ESBD_484263_1772654078345_04-TARLTON-RFP-0015 MMR Addendum 2.pdf

PDF 238 KB Posted

Attached to
MANAGEMENT OF CAMPUS SPONSORSHIPS, DIGITAL ADVERTISING AND ATHLETICS MULTIMEDIA RIGHTS
Solicitation number
04-TARLTON-RFP-0015
Issued by
Ellis County, Texline Town, Texas

About this file

This is Addendum 2 to Request for Proposal 04-TARLTON-RFP-0015 issued by Tarleton State University, a member of The Texas A&M University System, regarding Management of Campus Sponsorships, Digital Advertising and Athletics Multimedia Rights. The addendum provides technical specifications and clarifications for the baseball scoreboard and arena LED signage infrastructure. The baseball scoreboard has overall dimensions of 12 feet high by 42 feet wide, with an upper black section measuring 4 feet high by 28 feet wide and individual advertisement panels of 3 feet high by 7 feet wide each. The purple scoreboard section measures 8 feet high by 28 feet wide. Electrical power is available at the scoreboard location, though data connectivity is positioned behind the center field wall rather than at the scoreboard structure itself. Control of the scoreboard currently operates through a physical controller located in the Baseball Operations suite with no centralized control system in place. For arena LED arm stanchion signs, one 20-amp circuit is available at each basket with limited ethernet or fiber options on the ends. The addendum confirms that no fundraising campaign for a new baseball videoboard has commenced. The revised proposal submission deadline is 2:00 PM Central Time on Wednesday, March 11, 2026, with an approximate award date of April 1, 2026, and an expected contract start date of June 1, 2026.

The addendum does not contain pricing terms, set-aside requirements, incumbent information, or specific funding details, as these elements are addressed in the primary RFP documentation. The technical specifications provided in this addendum are intended to clarify infrastructure capabilities and limitations for vendors preparing proposals to manage the university's athletics and campus-wide digital advertising operations. The information regarding electrical and data connectivity constraints is critical for bidders to accurately assess capital investment requirements and implementation feasibility for digital signage and multimedia solutions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

March 4, 2026

ADDENDUM NUMBER 2

MANAGEMENT OF CAMPUS SPONSORSHIPS, DIGITAL ADVERTISING AND ATHLETICS MULTIMEDIA RIGHTS

04-TARLTON-RFP-0015

PROPOSAL MUST BE RECEIVED BEFORE:

2:00 PM Central Time, Wednesday, 11 March 2026

Addendum 1 has been issued as clarification to questions submitted and includes an updated Key Events Schedule:

EVENT DATE

Issue RFP January 19, 2026

Deadline for Submission of Questions February 2, 2026

Answers to Questions Posted February 18, 2026

Vendor Walk-Through February 25, 2026

1:00 pm – 5:00 pm Athletics Admin bldg 688 Stephenville, TX

Deadline for Submission of Proposals March 11, 2026

Approximate award date April 1, 2026

Expected Contract Start Date June 1, 2026 baseball scoreboard measurements are as follows:

• Overall dimensions (including advertisements): 12 ft (H) x 42 ft (W)

• Upper black section: 4 ft (H) x 28 ft (W)

• Individual advertisement panels: 3 ft (H) x 7 ft (W) each

• Purple scoreboard section: 8 ft (H) x 28 ft (W)

Electrical power is available at the scoreboard. However, data connectivity is not located at the scoreboard structure itself. The data connection point is positioned behind the center field wall.

At this time, we do not utilize a centralized control system. The only control mechanism currently in place is the physical scoreboard controller, located in the Baseball Operations suite. This controller manages each digit display and connects to the scoreboard via power.

1. Has a fundraising campaign for a new baseball videoboard already begun? No

2. Is there electricity and data behind the hoops in the arena for LED arm stanchion signs?

one (1) 20amp circuit at each basket, limited options on the ends for ethernet or fiber.

End of addendum

File details come from the government source that posted it. Updated .