About this file
Plaza Verde Building 3 HVAC Replacement Project - Contract Documents Summary
These are project drawings and contract documents for the Plaza Verde Building 3 HVAC Replacement project at Angelo State University, located at 2010 S Van Buren Street, San Angelo, Texas 76904. The project involves the complete replacement of the heating, ventilation, and air conditioning systems in a 3-story, 36-foot-tall dormitory building containing approximately 33,660 gross square feet (11,280 square feet per floor renovation area). The scope of work includes demolition of existing HVAC equipment, ductwork, refrigerant piping, and condensate systems, along with installation of new fan coil units, mini-split systems, condensing units, and associated mechanical infrastructure. The building is classified as occupancy type Group R-2 (dormitory) with construction type IIB and is sprinklered. The project is subject to the 2021 International Building Code, 2021 International Mechanical Code, 2021 International Energy Conservation Code, and applicable amendments adopted by the City of San Angelo as of May 18, 2026. The contract documents indicate a project number of 2574.02 with a document date of July 24, 2026, prepared by O'Connell Robertson with Engineering Firm Registration No. F-2708.
The drawings include comprehensive architectural, mechanical, electrical, and structural plans detailing the complete demolition and replacement scope. Architectural plans document the removal of existing carpet flooring, wall base, gypsum board ceilings, and shaft walls, along with room finish specifications using paint designations and carpet tiles. Mechanical plans specify the demolition and new installation of approximately 30 fan coil units, two heat recovery units, two mini-split condensing units, new ductwork routing, and exhaust fan systems with balancing requirements. The contractor is responsible for all permits, fees, inspections, protective dust partitions, firestopping of penetrations, maintaining occupied spaces, and coordination with the owner regarding infectious control measures and utility shutdowns requiring 72 hours' advance notice. Support facilities include a structural engineer (SKG Engineering, 811 Barton Springs Road, Suite 900, Austin, Texas 78704) and architectural-engineering team (2601 W Ave N, San Angelo, Texas 76909), with the engineering firm providing structural analysis and roof penetration details to verify equipment weight and footprint compatibility with existing conditions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Structural Engineer
706 SOUTH ABE ST
SAN ANGELO , TEXAS 76903
SKG ENGINEERING
811 BARTON SPRINGS ROAD, SUITE 900
AUSTIN, TEXAS 78704
Architecture - Engineering - Interiors
2601 W AVE N
SAN ANGELO , TEXAS 76909
ANGELO STATE UNIVERSITY
Revisions:
Engineering Firm:
O'CONNELL ROBERTSON
Firm Registration No. F-2708
A u st in
S a n A n to n io
H o u s to n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
A u to d e s k D o c s /A n g e lo S ta te
U n iv e rs it y /2
A S
U P la z a V e rd e B ld g
-H V
A C
R p lm n t_
M E
P C e n tr a l.
rv t
/2
/2
:5
:4
P
M
P L
A Z
A V
E R
D E
B L
D G
H
V A
C R
E P
L A
C E
M E
N T
S
S V
A N
B U
R E N
S T, S A
N A
N G
E
LO
TX
A N
G E
LO
S
TA
TE
U
N
IV
E R
S
IT
Y
PLAZA VERDE BLDG 3 HVAC REPLACEMENTS
2010 S VAN BUREN ST, SAN ANGELO, TX 76904
07/24/26
CONTRACT DOCUMENTS
Mission: We believe every project has a mission and strive to design environments that have a purpose that extend far beyond form and function.
07/24/26
Project No. 2574.02
CONTRACT DOCUMENTS
COVER SHEET
G1.0
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
TAS COMPLIANCE NOTE:
THIS PROJECT DOES NOT QUALIFY AS AN ALTERATION
PER TAS 106.5.5.
Drawing Index
Sheet Number Sheet Name
GENERAL
G1.0 COVER SHEET
G1.1 ARCHITECTURAL ABBREVIATIONS AND SYMBOLS
STRUCTURAL
S1.1 ROOF FRAMING PLAN
ARCHITECTURAL
A2.1 DEMOLITION FLOOR PLANS - LEVELS 1 & 2
A2.2 DEMOLITION FLOOR PLANS - LEVEL 3 & ROOF
A2.3 DEMOLITION REFLECTED CEILING PLANS - LEVELS 1 & 2
A2.4 DEMOLITION REFLECTED CEILING PLAN - LEVEL 3
A3.5 ROOF PLAN
A6.1 EXTERIOR DETAILS
A6.2 EXTERIOR DETAILS
A9.1 REFLECTED CEILING PLAN
A9.2 REFLECTED CEILING PLAN
A10.1 ROOM FINISH PLAN
A10.2 ROOM FINISH PLAN
MECHANICAL
M1.1 MECHANICAL NOTES, SYMBOLS AND ABBREVIATIONS
M2.1 FIRST & SECOND FLOOR MECHANICAL DEMOLITION PLANS
M2.2 THIRD FLOOR & ROOF MECHANICAL DEMOLITION PLANS
M3.1 FIRST & SECOND FLOOR MECHANICAL PLANS
M3.2 THIRD FLOOR & ROOF MECHANICAL PLANS
M7.1 MECHANICAL CONTROLS
M8.1 MECHANICAL SCHEDULES
M9.1 MECHANICAL DETAILS
ELECTRICAL
E1.1 ELECTRICAL NOTES, SYMBOLS AND ABBREVIATIONS
E2.1 FIRST & SECOND FLOOR ELECTRICAL DEMOLITION PLANS
E2.2 THIRD FLOOR & ROOF ELECTRICAL DEMOLITION PLANS
E3.1 FIRST & SECOND FLOOR ELECTRICAL POWER PLANS
E3.2 THIRD FLOOR & ROOF ELECTRICAL POWER PLANS
E4.1 FIRST & SECOND FLOOR LIGHTING PLANS
E4.2 THIRD FLOOR LIGHTING PLAN
E6.1 ELECTRICAL ENLARGED PLANS
E7.1 ELECTRICAL ONE-LINE DIAGRAM
E8.1 ELECTRICAL SCHEDULES
E8.2 ELECTRICAL SCHEDULES
E8.3 ELECTRICAL SCHEDULES
E9.1 ELECTRICAL DETAILS
2 RCP DETAILS
NO. DESCRIPTION DATENO. DESCRIPTION DATE
07/24/2026
1. GENERAL NOTES APPLY TO ALL SHEETS.
2. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS,
TOOLS, EQUIPMENT, AND RELATED ITEMS REQUIRED TO
COMPLETE THE DEMOLITION WORK AS INDICATED BY THE
CONTRACT DOCUMENTS.
3. CONTRACTOR TO VERIFY ALL DIMENSIONS.
4. ALL ACCESSIBLE ROUTES (OTHER THAN RAMPS) SHALL NOT
EXCEED A SLOPE OF 1:20, AND CROSS SLOPES SHALL NOT
EXCEED A SLOPE OF 1:50
5. THE DRAWINGS INDICATE BUILDING CONDITIONS PER
EXISTING DRAWINGS AND ACTUAL PROJECT
INVESTIGATION. THE CONTRACTOR SHALL ANTICIPATE
POSSIBLE SLIGHT DEVIATION FROM THESE DRAWINGS.
REFER TO ARCHITECTURAL & MEP DRAWINGS AND DETAILS
FOR EXTENT OF DEMOLITION.
6. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE
WORK, USING THEIR BEST SKILL AND ATTENTION. THEY
SHALL BE SOLELY RESPONSIBLE FOR ALL MEANS,
METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES
AND FOR COORDINATING ALL PORTIONS OF THE WORK
UNDER THE CONTRACT.
7. INSTALL TEMPORARY DUST PARTITIONS WITH DOORS FOR
CONSTRUCTION ACCESS AROUND AREAS OF WORK SO
THAT OPERATIONS IN EXISTING ADJACENT AREAS REMAIN
DUST FREE AND ACCESSIBLE TO BUILDING OCCUPANTS.
MAINTAIN IN PLACE UNTIL COMPLETION OF CONSTRUCTION.
8. REMOVE ALL BUILDING PARTS AND/OR OTHER ITEMS TO
ALLOW FOR THE INSTALLATION AND CONNECTION OF NEW
WORK, COORDINATE THE WORK WITH THE HVAC,
PLUMBING AND ELECTRICAL DEMOLITION DRAWINGS.
9. REMOVAL OF THE BUILDING PARTS SHALL BE PERFORMED
IN A SAFE, ORDERLY AND CAREFUL MANNER, WITH THE
CONSIDERATION AT ALL TIMES FOR THE SAFETY AND
WELFARE OF THE OWNER, BLDG. OCCUPANTS, &
PERSONNEL OF THE CONTRACTOR AND/OR
SUBCONTRACTOR.
10. MAINTAIN THE UTILITIES TO OCCUPIED SPACES AT ALL
TIMES. COORDINATE ANY UTILITY DOWNTIMES W/ OWNER.
PROVIDE 72 HOUR ADVANCE NOTICE TO THE OWNER OF
INTENDED UTILITY SHUT DOWN AND/OR DISRUPTION.
11. ANY QUESTIONS CONCERNING OWNERSHIP OF
SALVAGEABLE MATERIAL SHALL BE ANSWERED BY THE
OWNER, OR OWNER'S REPRESENTATIVE. ALL ITEMS OTHER
THAN FINISH MATERIALS TO BE REMOVED AS PART OF THIS
CONTRACT ARE INDICATED WITH DASHED LINES ON
DEMOLITION SHEETS. DISPOSE OF THESE MATERIALS AND
ITEMS AFTER CHECKING WITH OWNER FOR ITEMS TO BE
SALVAGED. SALVAGE ANY ITEMS REQUIRED TO COMPLETE
NEW WORK.
12. REMOVE ALL MISCELLANEOUS DEVICES AS REQUIRED TO
INSTALL NEW FINISHES, INCLUDING BUT NOT LIMITED TO:
PLUMBING FIXTURES, SIGNAGE, SWITCH PLATES,
TELEVISION BRACKETS, WALL OUTLET COVERS, TOILET
ACCESSORIES, CORNER GUARDS, ETC. SAVE FOR
REINSTALLATION AFTER COMPLETION OF FINISH WORK.
13. PROTECT ALL EXISTING FINISHES, DOOR FRAMES,
EQUIPMENT AND MATERIALS THAT ARE TO REMAIN IN
PLACE. DAMAGE TO EXISTING COMPONENTS BY
CONTRACTOR SHALL BE REPLACED WITH NEW MATERIAL
OF LIKE KIND AND QUALITY THAT MATCH THE EXISTING
STANDARDS. THE CONTRACTOR IS RESPONSIBLE FOR
PREPARING EXISTING SURFACES TO RECEIVE NEW
FINISHES SCHEDULED.
14. PROTECT EXISTING VEGETATION, INCLUDING EXISTING
TREES DURING CONSTRUCTION. REVEGETATE DAMAGED
AREAS ADJACENT TO NEW CONSTRUCTION; CONTRACTOR
SHALL MAINTAIN VEGETATED AREAS FOR 3 WEEKS AFTER
INITIAL PLANTING
15. REFER TO MECHANICAL, PLUMBING AND ELECTRICAL
DRAWINGS FOR OTHER WORK.
16. ELECTRICAL AND MECHANICAL INSTALLATIONS MAY
REQUIRE WORK ABOVE EXISTING CEILINGS BOTH IN THE
AREA OF WORK AND IN ADJACENT AREAS (POSSIBLY ON
OTHER FLOORS). REMOVE AND REINSTALL (OR REPLACE)
CEILING TILES AND GRID AS REQUIRED. REMOVE GYPSUM
BOARD AT WALLS AND CEILINGS AND REPLACE AS
REQUIRED.
17. U.N.O. ALL EXISTING ELECTRICAL OUTLETS & FIXTURES IN
REMODELED AREAS ARE TO BE REMOVED & RETURNED TO
OWNER. SEE ELECTRICAL SHEETS FOR DEVICES &
CIRCUITS TO BE REUSED.
18. ALL ITEMS AND ASSOCIATED CONNECTIONS ARE TO BE
REMOVED AND TERMINATED AT DESIGNATED POINTS.
SERVICE CONNECTIONS SHALL BE SAFELY REMOVED,
CAPPED OR PLUGGED IN CONFORMITY WITH LOCAL LAWS
AND ORDINANCES, REQUIREMENTS OF PUBLIC UTILITY
COMPANIES, AND OF THE NATIONAL BOARD OF FIRE
UNDERWRITERS, AND IN SUCH MANNER AS NOT TO
INTERFERE WITH THE USE OF THE OCCUPIED SPACES IN
THE BUILDING.
19. IF A CONDUIT OR UTILITY LINE IS CUT WHILE SLEEVING OR
CUTTING THE SLAB OR REMOVING A PARTITION, THE
CONTRACTOR IS RESPONSIBLE FOR REPAIRING IT
IMMEDIATELY.
20. ANY EXISTING TO REMAIN FIREPROOFING OR FIRE
ASSEMBLIES DAMAGED DURING CONSTRUCTION ARE TO BE
REPAIRED TO ORIGINAL FIRE PROTECTION REQUIREMENTS.
21. IMMEDIATELY SEAL ALL PENETRATIONS IN EXISTING
STRUCTURE OPENED DURING DEMOLITION WITH
FIRESTOPPING MATERIAL AND/OR WATERPROOFING.
22. SEAL ALL PENETRATIONS, NEW AND EXISTING, ABOVE
CEILINGS AT RATED FIRE WALLS IN AREAS OF WORK.
COUNTER MOUNTED DROP-IN SINK
COUNTER MOUNTED UNDER
MOUNT SINK
COUNTER MOUNTED INTEGRAL
SINK
WALL MOUNTED SINK
FLOOR MOUNTED TOILET
WALL MOUNTED TOILET
FLOOR MOUNTED REAR DISCHARGE
TOILET
ACCESSIBLE LOCATION
USE ON PLANS EXAMPLE
WALL MOUNTED URINAL
ABV ABOVE D DRAIN FRT FIRE RESISTANT TREATED M METER PSF POUNDS PER SQUARE FOOT TB TACK BOARD
ACOUS ACOUSTICAL DBL DOUBLE FT FOOT MAS MASONRY PSI POUNDS PER SQUARE INCH TOC TOP OF CURB
ADJ ADJUSTABLE DEMO DEMOLISH, DEMOLITION FURR FURRING MAX MAXIMUM PT PRESSURE TREATED TOSC TOP OF STRUCTURAL CONCRETE
AFF ABOVE FINISH FLOOR DEPT DEPARTMENT FWC FABRIC WALL COVERING MDF MEDIUM DENSITY FIBER BOARD TEL TELEPHONE
ALUM ALUMINUM DF DRINKING FOUNTAIN MED MEDIUM QT QUARRY TILE THK THICK
ALT ALTERNATE DIA or Ø DIAMETER GA GAUGE MEMB MEMBRANE QTB QUARRY TILE BASE TOB TOP OF BEAM
ANOD ANODIZED DIM DIMENSION GALV GALVANIZED MTL METAL TOP TOP OF PAVEMENT
APPROX APPROXIMATELY DIV DIVISION GB GRAB BAR MFGR MANUFACTURER RI RISER TOM TOP OF MASONRY
AWP ACOUSTICAL WALL PANEL DL DEAD LOAD GC GENERAL CONTRACTOR MH MANHOLE R RADIUS TOS TOP OF STEEL (BOTTOM OF ROOF DECK)
DN DOWN GCLU GLAZED CMU MIN MINIMUM RB RUBBER BASE TP TOILET PARTITION
BD BOARD DS DOWN SPOUT GI GALVANIZED IRON MISC MISCELLANEOUS RCP REFLECTED CEILING PLAN TV TELEVISION
BLDG BUILDING DSP DRY STAND PIPE GL GLASS MM MILLIMETER RD ROOF DRAIN TYP TYPICAL
BOT BOTTOM DTL DETAIL GLB GLASS BLOCK MO MASONRY OPENING REF REFERENCE TZ TERRAZZO
BW BOTH WAYS DWG DRAWING GMT GLASS MOSAIC TILE MOD MODULAR REFR REFRIGERATOR TZB TERRAZZO BASE
BM BENCH MARK GMTW GLASS MOSAIC TILE WALL MTD MOUNT(ED) (ING) REINF REINFORCING
E EAST GR GRADE MUL MULLION REQ REQUIRE(D) (ING) UC UNDERCUT
C CHANNEL EA EACH GYP GYPSUM REV REVISION UNO UNLESS OTHERWISE NOTED
CC CUBICAL CURTAIN EF EPOXY FLOOR GYP BD GYPSUM BOARD N NORTH RH RIGHT HAND USC UNDER SEPARATE CONTRACT
CK CORK EFB EPOXY FLOOR BASE NAT NATURAL RM ROOM(S)
CAB CABINET EJ EXPANSION JOINT HC HOLLOW CORE NIC NOT IN CONTRACT ROW RIGHT OF WAY VAR VARNISH
CB CHALK BOARD EG END GUARD HDR HEADER NO or # NUMBER RVWC RIGID VINYL WALL COVERING VB VAPOR BARRIER
CFCI CONTRACTOR FURNISH CONTRACTOR INSTALL EL ELEVATION HDW HARDWARE NOM NOMINAL VB VINYL BASE
CFOI CONTRACTOR FURNISH OWNER INSTALL ET EPOXY TERRAZZO FLOOR HDWD HARDWOOD NRC NOISE REDUCTION COEFFICIENT S SOUTH VCT VINYL COMPOSITION TILE
CFT CUBIC FOOT ETB EPOXY TERRAZZO BASE HGT HEIGHT NTS NOT TO SCALE SB SPLASH BLOCK VERT VERTICAL
CG CORNER GUARD ELECT ELECTRICAL HM HOLLOW METAL SC SOLID CORE VEST VESTIBULE
CL, CENTER LINE EM ENTRANCE MAT HORIZ HORIZONTAL OC ON CENTER SCHED SCHEDULE VT VINYL TILE
CLG CEILING EMER EMERGENCY HP HIGH POINT OD OUTSIDE DIAMETER SECT SECTION VTR VENT THROUGH ROOF
CI CAST IRON ENCL ENCLOSURE HR HANDRAIL OFD OVERFLOW ROOF DRAIN SHR SHOWER VWC VINYL WALL COVERING
CLO CLOSET EP EPOXY PAINT HVAC HEATING VENTILATION AIR CONDITIONING OFF OFFICE SIM SIMILAR
CLR CLEAR EQ EQUAL OFOI OWNER FURNISH OWNER INSTALL SPECS SPECIFICATION(S) W WEST
CMP CROWN MOLDING PAINTED EQUIP EQUIPMENT ID INSIDE DIAMETER OFCI OWNER FURNISH CONTRACTOR INSTALL SPK SPEAKER W/ WITH
CMS CROWN MOLDING STAINED EWC ELECTRIC WATER COOLER INCL INCLUDING OVH OVERHEAD SQ SQUARE WBP WOOD BASE PAINTED
CMT CERAMIC MOSAIC TILE EXP EXPANSION INSUL INSULATION OH OPPOSITE HAND SS STAINLESS STEEL WBS WOOD BASE STAINED
CMTB CERAMIC MOSAIC TILE BASE EXIST EXISTING INT INTERIOR OPNG OPENING ST STONE WC WATER CLOSET
CMTW CERAMIC MOSAIC TILE WALL EXT EXTERIOR IPS IRON PIPE SIZE OPP OPPOSITE STC STONE COUNTERTOP WD WOOD
CMU CONCRETE MASONRY UNIT STW STONE WALL WDS WOOD STAINED
CO CASED OPENING FA FIRE ALARM J JOIST P PAINT(ED) STB STONE BASE WIN WINDOW
COL COLUMN FBO FURNISHED BY OTHERS JAN JANITOR PARA PARALLEL STC STAINED CONCRETE W/O WITHOUT
CONC CONCRETE FD FLOOR DRAIN JT JOINT PBD PARTICLE BOARD STD STANDARD WP WOOD PANELING PREFINISHED
CONST CONSTRUCTION
FE FIRE EXTINGUISHER PCF POUNDS PER CUBIC FOOT STL STEEL WPP WOOD PANELING PAINTED
CR
FEC FIRE EXTINGUISHER CABINET KIT KITCHEN PERF PERFORATED STO STORAGE WPS WOOD PANELING STAINED
CORR
CHAIR RAIL FFE FINISH FLOOR ELEVATION KO KNOCKOUT PERI PERIMETER STRUCT STRUCTURAL WS WATER STOP
CPT
CORRIDOR FHC FIRE HOSE CABINET PFL POUNDS PER LINEAR FOOT SV SHEET VINYL WSCT WAINSCOT
CPTB
CARPET FHVC FIRE HOSE VALVE CABINET L LENGTH/LONG PL PLATE SVB SHEET VINYL COVED BASE WT WEIGHT
CT
CARPET BASE FE FINISHED END LAB LABORATORY PLAM PLASTIC LAMINATE SYM SYMMETRICAL WWF WELDED WIRE FABRIC
CTB
CERAMIC TILE FLR FLOOR LAM LAMINATE PLAS PLASTER SYS SYSTEM
CTW
CERAMIC TILE BASE FOC FACE OF CONCRETE LH LEFT HAND PLYWD PLYWOOD
CERAMIC TILE WALL FOF FACE OF FINISH LI LINOLEUM PP PORCELAIN PAVER
CTSK COUNTERSINK FOM FACE OF MASONRY LIB LINOLEUM COVED BASE PPB PORCELAIN PAVER BASE
CYD CUBIC YARD FOS FACE OF STUDS LIT LINOLEUM TILE PPW PORCELAIN PAVER WALL
FPRF FIREPROOFING LL LIVE LOAD PR PAIR
CONT CONTINUOUS
NEW CONSTRUCTION
EXISTING CONSTRUCTION
DEMOLITION
HIDDEN LINE
FIRE/SMOKE BARRIERS
1 HOUR FIRE BARRIER
SMOKE/FIRE BARRIER
2 HOUR FIRE BARRIER
FIRE/SMOKE PARTITIONS
1 HOUR FIRE PARTITION
30 MIN. FIRE PARTITION
FIRE WALLS
2 HOURS
1FB
1SB
2FB
1FP
0.5FP
2FW
BRICK
CONCRETE
CONCRETE BLOCK
EARTH
INSULATION, BATT
INSULATION, RIGID
METAL
PLYWOOD
FINISH GRADE
HARDWOOD
WOOD FRAMING
THROUGH MEMBER
WOOD FRAMING
INTERRUPTED MEMBER
PARTITION TYPES
DOOR NUMBER
KEY NOTE (NEW)
KEY NOTE (DEMO)
EQUIPMENT / ACCESSORY
WINDOW TAG
COLUMN GRID
CEILING ELEVATION A.F.F.
REVISION
INTERIOR
ELEVATION
SECTION
NORTH
ROOM NAME
N
A###
NAME
ROOM NUMBER
REFER TO ROOM NUMBER
FOR TYPICAL INFORMATION
1t
SIM
MATCHLINE
EXTERIOR
ELEVATION
EXTERIOR WALL TYPES-
A.F.F.
0'-0"
ELEVATION HEIGHT
HR#-IP RAILING TAG
ALIGN
Revisions:
A u st in
S a n A n to n io
H o u s to n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
A u to d e s k D o c s /A n g e lo S ta te
U n iv e rs it y /2
A
S U
P la z a V e rd e B ld g
-H
V A
C R p lm n t_
A R
C H
C e n tr a l.
rv t
/2
/2
:2
:2
A
M
P L
A Z
A V
E R
D E
B L
D G
H
V A
C R
E P
L A
C E
M E
N T
S
S V
A N
B U
R E N
S T, S A
N A
N G
E
LO
TX
A N
G E
LO
S
TA
TE
U
N
IV
E R
S
IT
Y
07/24/2026
Project No. 2574.02
CONTRACT DOCUMENTS
ARCHITECTURAL
ABBREVIATIONS AND
SYMBOLS
G1.1
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
GENERAL PROJECT
NOTES
TEXAS MAP VICINITY MAP LOCATION MAP
PLUMBING FIXTURES
ARCHITECTURAL ABBREVIATIONS
ARCHITECTURAL
LINETYPES
ARCHITECTURAL
MATERIALS
ARCHITECTURAL
SYMBOLS
Renovation Area 11,280 SF
Building Height 3 Stories, 36 Feet
Gross Square Footage Per Floor 11,220 SF
Total Gross Square Footage 33,660 SF
Building Construction Type IIB, Sprinklered
PROJECT SUMMARY
Existing Building Code 2021 International Existing Building Code
Accessibility Codes 2012 Texas Accessibilities Standards
City of San Angelo Accepted Amendments May 18, 2026
Energy Conservation Code 2021 International Energy Conservation Code
City of San Angelo Accepted Amendments May 18, 2026
Fuel Code 2021 Fuel Gas Code
City of San Angelo Accepted Amendments May 18, 2026
Fire Code 2021 International Fire Code
City of San Angelo Accepted Amendments May 18, 2026
Mechanical Code 2021 International Mechanical Code
City of San Angelo Accepted Amendments May 18, 2026
Plumbing Code 2021 International Plumbing Code
State: 2023 National Electrical Code
City of San Angelo Accepted Amendments May 18, 2026
Electrical Code City: 2020 National Electrical Code
City of San Angelo Accepted Amendments May 18, 2026
Building Code 2021 International Building Code
APPLICABLE CODES AND STANDARDS
JURISDICTION: City of San Angelo TX
LOCATION: 2010 S Van Buren St, San Angelo, TX 76904
PROJECT: Plaza Verde Building 3 HVAC Replacements
OR PROJECT NUMBER: 2574.02
OWNER: Angelo State University
BUILDING CODE ANALYSIS
TOM GREEN COUNTY
PROJECT
LOCATION
PROJECT
LOCATION
Roof Insulation above Deck=R-25 CI T C301.1
Climate Zone 3B T C301.1
2024 IECC ENERGY CODE ANALYSIS
Occupancy Types: Residential Group R-2 (Dormitory) 310.3
CHAPTER 3: USE & OCCUPANCY CLASSIFICATION
IBC
Secondary drains or scuppers Where roof drains are required, secondary (emergency overflow) roof drains or scuppers shall be provided where the roof perimeter extends above the roof in such a manner that water will be entrapped if the primary drains allow buildup for any reason.
1502.2
CHAPTER 15: ROOF ASSEMBLIES & ROOFTOP
STRUCTURES
Fire-resistance rating Shaft enclosures shall have a fire-resistance rating of not less than 2 hours where connecting four stories or more, and not less than 1 hour where connecting less than four stories. The number of stories connected by the shaft enclosure shall include any basements but not any mezzanines. Shaft enclosures shall have a fire-resistance not less than the floor assembly penetrated, but need not exceed 2 hours. Shaft enclosures shall...
713.4
Construction Shaft enclosures shall be constructed as fire barriers in accordance with Section 707 or horizontal assemblies in accordance with Section 711, or both.
713.2
CHAPTER 7: FIRE & SMOKE PROTECTION SYSTEMS
NO. DESCRIPTION DATE
UP
DN
UP
1. THE CONTRACTOR SHALL FURNISH ALL LABOR,
MATERIALS, TOOLS, EQUIPMENT AND RELATED ITEMS
REQUIRED TO COMPLETE THE DEMOLITION WORK AS
INDICATED BY THE CONTRACT DOCUMENTS
2. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE
WORK, USING THEIR BEST SKILL AND ATTENTION. THEY
SHALL BE SOLELY RESPONSIBLE FOR ALL DEMOLITION
MEANS, METHODS, TECHNIQUES, SEQUENCES AND
PROCEDURES. AND FOR COORDINATING ALL PORTIONS
OF THE WORK UNDER THE CONTRACT.
3. THE CONTRACTOR SHALL PAY FOR ALL PERMITS, FEES
AND INSPECTIONS REQUIRED FOR THE EXECUTION OF
THE WORK
4. SERVICE CONNECTIONS SHALL BE SAFELY REMOVED,
CAPPED OR PLUGGED IN CONFORMITY WITH LOCAL
LAWS AND ORDINANCES, REQUIREMENTS OF LOCAL
UTILITY COMPANIES, AND THE NATIONAL BOARD OF
FIRE UNDERWRITERS, AND IN SUCH MANNER AS TO
NOT TO INTERFERE WITH USE OF THE OCCUPIED
SPACES IN THE BUILDING
5. REMOVE ALL MISCELLANEOUS DEVICES AS REQUIRED
TO INSTALL NEW FINISHES, INCLUDED BUT NOT LIMITED
TO PLUMBING FIXTURES, SIGNAGE, SWITCH PLATES,
TELEVISION BRACKETS, WALL OUTLET COVERS, ETC.
SAVE FOR REINSTALLATION AFTER COMPLETION OF
FINISH WORK AT EXISTING LOCATIONS.
6. CONTRACTOR TO COORDINATE WITH OWNER'S
REPRESENTATIVE FOR INFECTIOUS CONTROL
MEASURES DURING CONSTRUCTION
7. DASHED LINES INDICATE WALLS, DOORS, FIXTURES,
CASEWORK, ETC. TO BE REMOVED IN THEIR ENTIRETY,
U.N.O.
8. ANY QUESTIONS CONCERNING OWNERSHIP OF
SALVAGEABLE MATERIAL SHALL BE ANSWERED BY THE
OWNER, OR THE OWNER'S REPRESENTATIVE
9. INSTALL TEMPORARY DUST PARTITIONS WITH DOORS
FOR CONSTRUCTION ACCESS AROUND AREAS OF
WORK SO THAT OPERATIONS IN EXISTING ADJACENT
AREAS REMAIN DUST FREE. MAINTAIN IN PLACE UNTIL
COMPLETION OF CONSTRUCTION
10. IMMEDIATELY SEAL ALL PENETRATIONS IN EXISTING
SLAB OPEN DURING DEMOLITION WITH FIRESTOPPING
MATERIAL AND WATERPROOFING
11. SEAL ALL PENETRATIONS, NEW AND EXISTING, ABOVE
CEILING AT FIRE RATED AND SMOKE PARTITIONS IN
AREAS OF WORK AS REQUIRED TO MAINTAIN RATING
12. PATCH EXISTING PARTITIONS AFFECTED BY
DEMOLITION AND PREPARE FOR NEW FINISHES.
13. PREPARE FLOORS FOR NEW FINISHES AT DEMOLISHED
FLOOR FINISHES.
14. REFER TO FLOOR PLANS FOR EXACT
LOCATION/DIMENSIONS OF NEW OPENINGS ON
EXISTING WALLS.
N
TRUE NORTH
N
PLAN NORTH
GATHERING
GATHERING
GATHERING
2 BED UNIT
2 BED UNIT
2 BED UNIT
ACCESSIBLE
UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
TEAM ROOM
LAUNDRY
ACCESSIBLE
UNIT
2 BED UNIT
2 BED UNIT
RA UNIT
31102 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
CORRIDOR
CORRIDOR
CORRIDOR
275 275 275
2 BED UNIT
2 BED UNIT
3207 2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
RA UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
CORRIDOR
GATHERING
GATHERING
GATHERING
CORRIDOR
CORRIDOR
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
275 275 275
SHAFT SIDE ROOM SIDE
FLOOR FINISH
BASE
C-H STUD, TO MATCH
EXISTING SIZE AND
GAUGE
GYPSUM LINER
PANEL
CEILING AS
SCHEDULED
GYPSUM WALLBOARD -
ONE LAYER @ 1 HOUR
PARTITION
BOTTOM OF
STRUCTURE
Revisions:
A u st in
S a n A n to n io
H o u s to n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
A u to d e s k D o c s /A n g e lo S ta te
U n iv e rs it y /2
A
S U
P la z a V e rd e B ld g
-H
V A
C R p lm n t_
A R
C H
C e n tr a l.
rv t
/2
/2
:2
:2
A
M
P L
A Z
A V
E R
D E
B L
D G
H
V A
C R
E P
L A
C E
M E
N T
S
S V
A N
B U
R E N
S T, S A
N A
N G
E
LO
TX
A N
G E
LO
S
TA
TE
U
N
IV
E R
S
IT
Y
07/24/2026
Project No. 2574.02
CONTRACT DOCUMENTS
DEMOLITION FLOOR
PLANS - LEVELS 1 & 2
A2.1
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
GENERAL
DEMOLITION NOTES
KEYNOTE LEGEND
270 REMOVE ENTIRE WIDTH OF SHAFT WALL FROM FLOOR
TO 7'-6" A.F.F. FOR MECHANICAL UPGRADES. AFTER
WORKS ARE FINALIZED, FILL IN OPENING WITH 1-HR
FIRE BARRIER PARTITION TO MATCH AND ALIGN WITH
EXISTING. SEE PARTITION DETAIL FOR REFERENCE.
275 REMOVE EXISTING CARPET FLOORING AND WALL
BASE IN ITS ENTIRETY
SCALE: 1/8" = 1'-0"
DEMOLITION FLOOR PLAN - LEVEL 1
SCALE: 1/8" = 1'-0"
DEMOLITION FLOOR PLAN - LEVEL 2
2 SCALE: 1/2" = 1'-0"
SHAFT WALL PARTITION
1. THE CONTRACTOR SHALL FURNISH ALL LABOR,
MATERIALS, TOOLS, EQUIPMENT AND RELATED ITEMS
REQUIRED TO COMPLETE THE DEMOLITION WORK AS
INDICATED BY THE CONTRACT DOCUMENTS
2. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE
WORK, USING THEIR BEST SKILL AND ATTENTION. THEY
SHALL BE SOLELY RESPONSIBLE FOR ALL DEMOLITION
MEANS, METHODS, TECHNIQUES, SEQUENCES AND
PROCEDURES. AND FOR COORDINATING ALL PORTIONS
OF THE WORK UNDER THE CONTRACT.
3. THE CONTRACTOR SHALL PAY FOR ALL PERMITS, FEES
AND INSPECTIONS REQUIRED FOR THE EXECUTION OF
THE WORK
4. SERVICE CONNECTIONS SHALL BE SAFELY REMOVED,
CAPPED OR PLUGGED IN CONFORMITY WITH LOCAL
LAWS AND ORDINANCES, REQUIREMENTS OF LOCAL
UTILITY COMPANIES, AND THE NATIONAL BOARD OF
FIRE UNDERWRITERS, AND IN SUCH MANNER AS TO
NOT TO INTERFERE WITH USE OF THE OCCUPIED
SPACES IN THE BUILDING
5. REMOVE ALL MISCELLANEOUS DEVICES AS REQUIRED
TO INSTALL NEW FINISHES, INCLUDED BUT NOT LIMITED
TO PLUMBING FIXTURES, SIGNAGE, SWITCH PLATES,
TELEVISION BRACKETS, WALL OUTLET COVERS, ETC.
SAVE FOR REINSTALLATION AFTER COMPLETION OF
FINISH WORK AT EXISTING LOCATIONS.
6. CONTRACTOR TO COORDINATE WITH OWNER'S
REPRESENTATIVE FOR INFECTIOUS CONTROL
MEASURES DURING CONSTRUCTION
7. DASHED LINES INDICATE WALLS, DOORS, FIXTURES,
CASEWORK, ETC. TO BE REMOVED IN THEIR ENTIRETY,
U.N.O.
8. ANY QUESTIONS CONCERNING OWNERSHIP OF
SALVAGEABLE MATERIAL SHALL BE ANSWERED BY THE
OWNER, OR THE OWNER'S REPRESENTATIVE
9. INSTALL TEMPORARY DUST PARTITIONS WITH DOORS
FOR CONSTRUCTION ACCESS AROUND AREAS OF
WORK SO THAT OPERATIONS IN EXISTING ADJACENT
AREAS REMAIN DUST FREE. MAINTAIN IN PLACE UNTIL
COMPLETION OF CONSTRUCTION
10. IMMEDIATELY SEAL ALL PENETRATIONS IN EXISTING
SLAB OPEN DURING DEMOLITION WITH FIRESTOPPING
MATERIAL AND WATERPROOFING
11. SEAL ALL PENETRATIONS, NEW AND EXISTING, ABOVE
CEILING AT FIRE RATED AND SMOKE PARTITIONS IN
AREAS OF WORK AS REQUIRED TO MAINTAIN RATING
12. PATCH EXISTING PARTITIONS AFFECTED BY
DEMOLITION AND PREPARE FOR NEW FINISHES.
13. PREPARE FLOORS FOR NEW FINISHES AT DEMOLISHED
FLOOR FINISHES.
14. REFER TO FLOOR PLANS FOR EXACT
LOCATION/DIMENSIONS OF NEW OPENINGS ON
EXISTING WALLS.
N
TRUE NORTH
N
PLAN NORTH
272NOT IN SCOPE
277 277
277277
277 277
274 274
274 274
2 BED UNIT
2 BED UNIT
3307 2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
GATHERING
GATHERING
GATHERING
CORRIDOR
2 BED UNIT
2 BED UNIT
RA UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
CORRIDOR
CORRIDOR
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
275 275 275
SCALE: 1/8" = 1'-0"
DEMOLITION ROOF PLAN
Revisions:
A u st in
S a n A n to n io
H o u s to n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
A u to d e s k D o c s /A n g e lo S ta te
U n iv e rs it y /2
A
S U
P la z a V e rd e B ld g
-H
V A
C R p lm n t_
A R
C H
C e n tr a l.
rv t
/2
/2
:2
:2
A
M
P L
A Z
A V
E R
D E
B L
D G
H
V A
C R
E P
L A
C E
M E
N T
S
S V
A N
B U
R E N
S T, S A
N A
N G
E
LO
TX
A N
G E
LO
S
TA
TE
U
N
IV
E R
S
IT
Y
07/24/2026
Project No. 2574.02
CONTRACT DOCUMENTS
DEMOLITION FLOOR
PLANS - LEVEL 3 & ROOF
A2.2
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
GENERAL
DEMOLITION NOTES
KEYNOTE LEGEND
270 REMOVE ENTIRE WIDTH OF SHAFT WALL FROM FLOOR
TO 7'-6" A.F.F. FOR MECHANICAL UPGRADES. AFTER
WORKS ARE FINALIZED, FILL IN OPENING WITH 1-HR
FIRE BARRIER PARTITION TO MATCH AND ALIGN WITH
EXISTING. SEE PARTITION DETAIL FOR REFERENCE.
272 REMOVE AND DEMOLISH EXISTING ROOFING SYSTEM
INCLUDING MEMBRANE, INSULATION AND ROOFING
CURBS DOWN TO EXISTING DECK
273 REMOVE AND DEMOLISH EXISTING METAL PARAPET
COPING IN ITS ENTIRETY
274 PATCH AND SEAL EXISTING ROOF OPENINGS SERVING
EXISTING REFRIGERANT PIPE RISERS THROUGH
ROOF, REF. STRUCTURAL
275 REMOVE EXISTING CARPET FLOORING AND WALL
BASE IN ITS ENTIRETY
276 ALL EXISTING VENTS THROUGH ROOF TO REMAIN
277 DEMOLISH OPENING IN EXISTING PARAPET FOR 8" H X
12" W SECONDARY OVERFLOW SCUPPER, REF. 4/A6.2
279 EXISTING ELEVATOR SHAFT TO REMAIN. REMOVE AND
DEMOLISH EXISTING ROOFING SYSTEM ABOVE
EXISTING DECK
280 EXISTING MECHANICAL EQUIPMENT TO BE
DEMOLISHED, TYP. REF. MECHANICAL
649 EXISTING ROOF CRICKET
650 EXISTING ROOF HATCH TO REMAIN
651 EXISTING ROOF PENETRATION FOR CONDENSATE
PIPE RISER TO REMAIN
652 EXISTING WATER HEATER FLUES TO REMAIN
SCALE: 1/8" = 1'-0"
DEMOLITION FLOOR PLAN - LEVEL 3
MATERIALS, TOOLS, EQUIPMENT AND RELATED ITEMS
REQUIRED TO COMPLETE THE DEMOLITION WORK AS
INDICATED BY THE CONTRACT DOCUMENTS
2. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE
WORK, USING THEIR BEST SKILL AND ATTENTION. THEY
SHALL BE SOLELY RESPONSIBLE FOR ALL DEMOLITION
MEANS, METHODS, TECHNIQUES, SEQUENCES AND
PROCEDURES. AND FOR COORDINATING ALL PORTIONS
OF THE WORK UNDER THE CONTRACT.
3. THE CONTRACTOR SHALL PAY FOR ALL PERMITS, FEES
AND INSPECTIONS REQUIRED FOR THE EXECUTION OF
THE WORK
4. SERVICE CONNECTIONS SHALL BE SAFELY REMOVED,
CAPPED OR PLUGGED IN CONFORMITY WITH LOCAL
LAWS AND ORDINANCES, REQUIREMENTS OF LOCAL
UTILITY COMPANIES, AND THE NATIONAL BOARD OF
FIRE UNDERWRITERS, AND IN SUCH MANNER AS TO
NOT TO INTERFERE WITH USE OF THE OCCUPIED
SPACES IN THE BUILDING
5. REMOVE ALL MISCELLANEOUS DEVICES AS REQUIRED
TO INSTALL NEW FINISHES, INCLUDED BUT NOT LIMITED
TO PLUMBING FIXTURES, SIGNAGE, SWITCH PLATES,
TELEVISION BRACKETS, WALL OUTLET COVERS, ETC.
SAVE FOR REINSTALLATION AFTER COMPLETION OF
FINISH WORK AT EXISTING LOCATIONS.
6. CONTRACTOR TO COORDINATE WITH OWNER'S
REPRESENTATIVE FOR INFECTIOUS CONTROL
MEASURES DURING CONSTRUCTION
7. DASHED LINES INDICATE WALLS, DOORS, FIXTURES,
CASEWORK, ETC. TO BE REMOVED IN THEIR ENTIRETY,
U.N.O.
8. ANY QUESTIONS CONCERNING OWNERSHIP OF
SALVAGEABLE MATERIAL SHALL BE ANSWERED BY THE
OWNER, OR THE OWNER'S REPRESENTATIVE
9. INSTALL TEMPORARY DUST PARTITIONS WITH DOORS
FOR CONSTRUCTION ACCESS AROUND AREAS OF
WORK SO THAT OPERATIONS IN EXISTING ADJACENT
AREAS REMAIN DUST FREE. MAINTAIN IN PLACE UNTIL
COMPLETION OF CONSTRUCTION
10. IMMEDIATELY SEAL ALL PENETRATIONS IN EXISTING
SLAB OPEN DURING DEMOLITION WITH FIRESTOPPING
MATERIAL AND WATERPROOFING
11. SEAL ALL PENETRATIONS, NEW AND EXISTING, ABOVE
CEILING AT FIRE RATED AND SMOKE PARTITIONS IN
AREAS OF WORK AS REQUIRED TO MAINTAIN RATING
12. PATCH EXISTING PARTITIONS AFFECTED BY
DEMOLITION AND PREPARE FOR NEW FINISHES.
13. PREPARE FLOORS FOR NEW FINISHES AT DEMOLISHED
FLOOR FINISHES.
14. REFER TO FLOOR PLANS FOR EXACT
LOCATION/DIMENSIONS OF NEW OPENINGS ON
EXISTING WALLS.
N
TRUE NORTH
N
PLAN NORTH
271 271 271
271 271
271271
271 271
271 271
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
RA UNIT
2 BED UNIT
3112 2 BED UNIT
ACCESSIBLE
UNIT
2 BED UNIT
ACCESSIBLE
UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
LAUNDRY
TEAM ROOM
271271
271 271
271271
271 271
271 271
271 271
271 271
271 271
271 271
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
RA UNIT
2 BED UNIT
3212 2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
32132 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
A
.1
Revisions:
A u st in
S a n A n to n io
H o u s to n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
A u to d e s k D o c s /A n g e lo S ta te
U n iv e rs it y /2
A
S U
P la z a V e rd e B ld g
-H
V A
C R p lm n t_
A R
C H
C e n tr a l.
rv t
/2
/2
:2
:2
A
M
P L
A Z
A V
E R
D E
B L
D G
H
V A
C R
E P
L A
C E
M E
N T
S
S V
A N
B U
R E N
S T, S A
N A
N G
E
LO
TX
A N
G E
LO
S
TA
TE
U
N
IV
E R
S
IT
Y
07/24/2026
Project No. 2574.02
CONTRACT DOCUMENTS
DEMOLITION REFLECTED
CEILING PLANS - LEVELS
1 & 2
A2.3
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
GENERAL
DEMOLITION NOTES
KEYNOTE LEGEND
271 REMOVE AND DEMOLISH EXISTING GYP BOARD
CEILING IN ITS ENTIRETY
278 REMOVE, SALVAGE AND REINSTALL CEILING AS
NEEDED FOR MECHANICAL SCOPE
SCALE: 1/8" = 1'-0"
DEMOLITION REFLECTED CEILING PLAN - LEVEL 1
SCALE: 1/8" = 1'-0"
DEMOLITION REFLECTED CEILING PLAN - LEVEL 2
MATERIALS, TOOLS, EQUIPMENT AND RELATED ITEMS
REQUIRED TO COMPLETE THE DEMOLITION WORK AS
INDICATED BY THE CONTRACT DOCUMENTS
2. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE
WORK, USING THEIR BEST SKILL AND ATTENTION. THEY
SHALL BE SOLELY RESPONSIBLE FOR ALL DEMOLITION
MEANS, METHODS, TECHNIQUES, SEQUENCES AND
PROCEDURES. AND FOR COORDINATING ALL PORTIONS
OF THE WORK UNDER THE CONTRACT.
3. THE CONTRACTOR SHALL PAY FOR ALL PERMITS, FEES
AND INSPECTIONS REQUIRED FOR THE EXECUTION OF
THE WORK
4. SERVICE CONNECTIONS SHALL BE SAFELY REMOVED,
CAPPED OR PLUGGED IN CONFORMITY WITH LOCAL
LAWS AND ORDINANCES, REQUIREMENTS OF LOCAL
UTILITY COMPANIES, AND THE NATIONAL BOARD OF
FIRE UNDERWRITERS, AND IN SUCH MANNER AS TO
NOT TO INTERFERE WITH USE OF THE OCCUPIED
SPACES IN THE BUILDING
5. REMOVE ALL MISCELLANEOUS DEVICES AS REQUIRED
TO INSTALL NEW FINISHES, INCLUDED BUT NOT LIMITED
TO PLUMBING FIXTURES, SIGNAGE, SWITCH PLATES,
TELEVISION BRACKETS, WALL OUTLET COVERS, ETC.
SAVE FOR REINSTALLATION AFTER COMPLETION OF
FINISH WORK AT EXISTING LOCATIONS.
6. CONTRACTOR TO COORDINATE WITH OWNER'S
REPRESENTATIVE FOR INFECTIOUS CONTROL
MEASURES DURING CONSTRUCTION
7. DASHED LINES INDICATE WALLS, DOORS, FIXTURES,
CASEWORK, ETC. TO BE REMOVED IN THEIR ENTIRETY,
U.N.O.
8. ANY QUESTIONS CONCERNING OWNERSHIP OF
SALVAGEABLE MATERIAL SHALL BE ANSWERED BY THE
OWNER, OR THE OWNER'S REPRESENTATIVE
9. INSTALL TEMPORARY DUST PARTITIONS WITH DOORS
FOR CONSTRUCTION ACCESS AROUND AREAS OF
WORK SO THAT OPERATIONS IN EXISTING ADJACENT
AREAS REMAIN DUST FREE. MAINTAIN IN PLACE UNTIL
COMPLETION OF CONSTRUCTION
10. IMMEDIATELY SEAL ALL PENETRATIONS IN EXISTING
SLAB OPEN DURING DEMOLITION WITH FIRESTOPPING
MATERIAL AND WATERPROOFING
11. SEAL ALL PENETRATIONS, NEW AND EXISTING, ABOVE
CEILING AT FIRE RATED AND SMOKE PARTITIONS IN
AREAS OF WORK AS REQUIRED TO MAINTAIN RATING
12. PATCH EXISTING PARTITIONS AFFECTED BY
DEMOLITION AND PREPARE FOR NEW FINISHES.
13. PREPARE FLOORS FOR NEW FINISHES AT DEMOLISHED
FLOOR FINISHES.
14. REFER TO FLOOR PLANS FOR EXACT
LOCATION/DIMENSIONS OF NEW OPENINGS ON
EXISTING WALLS.
N
TRUE NORTH
N
PLAN NORTH
271 271
271271
271 271
271271
271 271
271271
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
RA UNIT
2 BED UNIT
3312 2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
Revisions:
A u st in
S a n A n to n io
H o u s to n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
A u to d e s k D o c s /A n g e lo S ta te
U n iv e rs it y /2
A
S U
P la z a V e rd e B ld g
-H
V A
C R p lm n t_
A R
C H
C e n tr a l.
rv t
/2
/2
:2
:3
A
M
P L
A Z
A V
E R
D E
B L
D G
H
V A
C R
E P
L A
C E
M E
N T
S
S V
A N
B U
R E N
S T, S A
N A
N G
E
LO
TX
A N
G E
LO
S
TA
TE
U
N
IV
E R
S
IT
Y
07/24/2026
Project No. 2574.02
CONTRACT DOCUMENTS
DEMOLITION REFLECTED
CEILING PLAN - LEVEL 3
A2.4
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
GENERAL
DEMOLITION NOTES
KEYNOTE LEGEND
271 REMOVE AND DEMOLISH EXISTING GYP BOARD
CEILING IN ITS ENTIRETY
278 REMOVE, SALVAGE AND REINSTALL CEILING AS
NEEDED FOR MECHANICAL SCOPE
SCALE: 1/8" = 1'-0"
DEMOLITION REFLECTED CEILING PLAN - LEVEL 3
1. REFER TO SHEET A6.X FOR TYPICAL ROOF
DETAILS
2. NOT ALL ROOF PENETRATIONS ARE SHOWN
ON THE ARCHITECTURAL ROOF PLANS.
3. ALL ROOFING AREAS ARE MODIFIED
BITUMINOUS UNLESS NOTED OTHERWISE.
4. MINIMUM SLOPE FOR ROOF IS 1/4" PER 1'-0"
UNLESS NOTED OTHERWISE.
5. ALL SADDLES OR CRICKETS ARE FORMED
WITH TAPERED INSULATION UNLESS NOTED
OTHERWISE.
GENERAL ROOF NOTES
N
TRUE NORTH
N
PLAN NORTH
A.1 A.2 A.3 A.4 A.5 A.6 A.7 A.8 A.9
A.A
A.B
A.C
A.D
A.E
A.F
A.G
A.11A.10
/4
/4
/4
/4
/4
/4
/4
/4
" 630
RIDGE LINE
NOT IN SCOPE
617617
A6.2
A6.2
A6.2
A6.2
A6.2
A6.2
A6.2
A6.2
A6.2
__________3
A6.2
A6.2
A6.2
A6.2
TYP
/4
Revisions:
A u st in
S a n A n to n io
H o u s to n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
A u to d e s k D o c s /A n g e lo S ta te
U n iv e rs it y /2
A
S U
P la z a V e rd e B ld g
-H
V A
C R p lm n t_
A R
C H
C e n tr a l.
rv t
/2
/2
:2
:3
A
M
P L
A Z
A V
E R
D E
B L
D G
H
V A
C R
E P
L A
C E
M E
N T
S
S V
A N
B U
R E N
S T, S A
N A
N G
E
LO
TX
A N
G E
LO
S
TA
TE
U
N
IV
E R
S
IT
Y
07/24/2026
Project No. 2574.02
CONTRACT DOCUMENTS
ROOF PLAN
A3.5
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
KEYNOTE LEGEND
616 LOCATION OF NEW OVERFLOW SCUPPER
617 PREFINISHED METAL COPING, SLOPED TO DRAIN
630 ROOF CRICKET
650 EXISTING ROOF HATCH TO REMAIN
655 MECHANICAL EQUIPMENT, TYP. REF. MECHANICAL
SCALE: 1/8" = 1'-0"
ROOF PLAN
5/8" COVER BOARD
STEEL ROOF DECK
SEPARATION SHEET. SINGLE PLY
ROOF MEMBRANE
P.T. WOOD NAILERS - 7 1/4" WIDE BY
DEPTH OF INSULATION. SECURE TO
DECK @ 12" O.C. STAGGERED
CAP SHEET
EQUIPMENT CURB
24 GA GALV CAP
SECURED W/ NEOPRENE
HEAD SCREWS @ 24" O.C.
4" 2"
FASTENERS AT 8" O.C.
NAIL WITH WASHER HEAD
TO SECURE MEMBRANE3
R13 BATT INSULATION, MIN. 4" HIGH
3 1/2"
ROOF INSULATION
P.T. PLYWOOD
SINGLE PLY ROOF MEMBRANE
BASE FLASHING
CUT-EDGE SEALANT
BONDING ADHESIVE
5/8" COVER BOARD
ROOF INSULATION
SINGLE-PLY ROOFING MEMBRANE
TOS
VARIES
EXISTING STEEL ROOF DECK
/8
S P
E C
IF
IE
D
A S
PLUMBING VENT STACK
5/8" COVER BOARD
ROOF INSULATION
STEEL ROOF DECKNOTE:
1. VENT STACKS AND OTHER PIPES SHALL
HAVE A MINIMUM OF 12 INCHES OF
CLEARANCE ON ALL SIDES FROM WALLS,
CURBS AND OTHER PROJECTIONS TO
FACILITATE PROPER FLASHING.
SINGLE PLY ROOF
MEMBRANE
PIPE SHALL BE BRACED BACK TO
THE STRUCTURAL FRAME
DIRECTLY BELOW THE ROOF DECK
THERMOPLASTIC PRE-MOLDED
PIPE FLASHING
STAINLESS STEEL
CLAMPING RING
SINGLE PLY ROOF MEMBRANE
ROOF INSULATION
STEEL ROOF DECK
SEPARATION SHEET. SINGLE PLY ROOF MEMBRANE
P.T. WOOD NAILERS - 5 1/2" WIDE BY
DEPTH OF INSULATION. SECURE TO
DECK @ 12" O.C. STAGGERED
1/2" P.T. PLYWOOD
SINGLE PLY ROOF MEMBRANE BASE FLASHING
EXHAUST FAN OR VENT
NEOPRENE HEAD SCREWS
@ 16" O.C., MIN 2 EACH SIDE
PREFAB METAL CURB. THYCURB TC-3, OR APPROVED
EQUAL (18 GA GALV. STEEL SHELL AND BASE PLATE, 1
1/2" 3LB DENSITY INSULATION & FACTORY INSTALLED
2X2 NAILER) ANCHOR TO WOOD NAILERS @ 6" O.C.
M
IN
FASTENERS @ 8" O.C. TO
SECURE MEMBRANE
NOTES:
1. ON UPSLOPE OF UNIT,
PROVIDE TAPERED CRICKET
1/2" COVER BOARD
CUT-EDGE SEALANT
BONDING ADHESIVE
1"
MIN 4"
SINGLE PLY ROOF
MEMBRANE BASE
FLASHING
4" MIN. FLANGE - PRIME, SET
IN MASTIC AND FASTEN.
RADIUS CORNERS OF
FLANGE
SINGLE PLY ROOF
MEMBRANE
5/8" COVER BOARD
P.T. WOOD NAILERS 5 1/2" WIDE
BY DEPTH OF INSULATION
SEPARATION SHEET.
SINGLE PLY ROOF
MEMBRANE
METAL ROOF DECK
FILL VOID WITH
COMPRESSIBLE INSULATION
1/4" ANNULAR SPACE
AROUND PENETRATION
SEALANT
STAINLESS STEEL DRAWBAND
24 GA. GALV. SHEET METAL
RAIN COLLAR, SOLDER ALL
JOINTS
24 GA. GALV. SHEET METAL
PITCH PAN, SOLDER/WELD
NON-SHRINK GROUT
1/ 4"
PIPE/CONDUIT
POURABLE SEALANT
THERMOPLASTIC PRE-
FABRICATED SEALANT POCKET
ROOF INSULATION (DEPTH AS SPECIFIED)
EXISTING STEEL ROOF DECK
EXISTING P.T. WOOD NAILERS
EXISTING CURB COUNTER FLASHING
NOTES:
1. ON UPSLOPE OF UNIT, PROVIDE TAPERED CRICKET
EXISTING RIGID
INSULATION
EXISTING CONT.
STEEL ANGLE
SINGLE PLY ROOF MEMBRANE
CONT. FIBER CANT
COVER BOARD
CUT-EDGE SEALANT
1/2" P.T. PLYWOOD
Revisions:
A u st in
S a n A n to n io
H o u s to n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
A u to d e s k D o c s /A n g e lo S ta te
U n iv e rs it y /2
A
S U
P la z a V e rd e B ld g
-H
V A
C R p lm n t_
A R
C H
C e n tr a l.
rv t
/2
/2
:2
:3
A
M
P L
A Z
A V
E R
D E
B L
D G
H
V A
C R
E P
L A
C E
M E
N T
S
S V
A N
B U
R E N
S T, S A
N A
N G
E
LO
TX
A N
G E
LO
S
TA
TE
U
N
IV
E R
S
IT
Y
07/24/2026
Project No. 2574.02
CONTRACT DOCUMENTS
EXTERIOR DETAILS
A6.1
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
SCALE: 3" = 1'-0"
EQUIPMENT CURB DETAIL
2 SCALE: 3" = 1'-0"
EXHAUST FAN CURB DETAIL
SCALE: 3" = 1'-0"
PIPE/CONDUIT PENETRATION POCKET
4 SCALE: 3" = 1'-0"
VENT THRU ROOF (VTR)
SCALE: 3" = 1'-0"
R1 SINGLE PLY ROOF ASSEMBLY
SCALE: 3" = 1'-0"
ROOF HATCH DETAIL
EXISTING PRE-FORMED CORNICE TRIM
EXISTING EIFS ACRYLIC COATING SYSTEM
EXISTING PLYWOOD SHEATHING
SINGLE PLY ROOFING MEMBRANE
EXISTING INSULATED CONCRETE
WALL SYSTEM
1/2" COVER BOARD
CONT. P.T. 1/2" VENEER
CORE PLYWOOD
ROOF NAILING
CONT. P.T. 2x8 TAPERED
WOOD NAILER
CONT. CLEAT
/2
CONT. CLEAT
CONT. METAL COPING W/1"
STANDING SEAM JOINTS
EXISTING CORNICE
BACKER ROD AND
FLEXIBLE SEALANT AS
REQUIRED AT LOCATIONS
PRESENTING A GAP
LARGER THAN 1/4"
BETWEEN EXISTING WALL
AND NEW COPING
EXISTING PRE-FORMED CORNICE TRIM
EXISTING EIFS ACRYLIC COATING SYSTEM
EXISTING PLYWOOD SHEATHING
SINGLE PLY ROOFING MEMBRANE
CONT. P.T. 1/2" VENEER
CORE PLYWOOD
EXISTING INSULATED CONCRETE
WALL SYSTEM
5/8" COVERBOARD
EXISTING ACRYLIC COATING
ROOF NAILING
EXISTING CORNICE
CONT. P.T. 2x6 TAPERED
WOOD NAILER
CONT. CLEAT
/2
CONT. CLEAT
CONT. METAL COPING W/1"
STANDING SEAM JOINTS
BACKER ROD AND
FLEXIBLE SEALANT AS
REQUIRED AT LOCATIONS
PRESENTING A GAP
LARGER THAN 1/4"
BETWEEN EXISTING WALL
AND NEW COPING
SINGLE-PLY ROOFING MEMBRANE
EXISTING INSULATED CONCRETE
WALL SYSTEM
5/8" COVER BOARD
ROOF INSULATION (DEPTH AS SPECIFIED)
5/8" COVER BOARD
SINGLE-PLY ROOFING MEMBRANE
EXISTING STEEL ROOF DECK
EXISTING STRUCTURAL JOIST
E X
IS
T
IN
G
O P
E N
IN
G
EXISTING STEEL LINTEL (ONLY AT BRICK)
EXISTING THROUGH-WALL FLASHING
STAINLESS STEEL SCUPPER LINER
5/8" ROOF COVERBOARD
2X P.T. NAILERS
EXISTING METAL ROOF DECK
EXISTING STRUCTURAL JOIST
SINGLE-PLY ROOFING MEMBRANE
SEALANT
SINGLE-PLY ROOFING MEMBRANE
SEAL EDGES OF MEMBRANE
TO SCUPPER LINER
CONT. SEPARATION MEMBRANE
O P
E N
IN
G
STEEL LINTEL (ONLY AT BRICK)
PRE-FINISHED METAL COVER
STAINLESS STEEL SCUPPER LINER
5/8" ROOF COVERBOARD
P.T. WOOD BLOCKING TO ALIGN WITH
CANT. 2" ABOVE SCUPPER OUTLET
EXISTING METAL ROOF DECK
EXISTING STRUCTURAL JOIST
SINGLE-PLY ROOFING MEMBRANE
SEALANT
SINGLE-PLY ROOFING MEMBRANE
SEAL EDGES OF MEMBRANE
TO SCUPPER LINER
CONT. SEPARATION MEMBRANE
CONT. SEALANT
CONT. SEALANT
PRE-FINISHED METAL COVER
SCALE: 3" = 1'-0"
ROOF CORNICE AT BRICK
SCALE: 3" = 1'-0"
ROOF CORNICE AT ACRYLIC COATING
SCALE: 3" = 1'-0"
ROOF PARAPET BASE
Revisions:
A u st in
S a n A n to n io
H o u s to n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
A u to d e s k D o c s /A n g e lo S ta te
U n iv e rs it y /2
A
S U
P la z a V e rd e B ld g
-H
V A
C R p lm n t_
A R
C H
C e n tr a l.
rv t
/2
/2
:2
:3
A
M
P L
A Z
A V
E R
D E
B L
D G
H
V A
C R
E P
L A
C E
M E
N T
S
S V
A N
B U
R E N
S T, S A
N A
N G
E
LO
TX
A N
G E
LO
S
TA
TE
U
N
IV
E R
S
IT
Y
07/24/2026
Project No. 2574.02
CONTRACT DOCUMENTS
EXTERIOR DETAILS
A6.2
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
SCALE: 3" = 1'-0"
ROOF SCUPPER
SCALE: 3" = 1'-0"
OVERFLOW SCUPPER
N
TRUE NORTH
N
PLAN NORTH
EXISTING ACT CEILING
PAINTED GYPSUM WALL BOARD
OUT OF SCOPE
EXISTING PAINTED GYPSUM WALL BOARD
1. ALIGN NEW CEILINGS TO MATCH EXISTING HEIGHT.
CONTRACTOR TO VERIFY HEIGHT IN FIELD.
2. PAINT DESIGNATIONS AT GYP CEILINGS AND FURR
DOWNS APPLY TO ALL EXPOSED GYP U.N.O. GYP
CEILINGS AND FURR DOWNS TO BE PT2 U.N.O.
3. NOT ALL CEILING DEVICES ARE SHOWN ON THE
ARCHITECTURAL REFLECTED CEILING PLAN.
4. ROOMS OPEN TO STRUCTURE (WITH EXCEPTION
OF MEP ROOMS, UTILITY ROOMS, UTILITY CLOSETS,
AND STORAGE AREAS) PAINT -PT2 - ALL EXPOSED
STRUCTURE, DUCTWORK, CONDUITS, AND MEP
PIPING UNLESS NOTED OTHERWISE.
CORRIDOR
CORRIDOR
CORRIDOR
GATHERING
GATHERING
GATHERING
2 BED UNIT
2 BED UNIT
3107 2 BED UNIT
2 BED UNIT
2 BED UNIT
ACCESSIBLE
UNIT
2 BED UNIT
ACCESSIBLE
UNIT
2 BED UNIT
2 BED UNIT
RA UNIT
31102 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
TEAM ROOM
3118 LAUNDRY
RR
RR
38 RR
RR
RR
41 RR
RR
RR
RR
RR
RR
47RR
RR
RR
RR
RR
RR
VANITY
VANITY
55 VANITY
VANITY
VANITY
58 VANITY
VANITY
VANITY
61VANITY
VANITY
65VANITY
VANITY
VANITY
VANITY
VANITY
VANITY
JAN/ELEC
MECH
ELEC
ELEC
STAIRS
ELEV. MACH.
RM.
3120A
SPRINKLER RM
3120C
800 800
A
.1
A
.1
A
.1
TYP
2'-3"
T Y
P
DRYER PLENUM
3120B
EXISTING CROWN MOLDING
EXISTING
GYP BOARD
BOTTOM OF FURRDOWN
SCHEDULED SURFACE
MOUNTED LIGHT FIXTURE
Revisions:
A u st in
S a n A n to n io
H o u s to n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
A u to d e s k D o c s /A n g e lo S ta te
U n iv e rs it y /2
A
S U
P la z a V e rd e B ld g
-H
V A
C R p lm n t_
A R
C H
C e n tr a l.
rv t
/2
/2
:2
:3
A
M
P L
A Z
A V
E R
D E
B L
D G
H
V A
C R
E P
L A
C E
M E
N T
S
S V
A N
B U
R E N
S T, S A
N A
N G
E
LO
TX
A N
G E
LO
S
TA
TE
U
N
IV
E R
S
IT
Y
07/24/2026
Project No. 2574.02
CONTRACT DOCUMENTS
REFLECTED CEILING
PLAN
A9.1
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
RCP LEGEND
GENERAL RCP NOTES
SCALE: 1/8" = 1'-0"
REFLECTED CEILING PLAN - LEVEL 1
KEYNOTE LEGEND
800 REFINISH EXISTING CROWN MOLDING IN PT4.
SCALE: 3" = 1'-0"
LIGHT COVE DETAIL
N
TRUE NORTH
N
PLAN NORTH
EXISTING ACT CEILING
PAINTED GYPSUM WALL BOARD
OUT OF SCOPE
EXISTING PAINTED GYPSUM WALL BOARD
1. ALIGN NEW CEILINGS TO MATCH EXISTING HEIGHT.
CONTRACTOR TO VERIFY HEIGHT IN FIELD.
2. PAINT DESIGNATIONS AT GYP CEILINGS AND FURR
DOWNS APPLY TO ALL EXPOSED GYP U.N.O. GYP
CEILINGS AND FURR DOWNS TO BE PT2 U.N.O.
3. NOT ALL CEILING DEVICES ARE SHOWN ON THE
ARCHITECTURAL REFLECTED CEILING PLAN.
4. ROOMS OPEN TO STRUCTURE (WITH EXCEPTION
OF MEP ROOMS, UTILITY ROOMS, UTILITY CLOSETS,
AND STORAGE AREAS) PAINT -PT2 - ALL EXPOSED
STRUCTURE, DUCTWORK, CONDUITS, AND MEP
PIPING UNLESS NOTED OTHERWISE.
2 BED UNIT
2 BED UNIT
VANITY
VANITY
2 BED UNIT
2 BED UNIT
VANITY
VANITY
2 BED UNIT
2 BED UNIT
VANITY
VANITY
2 BED UNIT
2 BED UNIT
VANITY
VANITY
2 BED UNIT
VANITY
RR
2 BED UNIT
2 BED UNIT
VANITY
RR
RR
VANITY
VANITY
2 BED UNIT
2 BED UNIT
VANITY
VANITY
2 BED UNIT
RA UNIT
VANITY
2 BED UNIT
2 BED UNIT
VANITY
2 BED UNIT
2 BED UNIT
VANITY
VANITY
CORRIDOR
CORRIDOR
CORRIDOR
GATHERING
GATHERING
GATHERING
STAIRS
ELEC
IDF
JAN/ELEC
MECH
RR
RR
82 RR
RR
RR
RR
RR
RR
RR
115RR
RR
RR
RR
RR
RR
RR
A
.1
800 800
A
.1
A
.1
2 BED UNIT
2 BED UNIT
VANITY
VANITY
VANITY
VANITY
143 VANITY
VANITY
VANITY
VANITY
2 BED UNIT
2 BED UNIT
3307 2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
2 BED UNIT
VANITY
2 BED UNIT
2 BED UNIT
VANITY
VANITY
2 BED UNIT
2 BED UNIT
VANITY
VANITY
2 BED UNIT
VANITY
RA UNIT
2 BED UNIT
2 BED UNIT
VANITY
VANITY
2 BED UNIT
2 BED UNIT
VANITY
VANITY
CORRIDOR
CORRIDOR
GATHERING
GATHERING
GATHERING
CORRIDOR
ELEC
RECYCLING
JAN
ELEC
STAIRS
RR
RR
RR
RR
RR
142 RR
RR
RR
RR
RR
RR
RR
176RR
RR
RR
RR
RR
RR
RR
800 800
A
.1
A
.1
A
.1
Revisions:
A u st in
S a n A n to n io
H o u s to n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
A u to d e s k D o c s /A n g e lo S ta te
U n iv e rs it y /2
A
S U
P la z a V e rd e B ld g
-H
V A
C R p lm n t_
A R
C H
C e n tr a l.
rv t
/2
/2
:2
:3
A
M
P L
A Z
A V
E R
D E
B L
D G
H
V A
C R
E P
L A
C E
M E
N T
S
S V
A N
B U
R E N
S T, S A
N A
N G
E
LO
TX
A N
G E
LO
S
TA
TE
U
N
IV
E R
S
IT
Y
07/24/2026
Project No. 2574.02
CONTRACT DOCUMENTS
REFLECTED CEILING
PLAN
A9.2
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
KEYNOTE LEGEND
800 REFINISH EXISTING CROWN MOLDING IN PT4.
RCP LEGEND
GENERAL RCP NOTES
SCALE: 1/8" = 1'-0"
REFLECTED CEILING PLAN - LEVEL 2
SCALE: 1/8" = 1'-0"
REFLECTED CEILING PLAN - LEVEL 3
1. REFER TO THE LIST OF FINISHES FOR ALL
FINISH DESIGNATIONS. FINISH PLANS TO BE
USED WHEN MORE THAN ONE FINISH IS USED
IN A ROOM.
2. PT1 AT ALL WALLS U.N.O.
3. RE-FINISH EXISTING CRASH RAILS IN PT4.
XX EXTENTS OF FINISH
ROOM NAME
ROOM #
WALL FINISH
XXX
CHANGE IN FLOORING TYPE -
TRANSITION NEEDED
EXISTING FLOORING
CP1
NOTE: HATCHES SHOWN ON PLANS ARE
REPRESENTATIONAL AND ONLY SIGNIFY EXTENT OF
FINISH UNLESS STARTING POINT IS SHOWN.
OUT OF SCOPE
GRAIN DIRECTION
N
TRUE NORTH
N
PLAN NORTH
CORRIDOR
PT1
CORRIDOR
PT1
CORRIDOR
PT1
GATHERING
GATHERING
GATHERING
2 BED UNIT
PT1
2 BED UNIT
PT1
2 BED UNIT
PT1
2 BED UNIT
PT1
2 BED UNIT
PT1
ACCESSIBLE
UNIT
PT1
2 BED UNIT
PT1
ACCESSIBLE
UNIT
PT1
2 BED UNIT
PT1
2 BED UNIT
PT1
RA UNIT
PT13108
2 BED UNIT
PT1
2 BED UNIT
PT1
2 BED UNIT
PT1
2 BED UNIT
PT1
2 BED UNIT
PT1
2 BED UNIT
PT1
TEAM ROOM
PT1
LAUNDRY
PT1
RR
PT1
RR
PT1 39
RR
PT1
RR
PT1
RR
PT1
RR
PT1
RR
PT1
RR
PT1
RR
PT1
RR
PT1
RR
PT1
RR
PT1
RR
PT1
RR
PT1
RR
PT1
RR
PT1
RR
PT1
VANITY
PT1
VANITY
PT1 56
VANITY
PT1
VANITY
PT1
VANITY
PT1
VANITY
PT1
VANITY
PT1
VANITY
PT164
VANITY
PT1
VANITY
PT166
VANITY
PT1
VANITY
PT1
VANITY
PT1
VANITY
PT1
VANITY
PT1
VANITY
PT1
A10.1
A10.1
3 OH
A10.1
3 OH
A10.1
3 OH
A10.1
3 A10.1
A10.1
A10.1
3 OH
A10.1
A10.1
A10.1
A10.1
3 OH
A10.1
3 OH A10.1
3 OH
A10.1
3 OH3 OH 3
3120A
ELEV. MACH.
RM.
PT1
3120C
SPRINKLER RM
PT1
STAIRS
PT1
MECH
PT1
JAN/ELEC
PT1
ELEC
PT1
ELEC
PT1
PT4 PT4 PT4 PT4
A10.1 4 A10.14
900900 900
RB1 RB1
RB1
RB1 RB1
RB1
RB1 RB1
RB1
RB1
RB1
PT4
1'-0"
A L
IG
N
EXISTING
SIGNAGE
EXISTING
CRASH RAIL
LIFT AND RE-ADHERE
EXISTING RESILIENT
FLOORING
METAL EDGE TRIM BY TARKETT
CARPET AS SPECIFIED
EQ EQ
EXISTING
T.V.
DIMENSIONAL ACRYLIC SIGNAGE
BY FAST SIGNS.
CONTACT:
ALEX CRUZ
FASTSIGNS.177@FASTSIGNS.COM
512-445-4220
E Q
E Q 3
Revisions:
A u st in
S a n A n to n io
H o u s to n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
A u to d e s k D o c s /A n g e lo S ta te
U n iv e rs it y /2
A
S U
P la z a V e rd e B ld g
-H
V A
C R p lm n t_
A R
C H
C e n tr a l.
rv t
/2
/2
:2
:3
A
M
P L
A Z
A V
E R
D E
B L
D G
H
V A
C R
E P
L A
C E
M E
N T
S
S V
A N
B U
R E N
S T, S A
N A
N G
E
LO
TX
A N
G E
LO
S
TA
TE
U
N
IV
E R
S
IT
Y
07/24/2026
Project No. 2574.02
CONTRACT DOCUMENTS
ROOM FINISH PLAN
A10.1
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
GENERAL FINISH
PLAN NOTES
INTERIOR FINISH LEGEND
SCALE: 1/8" = 1'-0"
FINISH PLAN - LEVEL 1
LIST OF FINISHES
DESIGNATION DESCRIPTION MANUFACTURER/PRODUCT COLOR/NAME INSTALLATION/PATTERN STYLE REMARKS
PAINT
PT1 PAINT - FIELD COLOR SHERWIN WILLIAMS AGREEABLE GRAY 7029 N/A GENERAL FIELD COLOR
PT2 PAINT SHERWIN WILLIAMS HIGH REFLECTIVE WHITE 7757 N/A GYP CEILING U.N.O.
PT3 PAINT SHERWIN WILLIAMS MANOR HOUSE 7505 N/A DOORS U.N.O.
PT4 PAINT SHERWIN WILLIAMS OR SIMILAR MATCH WAVY NAVY BY KELLY MOORE N/A HM DOOR FRAME COLOR AND
ACCENT U.N.O.
BASE
RB1 4" BASE MATCH EXISTING MATCH EXISTING N/A
CARPET
CP1 18"X36" CARPET TILE TARKETT NIGHTSIDE 52601, EARTHBOUND VERTICAL ASHLAR INSTALL METHOD
SCALE: 1/2" = 1'-0"
TYP. STUDENT DOOR ACCENT
3SCALE: 12" = 1'-0"2
FLOORING TRANSITION -
CARPET TO RESILIENT
SCALE: 1/2" = 1'-0"
TYP. DISPLAY WALL
KEYNOTE LEGEND
900 NEW CARPET AND BASE TO BE INSTALLED WITHIN THE
EXISTING EXTENTS OF DEMOLISHED FLOOR FINISH.
UP
DN
N
TRUE NORTH
N
PLAN NORTH
2 BED UNIT
PT1
2 BED UNIT
PT1
VANITY
PT1
RR
PT1
RR
PT1
VANITY
PT1
2 BED UNIT
PT1
2 BED UNIT
PT1
VANITY
PT1
RR
PT1
RR
PT1
VANITY
PT1
2 BED UNIT
PT1
2 BED UNIT
PT1
VANITY
PT1
RR
PT1
RR
PT1
VANITY
PT1
2 BED UNIT
PT1
2 BED UNIT
PT1
VANITY
PT1
RR
PT1
RR
PT1
VANITY
PT1
2 BED UNIT
PT1
VANITY
PT1
RR
PT1
2 BED UNIT
PT1
2 BED UNIT
PT1
VANITY
PT1
RR
PT1
RR
PT1
VANITY
PT1
VANITY
PT1
RR
PT1
2 BED UNIT
PT1
2 BED UNIT
PT1
RR
PT1
VANITY
PT1
VANITY
PT1
RR
PT1
2 BED UNIT
PT1
RA UNIT
PT1
RR
PT1
VANITY
PT1
RR
PT1
RR
PT1
2 BED UNIT
PT1
2 BED UNIT
PT1
VANITY
PT1
2 BED UNIT
PT1
2 BED UNIT
PT1
VANITY
PT1
RR
PT1
RR
PT1
VANITY
PT1
CORRIDOR
PT1
CORRIDOR
PT1
CORRIDOR
PT1
GATHERING
GATHERING
GATHERING
A10.1
A10.1
3 A10.1
A10.1
A10.1
A10.1
3 OH
A10.1
3 OH
A10.1
3 OH A10.1
3 OH
A10.1
3 OH
A10.1
33 OH 3 OH
A10.1
3 OH
A10.1
3 OH A10.1
3 OH
A10.1
3 A10.1
STAIRS
PT1
ELEC
PT1
IDF
PT1
JAN/ELEC
PT1
MECH
PT1
PT4 PT4PT4 PT4
RB1 RB1
A10.1 4 A10.14 A10.1 4 A10.14
900900 900
RB1
RB1
RB1
RB1
RB1
RB1
RB1
RB1
RB1
RB1
OH
OH
OH
OH
OH
OH OH
OH
OH
OH
A10.1
A10.1
3 A10.1
A10.1
A10.1
A10.1
A10.1
A10.1
3 A10.1
A10.1
A10.1
33 3
A10.1
A10.1
3 A10.1
A10.1
3 A10.1
2 BED UNIT
PT1
2 BED UNIT
PT1
VANITY
PT1
RR
PT1
RR
PT1
VANITY
PT1
2 BED UNIT
PT1
2 BED UNIT
PT1
VANITY
PT1
RR
PT1
RR
PT1
VANITY
PT1
2 BED UNIT
PT1
2 BED UNIT
PT1
VANITY
PT1
RR
PT1
RR
PT1
VANITY
PT1
2 BED UNIT
PT1
2 BED UNIT
PT1
VANITY
PT1
RR
PT1
RR
PT1
VANITY
PT1
2 BED UNIT
PT1
VANITY
PT1
RR
PT1
2 BED UNIT
PT1
2 BED UNIT
PT1
VANITY
PT1
RR
PT1
RR
PT1
VANITY
PT1
VANITY
PT1
RR
PT1
2 BED UNIT
PT1
2 BED UNIT
PT1
RR
PT1
VANITY
PT1
VANITY
PT1
RR
PT1
2 BED UNIT
PT1
RA UNIT
PT1
RR
PT1
VANITY
PT1
RR
PT1
RR
PT1
2 BED UNIT
PT1
2 BED UNIT
PT1
VANITY
PT1
2 BED UNIT
PT1
2 BED UNIT
PT1
VANITY
PT1
RR
PT1
RR
PT1
VANITY
PT1
CORRIDOR
PT1
CORRIDOR
PT1
CORRIDOR
PT1
GATHERING
GATHERING
GATHERING
STAIRS
PT1
ELEC
PT1
RECYCLING
PT1
JAN
PT1
ELEC
PT1
PT4 PT4 PT4 PT4
RB1 RB1
A10.1 4 A10.14 A10.1 4 A10.14
900900 900
RB1
RB1
RB1
RB1
RB1
RB1
RB1
RB1
RB1
RB1
1. REFER TO THE LIST OF FINISHES FOR ALL
FINISH DESIGNATIONS. FINISH PLANS TO BE
USED WHEN MORE THAN ONE FINISH IS USED
IN A ROOM.
2. PT1 AT ALL WALLS U.N.O.
3. RE-FINISH EXISTING CRASH RAILS IN PT4.
XX EXTENTS OF FINISH
ROOM NAME
ROOM #
WALL FINISH
XXX
CHANGE IN FLOORING TYPE -
TRANSITION NEEDED
EXISTING FLOORING
CP1
NOTE: HATCHES SHOWN ON PLANS ARE
REPRESENTATIONAL AND ONLY SIGNIFY EXTENT OF
FINISH UNLESS STARTING POINT IS SHOWN.
OUT OF SCOPE
GRAIN DIRECTION
Revisions:
A u st in
S a n A n to n io
H o u s to n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
A u to d e s k D o c s /A n g e lo S ta te
U n iv e rs it y /2
A
S U
P la z a V e rd e B ld g
-H
V A
C R p lm n t_
A R
C H
C e n tr a l.
rv t
/2
/2
:2
:4
A
M
P L
A Z
A V
E R
D E
B L
D G
H
V A
C R
E P
L A
C E
M E
N T
S
S V
A N
B U
R E N
S T, S A
N A
N G
E
LO
TX
A N
G E
LO
S
TA
TE
U
N
IV
E R
S
IT
Y
07/24/2026
Project No. 2574.02
CONTRACT DOCUMENTS
ROOM FINISH PLAN
A10.2
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
SCALE: 1/8" = 1'-0"
FINISH PLAN - LEVEL 2
SCALE: 1/8" = 1'-0"
FINISH PLAN - LEVEL 3
GENERAL FINISH
PLAN NOTES
INTERIOR FINISH LEGEND
KEYNOTE LEGEND
900 NEW CARPET AND BASE TO BE INSTALLED WITHIN THE
EXISTING EXTENTS OF DEMOLISHED FLOOR FINISH.
A.E
A.D
A.G
A.C
A.F
A.B
A.A
9' -1
'-1
3/ 8"
9' -1
'-1
1/
8"
1' -4
2'
-2
/2
5' -7
'-2
/4
1' -4
182'-1 1/4"
'-2
12K3
16K3 14K3
16K3
9' -1
'-1
3/ 8"
9' -1
16K4 10 K1
K1
K4
HSS 10X4X1/4
HSS 10X4X1/4
H
SS
0X
4X 1/
H
SS
0X
4X 1/
W12X16W14X22 W12X14 W14X22
W12X16 W14X22
W12X16 W14X22 W
X1
W
X1
W
X1
W
X1
W
X1
W
X1
W
X1
W12X16W14X22
W
X1
W
X1
W
X1
W
X1
W
X1
W
X1
W
X1
W12X14 W14X22
W14X22 W12X16 RIDGE LINE
12K3
4 EQ. SPA.
SL
O
PE
SL
O
PE
12K3
RIDGE LINE
CU-3101
12K3 12K3
HRU-1
WEIGHT AND
FOOTPRINT TO
MATCH EXISTING
16K4
HRU-2
WEIGHT AND
FOOTPRINT TO
MATCH EXISTING
10K1
CU-3103
CU-3130
CU-3129
CU-3102
CU-3104
CU-3201
CU-3203
CU-3229
CU-3230
CU-3329
CU-3202
CU-3330CU-3204
CU-3303
CU-3301
CU-3304
CU-3302
CU-3305
CU-3227
CU-3105
CU-3207
CU-3307
CU-3306
CU-3206
CU-3308
CU-3208
CU-3205
CU-3107
CU-3127
CU-3327
CU-3106 CU-3108
CU-3209
CU-3109
CU-3111
CU-3211
CU-3324
CU-3310
CU-3210
CU-3312
CU-3212
CU-3110
CU-3124
CU-3112
CU-3224
CU-3309 CU-3311
CU-3316
CU-3314
CU-3116CU-3114
CU-3216
CU-3214
CU-3213
CU-3113 CU-3115
CU-3222 CU-3322
CU-3313
CU-3315CU-3215CU-3122
CU-3317
CU-3117
CU-3131
CU-3132
CU-3118
CU-3120
CU-3231
CU-3331
CU-3219
CU-3332
CU-3318
CU-3320
CU-3217
CU-3220
CU-3232
CU-3319
CU-3119
A.11 A.1 A.2 A.3 A.4 A.5 A.6 A.7 A.8 A.9A.10
CU-3218
CU-3120-A
18'-6" 19'-11 5/8" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 19'-0 5/8"
'-0
/8
2' -2
/2
35'-10 1/2" 38'-4 1/4" 33'-7 3/4" 38'-4 1/4" 35'-10 1/2"
12K3
12K3
12K3
NOTES:
1.
2.
3.
4.
THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
THE ROOF FRAMING SHOWN ON THIS PLAN IS EXISTING WITH LAYOUT AND MEMBER SIZES PER THE DRAWINGS
PROVIDED TO US.
REFER TO ARCHITECTURAL AND MEP DRAWINGS FOR INFORMATION NOT SHOWN ON THIS PLAN.
IF NEW HEAT RECOVERY UNITS AND/OR CONDENSING UNITS ARE PROCURED THAT ARE HEAVIER THAN SHOWN ON
THIS PLAN, CONTACT SKG ENGINEERING FOR VERIFICATION PRIOR TO INSTALLATION.
APPROX. (FIELD VERIFY)
2'-0" SQ.
6" LAP 6" LAP EXST. 1 1/2" 20GA TYPE B
ROOF DECK
PROVIDE NEW
1 1/2" 20GA, TYPE B
ROOF DECK INFILL
SCREW END LAPS TO
EXISTING B/W EACH RIB
AND SIDE LAPS @ 6" OC
USING #10 TEKS.
INSULATE AND ROOF PER
ARCHITECTURE.
EXISTING FRAMING
(5) LOCATIONS AT EXISTING ROOF PENETRATIONS
FOR EXISTING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .