ESBD_533035_1782845702135_Attachment 5 - Project Drawings.pdf
PDF 3 MB Posted
- Attached to
- CCRC Kitchen Cooler Remediation
- Solicitation number
- 3202600220
- Issued by
- Travis County, Austin City, Texas
About this file
This is a set of architectural and engineering design documents for the Texas Workforce Commission's Criss Cole Rehabilitation Center (CCRC) located at 101 East 15th Street in Austin, Texas, prepared by Stanley Consultants for kitchen cooler remediation work. The project involves the replacement of an existing refrigeration system with two smaller refrigeration units to improve cooling load control and redundancy. The scope of work includes removal of existing refrigeration equipment (EU-3 and CU-3), installation of two new evaporator units (EU-3 and EU-6) with corresponding condenser units (CU-3 and CU-6), routing of new refrigerant piping, condensate drain lines, and associated structural support and roof modifications. New roof rails, curbs, and waterproof penetrations are required, along with coordination of temporary walk-in cooler or freezer provision during construction to maintain facility operations. The design was issued for construction on June 26, 2026, with project number 32337.01.00 and includes comprehensive mechanical, electrical, and controls drawings with detailed specifications for materials, installation methods, and system operation requirements.
The project specifications require all work to comply with the 2024 International Building Code, 2021 International Mechanical Code, 2021 International Energy Conservation Code, and applicable ASHRAE, NFPA, and Texas accessibility standards. All roof work, fire alarm and fire protection modifications, and telecommunications cabling must be performed by Texas Workforce Commission's approved preferred contractors to maintain system integrity and warranties. The electrical design includes new circuit breaker provisions in existing panels CC and CC2, new NEMA 3R disconnect switches for remote condensing units, and coordination of 120-volt power and controls wiring through the existing building management system using Econet 2.0 lead-lag controls. Construction must be sequenced to minimize disruption to the occupied facility, with major shutdowns coordinated to occur during minimum occupancy periods and all work requiring two-week advance notice to building management. Field verification of existing conditions, as-built drawings, temporary protection systems, and coordination with all building trades and systems are mandatory contractor responsibilities.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AE DESIGN SERVICES FOR KITCHEN
COOLER REMEDIATION - CCRC
TEXAS WORKFORCE COMMISSION - AUSTIN, TEXAS
TEXAS WORKFORCE COMMISSION CONSTRUCTION &
FACILITIES MANAGEMENT
26 JUNE 2026
101 EAST 15TH STREET, AUSTIN, TX 78778-0001
Ju ne
CRISS COLE REHABILITATION CENTER (CCRC)
ISSUED FOR CONSTRUCTION
STANLEY CONSULTANTS PROJECT NUMBER: 32337.01.00
DESIGN CRITERIA
CONTACT
CLIENT
TEXAS WORKFORCE COMMISSION
101 EAST 15TH STREET
AUSTIN, TEXAS 78778-0001
TEL.(800) 628-5155
CONTACT: CLAYTON POCIUS
PROJECT MANAGER III
INTERNATIONAL BUILDING CODE (2024), AS AMENDED
INTERNATIONAL MECHANICAL CODE (2021), AS AMENDED
INTERNATIONAL ENERGY CONSERVATION CODE (2021), AS
AMENDED
INTERNATIONAL FIRE CODE (2021)
INTERNATIONAL EXISTING BUILDING CODE (2021)
INTERNATIONAL PLUMBING CODE (2021)
ASHRAE 62.1-2022 VENTILATION FOR ACCEPTABLE INDOOR AIR
QUALITY
ASHRAE 90.1-2016 ENERGY STANDARD FOR BUILDINGS EXCEPT
LOW-RISE RESIDENTIAL BUILDINGS
NFPA 70 NATIONAL ELECTRICAL CODE (2023)
NFPA 70E STARDARD FOR ELECTRICAL SAFETY IN THE
WORKPLACE (2024)
NFPA 72 NATIONAL FIRE ALARM CODE (2023)
NPFA 90A & 90B (2015) STANDARDS FOR INSTALLATION OF HVAC
SYSTEMS
TEXAS ACCESSIBILITY STANDARDS (TAS) (2023)
2010 ADA STANDARDS FOR ACCESSIBLE DESIGN - 2010
STANDARDS FOR STATE & LOCAL GOVERNMENTS TITLE II
TWC PROJECT # 320 260 0220
R.C. SCHRECENGOST
P.E. # 71591
STANLEY CONSULTANTS, INC.
6836 AUSTIN CENTER BLVD.
SUITE 350
AUSTIN, TEXAS 78731
TEL: (512) 427-3600
FAX: (512) 427-3699
CONTACT: R.C. SCHRECENGOST, P.E.
Texas Firm Registration No.: F-174
MECHANICAL ENGINEER
PROJECT
LOCATION
06/26/2026
GENERAL NOTES
& SITE PLAN
G0-001
R. SCHRECENGOST
D. McCURDY
R. SCHRECENGOST
0 ISSUED FOR CONSTRUCTION 06/26/2026
NORTH
SCALE:
SITE PLAN
NOT TO SCALE
PROJECT LOCATION
N. LAMAR BLVD.
W . G
U A
D A
LU
PE
ST
SU
NS
HI
NE
DR
W. 49TH ST.
PROJECT GENERAL NOTES:
1. READ THE SPECIFICATIONS AND ALL DRAWING NOTES PRIOR TO STARTING ANY WORK.
2. REFER TO ALL DRAWINGS AND SPECIFICATIONS OF ALL OTHER DISCIPLINES AND DIVISIONS, INCLUDING STRUCTURAL AND
DIVISION 1, FOR ADDITIONAL INFORMATION AND REQUIREMENTS RELATED TO AND EXECUTION OF CONSTRUCTION PHASING.
3. VERY FEW EXISTING AS-BUILT DRAWINGS EXIST. CONTRACTORS MUST FIELD VERIFY ALL EQUIPMENT AND DIMENSIONS FOR
FULL COORDINATION PRIOR TO BEGINNING WORK.
4. ASBESTOS IS NOT ANTICIPATED IN THE MAJORITY OF WORK AREAS. IF CONTRACTOR SUSPECTS ASBESTOS OR ACMS EXIST AND
ABATEMENT IS REQUIRED IN AREAS OF WORK, CONTACT THE TWC PROJECT REPRESENTATIVE AS THIS SCOPE OF WORK WOULD REQUIRE COORDINATION WITH, AND BE PERFORMED BY TWC'S ABATEMENT CONSULTANT PRIOR TO START OF WORK BY
ABATEMENT CONTRACTOR.
5. ALL ROOF WORK AND/OR ROOF PENETRATIONS AND PROTECTION EFFORTS, AS WELL AS ANY FIRE ALARM / FIRE PROTECTION WORK OR MODIFICATIONS, AND ALL TELECOM / IT CABLING INSTALLATION OR REMOVAL SHALL BE PERFORMED BY TWC'S FACILITIES REQUIRED ROOFING, FA / FP, AND TELECOM / IT PREFERRED CONTRACTORS, TO MAINTAIN SYSTEMS' INTEGRITY AND WARRANTIES. OBTAIN LIST OF PREFERRED CONTRACTORS FROM TWC PROJECT REPRESENTATIVE.
6. SHOULD ANY CONTRACTOR ENCOUNTER ANY QUESTIONS OR CONFLICTS BETWEEN THE PLANS AND SPECIFICATIONS, EITHER AMONG THEMSELVES OR WITH THE REQUIREMENTS OF ALL REVIEWING AND PERMIT-ISSUING AGENCIES, THE CONTRACTOR SHALL BRING THESE CONFLICTS TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE. CONTRACTOR SHALL SEEK CLARIFICATION IN WRITING PRIOR TO START OF WORK AND SHALL NOT PROCEED WITH THE WORK IF THERE ARE
DISCREPANCIES OR CONFLICTS UNTIL ALL SUCH HAVE BEEN RESOLVED.
7. ALL DRAWING ELEMENTS AND TEXT SHOWN IN GRAYSCALE ARE EXISTING ELEMENTS EITHER PROVIDED BY OWNER RECORD DRAWINGS OR OBTAINED THROUGH LIMITED FIELD OBSERVATIONS WHERE POSSIBLE AND ARE USED FOR BACKGROUND AND
REFERENCE PURPOSES.
8. ALL DIMENSIONS OF EXISTING CONSTRUCTION ARE APPROXIMATE, WHETHER DIMENSIONS AND/OR ELEVATIONS ARE MARKED (±). CONTRACTOR SHALL MAKE ALL NECESSARY FIELD MEASUREMENTS OF EXISTING STRUCTURES AND EQUIPMENT TO VERIFY DIMENSIONS SHOWN ON DRAWINGS AND TO PROVIDE DIMENSIONS NOT SHOWN, PRIOR TO FABRICATION AND CONSTRUCTION.
CONTRACTOR SHALL ADJUST IN LENGTHS AND FITTINGS AS REQUIRED FOR A COMPLETE AND WORKING SYSTEM. COSTS FOR MODIFICATION OF NEW CONSTRUCTION, DUE TO LACK OF CONFIRMATION OF DIMENSIONS BY FIELD MEASUREMENTS SHALL BE
BORNE BY CONTRACTOR.
9. THE DETAILS DESIGNATED AS "TYPICAL DETAILS" APPLY GENERALLY TO THE DRAWINGS IN ALL AREAS WHERE CONDITIONS ARE
LIKE THOSE DESCRIBED IN THE DETAILS.
10. ALL KEYNOTES THAT REFERENCE TYPICAL INSTALLATIONS, EITHER OF EQUIPMENT OR ASSOCIATED COMPONENTS; OR, INDICATED LOCATIONS THAT ARE SIMILAR IN NATURE OR CLEARLY DUPLICATED AND/OR TYPICAL IN OTHER LOCATIONS, SHALL BE CONSIDERED PART OF THE CONTRACT DOCUMENTS IN ALL LOCATIONS. WITH ACCEPTANCE OF THESE CONSTRUCTION DOCUMENTS, CONTRACTOR SHALL COMPLY WITH TYPICAL REFERENCES AND ADDITIONAL WORK OR CORRECTIONS REQUIRED
WILL BE AT NO ADDITIONAL COSTS.
11.FOR CLARITY, NOT ALL EQUIPMENT, DUCTWORK, PIPING, PANELS, CONDUIT, ETC. MAY BE SHOWN IN EACH VIEW. ACTUAL FIELD CONDITIONS MAY VARY. PRIOR TO START OF NEW WORK, ALL CONTRACTORS FOR ALL TRADES SHALL, IN THE PRESENCE OF THE OWNER, VISIT THE SITE AND PERFORM AN INSPECTION TO BECOME FAMILIAR WITH EXISTING FACILITIES AND AREAS SCHEDULED FOR WORK AND DETERMINE THE CONDITION OF EXISTING ELEMENTS TO BE AFFECTED AND/OR TO REMAIN. OTHER FIELD INVESTIGATIONS, AND/OR MINOR ADJUSTMENTS MAY BE REQUIRED TO ENSURE NEW WORK CAN BE INSTALLED WITH MINIMAL EFFORT OR REWORK. NOTIFY OWNER REPRESENTATIVE AND ENGINEER FOR ALL CLARIFICATIONS AS WORK
PROGRESSES
12.FIELD INVESTIGATIONS, AND/OR MINOR ADJUSTMENTS MAY BE REQUIRED TO ENSURE NEW WORK CAN BE INSTALLED WITH MINIMAL EFFORT OR REWORK. NOTIFY OWNER REPRESENTATIVE AND ENGINEER FOR ALL CLARIFICATIONS AS WORK
PROGRESSES
13. ANY QUESTIONS RELATED TO THE PROJECT SCOPE OF DEMOLITION AND NEW WORK, WORKING CONDITIONS SUCH AS STARTING TIME, NOISE AND VIBRATION LIMITATIONS, SHUTDOWN OF ELECTRICAL POWER SERVICES SHOULD BE ADDRESSED TO THE
OWNER'S PROJECT MANAGER FOR CLARIFICATION PRIOR TO START OF WORK.
14.DUE TO THE CRITICAL NATURE OF SOME OF THE DAY-TO-DAY FUNCTIONING OF THIS FACILITY, ALL WORK AND SHUTDOWNS TO BE COMPLETED MUST BE COORDINATED WITH OWNER'S PROJECT MANAGER, PLANT PERSONNEL, TENANT AGENCY PERSONNEL AS DIRECTED, WITH SPECIAL ATTENTION TO AREAS OR SYSTEMS THAT MUST REMAIN IN OPERATION. ALL WORK SHALL BE COORDINATED AND SCHEDULED THROUGH OWNER AND COMPLETED IN THE TIME FRAME REQUIRED BY OWNER.
A. WORK SHALL BE PERFORMED WITHIN AN OCCUPIED OFFICE / RESIDENCE COMPLEX. WORK MUST BE SCHEDULED AND PERFORMED TO HAVE MINIMAL IMPACT ON DAILY ON OPERATIONS, AND MUST MAINTAIN CONTINUOUS UNIMPEDED
OPERATIONS ALWAYS, UNO.
15.THE CONTRACTOR SHALL ACQUIRE A "HOT WORK PERMIT" DAILY OR AS DIRECTED BY OWNER'S PROJECT MANAGER PRIOR TO DOING ANY CUTTING / WELDING / BRAZING WORK OR OTHER SIMILAR WORK; AND SHALL INITIATE A FIRE WATCH DURING THIS
WORK.
16.CONTRACTOR SHALL PROVIDE LOCKS TO BE USED WITH THE OWNER'S LOCK-OUT / TAG-OUT SAFETY PROGRAM.
17.THE CONTRACTOR SHALL OBTAIN ALL THE NECESSARY PERMITS AS REQUIRED FOR CONSTRUCTION OF THIS PROJECT.
18.THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES OR STRUCTURES AT
THE SITE. INTERRUPTION OF UTILITY SERVICES IS NOT PERMITTED WITHOUT FULL COORDINATION WITH OWNER. SOME AREAS MAY REQUIRE WORK ON WEEKENDS OR SPECIAL SHUTDOWNS AS DIRECTED AND SEQUENCED BY OWNER.
19.IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE OWNER OF ALL UTILITIES OR STRUCTURES CONCERNED BEFORE STARTING WORK. WHEN ANY EXISTING UTILITY REQUIRES ADJUSTMENT OR RELOCATION, THE CONTRACTOR SHALL NOTIFY THE PROPER UTILITY AND COORDINATE HIS WORK ACCORDINGLY. THE CONTRACTOR SHALL NOTIFY THE PROPER UTILITY IMMEDIATELY UPON BREAK OR DAMAGE TO ANY UTILITY LINE OR APPURTENANCE, OR THE INTERRUPTION OF THEIR SERVICE. IF EXISTING UTILITY CONSTRUCTION CONFLICTS WITH PROJECT REQUIREMENTS, CONTRACTOR SHALL NOTIFY
OWNER SO THE CONFLICT MAY BE RESOLVED.
20.WORK SHALL COMPLY WITH APPLICABLE LOCAL, STATE, AND FEDERAL CODES AND ORDINANCES AND STANDARD SPECIFICATIONS OF ALL AGENCIES HAVING THE RESPONSIBILITY OF REVIEWING PLANS AND SPECIFICATIONS FOR CONSTRUCTION OF ALL ITEMS PER THESE PLANS AND SPECIFICATIONS IN THIS LOCALITY. COMPLY WITH ALL RECOMMENDED PRACTICES AS SET FORTH BY THE FOLLOWING, BUT NOT LIMITED TO: ASME, SMACNA, ASHRAE, NFPA, ALL LOCAL BUILDING, MECHANICAL, PLUMBING, NATIONAL ELECTRICAL CODE, OSHA, AND REGULATIONS OF ALL GOVERNING BODIES AS THEY APPLY
TO THIS PROJECT.
21.THE CONTRACT DOCUMENTS ARE COMPLIMENTARY, AND WHAT IS REQUIRED BY ONE DISCIPLINE'S DRAWINGS OR SPECIFICATIONS, ADDENDUM, BULLETIN, OR OTHER DOCUMENT SHALL BE BINDING AS IF REQUIRED BY ALL. CONTRACTOR SHALL USE ONLY COMPLETE SETS OF CONTRACT DOCUMENTS FOR WORK AND THESE PLANS AND SPECIFICATIONS SHALL HAVE
BEEN APPROVED BY ALL APPLICABLE PERMIT-ISSUING AGENCIES.
22.DISCIPLINE COORDINATION: THE STRUCTURAL, ELECTRICAL AND CONTROLS DESIGN SHOWN WITHIN THE DRAWINGS SUPPORT THE MECHANICAL EQUIPMENT BASIS OF DESIGN. IF DIVISION 23 CONTRACTOR PROPOSES OR SUBMITS MECHANICAL EQUIPMENT WITH DIFFERENT STRUCTURAL OR ELECTRICAL REQUIREMENTS, IT IS ALL THE CONTRACTOR'S RESPONSIBILITIES TO:
A. IDENTIFY AND RESOLVE ALL NECESSARY STRUCTURAL SUPPORT CHANGES (INCLUDING BUT NOT LIMITED TO MODIFICATIONS TO ROOF CURBS, SUPPORT FRAMING, BEAM SIZES, CONNECTION DETAILS, ETC.) AND CLEARLY DOCUMENT THE REVISED STRUCTURAL REQUIREMENTS ON APPROPRIATE SUBMITTALS WITH WRITTEN STATEMENTS THAT
CHANGES WILL BE AT NO COST.
B. IDENTIFY AND RESOLVE ALL NECESSARY ELECTRICAL AND CONTROLS CHANGES (E.G. CONDUIT AND CONDUCTOR SIZE, EQUIPMENT CONTROLLERS, ETC.) AND CLEARLY DOCUMENT THE REVISED REQUIREMENTS ON THE MECHANICAL /
ELECTRICAL SUBMITTALS WITH WRITTEN STATEMENTS THAT CHANGES WILL BE AT NO COST.
C. ANY MECHANICAL SUBMITTALS THAT DO NOT EXPLICITLY ADDRESS STRUCTURAL, ELECTRICAL OR CONTROLS IMPLICATIONS WILL BE PRESUMED TO FULLY COMPLY WITH THE CONTRACT DOCUMENTS AND THE ORIGINAL BASIS OF DESIGN. ANY CORRECTIONS REQUIRED AS A RESULT OF NON-COMPLIANCE OR LACK OF COORDINATION WILL BE THE
CONTRACTOR'S RESPONSIBILITY AT NO COST TO OWNER.
23.IN ACCORDANCE WITH GENERALLY ACCEPTED PRACTICES, CONTRACTOR SHALL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING CONSTRUCTION OF THE PROJECT. THIS INCLUDES BUT IS NOT LIMITED TO: SAFETY OF ALL PERSONS, INCLUDING CONTRACTOR'S EMPLOYEES & SUBCONTRACTORS, AND PROPERTY AND ANY OTHER ITEMS OF PUBLIC SAFETY REGULATIONS DEEMED NECESSARY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND
NOT BE LIMITED TO NORMAL WORKING HOURS.
24.ALL WORK SHALL BE GUARANTEED BY THE CONTRACTOR TO BE FREE FROM DEFECTS IN WORKMANSHIP AND MATERIALS AND IN CONFORMANCE WITH THE APPROVED PLANS AND SPECIFICATIONS, AND THAT THE CONTRACTOR SHALL REPLACE OR REPAIR
ANY WORK OR MATERIAL FOUND TO BE DEFECTIVE.
25.THE GENERAL CONTRACTOR SHALL PROVIDE NOT LESS THAN TWO (2) COPIES OF THE AS-BUILT DRAWINGS TO THE OWNER AT THE COMPLETION OF THE PROJECT, UNLESS NOTED OTHERWISE. AS-BUILT DRAWINGS SHALL BE KEPT ON THE JOB ALWAYS AND UPDATED THROUGHOUT THE CONSTRUCTION PHASE. NOTE SPECIFICATIONS REQUIRE ELECTRONIC AS-BUILT CADD FILES FOR FINAL PROJECT CLOSEOUT. BASE CADD FILES WILL BE PROVIDED BY ENGINEER FOR CONTRACTOR USE.
26.CONTRACTOR SHALL COORDINATE INSTALLATION AND ROUTING OF ALL ELECTRICAL AND CONTROL WIRE CONDUIT, EQUIPMENT, AND ASSOCIATED SUPPORTS WITH ALL CONFLICTS, RATED WALL, OR CEILING CONDITIONS PRIOR TO INSTALLATION.
27.ANY REFERENCE TO SPECIFIC MANUFACTURER'S PRODUCTS IS FOR ESTABLISHING A STANDARD FOR PERFORMANCE AND/OR TO PHYSICALLY FIT WITHIN EXISTING SPACE CONSTRAINTS, ETC. IT IS NOT INTENDED TO LIMIT SELECTIONS OF APPROVED EQUAL PRODUCTS FROM OTHER MANUFACTURERS, BUT CONTRACTOR SHALL ENSURE SELECTIONS WILL NOT COMPROMISE
PROJECT REQUIREMENTS.
28.WHERE APPROPRIATE AND NECESSARY INFORMATIONAL PURPOSES, ALL NEW MATERIALS, PRODUCTS, AND EQUIPMENT SHALL BEAR IDENTIFICATION OR TAG NOMENCLATURE, AND MANUFACTURERS NAME, MODEL NUMBER, AND/OR OTHER IDENTIFICATION
MARKINGS.
29.THE DESIGN AND PROVISION OF ALL TEMPORARY ITEMS REQUIRED SUCH AS FALSEWORK, SUPPORTS AND ANCHORS FOR SAFETY LINES, FENCING, OR ANY OTHER TEMPORARY ELEMENTS REQUIRED FOR THE EXECUTION OF THE CONTRACT ARE NOT INCLUDED IN THESE DRAWINGS AND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. TEMPORARY SUPPORTS SHALL NOT RESULT IN THE OVERSTRESS OR DAMAGE OF ANY ELEMENTS TO BE BRACED NOR ELEMENTS USED AS BRACE SUPPORTS.
30.THE DESIGN TEAM OR OWNER'S REPRESENTATIVE SHALL NOT BE RESPONSIBLE FOR, OR HAVE CONTROL OF, OR TAKE CHARGE OF, CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES; NOR FOR SAFETY PRECAUTIONS AND PROGRAMS ABOUT THE WORK; ASSIST WITH CONTRACTOR OR SUBCONTRACTOR ACCESS CONTROL OR BADGING FOR EMPLOYEES; AND WILL NOT BE RESPONSIBLE FOR THE CONTRACTOR'S FAILURE TO CARRY OUT THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. THE DESIGN TEAM OR OWNER'S REPRESENTATIVE SHALL NOT BE RESPONSIBLE NOR HAVE CONTROL OF THE CONTRACTOR, SUBCONTRACTORS OR ANY OF THEIR AGENTS OR EMPLOYEES, OR ANY OTHER PERSONS
PERFORMING ANY OF THE WORK.
31.APPROPRIATELY SEAL AND/OR FIRESTOP ALL PENETRATIONS THROUGH ROOFS, WALLS, AND CEILINGS AIR / WATERTIGHT AND TO MAINTAIN THE INTEGRITY OF ALL FIRE ASSEMBLIES TO MATCH EXISTING RATING OR AS REQUIRED.
32.CONTRACTOR SHALL EXAMINE AND PREPARE ALL NEW INSULATED AND BARE SURFACES (PIPES, BRACKETS, COLLARS, SUPPORTS EXCEPT WHERE ITEMS ARE PLATED OR COVERED WITH PREFINISHED COATING) TO REMOVE DIRT, OIL, GREASE, ETC.
AS NECESSARY, TO PROVIDE FOR MANUFACTURER'S COMPATIBLE PRIMER AND PAINT.
CONSTRUCTION SEQUENCING NOTES:
1. SEQUENCE OF WORK SHALL BE PLANNED AND SCHEDULED BY THE CONTRACTOR AND APPROVED
BY OWNER, TENANT AGENCY, AND ENGINEER PRIOR TO BEGINNING ANY WORK. THIS INCLUDES ALL LIFE SAFETY - FIRE PROTECTION AND EGRESS - AS WELL AS CONSTRUCTION ITEMS. ALL WORK
SHALL THEN BE ACCOMPLISHED PER THIS CONSTRUCTION SEQUENCING AGREED TO BY
CONTRACTOR AND/OR OWNER, TENANT AGENCY, AND ENGINEER TO MINIMIZE DISRUPTION DUE TO
THE CRITICAL NATURE OF THE DAY-TO-DAY FUNCTIONING OF THIS FACILITY. ALL WORK AND
SHUTDOWNS MUST ALSO BE THOROUGHLY COORDINATED WITH BUILDING FACILITIES PERSONNEL.
2. CONTRACTOR TO PROPOSE A SEQUENCE OF CONSTRUCTION INCORPORATING THE PROJECT
CONSTRAINTS, DEVELOP ADDITIONAL CONSTRUCTION SEQUENCING REQUIRED FOR COMPLETION
OF THE WORK, AND SECURE CONCURRENCE OF OWNER PRIOR TO STARTING WORK. OWNER'S
DECISION TO ADOPT THE CONTRACTOR'S PROPOSED SEQUENCE OF CONSTRUCTION IS WITH THE
UNDERSTANDING THAT THIS IN NO WAY RELIEVES THE CONTRACTOR FROM HIS OBLIGATIONS FOR
PREPARATION OF AND/OR MODIFICATION TO A WORKABLE SEQUENCE OF CONSTRUCTION AND
ASSUMING FULL RESPONSIBILITY FOR SAME.
3. THE PROPOSED SEQUENCE OF CONSTRUCTION ACTIVITIES DEFINES SPECIFIC TIME CONSTRAINTS
AND/OR RESTRAINTS ASSOCIATED WITH CONSTRUCTION ACTIVITIES THAT ARE TO BE
ACCOMMODATED; AND NEEDS ONLY MENTION COMPONENTS OF WORK THAT ARE
SEQUENCE-SENSITIVE. CONTRACTOR TO CONTINUALLY REVIEW THIS PROPOSED SEQUENCE OF
CONSTRUCTION AND THOROUGHLY FAMILIARIZE HIMSELF WITH ALL ASPECTS OF PROJECT
REQUIREMENTS.
4. WORK SHALL BE PERFORMED WITHIN AN OCCUPIED OFFICE / RESIDENCE COMPLEX. WORK MUST BE SCHEDULED AND PERFORMED TO HAVE MINIMAL IMPACT ON DAILY ON OPERATIONS, AND MUST
MAINTAIN CONTINUOUS UNIMPEDED OPERATIONS ALWAYS, UNLESS NOTED OTHERWIS.
5. ALTHOUGH IT IS THE OWNER'S INTENT TO ACCOMMODATE THE NEEDS OF THE CONTRACTOR,
BUILDING OPERATIONAL REQUIREMENTS TAKE PRECEDENCE OVER CONTRACTOR'S ACTIVITIES.
THEREFORE, ANY INTERRUPTION OF OPERATIONS MUST BE PLANNED AND COORDINATED WITH THE OWNER AT LEAST TWO WEEKS PRIOR TO ANY REQUIRED INTERRUPTION AND IS SUBJECT TO THE
OPERATIONAL REQUIREMENTS AND CONSTRAINTS OF THE BUILDING.
6. “LIMITED INTERRUPTION OF BUILDING OPERATIONS” IS DEFINED AS ANY ACTIVITY THAT WILL RESULT IN A CHANGE IN THE CURRENT METHOD OF BUILDING OPERATION OR IN THE POSITION OF
BUILDING FACILITIES (VALVES, SWITCHES, ETC.). CONTRACTOR SHALL REQUEST SUCH
“INTERRUPTION OF BUILDING OPERATIONS” FROM THE OWNER NO LATER THAN TWO WEEKS PRIOR TO SUCH NEED AND SHALL CONFIRM OWNER'S APPROVAL FOR SUCH INTERRUPTION NO LESS THAN
SEVENTY-TWO (72) HOURS IN ADVANCE. OWNER MAY DEFER ANY PLANNED INTERRUPTION AS
REQUIRED TO MAINTAIN UNIMPEDED BUILDING OPERATIONS. AN UNANTICIPATED NEED FOR
“INTERRUPTION OF BUILDING OPERATIONS” MAY BE ACCOMMODATED AT THE SOLE DISCRETION OF THE OWNER ON A LIMITED REQUEST BASIS ONLY IF SUCH INTERRUPTION WILL NOT ADVERSELY
AFFECT BUILDING OPERATIONS.
7. FURNISH CONTRACTOR'S SEQUENCE OF OPERATIONS IN ACCORDANCE WITH OWNER'S UNIFORM
GENERAL CONDITIONS (UGC'S) AND SPECIFICATIONS FOR ENGINEER AND OWNER'S APPROVAL
PRIOR TO PERFORMING THE WORK. CONTRACTOR'S SEQUENCE OF CONSTRUCTION SHALL DEFINE
WORK TO BE PERFORMED AND SHALL INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING ITEMS:
A. PERFORM WORK DURING NORMAL HOURS OF OPERATION WHICH IS BETWEEN 7:00 A.M. TO 5:00
P.M., MONDAY TO FRIDAY.
B. DEFINITION OF THE START DATE, DURATION AND END DATE FOR EACH OF THE SEGMENTS OF
WORK DEFINED IN PROPOSED PHASING BELOW.
C. FOR EACH SEGMENT OF WORK, DEFINE ACTIVITIES TO BE PERFORMED BY OR WITNESSED BY
OWNER AND DATE ON WHICH THESE ACTIVITIES ARE TO BE PERFORMED.
D. SCHEDULED AND/OR TIMING OF MANUFACTURER'S FIELD SERVICES WHEN APPLICABLE,
E. SCHEDULED AND / OR TIMING FOR SPECIAL INSPECTIONS REQUIRED FOR THE PROJECT AND
PERFORMED BY OWNER'S THIRD-PARTY TESTING COMPANY (E.G. TESTING, ADJUSTING AND
BALANCING, COMMISSIONING, ETC.)
F. LIMITED INTERRUPTION OF BUILDING OPERATION OR SHUTDOWNS REQUIRED TO PERFORM
THIS WORK. DEFINE PURPOSE FOR INTERRUPTION / SHUTDOWN; DATE AND TIME OF
INTERRUPTION / SHUTDOWN; AND DURATION OF INTERRUPTION / SHUTDOWN IN HOURS.
SHUTDOWNS AND FACILITY INTERRUPTIONS
1. WORK IS ANTICIPATED TO INCLUDE PROJECT SHUTDOWNS FOR KITCHEN MECHANICAL
SYSTEMS, ALONG WITH ASSOCIATED ELECTRICAL, AND POTENTIAL FIRE ALARM AND FIRE
PROTECTION COMPONENTS AS NEEDED, BOTH FULL OR GLOBAL FOR BUILDING AND SOME
LIMITED. THESE SHUTDOWNS SHOULD BE LIMITED, BUT OVERALL CONSTRUCTION SEQUENCING
AND COORDINATION OF THESE SHUTDOWNS SHALL BE DETERMINED WITH THE TEXAS
WORKFORCE COMMISSION (TWC) AND BUILDING OCCUPYING AGENCIES AND AGENCIES
HOLIDAYS AND INCLUDING EQUIPMENT LEAD AND DELIVERY TIMES.
2. ALL SHUTDOWN WORK MUST BE COMPLETED PRIOR TO ANY OTHER PHASING OF WORK TO
AVOID NEGATIVELY IMPACTING PROJECT TIMELINES.
3. MAJOR SHUTDOWNS ARE ANTICIPATED TO BE COMPLETED OVER EXTENDED TIME FRAMES, AS
COORDINATED WITH TWC AND TENANT AGENCIES, TO OCCUR WHEN THE BUILDING WILL BE AT
MINIMUM OCCUPANCY. MINOR SHUTDOWNS COULD BE OVER A NORMAL WEEKEND BEGINNING
NO EARLIER THAN 6 PM ON FRIDAY AND FINISHING BY 6 PM ON SUNDAY TO ALLOW TIME FOR
CLEANUP AND RESTORING SYSTEM OPERATIONS OR ANTICIPATED TO BE COMPLETED OVER A
LONGER HOLIDAY (3 DAY) WEEKEND.
GENERAL SCOPE OF WORK:
WORK PHASING, DEMOLITION & NEW CONSTRUCTION:
1. THE PLANNED SEQUENCE OF WORK SHALL INCLUDE ALL OTHER ITEMS AS REQUIRED BY THE CONTRACT DOCUMENTS THAT MAY BE INCLUDED IN THE SYSTEM SHUTDOWNS DESCRIBED ABOVE OR INCLUDED IN THE PHASED WORK AS DETERMINED BY THE CONSTRUCTION SEQUENCING PLAN BY THE CONTRACTOR.
ALL WORK SHALL BE COORDINATED WITH APPROVED SEQUENCE INCLUDING PROCUREMENT OF
EQUIPMENT AND SUPPLIES. COORDINATION MUST OCCUR WITH ANY / ALL OTHER TRADES.
2. ENGINEER HAS PERFORMED LIMITED FIELD INVESTIGATIONS AND VERIFIED SELECTED AREAS OF
CONCERN FOR EQUIPMENT AND COMPONENT LOCATIONS. MECHANICAL CONTRACTOR SHALL FIELD
MEASURE AND CONFIRM ALL EXISTING FIELD CONDITIONS TO ENSURE AN EXACT MATCHUP OR
ASSOCIATED SYSTEM MODIFICATIONS CAN BE PERFORMED. EQUIPMENT INSTALLATION SHALL NOT OCCUR UNTIL ALL FIELD MEASUREMENTS ARE CONFIRMED AND APPROVED, AND AGAIN CONFIRMED ON SITE
AFTER DELIVERY.
3. ONCE ALL EQUIPMENT IS ON SITE, AND DEEMED ACCEPTABLE, INSTALL EQUIPMENT PER APPROVED PHASING SEQUENCE, TAKING CARE NOT TO DAMAGE ANY OTHER EQUIPMENT, PIPING, OR OTHER ACCESSORIES OR APPURTENANCES. ALL COMPONENTS AND SYSTEMS SHALL BE TESTED AND PROVED
FULLY OPERATIONAL BEFORE BEGINNING ADDITIONAL PHASES OR SHUTDOWNS.
4. THE BUILDING FIRE PROTECTION AND ALARM SYSTEMS NEED TO REMAIN FULLY FUNCTIONAL WITHIN AREAS OUTSIDE OF THE PHASED WORK ALWAYS IN COMPLIANCE TO LOCAL BUILDING AND FIRE CODES.
ANY / ALL WORK RELATED TO THESE BUILDING SYSTEMS SHALL BE COORDINATED WITH THE TWC'S
FACILITIES APPROVED FIRE ALARM / FIRE PROTECTION CONTRACTORS.
5. THE CONTRACTOR IS RESPONSIBLE FOR RETURNING THE BUILDING AREAS / SPACES BACK TO A SIMILAR
CONDITION TO THAT FOUND ORIGINALLY.
6. ALL ITEMS TO BE REMOVED SHALL BE PROPERLY DISPOSED OF AND AS DIRECTED IN FULL COORDINATION WITH OWNER REPRESENTATIVE. CONTRACTOR SHALL REMOVE AND CUT DEMOLISHED ITEMS TO EASILY MANAGEABLE SIZES TO IMPROVE HANDLING & DECREASE THE RISK OF DAMAGE TO THE BUILDING DURING
HAUL OUT.
7. BASED UPON SEQUENCING, CONTRACTORS SHALL PREPARE ALL SYSTEMS AND PERFORM ALL POSSIBLE NEW WORK PRIOR TO CONSTRUCTION OF PHASED WORK INCLUDING, BUT NOT LIMITED TO: PROCUREMENT OF EQUIPMENT AND SUPPLIES SUCH AS VALVES, PIPING, CONTROL SYSTEMS, AND APPURTENANCES;
CONDUIT AND WIRING, INSTALLATION OF PIPE TAPS, PLACEMENT & WIRING OF ELECTRICAL EQUIPMENT.
COORDINATE ALL MECHANICAL, ELECTRICAL AND CONTROLS WITH ALL OTHER TRADES, ETC.
8. THE GENERAL SCOPE OF WORK ENTAILS REMOVAL OF AN EXISTING REFRIGERATION UNIT AND REPLACEMENT WITH TWO NEW SMALLER REFRIGERATION UNITS. THIS WILL REQUIRE ASSOCIATED ROOF WORK AND PIPING, ELECTRICAL, CONTROLS AND ANY APPURTENANCES TO ENSURE THE SYSTEM IS FULLY
FUNCTIONAL AT THE END OF THE PROJECT.
9. CONTROLS WORK CONSISTS OF, BUT NOT LIMITED TO, THE PROVISION OF NEW CONTROLS, CONDUIT AND WIRING, CONTROL WIRING FOR NEW REFRIGERATION UNITS TO WORK AS LEAD / LAG UNITS. CONTROL
SYSTEM POINT-TO-POINT CHECK, COMMISSIONING, AND MISCELLANEOUS WORK.
10.ELECTRICAL CONTRACTOR TO FIELD VERIFY AND CONFIRM ALL EXISTING CONDITIONS (INCLUDE TRACING OF ELECTRICAL CIRCUITS AS NECESSARY) ON ALL EQUIPMENT TO ENSURE AN EXACT MATCHUP TO
REFEED EXISTING AND NEW EQUIPMENT FROM PANELBOARDS.
11. AS THE BUILDING NEEDS TO REMAIN FULLY FUNCTIONAL WITHIN AREAS OUTSIDE OF THE PHASED WORK AT THE TIME, ONLY THE EQUIPMENT AND ASSEMBLIES IN THE PHASED AREAS CAN BE REMOVED AND REPLACED DURING THE TIMING OF THAT WORK. ALL TRADES, MECHANICAL, ELECTRICAL AND CONTROLS, SHALL BE FULLY COORDINATED WITH ALL DEMOLITION AND NEW WORK.
12. THE BUILDING FIRE PROTECTION AND ALARM SYSTEMS NEED TO REMAIN FULLY FUNCTIONAL WITHIN AREAS OUTSIDE OF THE PHASED WORK ALWAYS IN COMPLIANCE TO LOCAL BUILDING AND FIRE CODES.
ONLY THE RELATED SYSTEM COMPONENTS - EQUIPMENT AND ASSEMBLIES - IN THE PHASED AREAS CAN
BE TEMPORARILY SHUTDOWN, REMOVED AND/OR REPLACED DURING THE TIMING OF THAT WORK.
13.CONTRACTOR SHALL PROTECT AREAS, SURFACES, AND INSTALLATIONS ADJACENT TO THE
CONSTRUCTION AREA FROM DAMAGE AND DEBRIS BY MEANS OF BARRIERS, DUST PARTITIONS OR OTHER MEANS AS COORDINATED WITH THE OWNER'S PROJECT MANAGER AND MAINTENANCE STAFF. ALL AREAS
SHALL BE CLEAN AND SERVICEABLE AT THE COMPLETION OF WORK. CONTRACTOR SHALL BE
RESPONSIBLE FOR DAMAGE TO EXISTING PROPERTY BY CONTRACTOR'S STAFF OR SUBCONTRACTORS.
DUST AND NOISE CONTROL:
1. DUST AND NOISE CONTROL SHALL BE MAINTAINED WITH DEMOLITION, VEHICLE OPERATION, DRILLING, CONCRETE SAW CUTTING, AND SITE WORK.
2. TEMPORARY BARRIERS, TEMPORARY BUILDING STRUCTURE PROTECTION SYSTEMS, AND DUST / DEBRIS MANAGEMENT SYSTEMS SHALL BE IN PLACE AND OPERATIONAL PRIOR TO BEGINNING ANY WORK.
REFERENCE DRAWINGS:
1. ANY / ALL ASSOCIATED REFERENCE (MECHANICAL XFM-SERIES; ELECTRICAL XFE-SERIES; FIRE PROTECTION XFP-SERIES AND FIRE ALARM XFA-SERIES) DRAWINGS THAT MAY BE PROVIDED WITHIN THESE DOCUMENTS ARE KNOWN AND AVAILABLE DRAWINGS AS PROVIDED TO STANLEY CONSULTANTS BY THE TEXAS WORKFORCE COMMISSION. THE SIZE, LABELING AND LOCATION OF EXISTING STRUCTURE;
MECHANICAL AND ELECTRICAL, FIRE PROTECTION AND ALARM SYSTEM COMPONENTS SUCH AS
EQUIPMENT, PANELS, GEAR, DUCTWORK, PIPING; PLUMBING FIXTURES; NOTIFICATION AND ALARM DEVICES; AND ARCHITECTURAL FEATURES SHALL BE CONSIDERED APPROXIMATE AND ARE PROVIDED FOR
CONTRACTOR GENERAL INFORMATION. STANLEY CONSULTANTS HAS PROVIDED THESE FOR
BACKGROUND AND REFERENCE PURPOSES ONLY; AND ALTHOUGH WE HAVE COMPLETED OUR OWN
LIMITED FIELD INVESTIGATIONS, WE HAVE NOT CONFIRMED NOR TAKE ANY RESPONSIBILITY FOR THEIR
COMPLETE ACCURACY.
2. ALL REFERENCE DRAWING ELEMENTS AND TEXT SHOWN AND PROVIDED HEREIN FOR ILLUSTRATION OF DEMOLITION OR NEW WORK ARE REFERENCED TO EXISTING AS-BUILT DRAWINGS AS DATED AND LABELED AS CONTRACTOR OR SUB-CONTRACTOR FOR THE RENOVATION OF THE TWC BUILDINGS WITHIN THIS
PROJECT.
3. AS THESE DRAWINGS WERE PROVIDED BY THE TWC, AND THE ORIGINAL ENGINEER MAY BE UNKNOWN, THE DRAWINGS ARE TO BE USED FOR REFERENCE WITH ANY INDICATED MODIFICATIONS AS KEYNOTED IN
STANLEY CONSULTANTS DRAWING SHEETS. PARTIAL BACKGROUNDS MAY BE USED FROM THE
REFERENCE DRAWINGS TO SCALE UP THE AREAS TO BE LEGIBLE.
4. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING TYPE, SIZE, AND LOCATIONS OF ALL ITEMS FOR THIS PROJECT. ALL CONTRACTOR ASSUMPTIONS AND JUDGMENTS IN PROVIDING HIS OPINIONS OF PROBABLE PROJECT COSTS FOR BIDDING OR CONSTRUCTION PURPOSES ARE MADE SOLELY AT HIS DISCRETION.
THEREFORE, STANLEY CONSULTANTS DOES NOT TAKE RESPONSIBILITY THAT PROPOSALS, BIDS, OR
ACTUAL CONSTRUCTION COSTS WILL NOT VARY BASED ON THE INFORMATION PRESENTED.
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
TEXAS workforce
COMMISSION
101 East 15th street Austin, Texas 78701
800.628.5115
SHEET NUMBER
SHEET NAME
TEAM
ISSUED FOR CONSTRUCTION
PROJECT NUMBER:
AE
D
ES
IG
N
SE
R
VI
C
ES
FO
R
KI
TC
H
EN
C O
O
LE
R R
EM
ED
IA
TI
O N
-C C
R C
IS
SU
ED
FO
R C
O N
ST
R
U C
TI
O
N
Revision Schedule Number Description Date
AE DESIGN SERVICES FOR KITCHEN
COOLER REMEDIATION - CCRC
101 EAST 15TH STREET - ROOM 116
AUSTIN, TEXAS
JU
N E
DESIGNED:
DRAWN:
CHECKED:
320 260 0220
06/26/2026
06/26/2026
6836 Austin Center Blvd, Suite 350, Austin, Texas 78731 www.stanleyconsultants.com
Texas Firm Registration No.: F-174
STANLEY CONSULTANT'S PROJECT NUMBER: 32337.01
PON
MLKJHGC
BA
D E F
CORRIDOR 198
OFFICE 205
OFFICE 201
CORRIDOR 200
RECEPTION 199
OBSERV. 189
OBSERV. 191
PSYCH. TESTING 187
OFFICE 214OFFICE 211
CONFERENCE 206
OFFICE 207
OFFICE 210
WORK ROOM 208
CORRIDOR 217
OFFICE 213 OFFICE 216
OFFICE 196 OFFICE 195
HALL 193
WAITING 192
OFFICE 191
OFFICE 184 OFFICE 183
C O
R R
ID
O
R
OFFICE 169
HOME MAINTENANCE 163
OPEN COURT
OFFICE 145
W K.
R M
.1
LI
ST
.1
LIST. 140
LIBRARY 120
EXAM 123
R A
G E
D O
R
OPT. AIDS 125
INFIRMARY 130
INFIRMARY 134
NURSE 139
CHAPEL 137
OFFICE 135
WAITING 136SNACK BAR 149
CAFETERIA 152
KITCHEN 153
DISHWASH 160
OFFICE 159
STORAGE 158
JANITOR 157
DR. 155
SHOP 165
CRAFTS 172
GEN. OFFICE 224
STORAGE 175
JAN. 174
OFFICE 176
OFFICE 173
VEST. 225
OFFICE 180
TELE. 178
OFFICE 182OFFICE 181
S
TO
R A
G E
STORAGE 223
FILE ROOM 221
W O
M
EN
C O
R R
ID
O
R
C O
R R
ID
O
R
B
AT
H
B
AT
H
JA
N
.1
33DISP. 126
STORAGE 138
LI
ST
.1
LI
ST
.1
STORAGE 186STORAGE 185
OFFICE 215
STOR.
TOIL.
VEST.
OFFICE 212
LOBBY 101
VOC. EVALUATION 164
MECH. 162
GEN. STORAGE 161
STAIR
M
EC
H .C
H
AS
E
OFFICE 166
OFFICE 167
MECH. 146
W O
M
EN
M
EN
GROUP THERAPY 188
RAMPRAMP
-10°F
FREEZER
35°F
COOLER
GENERAL
BUILDING GROUND
FLOOR PLAN
G0-002
R. SCHRECENGOST
D. McCURDY
R. SCHRECENGOST
0 ISSUED FOR CONSTRUCTION
SCALE:
PLAN BUILDING GROUND FLOOR PLAN
3/32" = 1'-0"
G0-02 G0-02
NOTES:
1. REFER TO SHEET G0-001 FOR GENERAL PROJECT NOTES THAT
SHALL APPLY TO ALL SHEETS IN THIS SET UNLESS NOTED
OTHERWISE (U.N.O.) IN KEYED NOTES.
KEYNOTES:
1. SOUTH SIDE FRONT ENTRANCE, LOBBY AND SECURITY POINT.
2. NORTH WEST SIDE ENTRANCE AREA FOR RESIDENTIAL MEMBERS
AND STAFF
3. WEST PARKING AREA WHERE EQUIPMENT CAN BE UNLOADED AND
TEMPORARILY STAGED PRIOR TO BUILDING ENTRY. SPECIFIC AREA
TO BE COORDINATED WITH TWC AND TENANT SCHEDULES
4. IMMEDIATE AREA OF WORK. ROOF TOP EQUIPMENT ABOVE WILL
REQUIRE LIFTS OR OTHER EQUIPMENT TO BE COORDINATED WITH
TWC AND TENANT SCHEDULES.
5. COORDINATE AND PROVIDE AN APPROPRIATE NEMA RECEPTACLE,
WATER TIGHT, TO SERVE TEMPORARY WALK-IN COOLER AS
NECESSARY. REFER TO REMAINING DRAWINGS AS NEEDED.
M1-100 M2-100 E1-100 E2-100
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
TEXAS workforce
COMMISSION
101 East 15th street Austin, Texas 78701
800.628.5115
SHEET NUMBER
SHEET NAME
TEAM
ISSUED FOR CONSTRUCTION
PROJECT NUMBER:
AE
D
ES
IG
N
SE
R
VI
C
ES
FO
R
KI
TC
H
EN
C O
O
LE
R R
EM
ED
IA
TI
O N
-C C
R C
IS
SU
ED
FO
R C
O N
ST
R
U C
TI
O
N
Revision Schedule Number Description Date
AE DESIGN SERVICES FOR KITCHEN
COOLER REMEDIATION - CCRC
101 EAST 15TH STREET - ROOM 116
AUSTIN, TEXAS
JU
N E
DESIGNED:
DRAWN:
CHECKED:
320 260 0220
06/26/2026
06/26/2026
6836 Austin Center Blvd, Suite 350, Austin, Texas 78731 www.stanleyconsultants.com
Texas Firm Registration No.: F-174
STANLEY CONSULTANT'S PROJECT NUMBER: 32337.01
KEY PLAN NORTH
PANEL "LPP"
MECHANICAL
LEGEND SHEET &
GENERAL NOTES
M0-000
R. SCHRECENGOST
D. McCURDY
R. SCHRECENGOST
0 ISSUED FOR CONSTRUCTION
PLUMBING/PIPING FITTINGS
GATE
NORMALLY
OPEN
NORMALLY
CLOSED
SOLENOID AUTOMATED
VALVE
CONTROL VALVE ASSEMBLY
FOUR-WAY (WITH
TYP FAIL POSITION)
THREE-WAY (WITH
TYP FAIL POSITION)
PRESSURE REDUCING
WITH EXTERNAL TAP
PRESSURE REDUCING,
SELF-CONTAINED
BACK PRESSURE
REGULATOR
(SELF-CONTAINED)
POPPET OR TELESCOPING
BACK PRESSURE
REGULATOR
EXTERNAL TAP
PITCH DOWN IN DIRECTION
OF FLOW
TIE POINT INTO AN EXISTING SYSTEM
YYY = P&ID DRAWING NUMBER
XX = TIE POINT NUMBER
VALVE DESIGNATIONS
GENERAL
BALL CHECK
AUTOMATIC RECIRCULATION
ANGLE SAFETY RELIEF
BACKFLOW PREVENTER
GAGE COCK
VACUUM RELIEF
BALANCING
FLAP GATE
PINCH
FLOAT
WAFER CHECK
FLOW STRAIGHTENING VANE
VALVES
SWING CHECK
HOSE BIB
W/ HYDRANT
RESTRAINED FLANGED
COUPLING ADAPTER
RESTRAINED SLEEVE TYPE
MECHANICAL COUPLING
FLANGED COUPLING
ADAPTER
GROOVED END
MECHANICAL COUPLING
SLEEVE TYPE
MECHANICAL COUPLING
PIPE AND FITTINGS
PLUMBING LINE TYPES
TRAP (LAV, DRAIN, ETC.)
SHOCK ABSORBER OR
WATER HAMMER ARRESTOR
ALL FITTINGS AND VALVES MAYBE SHOWN AS INDICATED UNLESS
STATED (PLAN) ONLY.
SCHEMATIC/FITTINGS AND VALVES
V
ED
FD
HB
TAG
M
UTILITY STATION
(LETTER, IF ANY, DESIGNATES TYPE)
HVAC
X
X
X
RS
CFM
TAG#
FD - FIRE DAMPER
SD - SMOKE DAMPER
FSD - FIRE SMOKE DAMPER
DIFFERENTIAL PRESSURE
SENSOR/SWITCH
DIFFERENTIAL PRESSURE
TRANSMITTER
TIE POINT TO EQUIPMENT OR
ANOTHER CONTRACT
X = EQUIPMENT OR CONTRACT
DESIGNATOR
YY = P&ID NUMBER
ZZZ= TIE POINT NUMBER
TIE POINT DESIGNATORS
GENERAL NOTES
DEMOLITION
NEW WORK
EXISTING
FUTURE
STREAM IDENTIFICATION
FLOW ARROW
FLANGED JOINT
MECHANICAL JOINT
PUSH-ON JOINT
WELDED JOINT
EXPANSION JOINT
VENT THRU ROOF
VTR
SPLITTER DAMPER
ROUND DUCT TURNING UP
ROUND DUCT TURNING DOWN
DUCT W/VOLUME DAMPER
BRANCH DUCT IN SIDE OF
RETURN, SUPPLY, OR EXHAUST
TAP FROM BOTTOM OF DUCT
RETURN OR EXHAUST DUCT
DUCT TURNING UP
RECTANGULAR SUPPLY
DUCT TURNING DOWN
RECTANGULAR SUPPLY
DUCT TURNING UP
RECTANGULAR RETURN
DUCT TURNING DOWN
RECTANGULAR RETURN
SIDE OR BOTTOM
ACCESS DOOR IN DUCT
COIL IN DUCT
REHEAT OR PREHEAT
BACKDRAFT DAMPER-SECTION VIEW
BACKDRAFT DAMPER-PLAN VIEW
OR OPPOSED BLADE-PLAN VIEW
MOTORIZED DAMPER-PARALLEL
DUCT WITH RESPECT TO AIR FLOW
INCLINED RISE IN ELEVATION OF
DUCT WITH RESPECT TO AIR FLOW
INCLINED DROP IN ELEVATION OF
FLEXIBLE DUCT CONNECTION
VOLUME DAMPER (MANUAL)
FLEXIBLE DUCT
TEE WITH TURNING VANES
TURNING VANES
SQUARE ELBOW WITH
TURNING VANES IN ELBOW
DOUBLE THICKNESS, AIRFOIL
FLOW IN DUCT
DIRECTION OF
ROUND DUCT
SECOND FIGURE = SIDE NOT SHOWN
FIRST FIGURE = SIDE SHOWN
DUCT-(INSIDE CLEAR DIMENSIONS)
REFRIGERANT SENSOR
DIGITAL
INDICATOR
H = HUMIDISTAT
P = PRESSURE
T = THERMOSTAT
UNIT HEATER
OTHER THAN 1 HOUR)
(NUMBER INDICATES FIRE RATING
FIRE & SMOKE DAMPER
SMOKE DAMPER
OTHER THAN 1 HOUR)
(NUMBER INDICATES FIRE RATING
FIRE DAMPER
CFM VALUE
EQUIPMENT TAG NUMBER
AIRFLOW SAFETY SWITCH
HIGH LIMIT HUMIDISTAT
SMOKE DAMPER
RETURN/EXHAUST AIR
SUPPLY/VENTILATING AIR
FAN
EXHAUST FAN
SLOT DIFFUSER
W/CFM AND FIXTURE TYPE SHOWN
RETURN OR EXHAUST GRILLE
W/CFM AND FIXTURE TYPE SHOWN
SUPPLY OR VENTILATING DIFFUSER
VOLUME EXTRACTOR
SQUARE TO ROUND TRANSITION
IDENTIFYING # THROWS
CEILING DIFFUSER
18/18
CD-1
350 CFM
RG-1, EG-1
350 CFM
HL
AS
= LINE FILTERLF
MT = MOISTURE TRAP
QUICK DISCONNECT
FLEX CONNECTOR W/SPARE
FLEX CONNECTION
DOUBLE END
EXPANSION JOINT
SINGLE END
EXPANSION JOINT
EXPANSION JOINT
WALL CLEANOUT
FLOOR CLEANOUT
FLOOR DRAIN
EQUIP DRAIN
ROOF DRAIN
ECCENTRIC REDUCER
CONCENTRIC REDUCER
PIPE PLUG
THREADED CAP
WELDED CAP
BLIND FLANGE
SEAL WATER CONTROL UNIT
INLINE PUMP
CENTRIFUGAL PUMP
FIRE HOSE VALVE
CONSERVATION VENT
(AUTOMATIC VENT) AV
(MANUAL VENT) MV
STEAM VENT
AIR VENT
VENT THRU ROOF (PLAN)
SPRAY NOZZLE
DRAIN
TEMPORARY STRAINER IN-LINE
START-UP STRAINER
DUPLEX STRAINER
SIMPLEX STRAINER
BUCKET STRAINER
W/ N.C. BALL VALVE
CAPPED Y-STRAINER
Y-STRAINER W/ DRAIN
Y-STRAINER METER
90° BEND PIPE TURN DOWN
90° BEND PIPE TURN UP
45° BEND
UNION
PIPE GUIDE
PIPE ANCHOR
= STEAM TRAPST
18/14
12 Ø
W
ST
A
DOMESTIC HOT WATER RECIRCULATING
DOMESTIC HOT WATER
DOMESTIC COLD WATER
SANITARY VENT
SANITARY SEWER
INLINE EXHAUST FAN
QUICK OPEN
PARALLEL SLIDE GATE
BALL
PLUG
STOP CHECK
V-BALL
BUTTERFLY
NEEDLE
DIAPHRAGM
ANGLE GLOBE
ANGLE GATE
KNIFE GATE
SLIDE GATE
SLUCE GATE
GLOBE
1. READ THE SPECIFICATIONS AND ALL DRAWING NOTES PRIOR TO
STARTING ANY WORK.
2. REFER TO SHEET G0-01 FOR GENERAL PROJECT NOTES AND SHEETS
E0-000 AND BA-000 FOR ALL GENERAL ELECTRICAL, AND CONTROLS
NOTES, RESPECTIVELY, THAT SHALL APPLY TO ALL SHEETS IN THIS SET
UNLESS NOTED OTHERWISE (U.N.O.) IN KEYED NOTES.
3. ALL MECHANICAL SYMBOLS AND ABBREVIATIONS SHOWN ON THIS
LEGEND SHEET MAY NOT APPEAR IN THIS SET OF DRAWINGS.
4. ALL DRAWING ELEMENTS AND TEXT SHOWN IN GRAYSCALE ARE KNOWN
/ AVAILABLE EXISTING ELEMENTS, EITHER PROVIDED BY OWNER
RECORD DRAWINGS OR OBTAINED THROUGH FIELD OBSERVATIONS
WHERE POSSIBLE AND ARE USED FOR BACKGROUND AND REFERENCE
PURPOSES. FOR CLARITY, NOT ALL EQUIPMENT, DUCTWORK, PIPING,
PANELS, CONDUIT, ETC. MAY BE SHOWN IN EACH VIEW.
5. DEPICTION OF EXISTING MECHANICAL SYSTEM IS BASED ON RECORD
DRAWINGS PROVIDED BY THE OWNER AND LIMITED FIELD
INVESTIGATIONS. FIELD VERIFICATION OF ANY EXISTING CONDITIONS IS
REQUIRED PRIOR TO ANY WORK OR DEVELOPMENT OF ANY SHOP
DRAWINGS BY THE CONTRACTOR. REPORT ANY DISCREPANCIES TO
THE OWNER/ENGINEER.
6. NEW EQUIPMENT, PIPING AND DUCT LAYOUT ILLUSTRATES DESIGN
INTENT. EXACT LOCATION OF SUCH SHALL BE COORDINATED WITH
BUILDING STRUCTURE AND ALL OTHER WORK. ALL EQUIPMENT
PLACEMENT AND CONNECTIONS ARE APPROXIMATE AND SHALL BE
FIELD VERIFIED BY THE CONTRACTOR.
7. COORDINATE / LOCATE AND INSTALL ALL MANUFACTURED ITEMS,
MATERIALS, AND EQUIPMENT WHERE SHOWN, AND IN STRICT
ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS,
EXCEPT WHERE THE DRAWINGS OR SPECIFICATIONS, IF MORE
STRINGENT, SHALL GOVERN. IF EQUIPMENT IS NEW, CONTRACTOR
SHALL ENSURE THE EXECUTION OF ALL WARRANTIES AND START-UP AS
PRESCRIBED BY OWNER.
8. DUCT, PIPING, AND CONDUIT SHALL BE RUN LEVEL U.N.O. OR REQUIRED
OTHERWISE. DUCT, PIPING, AND CONDUIT TO BE OFFSET INTO ROOF
TEE OR JOIST SPACE, OR HAVE ALTERNATE ROUTING WHERE
NECESSARY AND AS REQUIRED, FOR PROPER FIT AND FUNCTION AND
FOR CLEARANCE WHERE SPACE IS NOT SUFFICIENT FOR DUCTS AND
PIPING TO CROSS OTHER CONFLICTS, U.N.O.
9. ALL CONTROL RELATED ITEMS (I.E. VALVES, DAMPERS, ETC.) THAT
REQUIRE AN ELECTRONIC ACTUATION PACKAGE WITH ASSOCIATED
120V POWER BY ELECTRICAL CONTRACTOR, AND SIGNAL AND
COMMUNICATION WIRING BY CONTROLS CONTRACTOR, SHALL BE
FULLY COORDINATED WITH THOSE TRADES.
10. ELECTRICAL CONTRACTOR SHALL PROVIDE, ROUTE AND INSTALL
CONDUIT AND WIRING FROM CONTROL OR ELECTRICAL PANELS FOR
ALL 120V POWER TO MECHANICAL ASSEMBLIES, WITH COORDINATION
OF CIRCUIT SELECTION WITH OWNER PERSONNEL, AND IN
COORDINATION WITH CONTROLS SYSTEM CONTRACTOR. AT A MINIMUM,
ELECTRICAL CONTRACTOR SHALL PROVIDE FISHTAPE IN CONDUIT FOR
WIRING INSTALLATION AT A LATER DATE AS NECESSARY.
11. IF THE CONTRACTOR SUBMITS MECHANICAL EQUIPMENT THAT HAS
DIFFERENT ELECTRICAL REQUIREMENTS, IT IS THE CONTRACTOR'S
RESPONSIBILITY TO RESOLVE ALL ELECTRICAL CHANGES (E.G. CONDUIT
AND CONDUCTOR SIZE, ETC.) AND CLEARLY SHOW THE NEW
REQUIREMENTS ON THE MECHANICAL / ELECTRICAL SUBMITTALS WITH
A WRITTEN STATEMENT THAT ANY CHANGES WILL BE AT NO
ADDITIONAL COST. THE INTENDED ELECTRICAL DESIGN SHOWN WITHIN
THE DRAWINGS SUPPORTS THE INTENDED MECHANICAL EQUIPMENT
BASIS OF DESIGN. MECHANICAL SUBMITTALS WITHOUT REFERENCE TO
THE ELECTRICAL DESIGN WILL BE PRESUMED TO BE COMPLIANT WITH
THE CONTRACT DOCUMENTS AND ANY CORRECTIONS REQUIRED WILL
BE AT NO ADDITIONAL COSTS.
12. NOTE: ASBESTOS IS NOT ANTICIPATED IN THE MAJORITY OF WORK
AREAS. IF CONTRACTOR SUSPECTS ASBESTOS OR ACMS EXIST AND
ABATEMENT IS REQUIRED IN AREAS OF WORK, CONTACT THE TWC
PROJECT REPRESENTATIVE AS THIS SCOPE OF WORK WOULD REQUIRE
COORDINATION WITH, AND BE PERFORMED BY TWC'S ABATEMENT
CONSULTANT PRIOR TO START OF WORK BY ABATEMENT CONTRACTOR.
13. NOTE: ALL ROOF WORK AND/OR ROOF PENETRATIONS AND
PROTECTION EFFORTS, AS WELL AS ANY FIRE ALARM / FIRE
PROTECTION WORK OR MODIFICATIONS, AND ALL TELECOM / IT
CABLING INSTALLATION OR REMOVAL SHALL BE PERFORMED BY TWC'S
FACILITIES REQUIRED ROOFING, FA / FP, AND TELECOM / IT PREFERRED
CONTRACTORS, TO MAINTAIN SYSTEMS' INTEGRITY AND WARRANTIES.
OBTAIN LIST OF PREFERRED CONTRACTORS FROM TWC PROJECT
REPRESENTATIVE.
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
TEXAS workforce
COMMISSION
101 East 15th street Austin, Texas 78701
800.628.5115
SHEET NUMBER
SHEET NAME
TEAM
ISSUED FOR CONSTRUCTION
PROJECT NUMBER:
AE
D
ES
IG
N
SE
R
VI
C
ES
FO
R
KI
TC
H
EN
C O
O
LE
R R
EM
ED
IA
TI
O N
-C C
R C
IS
SU
ED
FO
R C
O N
ST
R
U C
TI
O
N
Revision Schedule Number Description Date
AE DESIGN SERVICES FOR KITCHEN
COOLER REMEDIATION - CCRC
101 EAST 15TH STREET - ROOM 116
AUSTIN, TEXAS
JU
N E
DESIGNED:
DRAWN:
CHECKED:
320 260 0220
06/26/2026
06/26/2026
6836 Austin Center Blvd, Suite 350, Austin, Texas 78731 www.stanleyconsultants.com
Texas Firm Registration No.: F-174
M
KITCHEN 153
DISHWASH 160
OFFICE 159
STORAGE 158
JANITOR 157
DR. 155
MECH. 162
GEN. STORAGE 161
H
AS
E
RAMPRAMP
-10°F
FREEZER
35°F
COOLER
MECHANICAL
DEMOLITION
PLANS
M1-100
R. SCHRECENGOST
D. McCURDY
R. SCHRECENGOST
0 ISSUED FOR CONSTRUCTION
SCALE:
PLAN KITCHEN - ENLARGED ROOF PLAN - DEMOLITION
1/8" = 1'-0"
M1-100 B-M1-100
SCALE:
PLAN KITCHEN - ENLARGED PLAN - DEMOLITION
1/8" = 1'-0"
M1-100 A-M1-100
NOTES:
1. REFER TO SHEET G0-001 FOR GENERAL PROJECT NOTES AND SHEETS M0-000, E0-000, AND
BA-000 FOR ALL GENERAL MECHANICAL, ELECTRICAL, AND CONTROLS NOTES, RESPECTIVELY,
THAT SHALL APPLY TO ALL SHEETS IN THIS SET UNLESS NOTED OTHERWISE (U.N.O.) IN KEYED
NOTES.
2. COORDINATE ALL WORK ACTIVITY, PARTICULARLY UTILITY AND HVAC SYSTEM SHUTDOWNS,
THROUGH AN APPROVED CONSTRUCTION SEQUENCE AND WITH TWC PROJECT MANAGER.
3. NOT ALL EQUIPMENT, DUCTWORK, PIPING, PANELS, CONDUIT, ETC. MAY BE SHOWN.
CONTRACTORS MUST FIELD VERIFY EQUIPMENT, DIMENSIONS, AND TRACE CONDUIT / WIRING
FOR CIRCUITS FOR FULL COORDINATION OF WORK.
4. CONTRACTOR TO VERIFY WITH OWNER THE EXTENT OF DEMOLITION. WORK SCOPE INVOLVES
REMOVAL OF EXISTING REFRIGERATION EQUIPMENT, PIPING AND ALL APPURTENANCES, AS
WELL AS EXISTING TERMINAL EQUIPMENT THERMOSTATS AND CONTROLLERS AND OTHER
DEVICES, CONTROLS WIRING, ETC., AND PROVIDE NEW, UNLESS NOTED OTHERWISE.
5. THIS IS NO ANTICIPATED WORK RELATED TO ACM ABATEMENT OR MODIFICATIONS TO ANY FIRE
ALARM / FIRE PROTECTION, TELECOM / IT CABLING REMOVAL OR INSTALLATION
REQUIREMENTS.
6. ALL ITEMS WITHIN THE COOLER / FREEZERS NOT INCLUDED IN THE SOW SHALL BE REMOVED
AND OR PROTECTED FROM DAMAGE (SUCH AS SHELVING, ETC.). NOTHING IS TO BE
ABANDONED. REPORT ANY DISCREPANCIES OR CONCERNS TO THE OWNER/ENGINEER.
KEYNOTES:
1. EXISTING WALK-IN COOLERS / FREEZERS IN LOCATION SHOWN, ALONG WITH THE EVAPORATOR
UNITS, PIPING, T-STATS, AND ALL APPURTANCES ARE TO REMAIN, UNLESS NOTED OTHERWISE.
2. EXISTING CONDENSER UNITS (CU-4, CU-5) ROOF RAILS & CURBS, REFRIGERANT PIPING & SUPPORTS
DOWN THROUGH ROOF PENETRATIONS TO COOLER / FREEZER EVAPORATOR UNITS TO REMAIN.
INVESTIGATE CONDITION OF INSULATION ON REFRIGERANT PIPING AND ENSURE ROOF
PENETRATIONS ARE WATER TIGHT. REPORT ANY DISCREPANCIES OR CONCERNS TO THE
OWNER/ENGINEER
3. DEMOLITION SCOPE INVOLVES REMOVAL OF EXISTING REFRIGERATION EQUIPMENT (EU-3 & CU-3), PIPING AND ALL APPURTENANCES IN THIS LOCATION, AS WELL AS EXISTING TERMINAL EQUIPMENT
THERMOSTAT, CONTROLLER AND ASSOCIATED APPURTENANCES (OTHER DEVICES, CONTROLS
WIRING, ETC.) WITHIN COOLER BELOW.
4. EXISTING ROOF RAILS & CURBS FOR EXISTING CU-3 TO REMAIN FOR USE WITH NEW CONDENSER UNIT (ALSO TO BE CU-3). ENSURE PENETRATION THROUGH ROOF REMAINS VIABLE FOR REUSE.
5. CONTRACTOR TO COORDINATE POSSIBLE LOCATION FOR NEW ROOF RAILS & CURBS FOR NEW
CONDENSING UNIT (CU-6). THIS UNIT WILL NEED PIPING PENETRATION THROUGH ROOF OR
CONSOLIDATED WITH NEARBY EXISTING PENETRATIONS FOR CU-3 TO BE REPLACED.
6. CONTRACTOR TO WORK WITH OWNER TO DETERMINE IF A TEMPORARY WALK-IN COOLER / FREEZER SHOULD BE PROVIDED. COOLER / FREEZER SHALL HAVE SHELVING PROVIDED AND CAN BE PLACED IN THIS GENERAL LOCATION IN EXISTING PARKING SPACES AS SHOWN. IF NEEDED, IT SHALL BE
FUNCTIONAL PRIOR TO ANY DEMOLITION WORK. TEMPORARY UNIT TO BE REMOVED AT PROJECT
COMPLETION, AND AREA CLEANED AND RETURNED TO EXISTING CONDITIONS.
LEGEND:
DEMOLITION
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
TEXAS workforce
COMMISSION
101 East 15th street Austin, Texas 78701
800.628.5115
SHEET NUMBER
SHEET NAME
TEAM
ISSUED FOR CONSTRUCTION
PROJECT NUMBER:
AE
D
ES
IG
N
SE
R
VI
C
ES
FO
R
KI
TC
H
EN
C O
O
LE
R R
EM
ED
IA
TI
O N
-C C
R C
IS
SU
ED
FO
R C
O N
ST
R
U C
TI
O
N
Revision Schedule Number Description Date
AE DESIGN SERVICES FOR KITCHEN
COOLER REMEDIATION - CCRC
101 EAST 15TH STREET - ROOM 116
AUSTIN, TEXAS
JU
N E
DESIGNED:
DRAWN:
CHECKED:
320 260 0220
06/26/2026
06/26/2026
6836 Austin Center Blvd, Suite 350, Austin, Texas 78731 www.stanleyconsultants.com
Texas Firm Registration No.: F-174
STANLEY CONSULTANT'S PROJECT NUMBER: 32337.01
KEY PLAN NORTH
CU-4
CU-5
CU-1 CU-2
EXISTING ROOF PENETRATION
EXISTING ROOF PENETRATION
TO BE ENLARGED IF POSSIBLE
AND/OR REUSED FOR ON OF
TWO NEW CU PIPING SYSTEMS
EU-5EU-4EU-3
TT
EU-1 EU-2
T T
CU-3
NORTH
NORTH
EXISTING ROOF
PENETRATION
APPROX. LOCATION OF
EXISTING FLOOR DRAIN.
KITCHEN 153
DISHWASH 160
OFFICE 159
STORAGE 158
JANITOR 157
DR. 155
MECH. 162
GEN. STORAGE 161
H
AS
E
RAMPRAMP
-10°F
FREEZER
35°F
COOLER
MECHANICAL
ROOF & 1ST
FLOOR PLANS
M2-100
R. SCHRECENGOST
D. McCURDY
R. SCHRECENGOST
0 ISSUED FOR CONSTRUCTION
SCALE:
PLAN KITCHEN - ENLARGED ROOF PLAN
1/8" = 1'-0"
M2-100 B-M2-100
SCALE:
PLAN KITCHEN - ENLARGED PLAN
1/8" = 1'-0"
M2-100 A-M2-100
NOTES:
1. refer to sheet g0-001 for general project notes and sheets m0-000, e0-000, and ba-000 for all general mechanical, electrical, and controls notes, respectively, that shall apply to all sheets in this set unless noted otherwise (u.n.o.) in keyed notes.
2. COORDINATE ALL WORK ACTIVITY, PARTICULARLY UTILITY AND HVAC SYSTEM SHUTDOWNS,
THROUGH AN APPROVED CONSTRUCTION SEQUENCE AND WITH TWC PROJECT MANAGER.
3. NOT ALL EQUIPMENT, DUCTWORK, PIPING, PANELS, CONDUIT, ETC. MAY BE SHOWN.
CONTRACTORS MUST FIELD VERIFY EQUIPMENT, DIMENSIONS, AND TRACE CONDUIT / WIRING
FOR CIRCUITS FOR FULL COORDINATION OF WORK.
4. DESIGN INTENT TO REPLACE EU-3 & CU-3 WITH TWO SMALLER EUS & CUS (NEW EU-3, CU-3 &
EU-6 & CU-6) TO ALLOW FOR THE COOLER LOAD TO BE CONTROLLED BETTER WITH OVERALL
LOADS THROUGHOUT THE YEAR AND USING THE ECONET CONTROL SYSTEM IN A LEAD / LODE
OPERATION.
5. CONTRACTOR SHALL COORDINATE ALL ROOF WORK WITH TWC'S APPROVED ROOFING
CONTRACTOR TO ENSURE ROOF WARRANTIES ARE MAINTAINED.
6. ALTHOUGH NOT ANTICIPATED, IF FIRE ALARM / FIRE PROTECTION OR TELECOM / IT CABLING
INSTALLATION OR REMOVAL WORK IS REQUIRED, CONTRACTOR SHALL COORDINATE ALL WORK
WITH TWC'S APPROVED CONTRACTORS TO ENSURE INTEGRITY OF THE SYSTEMS ARE
MAINTAINED.
KEYNOTES:
1. EXISTING WALK-IN COOLERS / FREEZERS IN LOCATION SHOWN.
2. EXISTING CONDENSER UNITS (CU-4, CU-5) ROOF RAILS & CURBS, REFRIGERANT PIPING & SUPPORTS
DOWN THROUGH ROOF PENETRATIONS TO COOLER / FREEZER EVAPORATOR UNITS TO REMAIN.
RE-INSULATE REFRIGERANT PIPING AND ENSURE ROOF PENETRATIONS ARE WATER TIGHT, AS
NEEDED. REPORT ANY ISSUES / PROBLEMS OR CONCERNS TO THE OWNER/ENGINEER
3. CONTRACTOR TO PROVIDE NEW REFRIGERATION SYSTEM (EU-3, CU-3) AND FIELD ROUTE NEW REFRIGERANT PIPING FROM CONDENSER UNIT ATTACHED TO EXISTING ROOF RAIL & CURB. PROVIDE
NEW REFRIGERANT PIPING PARALLEL WITH STRUCTURE DOWN THROUGH EXISTING ROOF
PENETRATION TO NEW EVAPORATOR UNIT (EU-3) IN COOLER WHERE SHOWN. INSULATE
REFRIGERANT PIPING PER SPECIFICATIONS AND ENSURE ROOF PENETRATION IS WATER TIGHT. SEE SCHEDULE FOR UNIT AND PROVIDE WITH ECONET 2.0 CONTROLS AND ALL REQUIRED DEVICES FOR
LEAD / LAG CONTROL WITH OTHER NEW UNIT (EU-6 & CU-6).
4. CONTRACTOR TO PROVIDE NEW REFRIGERATION SYSTEM (EU-6, CU-6) AND NEW ROOF RAIL & CURB ATTACHING CU-6 TO COMPONENTS AS REQUIRED. PROVIDE AND FIELD ROUTE NEW REFRIGERANT
PIPING, PARALLEL WITH STRUCTURE, FROM CONDENSER UNIT DOWN THROUGH EXISTING (IF
POSSIBLE) OR NEW ROOF PENETRATION (AS NEEDED) TO NEW EVAPORATOR UNIT (EU-6) IN COOLER
WHERE SHOWN. INSULATE REFRIGERANT PIPING PER SPECIFICATIONS AND ENSURE ROOF
PENETRATION IS WATER TIGHT. SEE SCHEDULE FOR UNIT AND PROVIDE WITH ECONET 2.0 CONTROLS AND ALL REQUIRED DEVICES FOR LEAD / LAG CONTROL WITH OTHER NEW UNIT (EU-3 & CU-3).
5. SIZE REFRIGERANT PIPING FOR NEW SYSTEMS PER MANUFACTURERS REQUIREMENTS. ROUTE
PIPING PARALLEL WITH STRUCTURE IN AN ORDERLY FASHION. INSULATE REFRIGERANT PIPING PER
PIPING SCHEDULE. ENSURE ROOF PENETRATION IS WATER TIGHT.
6. ROUTE SEPARATE 3/4" CONDENSATE DRAIN LINES FROM EACH COOLER EVAPORATOR TO EXISTING FLOOR DRAIN. SLOPE PIPE WITH A MINIMUM OF 1/4" PER FOOT AND TERMINATE AT FLOOR DRAIN WITH 1" AIR GAP. INSULATE PIPING PER PIPING SCHEDULE. WRAP DRAIN LINE HEATER CABLE
AROUND FREEZER CONDENSATE DRAIN LINE PER MANUFACTURES INSTRUCTIONS.
7. PROVIDE ON WALK-IN COOLER WALL NEW EVAPORATORS AND LEAD-LAG HTPG ECONET 2.0
CONTROLS, THERMOSTATS AND ALL OTHER DEVICES AS REQUIRED, AND CONNECT TO THE NIAGARA JACE BUILDING MANAGEMENT SYSTEM (BMS) FOR MONITORING. THE SYSTEM SHALL LOG AND SEND ALARMS WHEN THE TEMPERATURE OF THE WALK-IN FREEZER & COOLER IS ABOVE AN ADJUSTABLE
ALARM SET POINT. ALL CONTROLS WORK TO BE COMPLETED BY OWNER-APPROVED CONTROLS
CONTRACTOR.
8. CONTRACTOR TO WORK WITH OWNER TO DETERMINE IF A TEMPORARY WALK-IN COOLER / FREEZER SHOULD BE PROVIDED. COOLER / FREEZER SHALL HAVE SHELVING PROVIDED AND CAN BE PLACED IN THIS GENERAL LOCATION IN EXISTING PARKING SPACES AS SHOWN. IF NEEDED, IT SHALL BE
FUNCTIONAL PRIOR TO ANY DEMOLITION WORK. TEMPORARY UNIT TO BE REMOVED AT PROJECT
COMPLETION, AND AREA CLEANED AND RETURNED TO EXISTING CONDITIONS.
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
TEXAS workforce
COMMISSION
101 East 15th street Austin, Texas 78701
800.628.5115
SHEET NUMBER
SHEET NAME
TEAM
ISSUED FOR CONSTRUCTION
PROJECT NUMBER:
AE
D
ES
IG
N
SE
R
VI
C
ES
FO
R
KI
TC
H
EN
C O
O
LE
R R
EM
ED
IA
TI
O N
-C C
R C
IS
SU
ED
FO
R C
O N
ST
R
U C
TI
O
N
Revision Schedule Number Description Date
AE DESIGN SERVICES FOR KITCHEN
COOLER REMEDIATION - CCRC
101 EAST 15TH STREET - ROOM 116
AUSTIN, TEXAS
JU
N E
DESIGNED:
DRAWN:
CHECKED:
320 260 0220
06/26/2026
06/26/2026
6836 Austin Center Blvd, Suite 350, Austin, Texas 78731 www.stanleyconsultants.com
Texas Firm Registration No.: F-174
STANLEY CONSULTANT'S PROJECT NUMBER: 32337.01
KEY PLAN NORTH
CU-4
CU-5
CU-1 CU-2
EXISTING ROOF PENETRATION
EXISTING ROOF PENETRATION
TO BE ENLARGED IF POSSIBLE
AND/OR REUSED FOR ON OF
TWO NEW CU PIPING SYSTEMS
EU-5EU-4EU-3
TT
EU-1 EU-2
T T
CU-3CU-6
T
EU-6
NORTH
NORTH
EXISTING ROOF
PENETRATION
DETAILS
M4-100
R. SCHRECENGOST
D. McCURDY
R. SCHRECENGOST
0 ISSUED FOR CONSTRUCTION
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
TEXAS workforce
COMMISSION
101 East 15th street Austin, Texas 78701
800.628.5115
SHEET NUMBER
SHEET NAME
TEAM
ISSUED FOR CONSTRUCTION
PROJECT NUMBER:
AE
D
ES
IG
N
SE
R
VI
C
ES
FO
R
KI
TC
H
EN
C O
O
LE
R R
EM
ED
IA
TI
O N
-C C
R C
IS
SU
ED
FO
R C
O N
ST
R
U C
TI
O
N
Revision Schedule Number Description Date
AE DESIGN SERVICES FOR KITCHEN
COOLER REMEDIATION - CCRC
101 EAST 15TH STREET - ROOM 116
AUSTIN, TEXAS
JU
N E
DESIGNED:
DRAWN:
CHECKED:
320 260 0220
06/26/2026
06/26/2026
6836 Austin Center Blvd, Suite 350, Austin, Texas 78731 www.stanleyconsultants.com
Texas Firm Registration No.: F-174
STANLEY CONSULTANT'S PROJECT NUMBER: 32337.01
28-1/4 26-1/4
AIR
18-3/4
4-7/8 3-3/16
24-3/16 SUCTION 27-7/8
27-1/8
27-1/8 17-1/4 5 15-1/2
14-1/2 16-3/4 18-1/8
AIR
SUCTION
(BACKSIDE)
3/4 - 14 NPT DRAIN 11-1/2
7/8” KO (2) FOR
ELECTRICAL
CONNECTIONS
LIQUID
OUT
CONTROL
PANEL
7/8 ELECTRICAL
KNOCKOUTS
(BACKSIDE)
SCALE:
DETAIL CONDENSER UNIT
NONE
M4-100 A-M4-100
SCALE:
DETAIL EVAPORATOR UNIT
NONE
M4-100 B-M4-100
SCALE:
DETAIL ROOF CURB CONNECTION
NONE
M4-100 C-M4-100
NOTES:
1. CU WEIGHT APPROX. 195 LBS
2. CU APPROX DIMENSIONS: 25.5" L x 26.5" W x 20" H
3. PROVIDE ALL PARTS & ACCESSORIES NECESSARY TO SUPPORT CU & ANCHOR IT TO STRUCTURE TO
RESIST UPLIFT. SUBMIT SHOP DRAWINGS FOR REVIEW PRIOR TO CONSTRUCTION.
CONDENSING UNIT
(200# MAX WEIGHT)
CONNECT CURB COMPONENTS TO
EXIST ROOF MEMBER AS REQUIRED.
M A
TC
H
E
XI
ST
IN
G A
S R
E Q
U
IR
ED
ROOF PRODUCTS & SYSTEMS ER-3A
STYLE, OR EQUAL.FLASHING &
WATERPROOFING BY OTHERS
PROVIDE EQUIPMENT
RAILS & ATTACH CU
NAILING STRIP, MINIMUM
OF 4 PLACES
ROOFING AND THICKNESS TO MATCH
EXISTING. BY OWNER APPROVED
ROOFING CONTRACTOR
SCALE:
DETAIL LEAD / LAG SYSTEM INSTALLATION
NONE
M4-100 D-M4-100
NOTES:
1. 100% LOAD REQUIREMENT EACH COMPRESSOR.
2. REFER TO M12-100 SCHEDULE & CONTROLS SHEET FOR OPERATION.
3/8” MOUNTING
HOLES (4)
CONDENSING
UNIT
MANAGER
CONDENSING
UNIT
PARTNER
EVAP 01
MANAGER
EVAP 02
PARTNER
ECONETECONET
SCHEDULES &
CONTROLS
M12-100
R. SCHRECENGOST
D. McCURDY
R. SCHRECENGOST
0 ISSUED FOR CONSTRUCTION
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
TEXAS workforce
COMMISSION
101 East 15th street Austin, Texas 78701
800.628.5115
SHEET NUMBER
SHEET NAME
TEAM
ISSUED FOR CONSTRUCTION
PROJECT NUMBER:
AE
D
ES
IG
N
SE
R
VI
C
ES
FO
R
KI
TC
H
EN
C O
O
LE
R R
EM
ED
IA
TI
O N
-C C
R C
IS
SU
ED
FO
R C
O N
ST
R
U C
TI
O
N
Revision Schedule Number Description Date
AE DESIGN SERVICES FOR KITCHEN
COOLER REMEDIATION - CCRC
101 EAST 15TH STREET - ROOM 116
AUSTIN, TEXAS
JU
N E
DESIGNED:
DRAWN:
CHECKED:
320 260 0220
06/26/2026
06/26/2026
6836 Austin Center Blvd, Suite 350, Austin, Texas 78731 www.stanleyconsultants.com
Texas Firm Registration No.: F-174
STANLEY CONSULTANT'S PROJECT NUMBER: 32337.01
NOTES:
1. REFER TO SHEET G0-001 FOR GENERAL PROJECT NOTES AND SHEETS M0-000,
E0-000, AND BA-000 FOR ALL GENERAL MECHANICAL, ELECTRICAL, AND
CONTROLS NOTES, RESPECTIVELY, THAT SHALL APPLY TO ALL SHEETS IN THIS
SET UNLESS NOTED OTHERWISE (U.N.O.) IN KEYED NOTES.
2. DESIGN INTENT TO REPLACE EU-3 & CU-3 WITH TWO SMALLER EUS & CUS (NEW
EU-3, CU-3 & EU-6 & CU-6) TO ALLOW FOR THE COOLER LOAD TO BE CONTROLLED
BETTER WITH OVERALL LOADS THROUGHOUT THE YEAR AND USING THE ECONET
2.0 CONTROL SYSTEM IN A LEAD / LODE OPERATION.
KEYNOTES:
1. CONTRACTOR SHALL PROVIDE ECONET 2.0 WITH LEAD / LAG CONTROLS TO TIE TWO
SEPARATE EVAPORATOR / CONDENSING PAIRS TOGETHER IN LEAD / LAG
OPERATIONAL MODE.
2. LEAD / LAG WILL ALLOW LINKING OF TWO REDUNDANT SYSTEMS FOR BACKUP
COOLING AND ABILITY TO EQUALIZE COMPRESSOR RUNTIME BETWEEN THE TWO
SYSTEMS.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING VENDOR CERTIFICATION
AND/OR PROVIDE VENDOR SUPPORT FOR SETTING UP THE CONTROLS SYSTEM,
FOLLOWING ALL MANUFACTURER RECOMMENDED CONNECTIONS / PROGRAMMING.
4. CONFIGURATION OF TWO CONTROLLER UNDER LEAD / LAG SHALL INCLUDE:
A. ONE OF THE TWO EVAPORATORS TO BE DESIGNATED AS THE MANAGER, AND
THE OTHER…
This is the start of the file's text. The full file is on GovTribe.