Addendum No. 1 to Snow Removal and Ice Control Services RFP

This document is Addendum No. 1 issued by the Minnesota Office of State Procurement for the Snow Removal and Ice Control Services solicitation for the Perpich Center for Arts Education located at 6125 Olson Memorial Highway, Golden Valley, Minnesota. The addendum, dated November 4, 2026, incorporates Exhibit E (Facility Site Map: Snow Dumping Zones) into the solicitation documents and provides responses to seven questions submitted during the question and answer period. The original response deadline of November 9, 2026, at 3:00 p.m. CT remains unchanged. The anticipated service start date is November 19, 2026, with the contract term running through November 18, 2027, and an option to extend up to four additional years at the State's discretion. No site visits are available to prospective bidders, who must base their proposals on facility maps included in the solicitation documents.

Key clarifications provided in the addendum address critical operational requirements and certification requirements. Subcontracting is strictly prohibited; all services must be performed exclusively by the contractor's direct employees. Per-occurrence snow removal pricing is based on snowfall accumulation at the time of service, with each separate service visit during a storm event considered a distinct occurrence and billed according to the applicable pricing category. Deicing services shall be performed only upon written direction from the Site Supervisor or designee, communicated through email, text message, or other approved written formats. All operators must complete MPCA Smart Salting Level 1 training and provide certificates within 30 days of contract commencement; Level 2 Smart Salting Certification is not required at contract start but must be obtained or measurable progress demonstrated within 24 months of the Notice to Proceed. The most recent service provider for this location was Landsculpt, Inc.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Office of State Procurement 112 Administration Building

50 Sherburne Avenue St. Paul, MN 55155

SOLICITATION ADDENDUM

Addendum No.: 1 Date of Addendum: November 4, 2026

Due Date, Time: November 9, 2026, 3:00 PM CT Revised Due Date, Time:

Buyer: Kara Ramm Agency: Office of State Procurement

SWIFT Event/Posting Ref. No.: 2000018792 Title: Snow Removal and Ice Control- Perpich

SCOPE OF ADDENDUM

This addendum containing the following revisions, additions, deletions, or clarifications is hereby made part of the Solicitation, including the Sample Contract and Exhibits if applicable.

The purpose of this addendum is to incorporate the additional Exhibit E Facility Site Map: Snow Dumping Zones into the Solicitation documents and to provide responses to questions received during the solicitation’s question and answer period.

Except as modified by this addendum, all the terms and conditions remain in full force and effect.

ADDENDUM

I. An additional Exhibit E Facility Site Map: Snow Dumping Zones which identifies designated Snow Dumping Zones is included in this addendum and will be considered part of the solicitation documents.

II. Below are the State’s responses to questions received by the deadline stated in the solicitation.

Q1. Will a site visit be made available for this solicitation?

A1. No, a site visit is not available. Responders should base their proposals on the facility maps included within the solicitation documents.

Q2. Confirm the anticipated service start date of November 19.

A2. The State is working towards a service start date of November 19, 2026. The official service date will be in effect once the contract has been fully executed.

Q3. Who is the most recent service provider for this location?

A3. The most recent service provider for this location is Landsculpt, Inc.

Q4. Is subcontracting permitted under this contract?

A4. No, subcontracting is not permitted under this contract as stated in the Sample Contract, Exhibit C, section 2.3. Prohibition on Subcontracting:

“Subcontracting is prohibited under this contract. The Contractor’s employees must perform all services under this contract. Subcontracting, delegation, or assignment of any duties, obligations, or performance requirements is strictly prohibited. All services required under the Contract shall be performed exclusively by the individuals who are direct employees of the Contractor. The Contractor shall not utilize agents, independent contractors, subcontractors, temporary personnel, or any third-party for the provisions under this Contract.”

Q5. Snow Removal Pricing – Per-Occurrence Billing

Can you clarify whether the per-occurrence snow removal pricing is based on the total snowfall accumulation for an entire storm or the actual snowfall accumulation each time the contractor services the property?

For example, if an 8-inch storm requires two separate plowing visits, with 4 inches of accumulation before each visit, would the contractor bill for two occurrences in the 1–5 inch pricing category? Or would the entire storm be considered one 5–10 inch event, regardless of the number of visits required?

A5. Per-occurrence pricing is based on the snowfall accumulation at the time service is performed, not the total accumulation for the entire storm. If the State requests multiple service visits during a storm event, each visit is considered a separate occurrence, and the applicable pricing category resets based on the snowfall accumulation since the previous service.

For example, two visits with approximately 4 inches of accumulation before each service would be billed as two occurrences in the 1–5 inch category. If service is not requested until the storm has ended, pricing will be based on the total accumulation at the time of service.

Q6. Deicing Requirements and Authorization

The RFP indicates that deicing services require written directions from the Site Supervisor or designee. Is deicing expected after every snow removal/plowing event, or only when specifically authorized by the Site Supervisor?

Please clarify when deicing should be performed and how authorization will be communicated.

A6. Deicing shall be performed only upon written direction from the Site Supervisor or designee, as stated in the Sample Contract, Exhibit C: Specifications, Duties, and Scope of Work, Section 3.4, Deicing Application. Written direction may be communicated through email, text message, or another written form of communication approved by the State. Contractors should not assume deicing is required after every snow removal event, as authorization will be based on site conditions, weather forecasts, and operational needs.

Q7. Smart Salting Certification Requirements

The RFP references obtaining or making measurable progress toward Level 2 certification within 24 months of the Notice to Proceed. However, Exhibit C also references current Minnesota Road Salt Applicator and SMART SALT certifications for personnel applying deicing products.

Can the State clarify which certifications are required before contract commencement and which may be obtained during the 24-month period?

A7. Contractors must comply with the Smart Salting requirements identified in the solicitation. All operators are required to complete MPCA Smart Salting Level 1 training appropriate to their duties and provide training certificates within 30 days of contract commencement. Level 2 Smart Salting Certification is not required at contract commencement; however, the Contractor must obtain or make measurable progress toward Level 2 certification within 24 months of the Notice to Proceed, as specified in the RFP

Sample Contract, Exhibit C: Specification, Duties, and Scope of Work, section 2.1, Smart Salting Requirements.

END OF ADDENDUM

I. An additional Exhibit E Facility Site Map: Snow Dumping Zones which identifies designated Snow Dumping Zones is included in this addendum and will be considered part of the solicitation documents.
II. Below are the State’s responses to questions received by the deadline stated in the solicitation.
Q1. Will a site visit be made available for this solicitation?
A1. No, a site visit is not available. Responders should base their proposals on the facility maps included within the solicitation documents.
Q2. Confirm the anticipated service start date of November 19.
A2. The State is working towards a service start date of November 19, 2026. The official service date will be in effect once the contract has been fully executed.
Q3. Who is the most recent service provider for this location?
A3. The most recent service provider for this location is Landsculpt, Inc.
Q4. Is subcontracting permitted under this contract?
A4. No, subcontracting is not permitted under this contract as stated in the Sample Contract, Exhibit C, section 2.3. Prohibition on Subcontracting:
“Subcontracting is prohibited under this contract. The Contractor’s employees must perform all services under this contract. Subcontracting, delegation, or assignment of any duties, obligations, or performance requirements is strictly prohibited. All ...
Q5. Snow Removal Pricing – Per-Occurrence Billing
Can you clarify whether the per-occurrence snow removal pricing is based on the total snowfall accumulation for an entire storm or the actual snowfall accumulation each time the contractor services the property?
For example, if an 8-inch storm requires two separate plowing visits, with 4 inches of accumulation before each visit, would the contractor bill for two occurrences in the 1–5 inch pricing category? Or would the entire storm be considered one 5–10 inc...
A5. Per-occurrence pricing is based on the snowfall accumulation at the time service is performed, not the total accumulation for the entire storm. If the State requests multiple service visits during a storm event, each visit is considered a separate...
For example, two visits with approximately 4 inches of accumulation before each service would be billed as two occurrences in the 1–5 inch category. If service is not requested until the storm has ended, pricing will be based on the total accumulatio...
Q6. Deicing Requirements and Authorization
The RFP indicates that deicing services require written directions from the Site Supervisor or designee. Is deicing expected after every snow removal/plowing event, or only when specifically authorized by the Site Supervisor? Please clarify when deici...
A6. Deicing shall be performed only upon written direction from the Site Supervisor or designee, as stated in the Sample Contract, Exhibit C: Specifications, Duties, and Scope of Work, Section 3.4, Deicing Application. Written direction may be communi...
Q7. Smart Salting Certification Requirements
The RFP references obtaining or making measurable progress toward Level 2 certification within 24 months of the Notice to Proceed. However, Exhibit C also references current Minnesota Road Salt Applicator and SMART SALT certifications for personnel ap...
Can the State clarify which certifications are required before contract commencement and which may be obtained during the 24-month period?
A7. Contractors must comply with the Smart Salting requirements identified in the solicitation. All operators are required to complete MPCA Smart Salting Level 1 training appropriate to their duties and provide training certificates within 30 days of ...