Estimated_Timeline.pdf
PDF 71 KB Posted
- Solicitation number
- N6278926Q0012
About this file
This document is an estimated project timeline for potable water tank services involving the vendor and the Navy. The timeline is divided into three sequential phases spanning June through mid-July 2026. The vendor is responsible for preparing potable water tanks from June 3-17, 2026, followed by a Navy-led nondestructive testing phase from June 18 through July 2, 2026. The final phase, scheduled for July 6-17, 2026, requires the vendor to complete preservation activities on the potable water tanks. The document emphasizes that specific task responsibilities are clearly delineated between the contractor and the Navy, with no pricing information, contract type, or additional technical requirements specified in this timeline excerpt.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation-Amendment.pdf | ||
| A11_Wage_Determination_Groton.pdf | ||
| SPEC_Prep_PW1.2_REV_Redacted.pdf | ||
| N6278926Q0012-Solicitation_Redacted.pdf | ||
| SPEC_Prep_PW1.2_REV.pdf | ||
| N6278926Q0012-Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
*ESTIMATED* TIMELINE
6/3/26 – 6/17/26: Prepare Potable Water Tanks (TO BE COMPLETED BY VENDOR)
6/18/26 – 7/2/26: Nondestructive Testing (TO BE COMPLETED BY NAVY)
7/6/26-7/17/26: Preserve Potable Water Tanks (TO BE COMPLETED BY VENDOR)