This Scope of Work document outlines the Invitation for Bid (IFB-26-008) issued by Texas A&M Forest Service for comprehensive pre-buy aircraft inspection services on C-130H Hercules airtankers. The project involves a two-phase inspection process: Phase 1 consists of records review and compliance audits on up to six aircraft, with the four best candidates advancing to Phase 2 physical inspections. Phase 1 deliverables must be completed within 30 calendar days of records access, while Phase 2 inspections must be completed within 60 days of notice to proceed, with final reports due 30 days after inspection completion. The inspections will assess airworthiness, structural integrity, maintenance history, modification status, and overall aircraft condition to support informed purchase decisions and mitigate acquisition risks. Proposers must demonstrate specific expertise with the C-130H platform, including access to Lockheed Martin technical data, familiarity with T56 engines, center wing box fatigue programs, and airtanker-specific modifications.
Proposers must submit fixed-price or not-to-exceed pricing for both Phase 1 and Phase 2 work, with detailed cost breakdowns including travel, per diem, non-destructive testing, borescope inspections, potential test flights, and other reimbursable expenses. Qualified contractors must have minimum five years of experience with heavy aircraft maintenance and inspections, personnel holding FAA A&P certificates with Inspection Authorization credentials, professional liability insurance of at least $1-2 million, and references from at least two similar pre-buy projects on large transport aircraft. Travel and meal expenses will be reimbursed according to State of Texas rates and regulations, with receipts required and no reimbursement for alcohol purchases. The contractor must maintain independence from the aircraft seller, current operator, or any party with a financial interest in the transaction, and must possess current Lockheed Martin C-130H technical publications and NDT capabilities or established partnerships to support the specialized inspection requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment C
IFB-26-008 Prebuy Aircraft Inspection Services
1. Introduction and Background
Texas A&M Forest Service (TFS) is seeking proposals from qualified firms or independent agents to perform comprehensive pre-buy (pre-purchase) inspections on C-130H Hercules airtankers. These aircraft are former military transports modified for aerial firefighting with retardant delivery systems.
The purpose of this purchase is to obtain an independent, thorough assessment of airworthiness, structural integrity, maintenance history, modification status, and overall condition of aircraft to support an informed purchase decision of these platforms and mitigate acquisition risks. Initial records review and compliance audit (Phase 1) will be conducted on not more than six (6) aircraft, with the best four (4) acceptable aircraft moving to physical inspection (Phase 2).
Aircraft Details (to be provided upon receipt of Non Disclosure Agreement (NDA)):
• Aircraft identifications (N (registration) numbers / SNs (Serial numbers))
• Approximate Total Time Since New (TTSN) and cycles.
• Known history (e.g., ex-USAF/USCG, prior airtanker conversions).
• Location of aircraft for inspection.
Proposers must demonstrate specific expertise with the C-130H platform, including access to Lockheed Martin technical data, familiarity with T56 engines, center wing box fatigue programs, and airtanker-specific modifications.
2. Scope of Services
The selected contractor shall provide services in two phases. Phase 1 is mandatory. Phase 2 is contingent upon acceptable Phase 1 findings and TFS approval.
Phase 1: Records Review and Compliance Audit
Conduct a comprehensive audit of all available maintenance and airworthiness records and flight records, including:
• Complete airframe, engine (T56 series), propeller, APU, and component logbooks (military AFTO 781 series and civil equivalents).
• FAA airworthiness file, including Form 337s for major repairs/alterations, Supplemental Type Certificates (STCs) for retardant tank systems and other modifications, and weight & balance records.
• Title and lien search; ownership and export compliance history.
• Compliance status with all applicable Airworthiness Directives (ADs), Service Bulletins
(SBs), and Airworthiness Limitations, with special attention to fatigue-related items (e.g., Lockheed Martin SB 82-790/382-57-85 and related center wing lower surface inspections for cracking and widespread fatigue damage (WFD)).
• Programmed Depot Maintenance (PDM) history, structural inspection program status, and any progressive/phase inspections.
• Time-in-service, cycle counts, and status of life-limited parts and Time-Between- Overhaul (TBO) items.
• Accident, incident, or damage history with full repair documentation.
• Airtanker-specific modifications: retardant tank installation, plumbing, gates/valves, structural reinforcements, and any associated fatigue or corrosion implications from retardant exposure.
• Avionics, software, and equipment lists; flight manual supplements.
• Identification of record gaps, inconsistencies, or red flags (e.g., unexplained time discrepancies, incomplete military-to-civil conversion documentation).
Deliverable: Written Phase 1 Report within [30] calendar days of receiving records access. The report shall include an executive summary, compliance matrix, risk assessment, and recommendations on whether to proceed to physical inspection.
Phase 2: Physical Inspection and Functional Checks
Perform a detailed, independent pre-purchase survey at the aircraft’s location (or agreed facility).
The inspection shall follow applicable Lockheed Martin C-130H technical orders (TOs), FAA guidelines, and industry best practices for large transport-category aircraft. Scope shall include, at minimum:
• General Condition: Exterior and interior visual inspection (dents, corrosion, paint/decal condition, evidence of prior damage or repairs).
• Structural Emphasis: Detailed inspection of the center wing box (lower surface panels, rainbow fittings, and attachments) for fatigue cracking or Widespread Fatigue Damage (WFD) using appropriate Non Destructive Testing (NDT) methods (eddy current, ultrasonic, dye penetrant, radiography as needed). Inspection of wing spars, attach points, fuselage, empennage, and landing gear attachments. Assessment of retardant system structural interfaces for corrosion or fatigue.
• Powerplant and Propellers: Borescope inspections of engines (compressors, hot sections), oil/filter analysis, ground runs/performance checks, leak detection. Propeller and governor condition.
• Systems: Functional checks of flight controls, hydraulics, pneumatics, electrical, environmental, landing gear/brakes, and fuel systems. Special attention to corrosion in areas exposed to fire retardant.
• Airtanker-Specific Systems: Retardant tank, delivery plumbing, pumps, gates/doors, and associated reinforcements for integrity, leaks, and corrosion.
• Avionics and Instruments: Operational checks of comm/nav, autopilot, radar, Terrain Avoidance and Warning System (TAWS)/ Ground Proximity Warning System (GPWS), Traffic Alert and Collision Avoidance System (TCAS), transponder, etc. Pitot-static and transponder certification status (if applicable). Software currency.
• Additional: Interior/cargo compartment; hidden area inspections (wheel wells, under floorboards, fuel tanks where accessible). Corrosion detection program review.
• Operational Checks: Ground functional tests. A test flight may be recommended if records and ground inspection support it (scope and cost to be coordinated).
All discrepancies shall be photographed and documented. NDT results shall be included with interpretations.
Deliverable: Inspection shall be completed within 60-days of TFS’s notice to proceed with Phase II work. Comprehensive Final Report within [30] days of inspection completion. The report shall include:
• Executive summary with overall condition assessment and purchase recommendations.
• Detailed findings categorized by severity (e.g., immediate airworthiness/grounding items, major economic items, minor/cosmetic).
• Photos, NDT data, and supporting documentation.
• Estimated rectification costs where practical.
• Assessment of remaining useful life or upcoming major maintenance (e.g., center wing box considerations).
3. Qualifications and Experience
Proposers must demonstrate:
• Minimum 5 years of experience in heavy aircraft maintenance, inspections, or due diligence, with specific, documented experience on C-130H or equivalent large turboprop/military transport aircraft.
• Access to current Lockheed Martin C-130H technical publications, tooling, and NDT capabilities (or established partnerships).
• Personnel holding FAA A&P (Airframe and Powerplant) certificates with Inspection Authorization (IA).
• Independence from the aircraft seller, current operator, or any party with a financial interest in the transaction.
• Adequate insurance: Professional liability/errors & omissions (minimum $[1–2] million), general liability, and workers’ compensation.
References from at least [2] similar pre-buy or due-diligence projects on large transport aircraft (C-130H or similar).
4. Proposal Submission Requirements
Submit proposals electronically to [email] by the due date. Include:
• Signed IFB Form
Technical Proposal:
• Detailed approach and methodology for Phases 1 and 2, including how C-130H airtanker-specific risks (fatigue, retardant corrosion, military records) will be addressed.
• Work plan and schedule.
• Team qualifications, resumes, references, relevant certifications, and organizational chart.
• Sample report from a prior similar project (redacted if necessary).
Cost Proposal:
• Fixed price or not-to-exceed pricing for Phase 1 (records review) and Phase 2 (physical inspection per aircraft).
• Breakdown of travel, per diem, NDT, borescope, test flight (if proposed), and other reimbursables.
• Hourly rates for additional work.
5. Travel
For reasonable business-related travel, lodging and/or meal expenses validly incurred directly and solely in support of the Services and approved by MEMBER in advance, PROVIDER will be reimbursed by MEMBER according to the State of Texas rates, rules, and regulations (https://fmx.cpa.texas.gov/fmx/travel/textravel/rates/current.php). When requesting such reimbursement, PROVIDER will submit to MEMBER receipts, invoices and other documentation as required by MEMBER. Under no circumstances will PROVIDER be reimbursed for alcohol purchases. State travel rates are subject to change without notice and will be adjusted accordingly. Mileage rates will be calculated from point-to-point (PROVIDER’s place of business to job site) using the State of Texas mileage. Should the Agreement be renewed for an additional term, travel reimbursement amounts will be renegotiated at that time.
https://fmx.cpa.texas.gov/fmx/travel/textravel/rates/current.php
| IFB-26-008 Prebuy Aircraft Inspection Services |
| 1. Introduction and Background |
| 2. Scope of Services |
| Phase 1: Records Review and Compliance Audit |
| Phase 2: Physical Inspection and Functional Checks |
| 3. Qualifications and Experience |
| 4. Proposal Submission Requirements |
| 5. Travel |