ESBD_File_353553_2024.03.05 UT MCD HET HVAC Upgrades - 100% CDs - Drawings.pdf
PDF 14 MB Posted
- Attached to
- MCD (M53) HET HVAC REPLACEMENT
- Solicitation number
- 24CSP010
- Issued by
- Jeff Davis County, Texas
About this file
This document appears to be a 100% construction drawing set for the HVAC upgrades at the Hobby-Eberly Telescope located at the McDonald Observatory in Fort Davis, Texas. The scope of work includes providing a new HVAC system featuring air-cooled chillers, pumps, air handlers, electrical equipment, and associated controls, supports, and appurtenances. The project is located in Jeff Davis County, Texas.
The document does not contain information about response dates, due dates, site visits, bidder's meetings, award dates, or contract term. There are also no details provided on pricing terms, set asides, incumbents, funding requirements and sources, or other salient information.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGN & CONSTRUCTION STANDARDS VERSION: CONTRACT DATE - NUMBER:
MCD: (M53) HET HVAC REPLACEMENT
MCDONALD OBSERVATORY: HOBBY-EBERLY
TELESCOPE
CAPITAL PROJECT NO. CP#766229
SEAL / SIGNATURE:
CAPITAL PROJECT NUMBER:
SHEET NUMBER:
SHEET TITLE:
PMCS PROJECT MANAGER:
SHEET ISSUE DATE
DESIGN & CONSTRUCTION STANDARDS VERSION:
ORIGINAL ISSUE DATE
BUILDING ABBREVIATION - NUMBER:
BUILDING NAME:
PROJECT ADDRESS:
PROJECT TITLE:
CONSULTANT:
MCD: (M53) HET
SEPT 2021
JOHN VERSHAW
0 03/05/2024 100% CD
G0.0
CP#766229
COVER SHEET
MCD: (M53) HET
HVAC
REPLACEMENT
MCDONALD OBSERVATORY:
HOBBY-EBERLY TELESCOPE
32 MT. FOWLKES RD
FORT DAVIS, TX 79734
MCDONALD OBSERVATORY
03/05/2403/05/24
SHEET INDEX
M7.1 CONTROL DIAGRAMS - HVAC
M7.2 CONTROL DIAGRAMS - HVAC
M8.1 DETAILS - HVAC
M8.2 DETAILS - HVAC
M8.3 DETAILS - HVAC
E0.0 ELECTRICAL LEGEND
E0.1 ELECTRICAL ONE-LINE DIAGRAM
E0.2 ELECTRICAL SCHEDULES
E1.1 SITE PLAN - ELECTRICAL DEMOLITION
E1.2 SITE PLAN - ELECTRICAL
E1.3 FLOOR PLAN - FIRE ALARM
E1.4 POWER PLAN - LEVEL 2 - NEW
SHEET INDEX
G0.0 COVER SHEET
G0.1 GENERAL PROJECT INFORMATION
G0.2 CONSTRUCTION SEQUENCING SCHEMATIC DIAGRAM
G0.3 CONSTRUCTION SEQUENCING SCHEMATIC DIAGRAM
CS1.1 EROSION AND SEDIMENTATION CONTROL PLAN
CS6.1 EROSION AND SEDIMENTATION CONTROL DETAILS
S1.2 SITE PLAN - NEW
S3.1 GENERAL NOTES & DETAILS
M0.0 LEGENDS & ABBREVIATIONS - HVAC
M0.1 GENERAL NOTES - HVAC
M0.2 SCHEDULES - HVAC
M0.3 SCHEDULES - HVAC
M1.1 HVAC PLAN - SITE DEMOLITION
M1.2 HVAC PLAN - SITE NEW
M1.3 HVAC PLAN - SITE 3D NEW
M2.2 HVAC PLAN - LEVEL 2 - DEMOLITION
M3.1 HVAC PLAN - LEVEL 1 - NEW
M3.2 HVAC PLAN - LEVEL 2 - NEW
M4.1 HVAC PLAN - SECTIONS
M6.1 PIPING SCHEMATIC DIAGRAM - HVAC
FEB 2019 4/14/2021 - 20PSA04001
MEP ENGINEER:
MEP ENGINEERING, INC
JOSEPH REYES, PE
512-306-9650
JREYES@MEPENGINEERING.COM
TEXAS REGISTERED ENGINEERING FIRM F-342
STRUCTURAL ENGINEER:
DATUM RIOS, LLC
ROBERT FRY, PE
512-469-9490
RFRY@DATUMENGINEERS.COM
TEXAS REGISTERED ENGINEERING FIRM F-2819
LOCATOR MAP
TRUE
NORTH
KEY PLAN
TRUE
NORTH
BUILDING LOCATION
PROJECT LOCATION
CIVIL ENGINEER:
BAEZA ENGINEERING
SALVADOR BAEZA, PE, LEED AP
512-400-4207
SAL@BAEZAENGINEERING.COM
TEXAS REGISTERED ENGINEERING FIRM F-19569
ISSUE LOG
NO DATE DESCRIPTION
SEAL / SIGNATURE:
CAPITAL PROJECT NUMBER:
SHEET NUMBER:
SHEET TITLE:
PMCS PROJECT MANAGER:
SHEET ISSUE DATE
DESIGN & CONSTRUCTION STANDARDS VERSION:
ORIGINAL ISSUE DATE
BUILDING ABBREVIATION - NUMBER:
BUILDING NAME:
PROJECT ADDRESS:
PROJECT TITLE:
CONSULTANT:
CP#766229
MCD: (M53) HET
HVAC
REPLACEMENT
MCDONALD OBSERVATORY:
HOBBY-EBERLY TELESCOPE
32 MT. FOWLKES RD
FORT DAVIS, TX 79734
MCDONALD OBSERVATORY
03/05/24
ISSUE LOG
NO DATE DESCRIPTION
MCD: (M53) HET
JOHN VERSHAW
SEPT 2021
0 03/05/2024 100% CD
G0.1
GENERAL NOTES
GENERAL NOTES
1. ALL WORK SHALL CONFORM WITH 2018 INTERNATIONAL ENERGY CODE, 2018 INTERNATIONAL
MECHANICAL, PLUMBING, FIRE, FUEL GAS AND BUILDING CODES, 2020 NATIONAL ELECTRICAL CODE, NFPA 1 - 2018, NFPA 45 - 2015, NFPA 90A - 2018, NFPA 91 - 2015 AND NFPA 101 - 2018 REQUIREMENTS.
REFER TO SECTIONS 23 00 00 AND 26 00 00 OF THE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
FIRE ALARM WORK SHALL, AT A MINIMUM, MEET THE REQUIREMENTS OF NFPA 72 (LATEST EDITION) AND THE UT AUSTIN DESIGN AND CONSTRUCTION STANDARD - 28 46 00 - FIRE ALARM AND SIGNALING
(LATEST EDITION).
2. REFER TO THE SPECIFICATIONS FOR ADDITIONAL INFORMATION REGARDING THE PROJECT. THE
DRAWINGS AND SPECIFICATIONS ARE BOTH INCLUDED IN THE CONTRACT DOCUMENTS.
3. PROVIDE COMPLETE SUBMITTAL DOCUMENTATION IN COMPLIANCE WITH DRAWINGS AND
SPECIFICATIONS AS DETERMINED BY OWNERS REPRESENTATIVE. DO NOT ORDER OR INSTALL ANY
EQUIPMENT, FIXTURES, APPARATUS OR MATERIALS UNTIL SUCCESSFUL COMPLETION OF THE
SUBMITTAL REVIEW PROCESS. IDENTIFY AND COORDINATE DELIVERY TIMES OF LONG-LEAD ITEMS
WITH SUPPLIERS THROUGHOUT SUBMITTAL PROCESS AND SCHEDULE WORK ACCORDINGLY.
4. THOROUGHLY REVIEW THE CONTRACT DOCUMENTS, INCLUDING ALL ADDENDA, PRIOR TO THE
SUBMITTAL PHASE OF THE PROJECT. NOTIFY THE ENGINEER OF ANY CONFLICTS WITHIN AND BETWEEN THE VARIOUS CONTACT DOCUMENTS IN WRITING PRIOR TO SUBMITTING PRODUCT DATA SHEETS FOR
REVIEW, AND PROCEED AS DIRECTED.
5. UNLESS NOTED OTHERWISE, SCHEDULED EQUIPMENT CAPACITIES ARE AT SITE CONDITIONS. ALL EQUIPMENT SHALL BE ADJUSTED, MODIFIED, AND ORDERED TO DELIVER SCHEDULED CAPACITIES AT
THE SPECIFIED SITE ALTITUDE AND CLIMATIC CONDITIONS.
6. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND DIMENSIONS IN THE FIELD. IT IS THE INTENT OF
THE CONTRACT DOCUMENTS TO INDICATE A COMPLETE DESIGN IN EVERY RESPECT. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE AND FULLY FUNCTIONAL INSTALLATION. THE
PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK BETWEEN
SUBCONTRACTORS TO ASSURE THAT THE INSTALLATION WILL BE COMPLETE WITHOUT ADDITIONAL COST TO THE CONTRACT. IN THE EVENT THAT ADDITIONAL DETAILS OR SPECIAL CONSTRUCTION MAY BE REQUIRED FOR WORK INDICATED, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE SAME AS WELL AS TO PROVIDE MATERIAL AND EQUIPMENT USUALLY FURNISHED WITH SUCH
SYSTEMS OR REQUIRED TO COMPLETE THE INSTALLATION, WHETHER MENTIONED OR NOT AT NO
ADDITIONAL EXPENSE TO THE OWNER.
7. WORK INDICATED IN THE CONTRACT DOCUMENTS IS BASED ON ASSUMPTIONS CONCERNING EXISTING CONDITIONS BASED ON VISITS TO THE JOB SITE AND BEST AVAILABLE RECORD INFORMATION. NO
ASSURANCE IS GIVEN THAT THESE ASSUMPTIONS ACCURATELY REFLECT ACTUAL JOB SITE
CONDITIONS. BIDS SHALL INCLUDED NECESSARY ADJUSTMENTS AS REQUIRED TO COMPLETE THE
WORK AS INDICATED ON PLANS.
8. COORDINATE WITH ALL OTHER TRADES. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE
PRIME CONTRACTOR AND THE ENGINEER FOR RESOLUTION PRIOR TO INSTALLATION.
9. CAREFULLY COORDINATE SCHEDULING ALL WORK WITH THE PRIME CONTRACTOR AND OWNER. NO
WORK SHALL PROCEED WITHOUT AN OWNER-APPROVED SCHEDULE.
10. REQUEST ALL UTILITY OR SYSTEM SHUTDOWNS WITH OWNER IN WRITING AT LEAST 7 WORKING DAYS IN ADVANCE. REFER TO SPECIFICATIONS FOR AREAS REQUIRING SPECIAL ACCESS, SCHEDULING, AND/OR SECURITY. SHUT-DOWN TYPICALLY SHOULD BE SCHEDULED DURING NON-WEEKDAY PERIODS.
NO SHUTDOWN TO OCCUR WITHOUT APPROVAL BY OWNER REPRESENTATIVE. SCHEDULE SHALL
INCLUDE BUILDING AREAS AFFECTED BY SHUTDOWN(S). CONTRACTOR SHALL COORDINATE ALL
UTILITY OUTAGES WITH UT SITE REPRESENTATIVE AND BUILDING MANAGER. PROVIDE PMCS PROJECT MANAGER, UT SITE REPRESENTATIVE AND BUILDING MANAGER WITH A PROJECT OUTAGE SCHEDULE FOR REVIEW. IT IS EXPECTED THAT OUTAGES WILL ALSO BE COORDINATED TO COINCIDE WITH
OUTAGES FOR WORK UNDER SEPARATE CP#.
11. PROTECTIONS OF THE SITE, BUILDING, PERSONNEL, FINISHED, FURNISHINGS, AND SYSTEMS FROM
DAMAGE, HAZARD, AND/OR CONTAMINATION ASSOCIATED WITH DEMOLITION AND CONSTRUCTION
SHALL BE PROVIDED BY THE CONTRACTOR IN ACCORDANCE WITH THE SPECIFICATIONS AND THE
UNIVERSITY.
12. COORDINATE THE REMOVAL AND OFF-SITE DISPOSAL OF EXISTING MATERIALS AND ROUTING OF ANY NEW PIPING, CONDUIT, DUCTWORK AT THE JOBSITE TO AVOID DAMAGE OR CONFLICT WITH EXISTING SYSTEMS AND STRUCTURE OBTAIN APPROVAL FROM OWNERS REPRESENTATIVE BEFORE DISPOSING OF ITEMS. SALVAGED EQUIPMENT AND/OR MATERIAL SHALL BE DELIVERED TO THE OWNER AT THE
LOCATION DESIGNATED. OBTAIN A RECEIPT.
13. MAINTAIN MINIMUM CLEARANCE IN FRONT OF ALL CONTROL AND ELECTRIC PANELS ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN ACCORDANCE WITH THE FOLLOWING: 120V = 36”, 208/240V = 42”, 460/480V = 48”. CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING GRID OR
ACCESS PANEL. WHERE FACTORY MOUNTED PANELS DO NOT ALLOW ADEQUATE CLEARANCE,
RELOCATE AND REMOUNT THE PANEL AS REQUIRED FOR PROPER, SAFE ACCESS. ALL FACTORY
WARRANTIES SHALL BE MAINTAINED.
14. BOTH THE SUBCONTRACTOR FOREMAN AND PRIME CONTRACTOR FOREMAN SHALL VISUALLY INSPECT THE QUALITY AND COMPLETENESS OF INSTALLATION PRIOR TO REQUESTING A FIELD OBSERVATION BY THE ENGINEER. PROVIDE A MINIMUM OF FORTY-EIGHT HOUR WRITTEN NOTICE TO THE ENGINEER
PRIOR TO ANY REQUIRED OR REQUESTED FIELD OBSERVATION.
15. DO NOT COVER ANY MECHANICAL OR PLUMBING WORK IN WALLS, BENEATH SLABS, IN TRENCHES, ABOVE CEILINGS, ETC. PRIOR TO ANY REQUIRED OR REQUESTED FIELD OBSERVATION.
16. DELIVER ALL EQUIPMENT AND MATERIAL OWNING, OPERATING AND MAINTENANCE (O&M) MANUALS IN
THE QUANTITIES SPECIFIED TO OWNER AND OBTAIN A RECEIPT.
17. DO NOT ORDER ANY MATERIALS, APPARATUS, FIXTURES, OR EQUIPMENT UNTIL SUBMITTAL PROCESS
IS SUCCESSFULLY COMPLETE. CONTRACTOR IS RESPONSIBLE FOR SUBSEQUENT ORDERING AND
DELIVERY OF ITEMS TO THE JOBSITE IN TIME FOR SUCCESSFUL COMPLETION OF THE PROJECT WITHIN
THE CONTRACTED CONSTRUCTION PERIOD.
18. COORDINATE SCHEDULE WITH OWNER FOR SAWING, HOLE-CUTTING, ETC. THROUGH CONCRETE
AND/OR MASONRY WALLS/FLOORS, COORDINATE ALL WORK WITH BUILDING OPERATORS FOR
ALLOWABLE DAYS AND TIMES. PROVIDE GPR-SCANNING PRIOR TO HOLE CUTTING CONCRETE AND/OR MASONRY MEMBRANES AS NECESSARY AND COORDINATE ACCORDINGLY. COORDINATE WITH UT EHS ASBESTOS PROGRAM FOR CORING AND CUTTING THROUGH CONCRETE OR MASONRY WALLS, FLOORS, WALKWAYS, CEILINGS OR ROOFS PRIOR TO THE WORK. THERE IS POTENTIAL SILICA EXPOSURE WHEN DRILLING, SANDING OR CUTTING THROUGH CONCRETE, BRICK, CERAMIC TILES AND STONE PRODUCTS.
19. COMPLETION: UPON COMPLETION OF THE WORK, AND PRIOR TO ACCEPTANCE, THE CONTRACTOR
SHALL FURNISH THE OWNER PAPER AND ELECTRONIC DOCUMENTS IN THE FORM OF QUANTITIES
REQUIRED BY THE SPECIFICATIONS; OWNERS MANUAL AND BUILDING PROJECT RECORD DRAWINGS.
COMPLETE THE ADD/DELETE LOG INCLUDING OBTAINING ALL SERIAL AND EQ NUMBERS ON REMOVED
EQUIPMENT PRIOR TO DEMOLITION.
20. THE BUILDING WILL BE OWNER OCCUPIED FOR THE DURATION OF THE PROJECT EXCEPT IN THE DESIGNATED WORK AREAS AND IN THE AREAS SERVED BY AIR HANDLERS BEING REPLACED VIA THIS
PROJECT.
21. CONTRACTOR SHALL ENSURE THAT MAJOR ELECTRICAL AND MECHANICAL EQUIPMENT COMPONENTS ARE TRANSPORTED INTO AND THROUGH BUILDING BY QUALIFIED RIGGING FIRM AS A THIRD PARTY OR
EMPLOYED BY SUBCONTRACTOR. COORDINATE ACROSS DISCIPLINES AS NECESSARY.
22. COORDINATE ANY ONSITE MATERIAL STORAGE OR CONSTRUCTIONS STAGING ON SITE WITH UT EHS.
ANY OUTDOOR DISTURBANCE, STAGING AREA OR LANDSCAPING MUST SUBMIT A TEMPORARY EROSION
AND SEDIMENT CONTROL PLAN.
23. THERE IS POTENTIAL SILICA EXPOSURE WHEN DRILLING, SANDING OR CUTTING THROUGH CONCRETE, BRICK, CERAMIC TILES AND STONE PRODUCTS.
GENERAL DEMOLITION NOTES
1. FIELD VERIFY CONDITIONS, LOCATIONS OF UTILITIES (CHILLED WATER, ELECTRICAL, PLUMBING, ETC).
ANY DISRUPTION CAUSED BY DEMOLITION/CONSTRUCTION TO UTILITIES OR DAMAGE OF SERVICES LINES TO REMAIN SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AS PER THE SPECIFICATIONS.
2. EXISTING LAY-OUT FOR CONDUIT, PIPING, ETC. FOR AREAS INDICATED ON THE PLANS ARE SCHEMATIC ONLY. CONTRACTOR SHALL COORDINATE WITH EXISTING SYSTEMS WHICH ARE TO REMAIN AFTER DEMOLITION AND COORDINATE WITH OTHER TRADES) PLUMBING, ELECTRICAL CONDUITS, ETC. TO RELOCATE OR REROUTE EXISTING PIPING, CONDUITS AS NECESSARY TO ACCOMMODATE THE NEW WORK AND PROVIDE A COMPLETE AND WORKING SYSTEM. REFER TO SPECIFICATIONS AND GENERAL NOTES TO THIS SHEET FOR DEMOLITION WORK AS WELL AS NEW WORK DESCRIBED IN THE PLANS AND
SPECIFICATIONS.
3. INSTALL TEMPORARY CAPS AT TERMINATION POINTS OF EXISTING ELECTRICAL CIRCUITS, PIPING, ETC.
TO REMAIN DURING DEMOLITION TO ALLOW FOR FUTURE CONNECTIONS WITH NEW WORK.
COORDINATE EXTENT OF DEMOLITION WITH NEW WORK.
4. CONTRACTOR SHALL DETERMINE EXACT TERMINATION POINTS OF EXISTING PIPING, ELECTRICAL, PNEUMATIC CONTROLS, ETC. AND COORDINATE THE CONNECTION NEW WORK AS NECESSARY TO
PROVIDE COMPLETE AND WORKING SYSTEMS AS INDICATED BY PLANS AND SPECIFICATIONS.
5. FOR EXISTING DUCTWORK OR PIPING, TO REMAIN, DAMAGE TO INSULATION AND JACKETING AS A RESULT OF THIS DEMOLITION WORK WILL REQUIRE REPAIR. PRIOR DAMAGE WILL ALSO BE REPAIRED.
REFER TO SPECIFICATIONS FOR NEW INSULATION PIPING OR DUCTWORK TO REMAIN.
6. PERMANENT CAPS ON ALL PIPES AND DUCTS ETC. SHALL MATCH EXISTING MATERIAL AND BE SEALED
TO ENSURE NO LEAKAGE.
7. COORDINATE WITH ACM ABATEMENT BY OWNER. THE CONTRACTOR WILL PROVIDE AND COORDINATE
DEMOLITION OF LEAD CONTAINING MATERIALS AS IDENTIFIED BY THE OWNER.
8. WHERE WORK IS ADJACENT TO OCCUPIED SPACE, PROVIDE DUST BARRIERS AS NECESSARY, KEEP CONSTRUCTION AREA AT A NEGATIVE PRESSURE RELATIVE TO SUCH SPACES, & FILTER DISCHARGE
AIR AS REQUIRED TO CONTAIN DUST.
9. IF HAZARDOUS MATERIALS (ASBESTOS CONTAINING MATERIALS) ARE FOUND TO BE PRESENT CONTRACTOR SHALL NOT BEGIN WORK UNTIL ABATEMENT IS COMPLETE AND CONSTRUCTION WORK
SITE IS CLEARED.
CONSTRUCTION NOTES
1. STAGING, STORAGE, AND PARKING ARE LIMITED FOR THIS PROJECT. THE CONTRACTOR SHALL
COORDINATE WITH OWNER AND ACCOMMODATE NEEDS OF THE BUILDING OCCUPANTS.
2. COORDINATE WITH OWNER FOR ALL SECURITY REQUIREMENTS. PERSONNEL ACCESS MAY BE AS
MANDATED BY OWNER.
3. ALL ACCESS INTO THE BUILDING SHALL BE MAINTAINED CLEAR AND SAFE AT ALL TIMES. THE
ENTRANCES WILL BE USED BY BUILDING STAFF DURING CONSTRUCTION.
4. THE BUILDING RESTROOM MAY NOT BE USED BY THE CONTRACTOR. THE CONTRACTOR MUST PROVIDE
PORTABLE RESTROOMS DURING CONSTRUCTION. KEEP PORTABLE RESTROOMS CLEAN THROUGHOUT
CONSTRUCTION.
5. OWNER RETAINS SALVAGE RIGHTS TO ALL EQUIPMENT AND MATERIALS THROUGHOUT. CLOSELY
COORDINATE WITH OWNER FOR SALVAGE OR DISCARD OF ALL ITEMS.
6. UPON REMOVAL OF STAGING AREA AFTER CONSTRUCTION, RE-ESTABLISH LANDSCAPE AND
HARDSCAPE TO MATCH EXISTING PRIOR TO CONSTRUCTION.
7. CONTRACTOR SHALL DOCUMENT EXISTING CONDITIONS WITHIN THE BUILDING PRIOR TO START OF SUBSTANTIAL CONSTRUCTION USING USING PHOTOGRAPHS AND/OR VIDEOS. ALL DOCUMENTATION SHALL BE PROVIDED TO THE OWNER IN SOFT COPY FORMAT AT THE ONSET OF THE PROJECT FOR
REFERENCE IN DETERMINING CONSTRUCTION DAMAGE ISSUES.
8. NO CONSTRUCTION ACTIVITIES SHALL TAKE PLACE WHILE THE TELESCOPE IS IN USE. THE TELESCOPE IS TYPICALLY IN USE FROM SUNSET TO SUNRISE THE NEXT DAY 365 DAYS PER YEAR DEPENDING ON
THE WEATHER.
ADDITIONAL CONSTRUCTION SAFETY CODES
1. 2018 NFPA 1 - FIRE CODE - CHAPTER 16 - SAFEGUARDING CONSTRUCTION, ALTERATION, AND
DEMOLITION OPERATIONS.
2. 2013 NFPA 241 - STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION
OPERATIONS.
SUMMARY OF MAJOR WORK
1. DECOMMISSION TWO EXISTING AIR HANDLING UNITS LOCATED ON EXTERIOR HOUSEKEEPING PADS.
DEMOLISH THE EXISTING AHU'S, RETURN FANS, AND ASSOCIATED DUCTWORK, HYDRONIC CHILLED
WATER, AND ELECTRICAL.
2. DECOMMISSION ONE EXISTING AIR COOLED CHILLER AND CHILLED WATER PUMPS. DEMOLISH THE
EXISTING CHILLER, PUMPS, PIPING, ACCESSORIES, AND ELECTRICAL.
3. INSTALL TWO NEW, AIR-COOLED CHILLERS, PUMPS, AND HYDRONIC ACCESSORIES ON A NEW PREFABRICATED EQUIPMENT SKID. INSTALL NEW CHILLED WATER SUPPLY AND RETURN PIPING FROM
NEW CHILLERS TO NEW AIR HANDLING UNITS.
4. INSTALL TWO NEW AHUS AND ASSOCIATED NEW DUCTWORK, HYDRONIC CHILLED WATER PIPING, AND
ELECTRICAL.
5. INSTALL NEW BUILDING MANAGEMENT SYSTEM (BMS). NEW BMS WILL CONTROL ALL NEW EQUIPMENT
ONLY. EXISTING EQUIPMENT WILL BE CONTROLLED THROUGH EXISTING BMS CONTROLS.
6. NEW ELECTRICAL EQUIPMENT TO SUPPORT NEW HVAC EQUIPMENT.
7. AREAS OF MAIN WORK ARE INDICATED ON SHEET G0.1.
ASBESTOS WARNING
THE OWNER IS NOT AWARE THAT ASBESTOS CONTAINING MATERIALS ARE PRESENT WITHIN
THE EXISTING BUILDING. IF ASBESTOS CONTAINING MATERIALS ARE SUSPECTED IN THE
AREAS OF WORK UNDER THIS CONTRACT, NOTIFY THE OWNER IMMEDIATELY AND THEY
SHALL BE TESTED BY THE OWNER. IF IT IS DETERMINED THAT ASBESTOS IS PRESENT, IT
SHALL BE REMOVED OR OTHERWISE ABATED, WHERE NECESSARY, BY THE OWNER AS PART
OF A SEPARATE CONTRACT. THE CONTRACTOR AND ALL SUBCONTRACTORS SHALL
COORDINATE AND COOPERATE IN THIS PROCESS AS REQUIRED. REFER TO SPECIFICATION
SECTION 024119 "SELECTIVE DEMOLITION".
LEAD PAINT WARNING
THE OWNER IS NOT AWARE THAT LEAD CONTAINING MATERIALS ARE PRESENT WITHIN THE
EXISTING BUILDING. IF LEAD CONTAINING MATERIALS ARE SUSPECTED IN THE AREAS OF
WORK UNDER THIS CONTRACT, NOTIFY THE OWNER IMMEDIATELY AND THEY SHALL BE
TESTED BY THE OWNER. IF IT IS DETERMINED THAT LEAD IS PRESENT, IT SHALL BE
REMOVED WHERE NECESSARY, BY THIS CONTRACTOR AS PART OF THIS CONTRACT. THE
CONTRACTOR AND ALL SUBCONTRACTORS SHALL COORDINATE AND COOPERATE IN THIS
PROCESS AS REQUIRED. REFER TO SPECIFICATION SECTION 024119 "SELECTIVE
DEMOLITION".
SCALE: 1" = 60'-0"
UT MCD HET CONSTRUCTION SITE PLAN1
KEYED NOTES
1. LOCATION OF EXISTING MECHANICAL EQUIPMENT.
2. LOCATION OF EXISTING GENERATOR, UTILITY TRANSFORMER, AND
ELECTRICAL EQUIPMENT.
3. CONTRACTOR SHALL MAINTAIN VEHICLE AND PEDESTRIAN TRAFFIC
FLOW CLEAR OF PRIVATE VEHICLE DRIVE AT ALL TIMES, EXCEPT
WHEN MOBILIZING AND DEMOBILIZING EQUIPMENT.
4. PRIMARY CONTRACTOR ACCESS TO BUILDING THRU LOADING DOCK
DOORS.
5. CONTRACTORS WILL BE ALLOWED TO PARK IN DESIGNATED SPOTS AT
THE SUMMIT BUILDING.
6. APPROXIMATE LOCATION OF LAY DOWN AREA AND DUMPSTER.
VERIFY EXACT LOCATION WITH UT.
7. MAIN BUILDING ENTRANCES FOR OFFICE EMPLOYEES, STAFF, AND
VISITORS. KEEP CLEAR AT ALL TIMES.
8. ALL MAJOR OR LARGE DELIVERIES SHALL BE MADE DURING THE DAY
DURING NORMAL WORK HOURS. NO DELIVERIES WILL BE ALLOWED
BETWEEN SUNSET AND SUNRISE EACH DAY.
9. EXISTING BUILDING RESTROOMS WILL NOT BE ALLOWED FOR
CONTRACTOR USE. CONTRACTOR SHALL USE THE PORTABLE
RESTROOM PROVIDED BY THE GENERAL CONTRACTOR. GENERAL
CONTRACTOR SHALL MAINTAIN RESTROOM CLEANLINESS PER UT
REQUIREMENTS.
10. CONTRACTOR TO USE EXTREME CAUTION AROUND TELESCOPE AND
ALL OTHER EQUIPMENT LOCATED IN THE DOME. CONTRACTOR CAN
USE EXISTING INDOOR LIFT FOR INDOOR ACTIVITIES. COORDINATE
WITH UT AND MCD STAFF.
PLAN
NORTH
03/05/24
SCALE: NTS
CONSTRUCTION SEQUENCING SCHEMATIC DIAGRAM1
STEP 3: INSTALL NEW PIPING ON PIPE SUPPORTS.
STEP 4: INSTALL NEW MSB, UTILITY TRANSFORMER AND ABOVE GROUND
CONDUIT.
STEP 5: INSTALL NEW CHILLER PLANT ON NEW EQUIPMENT PAD. CONNECT
PIPING AND ELECTRIC FEEDERS.
STEP 1: RELOCATE UNDERGROUND WASTE PIPING.
STEP 2: PERFORM ALL CONCRETE, STRUCTURAL, AND UNDERGROUND
ELECTRICAL CONDUIT WORK. INSTALL NEW PAD EXTENSIONS, PIPE
TRENCH, NEW CHILLER EQUIPMENT PAD, AND ALL OTHER PIPE SUPPORTS.
AHU-2
ETR
AHU-1
ETR
P-3
NEW
CH-1
NEW
P-1
NEW
CH-2
NEW
P-2
NEW
CHILLER
ETR
P-2
ETR
P-1
ETR
AHU-2
DEMO
AHU-1
ETR
P-3
NEW
CH-1
NEW
P-1
NEW
CH-2
NEW
P-2
NEW
CHILLER
ETR
P-2
ETR
P-1
ETR
STEP 6: DEMOLISH AHU-2, PIPING, AND DUCTWORK. KEEP EXISTING 3"
PIPING ON THE BUILDING PIPE SUPPORTS. AHU-1 SHALL REMAIN
OPERATIONAL. CONNECT EXISTING 3" PIPING TO NEW 3" PIPING. START UP
NEW CHILLER PLANT. AHU-1 SHALL BE FED FROM THE NEW CHILLER
PLANT.
AHU-NORTH
NEW
AHU-SOUTH
NEW
P-3
NEW
CH-1
NEW
P-1
NEW
CH-2
NEW
P-2
NEW
STEP 11: INSTALL NEW PIPING FROM AHU-NORTH TO AHU-SOUTH.
STEP 12: INSTALL NEW AHU-SOUTH, PIPING, AND DUCTWORK.
STEP 13: INSTALL ALL INDOOR FABRIC DUCTWORK.
STEP 14: COMMISSIONING OF ALL SYSTEMS.
GENERAL SEQUENCING AND PHASING NOTES:
1. GENERAL NOTES APPLY TO SHEETS G0.2 AND G0.3.
2. THE DOME IS TO REMAIN OPERATIONAL DURING CONSTRUCTION. ANY DOME
DOWN TIME MUST BE COORDINATED WITH UT HET A MINIMUM OF 2 MONTHS
PRIOR TO THE REQUIRED SHUTDOWN.
3. POWER OUTAGES WILL BE REQUIRED TO CONNECT THE NEW MSB AND THE
NEW UTILITY TRANSFORMER. COORDINATE THIS WORK WITH UT HET AND ALL
OTHER TRADES TO MINIMIZE DOME DOWNTIME.
4. IF THE POWER WILL BE OFF FOR MORE THAN THREE HOURS, TEMPORARY A/C
AND A PORTABLE GENERATOR SHALL BE BROUGHT IN TO COOL EXISTING IT
ROOMS. REQUIRED COOLING TONNAGE IS 6-TONS.
5. THE DOME CAN BE OPERATIONAL WHEN THE HVAC SYSTEM IS OFF LINE.
COORDINATE WORK TO MINIMIZE THE DOWNTIME OF THE HVAC SYSTEM.
6. THE INTENT OF THIS SEQUENCING PLAN IS THAT THERE WILL BE A MINIMUM
OF ONE AHU AVAILABLE FOR DOME COOLING THROUGHOUT MOST OF THE
CONSTRUCTION PERIOD.
7. THE TELESCOPE IS OPERATIONAL 7 DAYS PER WEEK, 365 DAYS PER YEAR AS
LONG AS THE WEATHER IS OPTIMAL STARTING AT DUSK EVERY NIGHT.
CONSTRUCTION ACTIVITIES CAN TAKE PLACE DURING THE DAY. IF REQUIRED,
MAKE OWNER AWARE OF ANY CONSTRUCTION ACTIVITIES THAT NEED TO
TAKE PLACE DURING NIGHT HOURS A MINIMUM OF 2 MONTHS IN ADVANCE.
8. THE SEQUENCE NOTED ON THIS SHEET IS THE SUGGESTED SEQUENCE
PROVIDED BY THE OWNER AND DESIGN TEAM. THIS IS NOT THE REQUIRED
SEQUENCE. PRIOR TO THE START OF CONSTRUCTION, CONTRACTOR SHALL
SUBMIT A PROPOSED SEQUENCE AND PHASING PLAN. THIS SCHEDULE SHALL
LIST ALL PERIODS OF TIME WHEN THE POWER, PLUMBING, AND HVAC
SYSTEMS WILL BE DOWN OR UNAVAILABLE.
9. COORDINATE THE LOCATION OF ALL EXISTING UNDERGROUND FIBER WIRING
WITH ALL SITE WORK.
NEW
UTILITY
XFMR
EDP
EXISTING
MSB
NEWNEW PIPE
SUPPORT
(TYP)
AHU-NORTH
NEW
AHU-1
ETR
P-3
NEW
CH-1
NEW
P-1
NEW
CH-2
NEW
P-2
NEW
CHILLER
DEMO
P-2
DEMO
P-1
DEMO
STEP 7: INSTALL NEW AHU-NORTH, PIPING, AND DUCTWORK. CONNECT
NEW PIPING TO EXISTING PIPING TO AHU-NORTH.
STEP 8: START UP AHU-NORTH. START USING THE NEW AHU-NORTH.
DISCONNECT THE EXISTING AHU-1 FROM THE CHILLED WATER PIPING
SYSTEM.
STEP 9: DEMOLISH EXISTING CHILLER, PUMPS, ACCESSORIES, AND
CENTRAL PLANT PIPING.
STEP 10: DEMOLISH AHU-1, PIPING, AND DUCTWORK. DEMOLISH PIPING
FROM AHU-2 TO AHU-1 ON THE DOME PIPE SUPPORTS. DOME PIPE
SUPPORTS EXISTING TO REMAIN.
DEMO EQPT/PIPING
EXISTING EQPT/PIPING
NEW EQPT/PIPING
LEGEND
NEW PIPE
SUPPORT
(TYP)
NEW PIPE
SUPPORT
(TYP)
NEW PIPE
SUPPORT
(TYP)
SEAL / SIGNATURE:
CAPITAL PROJECT NUMBER:
SHEET NUMBER:
SHEET TITLE:
PMCS PROJECT MANAGER:
SHEET ISSUE DATE
DESIGN & CONSTRUCTION STANDARDS VERSION:
ORIGINAL ISSUE DATE
BUILDING ABBREVIATION - NUMBER:
BUILDING NAME:
PROJECT ADDRESS:
PROJECT TITLE:
CONSULTANT:
CP#766229
MCD: (M53) HET
HVAC
REPLACEMENT
MCDONALD OBSERVATORY:
HOBBY-EBERLY TELESCOPE
32 MT. FOWLKES RD
FORT DAVIS, TX 79734
MCDONALD OBSERVATORY
03/05/24
ISSUE LOG
NO DATE DESCRIPTION
MCD: (M53) HET
JOHN VERSHAW
SEPT 2021
0 03/05/2024 100% CD
G0.2
CONSTRUCTION
SEQUENCING
SCHEMATIC DIAGRAM
CONSTRUCTION SEQUENCING SITE PLAN1
CHILLER
ETR
STEP 1: RELOCATE UNDERGROUND WASTE PIPING.
STEP 2: PERFORM ALL CONCRETE, STRUCTURAL, AND UNDERGROUND
ELECTRICAL CONDUIT WORK. INSTALL NEW PAD EXTENSIONS, PIPE
TRENCH, NEW CHILLER EQUIPMENT PAD, AND ALL OTHER PIPE SUPPORTS.
STEP 3: INSTALL NEW PIPING ON PIPE SUPPORTS.
STEP 4: INSTALL NEW MSB, UTILITY TRANSFORMER, AND ABOVE GROUND
CONDUIT.
STEP 5: INSTALL NEW CHILLER PLANT ON NEW EQUIPMENT PAD. CONNECT
PIPING AND ELECTRIC FEEDERS.
CHILLER
ETR
XFMR
MSBSTEP 1
STEP 2
STEP 2
STEP 2
STEP 2
STEP 2
STEP 3
STEP 3
STEP 3
STEP 4
STEP 5
STEP 6: DEMOLISH AHU-2, PIPING, AND DUCTWORK. KEEP EXISTING 3"
PIPING ON THE BUILDING PIPE SUPPORTS. AHU-1 SHALL REMAIN
OPERATIONAL. CONNECT EXISTING 3" PIPING TO NEW 3" PIPING. START UP
NEW CHILLER PLANT. AHU-1 SHALL BE FED FROM THE NEW CHILLER
PLANT.
CHILLER
ETR
XFMR
MSB
STEP 6
STEP 6
STEP 7: INSTALL NEW AHU-NORTH, PIPING, AND DUCTWORK. CONNECT
NEW PIPING TO EXISTING PIPING TO AHU-NORTH.
STEP 8: START UP AHU-NORTH. START USING THE NEW AHU-NORTH.
DISCONNECT THE EXISTING AHU-1 FROM THE CHILLED WATER PIPING
SYSTEM.
CHILLER
ETR
XFMR
MSB
STEP 7
STEP 8
CHILLER
NEW
CHILLER
NEW
CHILLER
NEW
STEP 9: DEMOLISH EXISTING CHILLER, PUMPS, ACCESSORIES, AND
CENTRAL PLANT PIPING.
STEP 10: DEMOLISH AHU-1, PIPING, AND DUCTWORK. DEMOLISH PIPING
FROM AHU-NORTH TO AHU-1 ON THE DOME PIPE SUPPORTS. DOME PIPE
SUPPORTS EXISTING TO REMAIN.
CHILLER
ETR
XFMR
MSB
STEP 10
CHILLER
NEW
STEP 9
STEP 10
STEP 11: INSTALL NEW PIPING FROM AHU-NORTH TO AHU-SOUTH.
STEP 12: INSTALL NEW AHU-SOUTH, PIPING, AND DUCTWORK.
STEP 13: INSTALL ALL INDOOR FABRIC DUCTWORK.
STEP 14: COMMISSIONING OF ALL SYSTEMS.
XFMR
MSB
STEP 12
CHILLER
NEW
STEP 11
STEP 13
STEP 14
AHU-NORTH
AHU-SOUTH
AHU-NORTH
AHU-01
AHU-02
AHU-01
AHU-NORTH
AHU-01
AHU-02
AHU-01
AHU-02
AHU-01
SEAL / SIGNATURE:
CAPITAL PROJECT NUMBER:
SHEET NUMBER:
SHEET TITLE:
PMCS PROJECT MANAGER:
SHEET ISSUE DATE
DESIGN & CONSTRUCTION STANDARDS VERSION:
ORIGINAL ISSUE DATE
BUILDING ABBREVIATION - NUMBER:
BUILDING NAME:
PROJECT ADDRESS:
PROJECT TITLE:
CONSULTANT:
CP#766229
MCD: (M53) HET
HVAC
REPLACEMENT
MCDONALD OBSERVATORY:
HOBBY-EBERLY TELESCOPE
32 MT. FOWLKES RD
FORT DAVIS, TX 79734
MCDONALD OBSERVATORY
03/05/24
ISSUE LOG
NO DATE DESCRIPTION
MCD: (M53) HET
JOHN VERSHAW
SEPT 2021
0 03/05/2024 100% CD
G0.3
CONSTRUCTION
SEQUENCING SITE PLAN
FS
FS
FS
FS
FS
FS
FSFSFSFSFSFSFS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FSFSFSFSFSFSFSFSFSFS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS FS
FS
FS
LIMITS OF
CONSTRUCTION
380 LF MULCH FILTER SOCK
ANCHOR INTO GROUND
FIELD ADJUST AS NEEDED
RE: DETAIL SHEET CS6.1
50 LF MULCH FILTER SOCK
ANCHOR INTO GROUND
FIELD ADJUST AS NEEDED
RE: DETAIL SHEET CS6.1
CONSTRUCTION STAGING, DUMPSTER, AND
CONCRETE WASHOUT AREA
CONTRACTOR TO COORDINATE WITH O.D.R.
IF AN ALTERNATE LOCATION IS PREFERRED
RE: DETAIL SHEET CS6.1
CONTRACTOR TO COORDINATE
USE OF EXISTING PARKING
SPACES WITH O.D.R. PRIOR TO
STAGING EQUIPMENT.
DAMAGES TO THE PAVEMENT
WILL BE REPAIRED AT THE
CONTRACTOR'S EXPENSE
CONCRETE, PAINT, AND
STUCCO WASHOUT
RE: DETAIL SHEET CS6.1
CS1.1
PLAN
NORTH
1 1" = 10'
SITE PLAN
LEGEND
CONSTRUCTION STAGING
MULCH FILTER SOCKFS
DIRECTION OF FLOW
LIMITS OF CONSTRUCTION (0.40 ACRES)
EROSION & SEDIMENTATION CONTROL NOTES:
1. IF THE CONTRACTOR WILL PREPARE THE TEMPORARY EROSION AND SEDIMENT
CONTROL PLAN, IT SHALL BE SUBMITTED TO A/E FOR REVIEW AND APPROVAL.
THIS CAN TAKE A MINIMUM OF 7-10 BUSINESS DAYS AND CONSTRUCTION SHALL
NOT START UNTIL THE PLAN IS APPROVED.
2. EROSION AND SEDIMENTATION CONTROLS AND STORM WATER BEST
MANAGEMENT PRACTICES SHALL COMPLY WITH THE UNIVERSITY OF TEXAS
STANDARD, DIVISION 1, 015723 FOR TEMPORARY STORM WATER POLLUTION
CONTROL.
3. NO TOPOGRAPHICAL OR SURVEY DATA HAS BEEN PROVIDED AS PART OF THIS
PROJECT. GENERAL SITE CONDITIONS AND FLOW INFORMATION HAS BEEN
DETERMINED BY SITE VISITS BY THE ENGINEER.
4. THE CONTRACTOR SHALL INSTALL EROSION/SEDIMENTATION CONTROLS AND
TREE/NATURAL AREA PROTECTIVE FENCING PRIOR TO ANY SITE PREPARATION
WORK (CLEARING, GRUBBING OR EXCAVATION).
5. THE CONTRACTOR IS TO INSPECT THE CONTROLS AND FENCES AT WEEKLY
INTERVALS AND AFTER SIGNIFICANT RAINFALL EVENTS TO ENSURE THAT THEY
ARE FUNCTIONING PROPERLY. THE PERSON(S) RESPONSIBLE FOR MAINTENANCE
OF CONTROLS AND FENCES SHALL IMMEDIATELY MAKE ANY NECESSARY REPAIRS
TO DAMAGED AREAS. SILT ACCUMULATION AT CONTROLS MUST BE REMOVED
WHEN THE DEPTH REACHES SIX (6) INCHES.
6. THE CONTRACTOR SHALL REMOVE BMP MEASURES WHEN CONSTRUCTION IS
COMPLETED AND PERMANENT STABILIZATION HAS BEEN ESTABLISHED FOR
DISTURBED AREAS WHEN APPROVED BY THE CONTRACTING OFFICE OR THE
OWNERS DESIGNATED REPRESENTATIVE.
7. MATERIALS TO BE TRANSPORTED BY TRUCK OR OTHER EQUIPMENT THAT
PROMOTE FUGITIVE DUST SHALL BE COVERED AND/OR WATER SPRINKLED.
8. IF EXCESSIVE DUST IS OBSERVED DURING EXCAVATION AND HAUL OFF
ACTIVITIES, CONTRACTOR IS TO REDUCE FUGITIVE DUST POTENTIAL BY WATER
SPRINKLING .
DEMOLITION AND STAGING NOTES:
1. ASPHALT PAVEMENT AND CONCRETE DEBRIS MUST BE HAULED AND DISPOSED
OF PROPERLY OFF-SITE.
2. LOCATIONS OF DUMPSTER AND STAGING AREA IS SHOWN WHERE OPEN SPACE IS
AVAILABLE ON SITE. CONTRACTOR TO COORDINATE THE PROPOSED LOCATION
WITH THE OWNER PRIOR TO MOBILIZATION.
3. CONTRACTOR TO ENSURE PROPER DISPOSAL OF LITTER AND DEBRIS REMOVED
FROM ROADWAYS BY LITTER COLLECTION AND/OR STREET SWEEPING.
SEAL / SIGNATURE:
CAPITAL PROJECT NUMBER:
SHEET NUMBER:
SHEET TITLE:
PMCS PROJECT MANAGER:
SHEET ISSUE DATE
DESIGN & CONSTRUCTION STANDARDS VERSION:
ORIGINAL ISSUE DATE
BUILDING ABBREVIATION - NUMBER:
BUILDING NAME:
PROJECT ADDRESS:
PROJECT TITLE:
CONSULTANT:
CP#766229
MCD: (M53) HET
HVAC
REPLACEMENT
MCDONALD OBSERVATORY:
HOBBY-EBERLY TELESCOPE
32 MT. FOWLKES RD
FORT DAVIS, TX 79734
MCDONALD OBSERVATORY
03/05/2403/05/24
ISSUE LOG
NO DATE DESCRIPTION
MCD: (M53) HET
JOHN VERSHAW
SEPT 2021
0 03/05/2024 100% CD
CIVIL ENGINEERING | PROJECT MANAGEMENT
1823 FORTVIEW RD, AUSTIN, TEXAS 78704
OFFICE: (512) 400-4207
TBPE FIRM REGISTRATION F-19569
BAEZA
ENGINEERING
EROSION AND
SEDIMENTATION
CONTROL PLAN
CONCRETE, PAINT, AND
STUCCO WASHOUT
TCEQ TPDES CONSTRUCTION GENERAL PERMIT (CGP) NO. TXR150000 :
1. CONSTRUCTION ACTIVITIES ARE LESS THAN 1 ACRE AND DO NOT REQUIRE FILING
OF A CONSTRUCTION GENERAL PERMIT WITH TCEQ.
2. CONTRACTOR TO FOLLOW DRAWINGS AND SPECIFICATIONS PROVIDED IN THE
EROSION CONTROL PLAN AND SPECIFICATIONS.
3. POSTING OF SWPPP SIGN IS NOT REQUIRED AS A PERMIT WILL NOT BE FILED
WITH TCEQ.
4. CONTRACTOR TO FOLLOW SPECIFICATIONS 01 57 23 - TEMPORARY STORM WATER
POLLUTION CONTROL, FOR MATERIALS AND EXECUTION OF WORK.
CS6.1
SEAL / SIGNATURE:
CAPITAL PROJECT NUMBER:
SHEET NUMBER:
SHEET TITLE:
PMCS PROJECT MANAGER:
SHEET ISSUE DATE
DESIGN & CONSTRUCTION STANDARDS VERSION:
ORIGINAL ISSUE DATE
BUILDING ABBREVIATION - NUMBER:
BUILDING NAME:
PROJECT ADDRESS:
PROJECT TITLE:
CONSULTANT:
CP#766229
MCD: (M53) HET
HVAC
REPLACEMENT
MCDONALD OBSERVATORY:
HOBBY-EBERLY TELESCOPE
32 MT. FOWLKES RD
FORT DAVIS, TX 79734
MCDONALD OBSERVATORY
03/05/2403/05/24
ISSUE LOG
NO DATE DESCRIPTION
MCD: (M53) HET
JOHN VERSHAW
SEPT 2021
0 03/05/2024 100% CD
CIVIL ENGINEERING | PROJECT MANAGEMENT
1823 FORTVIEW RD, AUSTIN, TEXAS 78704
OFFICE: (512) 400-4207
TBPE FIRM REGISTRATION F-19569
BAEZA
ENGINEERING
EROSION AND
SEDIMENTATION
CONTROL DETAILS
N.T.S.
CONCRETE, PAINT, AND STUCCO WASHOUT1 N.T.S.
CONCRETE, PAINT, AND STUCCO WASHOUT2
D D
D
S3.1
EXTEND CONCRETE
EQUIPMENT PAD
1/S3.1
TYP.
EXISTING
EQUIPMENT PAD
EXISTING
EQUIPMENT PAD
1/S3.1
TYP.
EXTEND CONCRETE
EQUIPMENT PAD
S3.1
6/S3.1
TYP.
42'-0"
'-0
3 EQ SPA
S3.1
S3.1
S3.1
TYP
7/S3.1
S3.1
'-0
7/S3.1
** DIMENSIONS NOTED ARE FROM
THE TOP OF THE EXISTING
HOUSEKEEPING PAD TO THE
EXISTING GRADE.
23"
17"
5"
7"
8'-0"
8'-0"
SEAL / SIGNATURE:
CAPITAL PROJECT NUMBER:
SHEET NUMBER:
SHEET TITLE:
PMCS PROJECT MANAGER:
SHEET ISSUE DATE
DESIGN & CONSTRUCTION STANDARDS VERSION:
ORIGINAL ISSUE DATE
BUILDING ABBREVIATION - NUMBER:
BUILDING NAME:
PROJECT ADDRESS:
PROJECT TITLE:
CONSULTANT:
MCD: (M53) HET
SEPT 2021
JOHN VERSHAW
www.datumrios.com | Co. Reg. No. F-16674
816 Camaron St Ste 245 San Antonio, TX 78212, 210-623-0409
Datum Rios Project No.
3/5/24
S1.2
CP#766229
SITE PLAN - NEW
MCD: (M53) HET
HVAC
REPLACEMENT
MCDONALD OBSERVATORY:
HOBBY-EBERLY TELESCOPE
32 MT. FOWLKES RD
FORT DAVIS, TX 79734
MCDONALD OBSERVATORY
03/05/2403/05/24
22702
3/32" = 1'-0"
SITE PLAN
PLAN
NORTH
ISSUE LOG
0 03/05/2024 100% CD
1. PERIODIC SITE OBSERVATIONS BY THE ENGINEER ARE SOLELY FOR THE PURPOSE OF DETERMINING GENERAL CONFORMANCE WITH THE CONTRACT DOCUMENTS. THOSE LIMITED OBSERVATIONS ARE NOT A SUBSTITUTE FOR INSPECTIONS AND TESTING PERFORMED BY THE OWNER’S QUALIFIED, INDEPENDENT TESTING LABORATORY, NOR ARE THEY INTENDED TO IDENTIFY ALL DEFECTS AND DEFICIENCIES IN THE WORK BY THE CONTRACTOR. THOSE OBSERVATIONS DO NOT FULFILL ANY PART OF THE SPECIAL INSPECTIONS REQUIREMENTS GIVEN IN THE SPECIFICATIONS. THE DESIGNATED SPECIAL INSPECTOR IS SOLELY RESPONSIBLE FOR FULFILLING THE SPECIAL INSPECTION REQUIREMENTS AS
OUTLINED HERE AND DEFINED IN THE SPECIFICATIONS
2. REFER TO THE SPECIFICATIONS FOR CODE MANDATED MATERIALS TESTING AND INSPECTION REQUIREMENTS FOR STRUCTURAL WORK.
3. ITEMS OF STRUCTURAL CONSTRUCTION WHICH REQUIRE SPECIAL INSPECTION INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING:
FOUNDATION EXCAVATIONS AND FILL OPERATIONS
INSTALLATION OF CONCRETE FOOTINGS
PLACEMENT OF STRUCTURAL CONCRETE
PLACEMENT OF CONCRETE REINFORCING
PLACEMENT OF ANCHOR BOLTS PLACED IN CONCRETE OR MASONRY
SPECIAL INSPECTION REQUIREMENTS
1. ALL WORK SHALL BE IN ACCORDANCE WITH THE 2018 INTERNATIONAL BUILDING CODE.
2. FIELD VERIFY ALL RELEVANT DIMENSIONS AND CONDITIONS AT EXISTING STRUCTURES PRIOR TO STARTING SHOP DRAWINGS AND THE
CONSTRUCTION PROCESS.
3. EXISTING CONDITIONS WHICH REQUIRE MODIFICATIONS TO THE DESIGN SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE
ARCHITECT.
4. ALL CONCRETE WORK SHALL BE IN ACCORDANCE WITH THE “BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE (ACI 318-14,” THE
AMERICAN CONCRETE INSTITUTE.
5. ALL CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH OF 3000 PSI AT 28 DAYS AND A MINIMUM CEMENT CONTENT OF 5 SACKS PER CUBIC YARD. SLUMP SHALL BE 3" TO 5". AGGREGATE SHALL CONFORM TO ASTM C 33. PROVIDE 5% (PLUS OR MINUS 1 1/2%) AIR ENTRAINMENT. APPLY
CURING COMPOUND TO ALL FLAT CONCRETE SURFACES IMMEDIATELY AFTER FINISHING.
6. ALL REINFORCING STEEL SHALL BE NEW DOMESTIC DEFORMED BILLET STEEL, CONFORMING TO ASTM A 615, GRADE 60.
7. STRUCTURAL STEEL SHALL CONFORM TO THE AISC 360-05 "SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS."
8. STRUCTURAL STEEL SHAPES, PLATES ETC., TO MEET THE REQUIREMENTS OF ASTM A 36.
9. STRUCTURAL TUBES TO BE ASTM A 500, GRADE B (46 KSI YIELD).
10. ALL WELDS TO CONFORM TO THE REQUIREMENTS OF THE SPECIFICATIONS OF THE AMERICAN WELDING SOCIETY. USE E70 ELECTRODES.
11. ALL WELDERS SHALL BE AWS CERTIFIED AND SHALL PROVIDE PROOF OF CERTIFICATION UPON REQUEST.
12. ALL STEEL SHALL BE COMMERCIAL BLAST CLEANED AND FURNISHED WITH SHOP COAT OF ZINC RICH PRIMER (TNEMEC SERIES 94-H20), A MINIMUM OF 3.0 MILS THICK. FINISH COATS SHALL BE 2 COATS OF TNEMEC ENDURO SHIELD 72, 3MILS PER COAT. COMPLY WITH INSTRUCTIONS OF COATING MANUFACTURER. COLOR TO BE SELECTED BY OWNER. ALTERNATIVELY, STEEL MAY BE HOT DIPPED GALVANIZED. RESTORE
DAMAGED COATINGS.
13. DRILLED EXPANSION BOLTS SHALL BE ONE OF THE FOLLOWING:
STRONG-BOLT 2, SIMPSON STRONG-TIE CO., PLEASANTON, CA
POWER STUD+SD1, POWERS FASTENERS, BREWSTER, NY
KWIK BOLT TZ, HILTI FASTENING SYSTEMS, TULSA, OK
HOLES DRILLED IN THE CONCRETE SHALL BE THE SAME NOMINAL DIAMETER OF THE BOLT. BOLTS SHALL BE INSTALLED PERPENDICULAR WITH A MAXIMUM DEVIATION FROM PERPENDICULAR OF 10 DEGREES. BOLT POSITIONS MAY BE ADJUSTED IN THE FIELD, A MAXIMUM OF 1 1/2" FROM THE DETAILED DIMENSION, AFTER LOCATING REBAR WITH A PACHOMETER. ALL ABANDONED HOLES SHALL BE COMPLETELY FILLED WITH GROUT.
14. GROUT UNDER BASE PLATE SHALL CONFORM TO ASTM C 1107, GRADE B, NON-SHRINK, NON-METALLIC GROUT WITH A COMPRESSIVE STRENGTH
OF 5000 PSI AT 28 DAYS.
15. EQUIPMENT PADS AND PIPE SUPPORTS SHALL BE SET PLUMB AND LEVEL.
GENERAL NOTES AND SPECIFICATIONS
1. THE EQUIPMENT PAD PREPARATION REQUIREMENTS ARE BASED ON THE RECOMMENDATIONS OF THE GEOTECHNICAL
REPORT PREPARED BY TRINITY ENGINEERING TESTING CORPORATION, DATED AUGUST, 1993.
2. STRIP ALL VEGETATION, ORGANIC TOP SOIL AND BROWN FAT CLAY WITHIN THE EQUIPMENT PAD LINES TO A DEPTH OF 18"
BELOW EXISTING GRADE.
3. JUST PRIOR TO FILL PLACEMENT, SCARIFY EXPOSED SUBGRADE AND COMPACT TO 95 PERCENT OF THE MAXIMUM DENSITY (TEST METHOD TEX 113E) AT A MOISTURE CONTENT OF -2 TO +2 PERCENT ABOVE OPTIMUM. WHERE EXPOSED SUBGRADE IS PREDOMINANTLY ROCK, PROOF ROLL TO DETECT ANY SOFT SPOTS AND REMOVE THE SOFT MATERIALS.
4. PLACE AND COMPACT SELECT FILL TO THE BOTTOM OF SLAB. SELECT FILL SHALL HAVE A PLASTICITY INDEX BETWEEN 5 AND 20, WITH A LIQUID LIMIT LESS THAN 40. PLACE FILL IN LIFTS NOT TO EXCEED 8" (LOOSE MEASURE), COMPACTING EACH LIFT TO 95 PERCENT OF MAXIMUM DENSITY (TEST METHOD TEX 113E) AT A MOISTURE CONTENT OF -1 TO+3 PERCENT ABOVE OPTIMUM. FLEXIBLE PAVEMENT BASE (ITEM 247, TYPE A, GRADE 1 OR 2) IS AN ACCEPTABLE SELECT FILL. FILL SHALL BE CLEAN OF ORGANICS, CONSTRUCTION DEBRIS AND ROCKS LARGER THAN 4" IN GREATEST DIMENSION. ON SITE
MATERIAL MEETING THE REQUIREMENTS MAY BE USED AS SELECT FILL.
5. CONTRACTOR SHALL CONTACT THE OWNER'S TESTING LABORATORY AT LEAST 7 DAYS BEFORE THE START OF FILLING OPERATIONS FOR THE PAD. COMPACTION AND MOISTURE CONTENT OF SUBGRADE AND EACH LIFT OF FILL SHALL BE TESTED AND APPROVED BEFORE PLACING NEXT LIFT. ADJUST MOISTURE CONTENT AND RECOMPACT WHERE REQUIRED.
6. SELECT FILL PLACED OUTSIDE THE GRADE BEAM LINES SHALL BE REMOVED AND REPLACED WITH ON- SITE CLAY
BACKFILL.
EQUIPMENT PAD PREPARATION
/2
/2
EXISTING
FOUNDATION
1#5X4'-0", DRILL & ADHESIVE
ANCHOR 1'-4" INTO EXISING
GRADE BEAM
NEW PAD
EXTENTION
2/S3.1
EXISTING
REINF, DO NOT
CUT
EXISTING
EQUIPMENT PAD
CHIP 3/4"
LEDGE
SAW CUT 3/4"
DEEP
LINE OF
EXISTING GRADE
REMOVE 6" MIN . OF SANDY
CLAY & REPLACE W/
COMPACTED SELECT FILL
COMPACT SELECT FILL
MIN
1'-0"
#4X2'-6" @12", DRILL & ADHESIVE
ANCHOR 6" INTO EXISTING SLAB
#4@12" E.W. CENTERED
2#5 TOP & BOT
#3 @12" VERT
#4@12" HORIZ
NATURAL SANDY CLAY
(SEVERELY WEATHERED
ROCK)
' M
IN
BEAR FOOTING ON
WEATHERED VOLCANIC
ROCK
'-0
M
IN
M
IN
/2
3#8 TOP & BOT
#3 STIRRUPS @10"
1'-6" MIN
COMPACTED
SELECT FILL
COMPACT EXPOSED
SUBGRADE
T Y
P
C L R
1'-6"SANDY LEAN
CLAY OR
WEATHERED
ROCK
#4@12" E.W., CENTERED IN SLAB
'-0
M
IN
'-0
REINF
2#8 TOP & BOT
#3 STIRRUPS @10"
T Y
P
C L R
1'-2"
3/S3.1
CORNER BARS
PLAN
NO SCALE
CORNER BARS
EA. FACE TO
MATCH BARS IN
DISCONTINUOUS
MEMBER
CORNER BARS EACH FACE TO MATCH SMALLER BAR
AT INTERSECTION.
DETAILED
REINFORCING STOP 2"
SHORT OF FORM,TYP.
CORNER BARS AT WALL OR GRADE BEAM INTERSECTION
TYPICAL DETAIL
NOTES:
1. PROVIDE CORNER BARS TO MATCH SIZE AND LOCATION OF ALL HORIZONTAL GRADE BEAM AND WALL BARS EXCEPT
HOOKED TOP AND BOTTOM BARS.
2. CORNER BARS ARE NOT REQUIRED WHEN BEAM OR WALL BARS HAVE HOOKED ENDS. TURN HOOKS SIDEWAYS.
EACH LEG (TYP.)
30 BAR DIAMETER
E A
C H
L E
G
T Y
P
B
A R
D
IA
M E
T E
R (2
M
IN
2'-3"
3#4 CONT.
#4@1'-4"
/-1
'-0
V A
R
IE
S '-0
M
IN
'-0
M
A X
4'-0"
SECTION
FUTURE PIPESMEP PIPES
REMOVE EXISTING ORGANIC
MATTER & LOOSE TOP SOIL PLACE
FOOTING IN FIRM SUBGRADE.
ELEVATION VARIES.
FIELD VERIFY BASED
UPON PIPE ROUTING
STRUT & PIPE
SUPPORT, SEE MEP
ELEVATION
SECTION
L4X4X1/4
BOLT STRUT TO ANGLE
8" 8"
L3X3X3/16 PL 1/2X 6"X 1'-0" W/
2-1/2"X10" GALV.
ANCHOR BOLTS
3/16 1 1/2
TYP. CL FOOTING
& ANGLE
3/16
4"
4" 4"
2'-3"
'-0
SECTION
E L E
V A
T
IO
N
10'-0" MAX TO
NEXT SUPPORTPIPE SUPPORT &
STRUT,SEE MEP
BOLT STRUT TO
ANGLE
EXISTING
DUCTS
EXISTING
FOOTING
LOCATE FOOTING TO AVOID
EXISTING DUCTS & PIPES
C.L. FOOTING
& ANGLE
6/S3.1
"1
'-0
FUTURE PIPES
MEP PIPES
REMOVE EXISTING ORGANIC
MATTER & LOOSE TOP SOIL PLACE
FOOTING IN FIRM SUBGRADE.
ELEVATION VARIES.
FIELD VERIFY BASED
UPON PIPE ROUTING
PIPE SUPPORT,
SEE MEP
ELEVATION
8" PL 1/2X12X12 W/ 4-1/2" DIA
X 10" GALV. ANCHOR
BOLTS @ 8" E.W.
3/16
TYP @
BASE
SECTION
4'-0"
NEW MEP PIPING
3/16 1 1/2
TYP.
L4X4X1/4, TYP
C L R
MIN
8"
'-4
/4
M
IN PIPE TRENCH
PERMISSIBLE C.J.
SLOPE TO DRAINS
8" DIA PVC PIPE SLEEVE
DRAINS THROUGH SLAB
AT 15'. FILL WITH GRAVEL
FIRM NATURAL
OR COMPACTED
SUBGRADE
6#4 CONT. W/ #4X @12"
CENTERED
TRENCH SECTION
3'-0"
MAX, 12,000 WHEEL
LOAD (HS 20)
3/4" STEEL CHECKERED FLOOR
PLATE IN SECTIONS.
PROVIDE 4 LIFTING LOOPS PER
SECTION. 4- 1/2" HILTI HDI
STAINLESS STEEL DROP-IN
ANCHORS PER SECTION, ONE
NEAR EACH CORNER.
4"
3"
SEAL / SIGNATURE:
CAPITAL PROJECT NUMBER:
SHEET NUMBER:
SHEET TITLE:
PMCS PROJECT MANAGER:
SHEET ISSUE DATE
DESIGN & CONSTRUCTION STANDARDS VERSION:
ORIGINAL ISSUE DATE
BUILDING ABBREVIATION - NUMBER:
BUILDING NAME:
PROJECT ADDRESS:
PROJECT TITLE:
CONSULTANT:
MCD: (M53) HET
SEPT 2021
JOHN VERSHAW
www.datumrios.com | Co. Reg. No. F-16674
816 Camaron St Ste 245 San Antonio, TX 78212, 210-623-0409
Datum Rios Project No.
3/5/24
S3.1
CP#766229
GENERAL NOTES &
DETAILS
MCD: (M53) HET
HVAC
REPLACEMENT
MCDONALD OBSERVATORY:
HOBBY-EBERLY TELESCOPE
32 MT. FOWLKES RD
FORT DAVIS, TX 79734
MCDONALD OBSERVATORY
03/05/2403/05/24
22702
NO SCALE 1 3/4" = 1'-0" 2 3/4" = 1'-0" 3
3/4" = 1'-0" 4 5
3/4" = 1'-0" 6 3/4" = 1'-0" 7 3/4" = 1'-0" 8
ISSUE LOG
0 03/05/2024 100% CD
CAPITAL PROJECT NUMBER:
SHEET NUMBER:
SHEET TITLE:
PMCS PROJECT MANAGER:
SHEET ISSUE DATE
DESIGN & CONSTRUCTION STANDARDS VERSION:
ORIGINAL ISSUE DATE
BUILDING ABBREVIATION - NUMBER:
BUILDING NAME:
PROJECT ADDRESS:
PROJECT TITLE:
CONSULTANT:
CP#766229
MCD: (M53) HET
HVAC
REPLACEMENT
MCDONALD OBSERVATORY:
HOBBY-EBERLY TELESCOPE
32 MT. FOWLKES RD
FORT DAVIS, TX 79734
MCDONALD OBSERVATORY
03/05/24
ISSUE LOG
NO DATE DESCRIPTION
MCD: (M53) HET
JOHN VERSHAW
SEPT 2021
0 03/05/2024 100% CD
M0.0
LEGENDS &
ABBREVIATIONS - HVAC
EXISTING EQUIPMENT OR PIPE TO BE REMOVED.
EXISTING DUCTWORK AND/OR AIR DEVICE TO BE REMOVED.
EXISTING EQUIPMENT OR PIPE TO REMAIN.
EXISTING DUCTWORK AND/OR AIR DEVICE TO REMAIN.
DUCTWORK AND TRANSITION. 1ST DIMENSION NOTED IS VISIBLE DIMENSION.
DUCTWORK SPLITTER DAMPER.
BRANCH TAKEOFF FROM DUCT W/VOLUME DAMPER AT EA TAKEOFF, EVEN IF
VOLUME DAMPER IS NOT SHOWN.
DUCTWORK: CEILING S/A DIFFUSERS. THROW IS FOUR-WAY UON.
ELBOW UP OR DOWN IN DUCTWORK.
DUCTWORK: RISE OR FALL
FLEXIBLE CONNECTIONS.
WALL SUPPLY AIR REGISTER.
WALL RETURN AIR GRILLE.
CEILING SUPPLY AIR DIFFUSER.
CEILING RETURN OR EXHAUST AIR DEVICE.
SUPPLY OR OUTSIDE AIR DUCTWORK SECTION.
RETURN AIR DUCTWORK SECTION.
EXHAUST AIR DUCTWORK SECTION.
DUCT DOWN THRU FLOOR
DUCT UP THRU CEILING
HORIZONTAL FIRE DAMPER W/ ACCESS DOOR.
VERTICAL FIRE DAMPER W/ ACCESS DOOR.
COMB. FIRE/SMOKE DAMPER W/ACCESS DOOR.
MOTORIZED SOLENOID (24 VOLT UON) AND DAMPER
CO2 SENSOR
THERMOSTAT
HUMIDISTAT
DUCT MOUNTED SMOKE DETECTOR
14/6
14/6
14/6
C
T
H
D
AIR DEVICE MARK, CFM. SEE SCHEDULE.
POINT OF CONNECTION, NEW TO OLD
DUCTWORK OR PIPE
GATE VALVE
GLOBE VALVE
CHECK VALVE
BUTTERFLY VALVE
BALL VALVE
PLUG VALVE
PRESSURE REDUCING VALVE
MOTOR/SOLENOID OPERATED VALVE
STRAINER W/ BLOWDOWN GATE VALVE
VALVE IN VERTICAL
TEMPERATURE/ PRESSURE RELIEF VALVE
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
EXISTING DOMESTIC COLD WATER
EXISTING DOMESTIC HOT WATER
EXISTING DOMESTIC HOT WATER RETURN
SANITARY SEWER
EXISTING SANITARY SEWER
SANITARY VENT
EXISTING SANITARY VENT
REFER TO ABBREVIATIONS FOR CONTENTS
(E.G. CHS = CHILLED WATER SUPPLY)
DIRECTION OF FLOW
PIPE SIZE REDUCER
CLEANOUT
P-TRAP
FLANGE CONNECTION
UNION
DIRT LEG (6" LONG)
TRAP
DROP AT 45° ANGLE
ELBOW TURNING DOWN
ELBOW TURNING UP
B,180
XX
ABBREVIATIONSLEGEND (NOTE: ALL SYMBOLS SHOWN ARE NOT NECESSARILY USED ON DRAWINGS.)
A AMPERES
ABV ABOVE
AD ACCESS DOOR
AD AUXILIARY DRAIN
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFMS AIR FLOW MEASURING STATION
AHU AIR HANDLING UNIT
ALUM ALUMINUM
AV ACID VENT
AW ACID WASTE
BA VA BALL VALVE
BAS BUILDING AUTOMATION SYSTEM
BF VA BUTTERFLY VALVE
BFF BELOW FINISHED FLOOR
BLW BELOW
BMS BUILDING MANAGEMENT SYSTEM
BTUH BRITISH THERMAL UNITS / HOUR
CA COMPRESSED AIR
CFM CUBIC FEET PER MINUTE
CHR/CHS CHILLED WATER RETURN / SUPPLY
CO CLEANOUT
CO2 CARBON DIOXIDE
CONT CONTINUATION
COORD COORDINATE
CW DOMESTIC COLD WATER
CWR/CWS CONDENSER WATER RETURN / SUPPLY
D CONDENSATE DRAIN LINE, EQUIP. DRAIN
DEG F DEGREES FAHRENHEIT
DF DRINKING FOUNTAIN
DI DEIONIZED WATER
DIA DIAMETER
DN DOWN
DFCO DOUBLE FLOOR CLEANOUT
DYCO DOUBLE YARD CLEANOUT
ETR EXISTING TO REMAIN
EA EXHAUST AIR
EDB ENTERING DRY BULB TEMPERATURE
EDF ELECTRIC DRINKING FOUNTAIN
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EFF EFFICIENCY
ELEC ELECTRICAL
EOD EMERGENCY OVERFLOW DRAIN
EQUIP EQUIPMENT
ESD EMERGENCY STORM DRAIN
ESP EXTERNAL STATIC PRESSURE
EWB ENTERING WET BULB TEMPERATURE
EWH ELECTRIC WATER HEATER
EWT ENTERING WATER TEMPERATURE
EXIST EXISTING
EA EXHAUST
F&I FURNISH AND INSTALL
FCO FLOOR CLEANOUT
FCU FAN COIL UNIT
FD FIRE DAMPER W/ AD
FD FLOOR DRAIN
FHV FIRE HOSE VALVE
FLEX FLEXIBLE DUCT
FS FLOOR SINK
FSD COMB. FIRE/SMOKE DAMPER W/ AD
FT FEET
G GAS
GL VA GLOBE VALVE
GA VA GATE VALVE
GR/GS GLYCOL RETURN / SUPPLY
GSH GROSS SENSIBLE HEAT
GLH GROSS LATENT HEAT
GTH GROSS TOTAL HEAT
GV GREASE VENT
GW GREASE WASTE
H HIGH, HEIGHT
HA HOT AIR
HW DOMESTIC HOT WATER
HWR DOMESTIC HOT WATER RETURN
HWR/HWS HEATING WATER RETURN / SUPPLY
IN INCHES
INSUL INSULATION, INSULATE
L LONG, LENGTH
LDB LEAVING DRY BULB
LPC LOW PRESSURE CONDENSATE
LPS LOW PRESSURE STEAM
LWT LEAVING WATER TEMPERATURE
LWB LEAVING WET BULB
MAX MAXIMUM
MIN MINIMUM
MTD MOUNTED
MTG HT MOUNTING HEIGHT
MVD MOTORIZED VOLUME DAMPER
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
OH OVERHEAD
NIC NOT IN CONTRACT
NTS NOT TO SCALE
PH PHASE
RELF RELIEF AIR
RA RETURN AIR
RH RELATIVE HUMIDITY
RD ROOF DRAIN, ROOF DRAIN LEADER
RED REDUCER
RELOC RELOCATE, RELOCATED
REQ'D REQUIRED
RPZ REDUCED PRESSURE ZONE
RPBP REDUCED PRESSURE BACKFLOW PREVENTER
SA SUPPLY AIR
SAN SOIL & WASTE MAIN, SITE
SEER SEASONAL ENERGY EFFICIENCY RATIO
SD SMOKE DAMPER W/ AD; STORM DRAIN
S/D SPLITTER DAMPER
SM GALVANIZED SHEET METAL
SP STATIC PRESSURE, IN. H2O
SS SANITARY SEWER BELOW GRADE
SS STAINLESS STEEL
T&P TEMPERATURE / PRESSURE RELIEF VALVE
TEMP TEMPERATURE
THK THICK, THICKNESS
TSTAT THERMOSTAT
TP TRAP PRIMER
TW TEMPERED WATER
TYP TYPICAL
UF UNDER FLOOR
UG UNDER GROUND
UON UNLESS OTHERWISE NOTED
V SANITARY VENT
V VOLT
VD VOLUME DAMPER
W WATT
W WIDE, WIDTH
W SANITARY SOIL/WASTE
W/ WITH
WCO WALL CLEANOUT
WG WATER GAGE
WHA WATER HAMMER ARRESTOR
W/IN WITHIN
GENERAL NOTES (HVAC & PLUMBING)
1. REFER TO MEP DRAWINGS FOR THE EXTENT OF WALL & CEILING DEMOLITION INCLUDED IN THE SCOPE
OF WORK. REFER TO DETAIL SHEETS FOR ADDITIONAL INSTALLATION INSTRUCTIONS.
2. REMOVE ALL ITEMS NORMALLY INSTALLED BY THIS TRADE IN WALLS TO BE DEMOLISHED & AS OTHERWISE REQUIRED BY THE SCOPE OF WORK. PATCH ANY OPENINGS IN FLOORS, WALLS, ROOF, ETC. CREATED AS A RESULT OF THIS DEMOLITION, TO MATCH SURROUNDING CONSTRUCTION.
3. REMOVE CEILING AIR DEVICES AS INDICATED ON THE DRAWINGS AND AS APPLICABLE TO ACCOMPLISH THE SCOPE OF WORK. WHERE AIR DEVICES ARE TO BE REUSED AS PART OF THE SCOPE OF WORK, SALVAGE AIR DEVICES, CLEAN, AND STORE FOR REINSTALLATION. WHERE AIR DEVICES ARE NOT TO BE
REUSED AS PART OF THE SCOPE OF WORK, OFFER THEM TO OWNER; IF OWNER DOES NOT WANT
THEM, REMOVE AND DISPOSE OF PROPERLY.
4. REMOVE ALL UNNEEDED AND/OR ABANDONED MATERIALS & EQUIPMENT BACK TO THE LIMITS OF CONSTRUCTION OR THE NEAREST POINT AT WHICH THE ITEM IS REQUIRED TO REMAIN IN SERVICE.
CAP AS APPROPRIATE. REINSULATE DUCTWORK WHEREVER INSULATED DUCTWORK IS PATCHED,
CAPPED, ETC.
5. REFER TO THE LEGEND SHEET FOR LEGEND, ABBREVIATIONS, & GENERAL MECHANICAL NOTES. REFER
TO DIVISION 23 SPECIFICATIONS.
6. HEAVY LINES INDICATE DEMO WORK; LIGHT LINES INDICATE APPROXIMATE EXISTING CONDITIONS.
FIELD VERIFY PRIOR TO BIDDING.
7. COORDINATE ALL WORK SCHEDULING WITH MEP PRIOR TO BIDDING TO DETERMINE THE EXTENT OF
AFTER-HOURS WORK REQUIRED, & INCLUDE SUCH AFTER-HOURS WORK.
8. ALL DUCT DIMENSIONS INDICATED ARE CLEAR INSIDE DIMENSIONS. CONSTRUCT ALL DUCTWORK DOWNSTREAM OF TERMINAL UNITS TO SMACNA 2 IN. PRESSURE CLASSIFICATION, AND ALL UPSTREAM OF TERMINAL UNITS TO SMACNA 6 IN. PRESSURE CLASSIFICATION UNLESS OTHERWISE INDICATED.
SEAL ALL DUCTWORK TO SMACNA TYPE A SEAL CLASS UNLESS OTHERWISE INDICATED.
9. WHERE WORK IS ADJACENT TO OCCUPIED SPACE, KEEP CONSTRUCTION AREA AT A NEGATIVE PRESSURE RELATIVE TO SUCH SPACES, & FILTER DISCHARGE AIR AS REQUIRED TO CONTAIN DUST.
10. DECOMMISSION ELECTRICAL SERVICE FROM ALL EQUIPMENT TO BE REMOVED. COORDINATE WITH
DIVISION 26 OF THE SPECIFICATIONS.
11. DISCONNECT WITH DIVISION 26 OF THE SPECIFICATIONS.
12. DISCONNECT, REMOVE AND SECURE ALL PIPING FROM EQUIPMENT TO BE REMOVED.
13. PATCH AND SEAL DUCT OPENINGS WHERE BRANCH DUCTS ARE REMOVED, CLEAN DUCTS TO REMAIN
AND EXTEND DUCTS AS REQUIRED FOR THE NEW AIR DISTRIBUTION SYSTEM
14. RE-ESTABLISH ALL MECHANICAL SYSTEMS DISTURBED BY THE WORK OF THIS PROJECT TO FULL
OPERATION. REMOVE ONLY EQUIPMENT AND SYSTEMS TO BE REPLACED. CONTRACTOR SHALL
REPLACE/REINSTALL ANY EQUIPMENT AND/OR SYSTEMS REMOVED THAT ARE TO REMAIN IN SERVICE.
15. EXISTING DOMESTIC WATER PIPE, STEAM, CONDENSATE RETURN, CHILLED WATER, PIPE VALVES, AND FITTINGS THROUGHOUT THE BUILDING SHALL REMAIN UNDAMAGED. MODIFY SYSTEMS AS REQUIRED
TO ACCOMMODATE THE REPLACEMENT WORK OF THIS PROJECT.
16. CONSULT WITH THE OWNER AND ENGINEER DURING DEMOLITION TO ASSURE THAT EXISTING SYSTEMS
AND EQUIPMENT TO REMAIN ARE NOT REMOVED.
17. EACH SUB-CONTRACTOR SHALL VERIFY DEMOLITION SCOPE OF WORK WITH THE PRIME CONTRACTOR FOR THE REMOVAL OF ANY EXISTING FIRE PROTECTION, PLUMBING FIXTURES, PIPING, HVAC UNITS, CHILLED WATER PIPING, STEAM PIPING, ETC. NOT BEING REUSED ON THIS PROJECT, UNLESS
SPECIFICALLY NOTED OTHERWISE. CONTRACTOR MUST VERIFY WITH THE OWNER ALL PRESUMED
ABANDONED EQUIPMENT, PIPES AND DUCTWORK PRIOR TO REMOVAL. ALL EXTRANEOUS ITEMS IN THE
SPACE NOT APPLICABLE TO THE NEW WORK MUST BE REMOVED AND ROOF/WALL/FLOOR
PATCHED/REPAIRED TO MATCH EXISTING STRUCTURE. EXISTING ABANDONED PIPES DUCTS, OR
EQUIPMENT IN THE FLOOR, EMBEDDED IN CONCRETE, OR OTHERWISE INACCESSIBLE ARE TO BE CUT OFF AND CAPPED BELOW OR WITHIN FLOOR OR WALL LEVEL, WHEN THEY ARE NOT TO BE REUSED IN THE PROJECT. IF REQUIRED BY OWNER OR CODES, ABANDONED PIPING AND/OR DUCTWORK MUST BE
REMOVED TO THE POINT OF ORIGIN. CONFIRM THE EXTENT OF DEMOLITION WITH THE PRIME
CONTRACTOR PRIOR TO BID AND INCLUDE THE BID PROPOSAL AS DIRECTED. ITEMS IDENTIFIED BY OWNER TO BE SALVAGED SHALL BE DELIVERED TO OWNERS SITE AND CONTRACTOR SHALL OBTAIN
WRITTEN RECEIPT FROM OWNER VERIFYING DELIVERY.
18. ALL UTILITY OUTAGES REQUIRE 60 DAYS WORKING NOTICE. CONTRACTOR SHALL COORDINATE ALL UTILITY OUTAGES WITH UT SITE REPRESENTATIVE, AND BUILDING MANAGER. CONTRACTOR SHALL PROVIDE PMCS PROJECT MANAGER, UT SITE REPRESENTATIVE, AND BUILDING MANAGER WITH A
PROJECT OUTAGE SCHEDULE FOR REVIEW.
SHEET NUMBER:
SHEET TITLE:
PMCS PROJECT MANAGER:
SHEET ISSUE DATE
DESIGN & CONSTRUCTION STANDARDS VERSION:
ORIGINAL ISSUE DATE
BUILDING ABBREVIATION - NUMBER:
BUILDING NAME:
PROJECT ADDRESS:
PROJECT TITLE:
CONSULTANT:
CP#766229
MCD: (M53) HET
HVAC
REPLACEMENT
MCDONALD OBSERVATORY:
HOBBY-EBERLY TELESCOPE
32 MT. FOWLKES RD
FORT DAVIS, TX 79734
MCDONALD OBSERVATORY
03/05/24
ISSUE LOG
NO DATE DESCRIPTION
MCD: (M53) HET
JOHN VERSHAW
SEPT 2021
0 03/05/2024 100% CD
M0.1
GENERAL NOTES -
HVAC
1. GENERAL NOTES APPLY TO ALL HVAC & PIPING SHEETS. REFER TO SPECIFICATIONS FOR ADDITIONAL MATERIALS AND INSTALLATION
REQUIREMENTS.
2. ALL DUCTWORK SHALL BE CONSTRUCTED AND SUPPORTED IN ACCORDANCE WITH THE LATEST EDITION OF SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION, INC. (SMACNA) STANDARD “HVAC DUCT CONSTRUCTION STANDARDS, METAL AND
FLEXIBLE”. FITTINGS SHALL BE RADIAL.
3. ALL DUCT DIMENSIONS INDICATED ARE CLEAR INSIDE DIMENSIONS. CONSTRUCT ALL DUCTWORK DOWNSTREAM OF TERMINAL UNITS TO SMACNA 2 IN. PRESSURE CLASSIFICATION, AND ALL UPSTREAM OF TERMINAL UNITS TO SMACNA 6 IN. PRESSURE CLASSIFICATION UNLESS OTHERWISE INDICATED. SEAL ALL DUCTWORK TO SMACNA TYPE A SEAL CLASS UNLESS OTHERWISE INDICATED.
4. DO NOT RUN AIR HANDLERS OR FANS UNTIL ALL INTERIOR CLEANING IS COMPLETE. CLEAN OR REPLACE ANY EQUIPMENT, DUCTWORK, ETC., WHICH IS FOULED DUE TO PAINT OR CONSTRUCTION DEBRIS.
5. COORDINATE LOCATION OF FLOOR PENETRATIONS WITH STRUCTURAL FRAMING PRIOR TO START OF STRUCTURAL ERECTION. SHIFT JOIST LOCATIONS W/IN ALLOWABLE LIMITS OF STRUCTURAL DRAWINGS, MODIFY CROSS-SECTION OF DUCTWORK (MAINTAINING CROSS-SECTIONAL AREA), OR PROPOSE ALTERNATE SOLUTION IN THE EVENT AN INTERFERENCE IS DISCOVERED, AS A PART OF THE WORK. CONCRETE SHALL BE GPR SCANNED FOR EMBEDMENTS AND CLEARLY MARKED FOR INSPECTION BY UT SITE REPRESENTATIVE
PRIOR TO CORING OR SAW CUTTING CONCRETE FLOORS.
6. WHERE WORK IS ADJACENT TO OCCUPIED SPACE,PROVIDE DUST BARRIERS AS NECESSARY. KEEP CONSTRUCTION AREA AT A NEGATIVE PRESSURE RELATIVE TO SUCH SPACES, & FILTER DISCHARGE AIR AS REQUIRED TO CONTAIN DUST. CONTRACTOR SHALL ERECT DUST BARRIERS PRIOR TO STARTING DEMOLITION WORK, COORDINATE WITH DEMOLITION NOTES, M0.2.
7. NORMAL DESIGN CONDITIONS:
7.1. SUMMER - OUTSIDE 92°/61°F DB/WB, INSIDE: 75°F +/- 2°F. DEHUMIDIFICATION: 70°F DB/67° WB.
7.2. WINTER - OUTSIDE 0°F, INSIDE: 68°F +/- 2°F. RELATIVE HUMIDITY: = 50% +10% / -20%.
8. INSTALL THE WORK IN ACCORDANCE WITH APPROVING AUTHORITY: THE UNIVERSITY OF TEXAS AT AUSTIN. REFERENCE UT DESIGN AND
CONSTRUCTION STANDARDS. HTTP://PMCSERVICES.UTEXAS.EDU/DCSTANDARDS/
9. IN ANY CASE WHERE A PIPE OR DUCT SHOWN ON A PLAN SHEET DIFFERS FROM THAT SHOWN IN A SCHEMATIC OR DETAIL, USE THE LARGER
OF THE TWO SIZES SHOWN.
10. PIPING AND DUCTWORK SHOWN ON EACH PLAN IS RUN ABOVE THE CEILING ON THE FLOOR WHERE IT IS SHOWN UON, EXCEPT SANITARY
PIPING IS RUN BELOW THE FLOOR WHERE IT IS SHOWN UON.
11. THE DRAWINGS ARE DIAGRAMMATIC ONLY; DO NOT SCALE. COORD. W/ OTHER TRADES AND W/ EXIST. CONDITIONS. DO NOT INSTALL OR FABRICATE ANY WORK SHOWN UNTIL ALL SUCH WORK IS FULLY COORDINATED. NOT ALL OFFSETS AND FITTINGS ARE SHOWN. F&I OFFSETS
AND FITTINGS AS REQ'D BY FIELD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .