ESBD_534716_1783354045002_RFB 2026-026 Pricing Sheet.pdf
PDF 2 MB Posted
- Solicitation number
- RFB2026-026
- Issued by
- Loving County, Texas
About this file
This is a pricing sheet and bid proposal form for the City of Waco, Texas, for the Mount Carmel Water Treatment Plant Vertical Turbine Pump #7 Installation project, identified as RFB 2026-026. The project encompasses multiple installation and support activities, including mobilization, bonding and insurance, erosion control planning and implementation, trench safety planning, confined space planning, pump installation components (CAN installation, VTP installation), motor control center installations (MCC-1 and MCC-2), piping and supports, and electrical instrumentation. The scope includes two project signs as discrete items. The bid proposal requires contractors to provide unit prices for each line item, with the total bid amount calculated by multiplying unit bid prices by estimated quantities and summing all extended amounts without rounding adjustments.
The pricing sheet establishes a structured bidding format requiring contractors to provide itemized costs for materials, labor, and equipment with a subtotal summary and grand total bid amount. Contractors must identify all subcontractors and their respective work assignments on the form, with acknowledgment that the official bid total is determined through multiplication of unit prices by estimated quantities. The document specifies that all dollar amounts must be written legibly or typed, with any errors initialed by the contractor. The form does not include information regarding response deadlines, site visit requirements, pre-bid meetings, award dates, or contract term details in the pricing sheet itself.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Bid
Item No. Description Estimated Quantity
Unit Measurement
Unit Price Item Amount
1.00
MOBILIZATION (FOLLOW PERCENTAGE REQUIREMENTS AS
OUTLINED IN SPECIAL PROJECT PROVISIONS)
1 LS
1.01
BONDING, INSURANCE, AND INCIDENTALS (FOLLOW PERCENTAGE
REQUIREMENTS AS OUTLINED IN SPECIAL PROJECT PROVISIONS)
1 LS
1.02 EROSION CONTROL PLAN & IMPLEMENTATION 1 LS
1.03 TRENCH SAFETY PLAN & IMPLEMENTATION 1 LS
1.04 CONFINED SPACE PLAN & IMPLEMENTATION 1 LS
1.05 CITY OF WACO PROJECT SIGN 2 EA
1.06 PUMP CAN INSTALLATION 1 LS
1.07 PUMP VTP INSTALLATION 1 LS
1.08 MCC-1 INSTALLATION 1 LS
1.09 MCC-2 INSTALLATION 1 LS
1.10 PIPING & SUPPORTS 1 LS
1.11 ELECTRICAL INSTRUMENTATION & ELECTRICAL INSTALLATION 1 LS
Subtotal
SUMMARY
TOTAL AMOUNT OF MATERIALS
TOTAL AMOUNT OF LABOR & EQUIPMENT
TOTAL AMOUNT OF BASE BID
I WILL USE THE FOLLOWING SUBCONTRACTORS FOR THIS WORK:
SUBCONTRACTOR TYPE OF WORK
FIRM NAME:
BY (SIGNED):
TITLE:
ADDRESS:
Contractor acknowledges and agrees that the official TOTAL AMOUNT OF BID is determined by multiplying the unit bid prices by the respective estimated quantities shown in this bid proposal and then totaling all of the extended amounts. Extended amounts SHOULD NOT be rounded up or down. All dollar amounts should be either written legibly or typed. Any mistakes should be rewritten and initialed by the Contractor.
City of Waco Bid Proposal For
Mount Carmel WTP VTP No. 7 Installation
RFB 2026-026 Page 16
File details come from the government source that posted it. Updated .