Evaluation_Score_BPM003384.pdf

PDF 30 KB Posted

Attached to
Master Agreement AZ|CTR057594
Contract number
CTR057594
Issued by
Arizona

About this file

The document is an evaluation scoresheet for Solicitation BPM003384 for Hydro Engineering Services, featuring scoring results from three evaluators across nine engineering firms: Cardno Inc, Dowl Hkm, J2 Engineering, JE Fuller, Natural Channel Design, NextGen Engineering, Stantec, Tetra Tech, and Wilson & Co. The scoresheet evaluates each firm's proposal across five key categories: Project Experience, Overall Experience, Design Philosophy/Process/QA/QC, Common Problems, and Overall Quality of Proposal.

The solicitation assesses the firms' technical proposals, with a maximum possible score of 100 points. Each category is weighted differently, with Project Experience carrying the most points (40) and Overall Quality of Proposal the least (10). Based on the evaluators' scores, J2 Engineering ranked first with a total score of 73.33, followed by Dowl Hkm at 68.67 and Cardno Inc at 68.33. The lowest-ranked firms were Natural Channel Design and NextGen Engineering, scoring 45.33 and 39.33 respectively. The scoring process involved three independent evaluators whose individual scores were then averaged to determine a consensus score for each firm across the evaluated categories.

View the file

Other files

File Type Posted
BPM003384_Due_Diligence_Check_List.pdf PDF
COI_3122.41649.00_DOWL_5-1-21_to_5-1-22.pdf PDF
DOWL_HKM_AZ_Corp_Commision_report.docx DOCX document
DOWL_O_A_for_BPM003384_signed.pdf PDF
EXECUTIVE_SUMMARY_BPM003384.pdf PDF
Evaluation_Team_Meeting_Sign_in_Sheet.docx DOCX document
PDS_T_Kmetz.pdf PDF
Rudolph_Ing_DOWL.pdf PDF
ST1646_1.PDF PDF
STAZMail_-_Insurance_Certificate__DOWL__LLC_10-4-21_2.53pm.pdf PDF
STAZ_Mail_-_Request_BAFO__BPM003384_-DOWL_9.17.21_11.52am.pdf PDF
TO_DOWL_BAFO_Sheet_9-15-21.xlsx XLSX spreadsheet
pds_drodriguez_pg2.jpeg JPEG file
12-31-24_DOWL.pdf PDF
8-10-21_DOWL_Negotiations_Sheet.xlsx XLSX spreadsheet
AZGFD_Contract_DOWL_Signed.pdf PDF
BPM003384_-_Evaluation_SPO_Form_120_-_Procurement_Disclosure_Statement_narasin.pdf PDF
BPM003_2.PDF PDF
COI_DOWL.pdf PDF
CTR057594-YR5_ContractRenewal_DOWL-Signed_Rb.pdf PDF
CTR057594_Renewal_Contract_DOWL.pdf PDF
DOWLNE_1.PDF PDF
DOWLNE_2.XLS XLS spreadsheet
DOWL_8-13-21_Negotiations_Sheet_DOWL_Response.pdf PDF
SAM_EntityInformation-DOWL.pdf PDF
ST0194_1.PDF PDF
STAZMA_2.PDF PDF
STAZ_Mail-Dowl_BPM3384_Hydro_EngSrvcs_-Negs_clarification.pdf PDF
STAZ_Mail_-_9.16.21_Request_BAFO__BPM003384_-TO_DOWL.pdf PDF
COI_3122.41649.00-_Arizona_Game_and_Fish_Department_PLI_2021-_dowl.pdf PDF
DOWL_BAFO_Sheet_9-17-21.xlsx XLSX spreadsheet
Evaluation_Narrative_for_BPM003384_-_NS.pdf PDF
Evaluation_for_Committee_Members_-drodriguez.pdf PDF
Proposal_Score_Sheet_BPM003384_-_NS.pdf PDF
STAZMA_1.PDF PDF
STAZ_Mail-BPM003384_Hydro_Eng_-Neg_6-16-2021DOWL.pdf PDF
STAZ_Mail_-_10-14-21_NOA_-_BPM003384__Hydro_Engineering_Services_-DOWL.pdf PDF
STAZ_Mail_-_BPM003384_-_Evaluation_Committee_ENGSERVICES-_HYDRO.pdf PDF
pds_drodriguez_pg1.jpeg JPEG file
STAZMA_4.PDF PDF
12-31-2023_DOWL_Prof_Liability.pdf PDF
DOWL_1-1-22_to_12-31-22.pdf PDF
DOWL_Insurance_5-1-21_to_5-1-22.pdf PDF
DOWL_Negotiations_Sheet_DOWL_Response_8-13-21-.xlsx XLSX spreadsheet
DOWL_SOQ_for_BPM003384.pdf PDF
Guidelines_for_Evaluation_for_Committee_Members.pdf PDF
Proposal_Score_Sheet_BPM003384.xlsx XLSX spreadsheet
Proposal_Score_Sheet_BPM003384.xlsx_-_drodriguez.pdf PDF
RFP_BPM003384_Hydro_Eng_Services_Award_Determination_signed.pdf PDF
STAZMail_to_Unsucessfuls-_10-14-21_Solicitation_-_BPM003384__Hydro_Engineering_Services.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M A

X

IM

U M

P O

IN

T

S

C a rd n o I n c

D o w l H k m

J

E n g in e e ri n g

J E

F u ll e r

N a tu ra l

C h a n n e l

D e s ig

N x tG

E g in e e ri g

S ta n te c

T e tr a

T e c h

W il s o

C o

Evaluator 1 22 22 10 22 5 5 18 14 10

2 28 32 25 35 20 15 30 31 32

3 28 28 18 28 20 20 20 20 28

CONSENSUS SCORE 26 27.333 17.667 28.333 15 13.333 22.667 21.667 23.333

Evaluator 1 14 12 10 14 5 5 8 8 15

2 15 13 15 18 10 10 18 15 17

3 16 16 14 16 12 12 14 16 16

CONSENSUS SCORE 15 13.667 13 16 9 9 13.333 13 16

Design Philosophy, Process, QA/QC

Evaluator 1 8 9 12 13 5 5 11 7 7

2 12 14 12 13 10 10 12 12 12

3 12 8 10 8 6 8 8 10 12

CONSENSUS SCORE 10.6667 10.333 11.333 11.333 7 7.6667 10.333 9.6667 10.333

Evaluator 1 6 7 7 14 12 2 5 11 5 2 12 12 12 10 10 10 8 8 12 3 12 8 8 6 4 4 8 6 8

CONSENSUS SCORE 10 9 9 10 8.6667 5.3333 7 8.3333 8.3333

Evaluator 1 2 6 6 6 4 2 6 5 6

2 8 9 10 7 9 6 8 8 9

3 10 10 10 10 4 4 8 10 10

CONSENSUS SCORE 6.66667 8.3333 8.6667 7.6667 5.6667 4 7.3333 7.6667 8.3333

100 68.33 68.67 59.67 73.33 45.33 39.33 60.67 60.33 66.33

Evaluator 1 52 56 45 69 31 19 48 45 43

2 75 80 74 83 59 51 76 74 82

3 78 70 60 68 46 48 58 62 74

64 68 60 76 45 35 62 60 63

RANK 3 2 6 1 8 9 5 6 4

Solicitation BPM003384 Hydro Engineering Services - EVALUATOR'S INDIVIDUAL SCORES

Project Experience

Common Problems

TOTAL SCORE

Overall Experience

Overall Quality of Proposal

File details come from the government source that posted it. Updated .