ESBD_534716_1783354062377_RFB 2026-026 Pricing Sheet.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Mount Carmel Water Treatment Plant Vertical Turbine Pump #7 Installation
Solicitation number
RFB2026-026
Issued by
Loving County, Texas

About this file

This is a bid pricing sheet for the City of Waco, Texas, for the Mount Carmel Water Treatment Plant Vertical Turbine Pump Number 7 Installation project, issued under Invitation for Bid (IFB) 2026-026. The project encompasses the installation of a vertical turbine pump system at the Mount Carmel Water Treatment Plant, with work items including mobilization, bonding and insurance, erosion control plan implementation, trench safety plan implementation, confined space plan implementation, project signage, pump can installation, pump VTP installation, motor control center installations (MCC-1 and MCC-2), piping and supports, and electrical instrumentation and electrical installation. All items are specified as lump sum (LS) or individual units with estimated quantities, and bidders are required to provide unit prices for each line item that will be extended to determine the total bid amount.

The pricing sheet requires contractors to submit unit prices for each bid item, with the final bid amount calculated by multiplying unit prices by estimated quantities without rounding. Contractors must acknowledge use of any subcontractors and identify the type of work to be subcontracted. The bid proposal requires adherence to special project provisions for mobilization and bonding percentages, and contractors must provide a summary totaling materials, labor and equipment costs, and the complete base bid amount. All dollar amounts must be legibly written or typed, with any errors initialed by the contractor to ensure accuracy in bid calculations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Proposal-IFB City of Waco Bid Proposal For Mount Carmel WTP VTP No. 7 Installation

Base Bid
Item No.DescriptionEstimated QuantityUnit MeasurementUnit PriceItem Amount
1.00MOBILIZATION (FOLLOW PERCENTAGE REQUIREMENTS AS OUTLINED IN SPECIAL PROJECT PROVISIONS)1LS
1.01BONDING, INSURANCE, AND INCIDENTALS (FOLLOW PERCENTAGE REQUIREMENTS AS OUTLINED IN SPECIAL PROJECT PROVISIONS)1LS
1.02EROSION CONTROL PLAN & IMPLEMENTATION1LS
1.03TRENCH SAFETY PLAN & IMPLEMENTATION1LS
1.04CONFINED SPACE PLAN & IMPLEMENTATION1LS
1.05CITY OF WACO PROJECT SIGN2EA
1.06PUMP CAN INSTALLATION1LS
1.07PUMP VTP INSTALLATION1LS
1.08MCC-1 INSTALLATION1LS
1.09MCC-2 INSTALLATION1LS
1.10PIPING & SUPPORTS1LS
1.11ELECTRICAL INSTRUMENTATION & ELECTRICAL INSTALLATION1LS
Subtotal
SUMMARY
TOTAL AMOUNT OF MATERIALS
TOTAL AMOUNT OF LABOR & EQUIPMENT
TOTAL AMOUNT OF BASE BID

I WILL USE THE FOLLOWING SUBCONTRACTORS FOR THIS WORK:

SUBCONTRACTOR TYPE OF WORK

FIRM NAME:

BY (SIGNED):

TITLE:

ADDRESS:

Contractor acknowledges and agrees that the official TOTAL AMOUNT OF BID is determined by multiplying
the unit bid prices by the respective estimated quantities shown in this bid proposal and then totaling all of the
extended amounts. Extended amounts SHOULD NOT be rounded up or down. All dollar amounts should