About this file

This is Addendum 2 to a Request for Competitive Sealed Proposals issued by the University of Texas at Arlington's Office of Facilities Management for an indefinite-quantity blanket order contract covering masonry restoration, brick and paver repairs and installation, and facilities waterproofing services. The addendum, dated April 22, 2026, updates the pricing sheet to include additional line items 57–65 in the DEMO section, which specify various paver installation and removal options such as concrete and clay pavers over sand beds with sand joints, concrete and clay pavers over mortar beds with grout joints, and new paver installations. The bid opening date and time is April 30, 2026, at 2:00 PM CDT. The contract will operate on an as-needed basis with multiple awards anticipated, and the initial term is two years with two successive two-year renewal options, potentially extending the contract duration to six years.

The addendum clarifies two key pricing matters: Payment and Performance Bonds should not be included in unit pricing and are only required for task orders exceeding specified thresholds, though if a bond is required for a specific project, its cost may be included in the project quote once assigned; additionally, the University does not pay surety premiums directly but allows contractors to include bond costs in project quotes when applicable. Respondents must submit comprehensive unit pricing for over 100 work categories detailed in the pricing proposal, including equipment rentals, sealants, coatings, pointing, masonry repairs, waterproofing, and investigative/consulting work. The contract is contingent upon continued appropriation of funds by the Texas Legislature and the University of Texas System Board of Regents, with an estimated cumulative value of at least $100,000 during the base period and each option period, potentially totaling approximately $600,000 over the full six-year contract period.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFICE OF FACILITIES MANAGEMENT

Box 19228 • 1225 W Mitchell Street • Wetsel Building, Suite 205 • Arlington, Texas 76019-0198

T 817-272-3571 • uta.edu/campus-ops/facilities

PAGE 1 of 1 DATE: Apr i l 22, 2026, BID INVITATION NUMBER: F M 2 0 2 6 - 0 0 7

BID OPENING DATE & TIME: April 30, 2026, at 2:00 PM CDT

CLARIFICATIONS:

Please see the additional items in the Pricing Sheet that has been updated to include in the DEMO section of the pricing sheet lines 57-65, (see attached below).

Q: Is an estimated cost available for the Masonry Restoration, Brick & Paver Repairs & Installation, and Facilities Waterproofing project?

A: This is based on an as needed basis, and dependent on receiving projects. This will also be a multiple award.

Q: Payment & Performance Bonds — Should the cost of the Payment and Performance Bonds be included in our unit pricing, or will the University be paying the surety directly for the bond premium?

A: Payment and Performance Bonds should not be included in pricing. These bonds are only required for Task Orders that exceed the thresholds identified in Section 1.28. Additionally, the University does not pay the surety directly for bond premiums. However, if a bond is required for a specific project, the cost may be included in the project quote once it is assigned.

Lead Contract Specialist (817) 272-4995

This addendum forms a part of the contract documents and modifies the original solicitation documents.

Acknowledge receipt of this Addendum in the space provided on the Bid Submittal Form, or by returning one (1) signed copy of this notice.

Make all changes identified above to the solicitation documents. All other terms and conditions in the solicitation documents remain unchanged and in full force and effect.

SIGNED:

COMPANY NAME:

ADDENDUM 2

ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE

WEIGHT

FACTOR

EXTENDED

PRICE

EQUIPMENT/RENTALS (If Required) 1 40' Lift 1 day X 1 2 1 week X 1 3 1 month X 1 4 60' Lift 1 day X 1 5 1 week X 1 6 1 month X 1 7 80' Lift 1 day X 1 8 1 week X 1 9 1 month X 1

10 125' Lift 1 day X 1 11 1 week X 1 12 1 month X 1 13 Scissor Lift 20' 1 day X 1 14 1 week X 1 15 1 month X 1 16 Scissor Lift 30' 1 day X 1 17 1 week X 1 18 1 month X 1 19 Scissor Lift 40' 1 day X 1 20 1 week X 1 21 1 month X 1 22 Dumpster 1 day X 1 23 1 week X 1 24 1 month X 1 25 Swing Stage 1 day X 1 26 1 week X 1 27 1 month X 1 28 SkyTracker - 20', 30', 40' 1 day X 3 29 1 week X 3 30 1 month X 3

SEALANTS

31 Recaulk perimeter of window - 5/8" joint 1 LF X 2 32 Recaulk brick control joint - 1/2" joint 1 LF X 2 33 Reglaze window - Silicone 1 LF X 1 34 Site recaulk expansion joints 1 LF X 2 35 Site recaulk control joints 1 LF X 2 36 Caulk and Sand 1 LF X 2

COATINGS

37 Install deck coating - Pedestrian Deck 1 SF X 1 38 Install deck coating - Vehicular Deck 1 SF X 1 39 Install masonry elastomeric coating 1 SF X 1 40 Shot/Blast Concrete 1 SF X 1

POINTING

41 Tuckpoint - Stone, Misc. 1 LF X 1 42 Tuckpoint - Stone, 100% 1 LF X 1 43 Tuckpoint - Brick, Misc. 1 SF X 1 44 Tuckpoint - Brick, 100% 1 SF X 1 45 Tuckpoint - Fancy Brick, Misc. 1 SF X 1 46 Tuckpoint - Fancy Brick, 100% 1 SF X 1

RFP # FM2026-006 EXHIBIT I - PRICING PROPOSAL -

Proposer must enter pricing in the Unit Price Column

FACTOR

EXTENDED

PRICE

RFP # FM2026-006 EXHIBIT I - PRICING PROPOSAL -

Proposer must enter pricing in the Unit Price Column

CLEANING

47 Clean building 1 SF X 1

WATER REPELLANT

48 Water repellant 1 SF X 1 49 Graffiti Clean-up and Removal 1 SF X 1 50 Graffiti Prevention 1 SF X 1

THRU-WALL FLASHING

Install thru-wall flashing and lintel, per Drawing S301, Details 1-6, per Fine Arts Building LF X 1

Install thru-wall flashing with new lintel. Includes removal and re-lay of 3 courses of brick. 1 LF X 1

53 Install thru-wall flashing without new lintel. 1 LF X 1

DEMO

54 Cut in door opening, interior, 3' x 7' 1 EA 55 Cut in door opening, exterior, 3' x 7' 1 EA 56 Remove & reset pavers 1 SF

Remove and reset concrete pavers over a sand bed with sand joints 1 SF

Remove and reset clay pavers over a sand bed with sand joints 1 SF

Remove and reset concrete pavers over a mortar bed with grout joints 1 SF

Remove and reset clay pavers over a mortar bed with grout joints 1 SF

61 New Install pavers 1 SF

Furnish and install clay pavers over a sand bed with sand joints 1 SF

Furnish and install clay pavers over a sand bed with sand joints 1 SF

Furnish and install concrete pavers over a mortar bed with grout joints 1 SF

Furnish and install clay pavers over a mortar bed with grout joints 1 SF

MASONRY REPAIR

58 Remove & replace cracked brick in wall 1 EA X 2 59 Remove, clean & salvage brick 1 SF X 2 60 Install new brick walls with ties 1 SF X 2 61 Install CMU walls, including rebar 1 SF X 2 62 Plaster repair 1 SF X 2 63 Install Lathe and Plaster 1 SF X 2 64 Patch stone - up to 1" 1 SF X 2 65 Patch Rough Stone - up to 1" 1 SF X 2 66 Patch concrete - up to 1" 1 SF X 2 67 Patch brick - up to 1" 1 EA X 2 68 Patch plaster - up to 1" 1 SF X 2 69 Patch Terra Cotta - up to 1" 1 SF X 2 70 Crack Repair - Concrete 1 LF X 2 71 Crack Repair - Brick 1 EA X 2 72 Crack Repair - Stone 1 LF X 2 73 Crack Repair - Plaster 1 LF X 2 74 Crack Repair - Terra Cotta 1 LF X 2

FACTOR

EXTENDED

PRICE

RFP # FM2026-006 EXHIBIT I - PRICING PROPOSAL -

Proposer must enter pricing in the Unit Price Column

75 Parge Coat - Removal 1 SF X 2 76 Parge Coat - Install 1 SF X 2 77 Helical anchor installation 1 EA X 2 78 Crack stitching 1 LF X 2 79 Remove/Salvage/Reinstall Stone Coping 1 LF X 2 80 Epoxy Crack Injection 1 LF X 2 81 Urethane Injection 1 LF X 2 82 Install Rust Inhibitor 1 LF X 2 83 Lintel replacement 1 LF X 2 84 Lintel refurbishment 1 LF X 2 85 Reset shifted stone 1 SF X 2 86 Apply stone strengthener consolidation 1 SF X 2 87 Mortar Analysis 1 EA X 2

PAINT

89 Lead Paint Abatement - Exterior 1 SF X 1 90 Strip Paint 100% 1 SF X 1 91 Paint metal windows and doors 1 SF X 1 92 Prep & Paint Lintel 1 LF X 2

WATERPROOFING

Replace below grade waterproofing - High Build (Excludes Excavating) 1 SF X 2

94 Ultraspan (1,2,3), 1" 1 LF X 2

INVESTIGATIVE/CONSULTING WORK

95 Leak Investigation/Water Test 1 man hour X 1

Per Diem

Per Diem - For job sites located more than ninety (90) miles from the DFW area with approval in writing prior start of job. -Minimum 1 day. 1 man X 1

Crew 97 Labor - Hourly rates billed at minimum 8 hours 1 hour X 2 98 Mechanic - Hourly rates billed at minimum 8 hours 1 hour X 2 99 Supervisor - Hourly rates billed at minimum 8 hours 1 hour X 2

100 Estimator - Hourly rates billed at minimum 8 hours 1 hour X 2

Materials Cost Plus Percentage Markup

Percentage Markup for Materials (cost plus percentage markup. Invoices for purchase of materials must be furnished for invoices with material cost plus percentage markup. 1 lot %

NOTE: Pricing Proposal Form must be returned with signed Pricing Submittal Form, signed Execution of offer form, and qualifications (answers to Section 3 questions) in one envelope. HUB Commitment Letter must be returned in a separate envelope.

ADDENDUM_2_2026_007
Pricing for RFP-EXHIBIT I
Sheet1

File details come from the government source that posted it. Updated .