ESBD_File_338829_Attachment B (Public Works Requirements).xlsx

XLSX spreadsheet 62 KB Posted

Attached to
Citywide Repair of Sidewalks and Streets
Solicitation number
IFB23-384
Issued by
Fort Bend County, Mildred Town, Texas

About this file

This document is an Exhibit B - Public Works Requirements related to a state and local contract opportunity for the City of Missouri City, Texas to perform citywide repair of sidewalks and streets. The contract will be for an initial 3-year term, with options to renew for up to 2 additional 1-year terms. The scope of work includes sidewalk, street panel replacement, asphalt patching/overlay, and concrete pavement lifting/leveling, with estimated quantities provided for each type of work. Bids must be submitted with various attachments, including B-1-1 through B-3-4 price sheets for each year.

The price sheets detail unit prices for a wide range of items, such as mobilization, temporary traffic control, wheelchair ramps, sidewalk and curb work, pavement markings, manhole/inlet adjustments, tree root removal, and irrigation work. Bidders must provide pricing for each item, and the total bid price will be calculated across the 3-year period. This is an indefinite delivery/indefinite quantity (ID/IQ) contract, where the City will order work on an "as needed" basis. The contract will be awarded to the responsive and responsible bidder(s) providing the lowest total 3-year bid price.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Year 1 (Sidewalks) Attachment B-1-1 Year 1 Price Sheet

(Public Works Estimated Requirements)
SIDEWALKS
Note: This sheet is formatted so that you can only enter unit pricing in the highlighted column.
Item No.Est. QtyUnitDescriptionUnit PriceExtension Price
11LSMobilization$ - 0$ - 0
2100EachTemporary Traffic Control$ - 0$ - 0
44EachStandard ADA Wheelchair Ramp (New)$ - 0$ - 0
518EachStandard ADA Wheelchair Ramp (remove and replace)$ - 0$ - 0
6230EachBricks, Truncated, for wheelchair ramps$ - 0$ - 0
7500SF6" Thick Sidewalk (New)$ - 0$ - 0
8500SF4" Thick Sidewalk (New)$ - 0$ - 0
92,200SF6" Thick Sidewalk (Remove and Replace)$ - 0$ - 0
10100,000SF4" Thick Sidewalk (Remove and Replace)$ - 0$ - 0
11565SF6" Concrete Curb (New)$ - 0$ - 0
12100EachConcrete Grinding Locations$ - 0$ - 0
131,000EachTree Root Removal (Unit price shall not be less than $200.00)$ - 0$ - 0
141,000LFInstall 12" Tree Root Barrier$ - 0$ - 0
Sidewalk Incidentals
1530EachManhole Adjustments$ - 0$ - 0
1630,000SFSod Block$ - 0$ - 0
1760EachSprinkler Replace & Installation (Includes all materials) See note 1a below$ - 0$ - 0
1820EachReplace Irrigation Sprinkler Head$ - 0$ - 0
191,000LFIrrigation line Replace & Installation (includes all materials) (all pipe sizes)$ - 0$ - 0
YEAR 1 (SIDEWALK) TOTAL BID PRICE:0.00

Note: This Price Sheet must submitted with Attachments B-1-1, B-1-2, B-1-3, B-1-4, B-2-1, B-2-2, B-2-3, B-2-4, B-3-1, B-3-2, B-3-3, and B-3-4.

Year 1 (Street Panel Replace) Attachment B-1-2 Year 1 Price Sheet

(Public Works Estimated Requirements)
STREET PANEL REPLACEMENT
Note: This sheet is formatted so that you can only enter unit pricing in the highlighted column.
Item No.Est. QtyUnitDescriptionUnit PriceExtension Price
Street Panel Replacement
201LSMobilization$ - 0$ - 0
211EachTraffic Contol$ - 0$ - 0
225,000LF2" Saw Cut$ - 0$ - 0
233,200LFFull Depth Saw Cut$ - 0$ - 0
2435LFSpalled Joint Repair$ - 0$ - 0
2510,000LF6" Concrete Curb Repair$ - 0$ - 0
2615,000SF7" Concrete Pavement Rem. & Repl. w/appurtenances - 7" Concrete Pavement Removal and Replacement with appurtenances$ - 0$ - 0
27150,000SFHigh Early 7" Concrete Repl.-High Early 7" Concrete Pavement Removal and Replacement with appurtenances, min 7 sack cement/CY$ - 0$ - 0
2820EachStandard Wheelchair Ramp Installation$ - 0$ - 0
29800EachTruncated Bricks$ - 0$ - 0
3015,500SF6" Driveway Repair$ - 0$ - 0
31625LF6" Yellow Thermoplastic marking (Hot applied including glass beads)$ - 0$ - 0
321,250LF6" White Thermoplastic marking (Hot applied including glass beads)$ - 0$ - 0
33250LF8" Yellow Thermoplastic marking (Hot applied including glass beads)$ - 0$ - 0
34500LF8" White Thermoplastic marking (Hot applied including glass beads)$ - 0$ - 0
35250LF12" Yellow Thermoplastic marking (Hot applied including glass beads)$ - 0$ - 0
36625LF12" White Thermoplastic marking (Hot applied including glass beads)$ - 0$ - 0
37500LF24" Yellow Thermoplastic marking (Hot applied including glass beads)$ - 0$ - 0
38750LF24" White Thermoplastic marking (Hot applied including glass beads)$ - 0$ - 0
393EachOnly (White Thermoplastic) (Hot applied including glass beads)$ - 0$ - 0
403EachArrow (single, White Thermplastic) (Hot applied including glass beads)$ - 0$ - 0
413EachArrow (Combo, White Thermoplactic) (Hot applied including glass beads)$ - 0$ - 0
42125EachRaised Pavement Markings$ - 0$ - 0
Street Panel Incidentals
472EachManhole Adjustments$ - 0$ - 0
4820EachInlet Adjustments$ - 0$ - 0
491SF6" Driveway New$ - 0$ - 0
501EachTree Root Removal (Unit Price shall not be less than $ 200)$ - 0$ - 0
511,000LF12" Tree Root Barrier$ - 0$ - 0
5211,000SFSod Block Placement$ - 0$ - 0
531EachRemove and replace mailbox$ - 0$ - 0
541EachRepair mailbox$ - 0$ - 0
YEAR 1 (STREET PANEL) TOTAL BID PRICE:0.00
Note: This Price Sheet must submitted with Attachments

Year 1 (Asphalt) Attachment B-1-3 Year 1 Price Sheet

(Public Works Estimated Requirements)
ASPHALT
Note: This sheet is formatted so that you can only enter unit pricing in the highlighted column.
Item No.Est. QtyUnitDescriptionUnit PriceExtension Price
Asphalt Patching / Overlay
561LSMobilization$ - 0$ - 0
571EachTraffic Contol$ - 0$ - 0
5810,000SF12" Asphalt Patching$ - 0$ - 0
5930,000SF1" Depth Asphalt Miling$ - 0$ - 0
6085,000SF1" Asphalt Overlay$ - 0$ - 0
YEAR 1 (ASPHALT) TOTAL BID PRICE:$ - 0

Note: This Price Sheet must submitted with Attachments

Year 1 (Pavement Lifting) Attachment B-1-4 Year 1 Price Sheet

(Public Works Estimated Requirements)
PAVEMENT LIFTING
Note: This sheet is formatted so that you can only enter unit pricing in the highlighted column.
Item No.Est. QtyUnitDescriptionUnit PriceExtension Price
Concrete Pavement Lifting / Leveling
61225,000SFLifting and Stabilizing Concrete Panels using Cementitious Slurry Material (pavment lift from 0.01" up to 6.00")$ - 0$ - 0
62300SFLifting and Stabilizing Concrete Panels using Cementitious Slurry Material (pavment lift from 6.01" and up)$ - 0$ - 0
63225,000SFLifting and Stabilizing Concrete Panels using polyurethane concrete lifting foam (pavment lift from 0.01" up to 6.00")$ - 0$ - 0
64300SFLifting and Stabilizing Concrete Panels using polyurethane concrete lifting foam (pavment lift from 6.01" and up)$ - 0$ - 0
6515EachLifting and Stabilizing Concrete Traffic Signal Pad (lifting from 0.01" up to 6.00")$ - 0$ - 0
6615EachLifting and Stabilizing Concrete Traffic Signal Pad (lifting from 6.01" and up)$ - 0$ - 0
YEAR 1 (PAVEMENT LIFTING) TOTAL BID PRICE:$ - 0

Note: This Price Sheet must submitted with Attachments

Year 2 (Sidewalks) Attachment B-2-1 Year 2 Price Sheet

(Public Works Estimated Requirements)
SIDEWALKS
Note: This sheet is formatted so that you can only enter unit pricing in the highlighted column.
Item No.Est. QtyUnitDescriptionUnit PriceExtension Price
11LSMobilization$ - 0$ - 0
2100EachTemporary Traffic Control$ - 0$ - 0
44EachStandard ADA Wheelchair Ramp (New)$ - 0$ - 0
518EachStandard ADA Wheelchair Ramp (remove and replace)$ - 0$ - 0
6230EachBricks, Truncated, for wheelchair ramps$ - 0$ - 0
7500SF6" Thick Sidewalk (New)$ - 0$ - 0
8500SF4" Thick Sidewalk (New)$ - 0$ - 0
92,200SF6" Thick Sidewalk (Remove and Replace)$ - 0$ - 0
10100,000SF4" Thick Sidewalk (Remove and Replace)$ - 0$ - 0
11565SF6" Concrete Curb (New)$ - 0$ - 0
12100EachConcrete Grinding Locations$ - 0$ - 0
131,000EachTree Root Removal (Unit price shall not be less than $200.00)$ - 0$ - 0
141,000LFInstall 12" Tree Root Barrier$ - 0$ - 0
Sidewalk Incidentals
1530EachManhole Adjustments$ - 0$ - 0
1630,000SFSod Block$ - 0$ - 0
1760EachSprinkler Replace & Installation (Includes all materials) See note 1a below$ - 0$ - 0
1820EachReplace Irrigation Sprinkler Head$ - 0$ - 0
191,000LFIrrigation line Replace & Installation (includes all materials) (all pipe sizes)$ - 0$ - 0
YEAR 2 (SIDEWALKS) TOTAL BID PRICE:0.00

Note: This Price Sheet must submitted with Attachments

Year 2 (Street Panel Replace) Attachment B-2-2 Year 2 Price Sheet

(Public Works Estimated Requirements)
STREET PANEL REPLACEMENT
Note: This sheet is formatted so that you can only enter unit pricing in the highlighted column.
Item No.Est. QtyUnitDescriptionUnit PriceExtension Price
Street Panel Replacement
201LSMobilization$ - 0$ - 0
211EachTraffic Contol$ - 0$ - 0
225,000LF2" Saw Cut$ - 0$ - 0
233,200LFFull Depth Saw Cut$ - 0$ - 0
2435LFSpalled Joint Repair$ - 0$ - 0
2510,000LF6" Concrete Curb Repair$ - 0$ - 0
2615,000SF7" Concrete Pavement Rem. & Repl. w/appurtenances - 7" Concrete Pavement Removal and Replacement with appurtenances$ - 0$ - 0
27150,000SFHigh Early 7" Concrete Repl.-High Early 7" Concrete Pavement Removal and Replacement with appurtenances, min 7 sack cement/CY$ - 0$ - 0
2820EachStandard Wheelchair Ramp Installation$ - 0$ - 0
29800EachTruncated Bricks$ - 0$ - 0
3015,500SF6" Driveway Repair$ - 0$ - 0
31625LF6" Yellow Thermoplastic marking (Hot applied including glass beads)$ - 0$ - 0
321,250LF6" White Thermoplastic marking (Hot applied including glass beads)$ - 0$ - 0
33250LF8" Yellow Thermoplastic marking (Hot applied including glass beads)$ - 0$ - 0
34500LF8" White Thermoplastic marking (Hot applied including glass beads)$ - 0$ - 0
35250LF12" Yellow Thermoplastic marking (Hot applied including glass beads)$ - 0$ - 0
36625LF12" White Thermoplastic marking (Hot applied including glass beads)$ - 0$ - 0
37500LF24" Yellow Thermoplastic marking (Hot applied including glass beads)$ - 0$ - 0
38750LF24" White Thermoplastic marking (Hot applied including glass beads)$ - 0$ - 0
393EachOnly (White Thermoplastic) (Hot applied including glass beads)$ - 0$ - 0
403EachArrow (single, White Thermplastic) (Hot applied including glass beads)$ - 0$ - 0
413EachArrow (Combo, White Thermoplactic) (Hot applied including glass beads)$ - 0$ - 0
42125EachRaised Pavement Markings$ - 0$ - 0
Street Panel Incidentals
472EachManhole Adjustments$ - 0$ - 0
4820EachInlet Adjustments$ - 0$ - 0
491SF6" Driveway New$ - 0$ - 0
501EachTree Root Removal (Unit Price shall not be less than $ 200)$ - 0$ - 0
511,000LF12" Tree Root Barrier$ - 0$ - 0
5211,000SFSod Block Placement$ - 0$ - 0
531EachRemove and replace mailbox$ - 0$ - 0
541EachRepair mailbox$ - 0$ - 0
YEAR 2 (STREET PANEL REPLACEMENT) TOTAL BID PRICE:0.00
Note: This Price Sheet must submitted with Attachments

Year 2 (Asphalt) Attachment B-2-3 Year 2 Price Sheet

(Public Works Estimated Requirements)
ASPHALT
Note: This sheet is formatted so that you can only enter unit pricing in the highlighted column.
Item No.Est. QtyUnitDescriptionUnit PriceExtension Price
Asphalt Patching / Overlay
561LSMobilization$ - 0$ - 0
571EachTraffic Contol$ - 0$ - 0
5810,000SF12" Asphalt Patching$ - 0$ - 0
5930,000SF1" Depth Asphalt Miling$ - 0$ - 0
6085,000SF1" Asphalt Overlay$ - 0$ - 0
YEAR 2 (ASPHALT) TOTAL BID PRICE:$ - 0

Note: This Price Sheet must submitted with Attachments

Year 2 (Pavement Lifting) Attachment B-2-4 Year 2 Price Sheet

(Public Works Estimated Requirements)
PAVEMENT LIFTING
Note: This sheet is formatted so that you can only enter unit pricing in the highlighted column.
Item No.Est. QtyUnitDescriptionUnit PriceExtension Price
Concrete Pavement Lifting / Leveling
61225,000SFLifting and Stabilizing Concrete Panels using Cementitious Slurry Material (pavment lift from 0.01" up to 6.00")$ - 0$ - 0
62300SFLifting and Stabilizing Concrete Panels using Cementitious Slurry Material (pavment lift from 6.01" and up)$ - 0$ - 0
63225,000SFLifting and Stabilizing Concrete Panels using polyurethane concrete lifting foam (pavment lift from 0.01" up to 6.00")$ - 0$ - 0
64300SFLifting and Stabilizing Concrete Panels using polyurethane concrete lifting foam (pavment lift from 6.01" and up)$ - 0$ - 0
6515EachLifting and Stabilizing Concrete Traffic Signal Pad (lifting from 0.01" up to 6.00")$ - 0$ - 0
6615EachLifting and Stabilizing Concrete Traffic Signal Pad (lifting from 6.01" and up)$ - 0$ - 0
YEAR 2 (PAVEMENT LIFTING) TOTAL BID PRICE:$ - 0

Note: This Price Sheet must submitted with Attachments

Year 3 (Sidewalks) Attachment B-3-1 Year 3 Price Sheet

(Public Works Estimated Requirements)
SIDEWALKS
Note: This sheet is formatted so that you can only enter unit pricing in the highlighted column.
Item No.Est. QtyUnitDescriptionUnit PriceExtension Price
11LSMobilization$ - 0$ - 0
2100EachTemporary Traffic Control$ - 0$ - 0
44EachStandard ADA Wheelchair Ramp (New)$ - 0$ - 0
518EachStandard ADA Wheelchair Ramp (remove and replace)$ - 0$ - 0
6230EachBricks, Truncated, for wheelchair ramps$ - 0$ - 0
7500SF6" Thick Sidewalk (New)$ - 0$ - 0
8500SF4" Thick Sidewalk (New)$ - 0$ - 0
92,200SF6" Thick Sidewalk (Remove and Replace)$ - 0$ - 0
10100,000SF4" Thick Sidewalk (Remove and Replace)$ - 0$ - 0
11565SF6" Concrete Curb (New)$ - 0$ - 0
12100EachConcrete Grinding Locations$ - 0$ - 0
131,000EachTree Root Removal (Unit price shall not be less than $200.00)$ - 0$ - 0
141,000LFInstall 12" Tree Root Barrier$ - 0$ - 0
Sidewalk Incidentals
1530EachManhole Adjustments$ - 0$ - 0
1630,000SFSod Block$ - 0$ - 0
1760EachSprinkler Replace & Installation (Includes all materials) See note 1a below$ - 0$ - 0
1820EachReplace Irrigation Sprinkler Head$ - 0$ - 0
191,000LFIrrigation line Replace & Installation (includes all materials) (all pipe sizes)$ - 0$ - 0
YEAR 3 (SIDEWALKS) TOTAL BID PRICE:0.00

Note: This Price Sheet must submitted with Attachments

Year 3 (Street Panel Replace) Attachment B-3-2 Year 3 Price Sheet

(Public Works Estimated Requirements)
STREET PANEL REPLACEMENT
Note: This sheet is formatted so that you can only enter unit pricing in the highlighted column.
Item No.Est. QtyUnitDescriptionUnit PriceExtension Price
Street Panel Replacement
201LSMobilization$ - 0$ - 0
211EachTraffic Contol$ - 0$ - 0
225,000LF2" Saw Cut$ - 0$ - 0
233,200LFFull Depth Saw Cut$ - 0$ - 0
2435LFSpalled Joint Repair$ - 0$ - 0
2510,000LF6" Concrete Curb Repair$ - 0$ - 0
2615,000SF7" Concrete Pavement Rem. & Repl. w/appurtenances - 7" Concrete Pavement Removal and Replacement with appurtenances$ - 0$ - 0
27150,000SFHigh Early 7" Concrete Repl.-High Early 7" Concrete Pavement Removal and Replacement with appurtenances, min 7 sack cement/CY$ - 0$ - 0
2820EachStandard Wheelchair Ramp Installation$ - 0$ - 0
29800EachTruncated Bricks$ - 0$ - 0
3015,500SF6" Driveway Repair$ - 0$ - 0
31625LF6" Yellow Thermoplastic marking (Hot applied including glass beads)$ - 0$ - 0
321,250LF6" White Thermoplastic marking (Hot applied including glass beads)$ - 0$ - 0
33250LF8" Yellow Thermoplastic marking (Hot applied including glass beads)$ - 0$ - 0
34500LF8" White Thermoplastic marking (Hot applied including glass beads)$ - 0$ - 0
35250LF12" Yellow Thermoplastic marking (Hot applied including glass beads)$ - 0$ - 0
36625LF12" White Thermoplastic marking (Hot applied including glass beads)$ - 0$ - 0
37500LF24" Yellow Thermoplastic marking (Hot applied including glass beads)$ - 0$ - 0
38750LF24" White Thermoplastic marking (Hot applied including glass beads)$ - 0$ - 0
393EachOnly (White Thermoplastic) (Hot applied including glass beads)$ - 0$ - 0
403EachArrow (single, White Thermplastic) (Hot applied including glass beads)$ - 0$ - 0
413EachArrow (Combo, White Thermoplactic) (Hot applied including glass beads)$ - 0$ - 0
42125EachRaised Pavement Markings$ - 0$ - 0
Street Panel Incidentals
472EachManhole Adjustments$ - 0$ - 0
4820EachInlet Adjustments$ - 0$ - 0
491SF6" Driveway New$ - 0$ - 0
501EachTree Root Removal (Unit Price shall not be less than $ 200)$ - 0$ - 0
511,000LF12" Tree Root Barrier$ - 0$ - 0
5211,000SFSod Block Placement$ - 0$ - 0
531EachRemove and replace mailbox$ - 0$ - 0
541EachRepair mailbox$ - 0$ - 0
YEAR 3 (STREET PANEL REPLACEMENT) TOTAL BID PRICE:0.00

Note: This Price Sheet must submitted with Attachments

Year 3 (Asphalt) Attachment B-3-3 Year 3 Price Sheet

(Public Works Estimated Requirements)
ASPHALT
Note: This sheet is formatted so that you can only enter unit pricing in the highlighted column.
Item No.Est. QtyUnitDescriptionUnit PriceExtension Price
Asphalt Patching / Overlay
561LSMobilization$ - 0$ - 0
571EachTraffic Contol$ - 0$ - 0
5810,000SF12" Asphalt Patching$ - 0$ - 0
5930,000SF1" Depth Asphalt Miling$ - 0$ - 0
6085,000SF1" Asphalt Overlay$ - 0$ - 0
YEAR 3 (ASPHAT) TOTAL BID PRICE:$ - 0

Note: This Price Sheet must submitted with Attachments

Year 3 (Pavement Lifting) Attachment B-3-4 Year 3 Price Sheet

(Public Works Estimated Requirements)
PAVEMENT LIFTING
Note: This sheet is formatted so that you can only enter unit pricing in the highlighted column.
Item No.Est. QtyUnitDescriptionUnit PriceExtension Price
Concrete Pavement Lifting / Leveling
61225,000SFLifting and Stabilizing Concrete Panels using Cementitious Slurry Material (pavment lift from 0.01" up to 6.00")$ - 0$ - 0
62300SFLifting and Stabilizing Concrete Panels using Cementitious Slurry Material (pavment lift from 6.01" and up)$ - 0$ - 0
63225,000SFLifting and Stabilizing Concrete Panels using polyurethane concrete lifting foam (pavment lift from 0.01" up to 6.00")$ - 0$ - 0
64300SFLifting and Stabilizing Concrete Panels using polyurethane concrete lifting foam (pavment lift from 6.01" and up)$ - 0$ - 0
6515EachLifting and Stabilizing Concrete Traffic Signal Pad (lifting from 0.01" up to 6.00")$ - 0$ - 0
6615EachLifting and Stabilizing Concrete Traffic Signal Pad (lifting from 6.01" and up)$ - 0$ - 0
YEAR 3 (PAVEMENT LIFTING) TOTAL BID PRICE:$ - 0

Note: This Price Sheet must submitted with Attachments

Three Year Total Bid Price Attachment B-3-5 Total Bid Price Sheet

(Public Works Estimated Requirements)
Note: This sheet is formatted so that it will automatically calculate the prices from years 1 through 3.
Year 1Year 2Year 3Total Bid Price
$ - 0$ - 0$ - 0$ - 0

Typed Name of Firm:

Name of Authorized Individual:

Manual Signature of Authorized Individual:

Note: This Price Sheet must submitted with Attachments