ESBD_534716_1783354062377_RFB 2026-026 Pricing Sheet.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- RFB2026-026
- Issued by
- Loving County, Texas
About this file
This is a bid pricing sheet for the City of Waco, Texas, for the Mount Carmel Water Treatment Plant Vertical Turbine Pump Number 7 Installation project, issued under Invitation for Bid (IFB) 2026-026. The project encompasses the installation of a vertical turbine pump system at the Mount Carmel Water Treatment Plant, with work items including mobilization, bonding and insurance, erosion control plan implementation, trench safety plan implementation, confined space plan implementation, project signage, pump can installation, pump VTP installation, motor control center installations (MCC-1 and MCC-2), piping and supports, and electrical instrumentation and electrical installation. All items are specified as lump sum (LS) or individual units with estimated quantities, and bidders are required to provide unit prices for each line item that will be extended to determine the total bid amount.
The pricing sheet requires contractors to submit unit prices for each bid item, with the final bid amount calculated by multiplying unit prices by estimated quantities without rounding. Contractors must acknowledge use of any subcontractors and identify the type of work to be subcontracted. The bid proposal requires adherence to special project provisions for mobilization and bonding percentages, and contractors must provide a summary totaling materials, labor and equipment costs, and the complete base bid amount. All dollar amounts must be legibly written or typed, with any errors initialed by the contractor to ensure accuracy in bid calculations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Proposal-IFB City of Waco Bid Proposal For Mount Carmel WTP VTP No. 7 Installation
| Base Bid | |||||
| Item No. | Description | Estimated Quantity | Unit Measurement | Unit Price | Item Amount |
| 1.00 | MOBILIZATION (FOLLOW PERCENTAGE REQUIREMENTS AS OUTLINED IN SPECIAL PROJECT PROVISIONS) | 1 | LS | |
| 1.01 | BONDING, INSURANCE, AND INCIDENTALS (FOLLOW PERCENTAGE REQUIREMENTS AS OUTLINED IN SPECIAL PROJECT PROVISIONS) | 1 | LS | |
| 1.02 | EROSION CONTROL PLAN & IMPLEMENTATION | 1 | LS | |
| 1.03 | TRENCH SAFETY PLAN & IMPLEMENTATION | 1 | LS | |
| 1.04 | CONFINED SPACE PLAN & IMPLEMENTATION | 1 | LS | |
| 1.05 | CITY OF WACO PROJECT SIGN | 2 | EA | |
| 1.06 | PUMP CAN INSTALLATION | 1 | LS | |
| 1.07 | PUMP VTP INSTALLATION | 1 | LS | |
| 1.08 | MCC-1 INSTALLATION | 1 | LS | |
| 1.09 | MCC-2 INSTALLATION | 1 | LS | |
| 1.10 | PIPING & SUPPORTS | 1 | LS | |
| 1.11 | ELECTRICAL INSTRUMENTATION & ELECTRICAL INSTALLATION | 1 | LS | |
| Subtotal | ||||
| SUMMARY | ||||
| TOTAL AMOUNT OF MATERIALS | ||||
| TOTAL AMOUNT OF LABOR & EQUIPMENT | ||||
| TOTAL AMOUNT OF BASE BID |
I WILL USE THE FOLLOWING SUBCONTRACTORS FOR THIS WORK:
SUBCONTRACTOR TYPE OF WORK
FIRM NAME:
BY (SIGNED):
TITLE:
ADDRESS:
| Contractor acknowledges and agrees that the official TOTAL AMOUNT OF BID is determined by multiplying |
| the unit bid prices by the respective estimated quantities shown in this bid proposal and then totaling all of the |
| extended amounts. Extended amounts SHOULD NOT be rounded up or down. All dollar amounts should |
| be either written legibly or typed. Any mistakes should be rewritten and initialed by the Contractor. |
File details come from the government source that posted it. Updated .