.

24. Shipping terms are FOB Origin. Freight has been included in this proposal.

25. This proposal does not include any time or cost for Federal, State, Local, or Site quarantine restrictions and/or requirements due to the Covid-19 virus. Should it be necessary, a separate proposal to capture costs associated with these requirements will be provided. Seller shall not be responsible for any failure to perform, or delay in performance of, its obligations resulting from the COVID-19 pandemic or any other future epidemic, and Buyer shall not be entitled to any damages resulting thereof.

Protective Relay Replacement Clarifications:

1. This proposal includes onsite time for the installation of programmed protective relays.

2. Others to provide an approved coordination study and setting files for the electrical system. The settings files are to be provided in an electronic, upload-compatible format.

3. Up to a Six-week lead time for programming & testing of new relays after received.

4. New relays are to be tested with voltage and current injection and a conversion/programming report to be provided.

5. Protective relay replacement cannot be performed on an energized circuit and will require a controlled shutdown of the circuit and/or transferring the load to an alternate source.

Optional Factory Witness Test Clarifications:

1. Optional Factory Witness Test Clarifications: The Customer Witness Test will highlight the equipment physical design, the HMI screens, and the control system’s ability to perform the approved Sequence of Operations. Simulators will be utilized in lieu of actual generators or utility service. The CWT process will cover many, but not all, project details, variations, combinations of equipment operation, installation requirements, and operations. No Hi-pot testing will be performed during the test. A detailed Customer Witness Test script will be provided after the project is released for manufacturing. Any incremental testing requests or additional time requested will be provided under a separate proposal. Travel expenses to be handled by others.