This file consists of architectural life safety plans for the Austin State Hospital Replacement Hospital, a project involving the University of Texas at Austin Dell Medical School and Texas Health and Human Services. The building drawings document three levels of a healthcare facility located at 4110 Guadalupe Street, Austin, Texas 78751, with detailed floor plans, smoke compartment designations, occupancy loads, exit configurations, and fire safety measures. The plans show comprehensive layouts for Level 1, Level 2, and Level 3, including patient care areas, clinical spaces, administrative offices, support services, and mechanical systems. Level 1 contains eight smoke compartments (SC-L1A through SC-L1K) totaling approximately 113,000 square feet with a combined occupant load of 1,386 persons. Level 2 contains nine smoke compartments (SC-L2A through SC-L2K) totaling approximately 145,000 square feet with a combined occupant load of 2,623 persons. Level 3 contains seven smoke compartments (SC-L3B through SC-L3J) with a combined occupant load of 1,379 persons. The facility incorporates multiple use groups including inpatient treatment areas, sleeping quarters, assembly spaces, business offices, kitchens, exercise rooms, and storage facilities, all separated by fire barriers and smoke barriers as required by the 2015 International Building Code.
The life safety plans include detailed egress analysis with exit locations, fire extinguisher cabinets, fire hose valve cabinets, emergency stairs, electrical rooms, and horizontal exits to adjacent smoke compartments. Specific features documented include areas of refuge for secured yards with occupant capacities, elevator locations with smoke curtains, seclusion areas, clinical team offices, patient care stations, and therapeutic spaces. The plans identify suites within smoke compartments with specific square footages and exit requirements, such as Suite L1H.a (Pharmacy, 3,500 SF) and Suite L1K.a (Kitchen, 8,153 SF). The architectural documents were prepared by Page Southerland Page, Inc. with associated engineering and consulting firms including Affiliated Engineers (mechanical), CNG Engineering (electrical), Garza EMC (civil), Datum Rios, LLC (structural), and other specialty consultants. The drawings were issued for construction on July 2, 2020, as part of the completion package for the Austin State Hospital Replacement Hospital project, designated as Project Number 118027.01 / UT CPC 102-1188 / HHSC 18-204-ASH.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P-M
P-S
P-M
P-M P-M P-M P-M P-M P-M
P-M
P-M
P-M
P-S
P-S
7'
3"
SC-L1A
12,163 SF
SC-L
1C
SC-L
1D
LEVEL 2 ABOVE
LEVEL 1
ENCLOSED COURTYARD
LEVEL 1 COURTYARD
(SECURE YARD)
LEVEL 1
COURTYARD
(AVAILABLE FOR
EGRESS, NO
REFUGE)
SC-L1K
8,225 SF
GROUP "U"
SPECIAL PURPOSE
INDUSTRIAL
(SEPARATED BY 2 HOUR FIRE BARRIER
PER TABLE 508.4 IBC 2015)
H E
BELOW GRADE
H E
H E H E
SC-L1D
7,095 SF
179' - 2"
1,955 SF
AREA OF REFUGE
325 OCCUPANTS
(PER IBC SEC 407.9
SECURED YARDS)
895 SF
AREA OF REFUGE
150 OCCUPANTS
(PER IBC SEC 407.9
SECURED YARDS)
5'
7"
4'
177' - 5"
9'
8"
0'
6"
5"
8'
5"
4'
1"
4'
6"S
C -L
1B S
C -L
1C
SC-L1B
SC-L1A
SC-L1FSC-L1A
SC-L1FSC-L1A
SC-L
1B
SC-L
1F
SC-L
1D
SC-L
1C
SC-L1H
SC-L1C
SC-L
1E
SC-L
1D
SC-L1H
SC-L1C
SC-L1B
LEVEL 1
ENCLOSED COURTYARD
LEVEL 1
ENCLOSED COURTYARD
SC-L1KSC-L1H
SC-L1E
10,134 SF
SC-L1C
15,334 SF
SC-L1B
14,721 SF
SC-L1F
11,985
SC-L1H
20,126 SF
SUITE
L1H.a
3,500 SF
SUITE L1K.a
8,153 SF
ELEV LOBBY
FEC
F E
C
FEC
F E
C
FEC
F E
C
FEC
F E
C
FEC
FEC
F E
C
F E
C
FEC
F E
C
168' - 6"
1,960 SF
AREA OF REFUGE
326 OCCUPANTS
(PER IBC SEC 407.9
SECURED YARDS)
113' - 2" 196' - 7"
HK
PATIENT STORAGE
OFFICE, SHIFT SUPERV.
CORRIDOR
CORRIDOR
GROUP THERAPY
GROUP THERAPY
CORRIDOR
CORRIDOR
CLOSET CANTEEN
OFFICE, PROG. DIR.
OFFICE, ADMIN. STAFF
OFFICE, THERAPY STAFF
OFFICE, THERAPY STAFF
OFFICE, THERAPY STAFF
OFFICE, NURSE MGR.
EXERCISE/ FITNESS
POP-UP CLOTHING
MOVEMENT STUDIO
ACTIVITY & REC. / SOCIAL /
MULTI-PURPOSE
COMPUTER ROOM
PEER SUPPORT ROOM
CONSULT / VISIT
OFFICE, THERAPY STAFF
CONSULT/ VISIT
GENERAL CLASSROOM
GENERAL CLASSROOM
PT / OT
CONFERENCE ROOM
GROUP THERAPY
CORRIDOR
CONSULTCONSULT
BATHBATH
RECEIVING
OFFICE, CHIEF PHARM.
CONFERENCE ROOM
VAULT
OFFICE, TECH SUPRV.
P.U.
OFFICE ALCOVE
CLINICAL PHARMACY
BATH BATHBATH
BATHBATH
BATH BATH
BATHBATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH
ST
STORAGE
BATH BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH
EXAM ROOM
CORRIDOR CORRIDOR
CHARTING
DINING
VT
SENSORY
PANTRY
VISITING
QUIET ACTIVITY
CONSULT
COMFORT
CONSULT
PT
HK
EQUIP. STOR.
TEAM ROOM
RESPITE
SOILED U.
PT
DATA
CLINICAL TEAM OFFICE
ST
C O
R R
ID
O
R
CORRIDOR
VESTIBULE
LAUNDRY
MEDS
EXAM
(E) PORCH QUIET ACTIVITY
BEDROOM (HC)
BEDROOM (HC)
BEDROOM (HC)
ACTIVITY
BEDROOM (HC)
BEDROOM (HC)
BEDROOM
BEDROOM
BEDROOM
BATH (HC)
CLOSET
BEDROOM
TUB ROOM
BATH (HC)
BATH (HC)
CARE STATION
CORRIDOR
CORRIDOR
QUIET ACTIVITY
BEDROOM (HC)
BEDROOM (HC)
BEDROOM (HC)
ACTIVITY
BEDROOM (HC)
BEDROOM (HC)
BEDROOM
BATH (HC)
CLOSET
QUIET ACTIVITY BEDROOM (HC)
BEDROOM (HC)
BEDROOM (HC)
ACTIVITY
BEDROOM (HC)
BEDROOM (HC)
BEDROOM
BEDROOM
BEDROOM
BATH (HC)CLOSET
CORRIDOR
STORAGE
BEDROOM
ST
ANTE
T
SECLUSION
PHARMACY
BATH
BATH
BATH
BATH
BATH
BATHBATH
CHARTING
DINING
VT SENSORY
PANTRY VISITING QUIET ACTIVITY
CONSULT
COMFORT
CONSULT
PT
HK
EQUIP. STOR.
TEAM ROOM
RESPITE
SOILED U.
CLEAN U.
PT
DATA
CLINICAL TEAM OFFICE
CLINICAL TEAM OFFICE
ST
C O
R R
ID
O
R
C O
R R
ID
O
R
VESTIBULE
LAUNDRY
MEDS
EXAM
(E) PORCHQUIET ACTIVITY
BEDROOM (HC)
BEDROOM (HC)
BEDROOM (HC)
ACTIVITY
BEDROOM (HC)BEDROOM (HC)
BEDROOM BEDROOM
BEDROOM BATH (HC)
CLOSET
BEDROOM
TUB ROOM
BATH (HC)
BATH (HC)
CARE STATION
CORRIDOR
CORRIDOR
QUIET ACTIVITY
BEDROOM (HC)
BEDROOM (HC)
BEDROOM (HC)ACTIVITY
BEDROOM (HC)
BEDROOM (HC)
BEDROOM
BATH (HC)
CLOSET
QUIET ACTIVITY
BEDROOM (HC)
BEDROOM (HC)
BEDROOM (HC)
ACTIVITY
BEDROOM (HC)
BEDROOM (HC)
BEDROOM
BEDROOM
BEDROOM
BATH (HC) CLOSET
STORAGE
BEDROOM
ST
ANTE
T
SECLUSION
VESTIBULE
BATH (HC)
BATH (HC)
BATH (HC)
BATH (HC)
PT/VT
ST
PT/VTST
BATH (HC)
BATH (HC) BATH (HC)
BATH (HC)
BATH (HC)
BATH (HC)BATH (HC)
BATH (HC)
BATH (HC)
BATH (HC)
BATH (HC)
BATH (HC)
BATH (HC)
BATH (HC)
BATH (HC)
BATH (HC)
CORRIDOR
CLINICAL TEAM OFFICE
CLOSET
CORRIDOR
BEDROOM
CORRIDOR
STORAGE
MEDS
LAUNDRY
CHARTING
HK
EQUIP.
TEAM ROOM
RESPITE
SOILED U.
PT
DINING
VT
VISITING
QUIET ACTIVITY
COMFORTPT
STORAGE
CLEAN U.
ST
CORRIDOR
CARE STATION
V E
S
TI
B U
LE
STORAGE
BEDROOM
CORRIDOR
QUIET ACTIVITY
ACTIVITY
BEDROOM
BEDROOM (HC)
BATH (HC)
BEDROOM
BEDROOM
CLOSET
BEDROOMBEDROOM
BEDROOM
ACTIVITY
CORRIDOR
BEDROOM
QUIET ACTIVITY
ACTIVITY
BEDROOM
BEDROOM (HC)
BATH (HC)
BEDROOM
CLOSET
BEDROOM BEDROOM BEDROOM
BEDROOM
C O
R R
ID
O
R
QUIET ACTIVITY
BEDROOM
BEDROOM (HC)
BATH (HC)
BEDROOM
BEDROOM
CLOSET
BEDROOM
BEDROOM
BEDROOM
DATA
ST
ANTE
PT
SECLUSION
CLINICAL TEAM OFFICE
PANTRY
CORRIDOR
CORRIDOR
CORRIDOR
(E) ELECTRICAL
REFRIGERATED WASTE
HOLDING
LOADING DOCK &
MARSHALLING
(E) CENTRAL UTILITY PLANT
(E) STAIR
(E) OFFICE
(E) CONTROL
(E) BOILER ROOM
(E) ELEC.
(E) STAIR
(E) STAIR
1.0S3
(E) STAIR
(E) STAIR
(E) STAIR
(E) STAIR
(E) STAIR
(E) STAIR
STAIR
(E) STAIR
(E) ELEC.
(E) ELECTRICAL
(E) ELECTRICAL
(E) ELECTRICAL
COURTYARD 1-5
COURTYARD 1-3
COURTYARD 1-6
COURTYARD 1-4
COURTYARD 1-1
COURTYARD 1-8
(E ) S
TA
IR
(E) STORAGE
50' - 0"
50' - 0"
50' - 0"
LEVEL 1 COURTYARD
(SECURE YARD)
LEVEL 1 COURTYARD
(SECURE YARD)
BATH
(E) PORCH
FHC FHC
CENTRAL STAIR
FEC
FEC
EMERG. PREP. BIOMED STORAGE
CONFERENCE (MED.)MAINT. DEPOTSTAFF RESPITE
BIOMEDICAL OFFICE
LOCKSMITH
FEC
FEC
F E
C
FEC
FEC
CLINICAL TEAM OFFICE
FEC
F E
C -K
FEC-K
OFFICE, SHARED
OFFICE (HOTELLING)
WAREWASH - SOILED
POT WASH
CART WASH
WAREWASH - CLEAN
HK
STORAGE, EQUIP / MISC
OFFICE, DIET CLERK
OFFICE, FS DIR.
OFFICE, ASST. DIR.
WALK-IN COOLER
DRY STORAGE
CART PARKING
CARTS
BACKUP STORAGE, CLEAN
LINEN
CLEAN HOLDING
MALE LOCKER FEMALE LOCKER
FEMALE TOILETMALE TOILET
STAT LAUNDRY
OFFICE
OFFICE (SHARED)
F E
C -K
FEC-K
(E) VESTIBULE
FEC-K
FEC-K
BIO. HOLD
G L.
GL.02
GL.02
GL.02
GL.02
GL.02
FEC
F E
C
FEC
F E
C
F E
C
F E
C
FEC
GL.02
LEVEL 2 ABOVE
BELOW GRADE
BELOW GRADE
MECHANICAL YARD
GL.02
STORAGE, BULK
CLEANING EQUIPMENT
BACKUP STORAGE
STAFF QUIET
HK
BUSINESS CENTER JIT STORAGE
SOILED HOLDING
MEDICAL STORAGE
ENV. SERVICES
OFFICE, PRIVATE
STAFF ELEV LOBBY
CORRIDOR
CLEAN U.
137' - 3"
G L.
ELEVATORS
NOT AN EXIT NOT AN EXIT
NOT AN EXIT
NOT AN EXIT
WKST
HOLDING
LIFE SAFETY PLAN LEGEND
SMOKE COMPARTMENT NAME
SMOKE COMPARTMENT AREA
SMOKE PARTITION
1-HOUR FIRE BARRIER
SMOKE BARRIER WITH 1-HOUR FIRE RESISTANCE
2-HOUR FIRE BARRIER
SMOKE BARRIER WITH 2-HOUR FIRE RESISTANCE
SC-L1A
150 SF
U S
E O
C C
S F
B
5,000
@ 100/OCC OCC PER GSF/NSF
USE GROUP
GSF/NSF
OCC LOADO
C
C U
P A
N C
Y T
A G
S M
O K
E C
M P
R M
N T
T A
G
EXIT LIGHT
EXIT LIGHT WITH DIRECTIONAL ARROW
FIRE EXTINGUISHER CABINET
FIRE EXTINGUISHER
FEC
FE
PATH OF TRAVEL & DISTANCE (TO EXIT)100'
XX XX
DOOR/STAIR
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
SMOKE COMPARTMENT SEPARATION
B - BUSINESS (100 SF/OCC.)
A - ASSEMBLY- UNCONCENTRATED (15 NET SF/OCC.)
S - STORAGE (300 SF/OCC.)
MEP - MECH / ELEC/ BUILDING SUPPORT (300 SF/OCC.)
IT- IT/TELECOM USE (300SF/OCC.)
HORIZONTAL EXITHE
XX" .XX
PATH OF TRAVEL & DISTANCE (TO ADJACENT
SMOKE COMPARTMENT)
FIRE HOSE VALVE CABINETFHC
COMMON PATH OF TRAVEL
100'
100'
(EGRESS FACTOR
INCHES/PERSON)
(CALCULATED EGRESS
CAPACITY)
(EGRESS LOAD)
(WIDTH OF EGRESS
COMPONENT
HATCH PATTERN CODE + AREA USE
INP - INPATIENT TREATMENT (240 SF/OCC.)
SL - SLEEPING (120 SF/OCC.)
K- KITCHEN (100 SF/OCC.)
EX - EXERCISE ROOMS (50 SF/OCC.)
LKR- LOCKER ROOMS (50 SF/OCC.)
SUITE C - CLASSROOM (20 SF/OCC.)
LIFE SAFETY LEGEND
REFERENCE SHEET GL-001 FOR FULL CODE REVIEW AND REQUIREMENTS
SMOKE COMPARTMENT SQUARE FOOTAGES
OCCUPANT LOAD - LEVEL 01
REFERENCE SHEET GL-001 FOR FULL CODE REVIEW AND REQUIREMENTS
USE GROUP
TOTAL
AREA OCC. LOAD FACTOR OCC. LOAD
USE GROUP AREA OCC. LOAD FACTOR OCC. LOAD
SMOKE COMPARTMENT - L1A
SL - SLEEPING 4,261 SF 120 SF/OCC 44
S - STORAGE 159 SF 300 SF/OCC 4
INP- INPATIENT TREAT 6,321 SF 240 SF/OCC 27
SMOKE COMPARTMENT - L1B
A- ASSEMBLY 1,316 SF 15 NSF/OCC 105
TOTAL 279
MEP - MECH/ELECT 232 SF 300 SF/OCC 2
IT - DATA 274 SF 300 SF/OCC 2
B - BUSINESS 1,037 SF 100 SF/OCC 12
INP- INPATIENT TREAT 8,174 SF 240 SF/OCC 35
A- ASSEMBLY 3,152 SF 15 NSF/OCC 215
USE GROUP AREA OCC. LOAD FACTOR OCC. LOAD
SMOKE COMPARTMENT - L1C
TOTAL 225
EX - EXERCISE 687 SF 50 SF/OCC & 15 SF/OCC 32
MEP - MECH/ELECT 401 SF 300 SF/OCC 2
S - STORAGE 761 SF 300 SF/OCC 4
B - BUSINESS 2,297 SF 100 SF/OCC 30
INP - INPATIENT TREAT 9,213 SF 240 SF/OCC 39
A - ASSEMBLY 1,230 SF 15 NSF/OCC 84
USE GROUP AREA OCC. LOAD FACTOR OCC. LOAD
SMOKE COMPARTMENT - L1D
TOTAL 126
MEP - MECH/ELECT 118 SF 300 SF/OCC 1
IT - DATA 136 SF 300 SF/OCC 1
B - BUSINESS 705 SF 100 SF/OCC 8
INP- INPATIENT TREAT 3,865 SF 240 SF/OCC 17
A - ASSEMBLY 1,319 SF 15 NSF/OCC 92
USE GROUP AREA OCC. LOAD FACTOR OCC. LOAD
SMOKE COMPARTMENT - L1E
USE GROUP AREA OCC. LOAD FACTOR OCC. LOAD
SMOKE COMPARTMENT - L1F
TOTAL 148
SL - SLEEPING 3,632 SF 120 SF/OCC 33
INP- INPATIENT TREAT 5,304 SF 240 SF/OCC 23
A- ASSEMBLY 1,057 SF 15 NSF/OCC 88
USE GROUP AREA OCC. LOAD FACTOR OCC. LOAD
SMOKE COMPARTMENT - L1H
TOTAL 189
LKR - LOCKERS 840 SF 50 SF/OCC 18
MEP - MECH/ELECT 121 SF 300 SF/OCC 1
S - STORAGE 7,259 SF 300 SF/OCC 32
B - BUSINESS 4,017 SF 100 SF/OCC 48
INP- INPATIENT TREAT 6,383 SF 240 SF/OCC 27
A- ASSEMBLY 904 SF 15 NSF/OCC 62
USE GROUP AREA OCC. LOAD FACTOR OCC. LOAD
SMOKE COMPARTMENT - L1K
TOTAL 75
MEP - MECH/ELECT 100 SF 300 SF/OCC 1
S - STORAGE 2,110 SF 300 SF/OCC 11
B - BUSINESS 553 SF 100 SF/OCC 8
K - KITCHEN 5,458 SF 100 SF/OCC 55
S - STORAGE 217 SF 300 SF/OCC 4
S - STORAGE 995 SF 300 SF/OCC 6
S - STORAGE 1,724 SF 300 SF/OCC 13
TOTAL 164
TOTAL LEVEL 01 OCCUPANT LOAD
SL - SLEEPING 4,280 SF 120 SF/OCC 43
S - STORAGE 161 SF 300 SF/OCC 4
INP- INPATIENT TREAT 6,222 SF 240 SF/OCC 26
A- ASSEMBLY 1,320 SF 15 NSF/OCC 91
IT - DATA 121 SF 300 SF/OCC 1
1,386
C - CLASSROOM 651 SF 100 SF/OCC 34
SUITE SUMMARY - LEVEL 01
REFERENCE SHEET GL-001 FOR FULL CODE REVIEW AND REQUIREMENTS
# AREA
L1H.a PHARMACY
NAME
L1K.a KITCHEN
SUITE TYPE
NON-PATIENT CARE
8,153 SF
3,500 SF
REQUIRED EXITS
2 EXIT REQ./2 PROVIDED
2 EXIT REQ./3 PROVIDEDNON-PATIENT CARE
A T
T S
XETE FO
S A
18 2 4 4
R E G
IS
TE
RED ARCH
ITE
C T
D.
B R
IA
N
RO
E D
E R
PROFESSIONAL SEALS
DESCRIPTIONREVISION DATE
DATE
CHECKED BYDRAWN BY
PROJECT NUMBER
ORIGINAL ISSUE
SHEET NUMBER
F
IL
E
P A
T H
U S E R
N A
M E
D A
T E S
T A
M P
REVISION HISTORY
KEY PLAN (NOT TO SCALE)
Page Southerland Page, Inc.
pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Dubai / Houston / Mexico City /
San Francisco / Washington DC / International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701
512 472 6721
512 477 3211
MECHANICAL ENGINEER
AFFILIATED ENGINEERS, INC
ONE GREEWAY PLAZA
SUITE 150
713-548-8900
HOUSTON, TX 77046
ELECTRICAL ENGINEER
CNG ENGINEERING, PLLC
1917 N. NEW BRAUNFELS AVE
SUITE 201
210-224-8841
SAN ANTONIO, TX 78208
CIVIL ENGINEER
GARZA EMC
7708 RIALTO BLVD
SUITE 125
512-298-3284
AUSTIN, TX 78735
ASSOCIATE ARCHITECT
ARCHITECTURE+
297 RIVER STREET
TROY, NY 12180
518-272-4481
U N
IV
E
R S
IT
Y
O F
T E
X A
S A
T A
U S
T
IN
D E
L L
M E
D
IC
A L S
C H
O O
L T
E X
A S
H E
A L
T H
A N
D H
U M
A N
S E
R V
IC
E
PAGE 118027.01 / UT CPC 102-1188 / HHSC 18-204-ASH
STRUCTURAL ENGINEER
DATUM RIOS, LLC
8140 N MOPAC, BLDG 1
SUITE 120
512-469-9490
AUSTIN, TX 78759
FOODSERVICE CONSULTANT
RICCA DESIGN STUDIOS
5325 S VALENTA WAY
GREENWOOD VILLAGE
303-221-0500
CO, 80111
LANDSCAPE ARCHITECTURE
ASAKURA ROBINSON
1224 E 12TH STREET
SUITE 310
512-351-9601
AUSTIN, TX 78702
TELECOMMUNICATIONS
DATACOM DESIGN GROUP
7600 BURNET ROAD
SUITE 350
512-478-6001
AUSTIN, TX 78757
A E
B F
GC
J
K
L
D H
07/02/2020
W
\1
-B
A S H
-A -R
-n h a r k r e a d e r.
R V T
/2
/2
:4 :1
P
M
HC-GL-101
02 JULY 2020ISSUED FOR CONSTRUCTION
BDREDB
GENERAL - LIFE SAFETY PLAN - LEVEL
G
U A D
A
LU
P E S
T A U
S T
IN
T X
A U
S T
IN
S T A T E H
O S P
IT
A L
R E P
LA
C E M
E N
T
H O
S P
IT
A L
C O
M P
LE
T
IO
N P
A C K A G
E
SCALE: 1" = 30'-0"1 ARCHITECTURAL - LIFE SAFETY PLAN - LEVEL 01
PLAN
NORTH
TRUE
NORTH
KEYED NOTES
NUMBER DESCRIPTION
SC-L1A 12,163 SF
SC-L1B 14,721 SF
SC-L1C 15,334 SF
SC-L1D 7,095 SF
SC-L1E 10,134 SF
SC-L1F 11,985 SF
SC-L1H 20,126 SF
SC-L1K 8,225 SF
SC-L2A 11,194 SF
SC-L2B 14,054 SF
SC-L2C 15,719 SF
SC-L2D 13,485 SF
SC-L2E 10,161 SF
SC-L2F 10,912 SF
SC-L2G 10,313 SF
SC-L2H 22,208 SF
SC-L2J 20,865 SF
SC-L2K 13,388 SF
SC-L3B 7,011 SF
SC-L3C 16,129 SF
SC-L3D 13,564 SF
SC-L3E 10,532 SF
SC-L3F 11,208 SF
SC-L3G 10,788 SF
SC-L3J 13,933 SF
GL.02 CARD READER + KEY OVERRIDE AT GATE DOORS. KEYS
PROVIDED TO STAFF FOR EGRESS AND FIRE FIGHTERS FOR
INGRESS.
GL.03 ACCESSIBLE PATH TO AREA OF REFUGE OUTSIDE RETAINING
WALL. ACCESS TO LAMAR (PUBLIC WAY)
GL.04 EGRESS ACROSS DOCK TO ACCESSIBLE PATH, NOT DOWN DOCK
STAIRS. REFERENCE NOTE GL.03
GL.09 CLEAR ACCESS TO PUBLIC WAY
LEVEL 1
ENCLOSED COURTYARD
LEVEL 1 COURTYARD
LEVEL 2 COURTYARD
(SECURE YARD)
LEVEL 2 COURTYARD
(AVAILABLE FOR EGRESS)
OT EVALUATION ROOM
PHYSIOTHERAPY ROOM
STORAGE
LEVEL 2 COURTYARD
(AVAILABLE FOR EGRESS)
6'
4"
GROUP "U"
SPECIAL PURPOSE
INDUSTRIAL
(SEPARATED BY 2 HOUR FIRE BARRIER
PER TABLE 508.4 IBC 2015)
1,060 SF
AREA OF REFUGE
176 OCCUPANTS
(PER IBC SEC 408.3.6
EXIT DISCHARGE)
SC-L2G
10,313 SF
SC-L2D
13,485 SF
SC-L2C
15,719 SF
SC-L2F
10,912 SF
SC-L2B
14,054 SF
SC-L2J
20,865 SF
SC-L2H
22,208 SF
SC-L2K
13,388 SF
165' - 10"
6'
117' - 5"
9'
5"
182' - 11"
75' - 9"
172' - 0"
171' - 10"
6'
8"
7'
8"
5"
106' - 10"
HEHE
HE
5'
4"
125' - 7"
137' - 2"
6'
5"
SC-L2B
SC-L2A
SC-L2FSC-L2A
SC-L2FSC-L2A
SC-L
2B
SC-L
2F
SC-L
2D
SC-L
2C
SC-L
2E
SC-L
2D
SC-L2C
SC-L2B
SC-L2B
SC-L2C
LEVEL 1
ENCLOSED COURTYARD LEVEL 2
ENCLOSED COURTYARD
LEVEL 1
ENCLOSED COURTYARD
SC-L2GSC-L2E
SC-L
2J
SC-L
2HSC-L2D
SC-L2G
SC-L
2K
LEVEL 1 COURTYARD
LEVEL 1 COURTYARD
SC-L2GSC-L2E
SC-L
2J
SC-L
2H
SC-L2H SC-L2K
SC-L2A
11,194 SF
4'
5"
LEVEL 1 COURTYARD
CARE STATION
FEC
F E
C
FEC
F E
C
FEC
F E
C
FEC
FEC FEC
F E
C
FEC FEC
F E
C
F E
C
FEC
F E
C
F E
C
FEC
FEC
F E
C
FEC
F E
C
FEC FEC
FEC
SUITE
L2J.d
2,955 SF
SUITE
L2J.c
834 SF
SUITE
L2J.f
1,068 SF
SUITE
L2J.g
1,000 SF
SUITE
L2J.a
2,061 SF
SUITE
L2J.e
1,079 SF
SUITE
L2K.a
1,543 SF
SUITE
L2K.b
869 SF
F E
C
SUITE L2H.a
999 SF
THERAPY STAFF OFFICE
MUSIC WKST.
MUSIC THERAPY
CHAPEL / MULTI-PURPOSE
GREENHOUSE
ADL APARTMENT
SENSORY GROUP
S
TO
R A
G E
, E Q
U
IP
STORAGE
SALON
STORAGE, GYM EQUIP
CLEANING EQUIP.
ST
STORAGE
CLEAN U.
SOILED. U
EXAM
ADMISSIONS OFFICE
EXAM
EXAM (IMM)EXAM (EKG)
DENT. OPER/EXAM DENT. OPER/EXAM
BUSINESS CTR
OFFICE, PRIVATE
CONFERENCE
STAFF RESPITE
LOCKERS
NIGHT CUPBOARD
HK
PT
INTAKE INV.
CONSULT
HOSP. CLOTH
CONSULT
WAITING (CHILD)
WAITING (ADULT)
STAFF DESK/TREATMENT
PLANNING
CLINIC OFFICE
PGME OFFICE
CORRIDOR
HALL
CLINIC OFFICE
CORRIDOR
HALL
CORRIDOR
ON-CALL BEDROOM
CORRIDOR
GENERAL STORE
STORAGE, GEN. STORE
BANK OFFICE
ART
PT/VT
ST
PT/VT
NURSE DESK
HK
GROUP THERAPY
GROUP THERAPY EXAM ROOM
CLINIC OFFICE
OFFICE, ADMISSIONS STAFF
OFFICE, SHARED
CORRIDOR
STAFF ELEV LOBBY
EQUIP.
RECORD/ TAPING
STORAGE
CLIENT RIGHTS OFFICE
CONFERENCE, SMALL
ST ST
CONFERENCE, MEDIUM
OFFICE, ASST. DIR. SRM
OFFICE, DIR. SRM
VOL. WORKROOM
OFFICE, PEER SUPPORT
DIR.
DATA
OFFICE, SENIOR TBD
OFFICE, DIR. NURSING
OFFICE, EXEC. ASST.
OFFICE, SR. EXEC. ASST.
OFFICE, ASST. SUPER
OFFICE, EXEC. ASST.
OFFICE, MD. DIR.
OFFICE, SUPER.
OFFICE, EXEC. ASST.
CONFERENCE
BUSINESS CENTER
STAFF QUIET
ST
STAFF RESPITE
OFFICE, DIR. PP.
HK
ST
CORRIDORCORRIDOR
STORAGE
OFFICE, ADMIN. STAFF
OFFICE, PROG. DIR.
OFFICE, SHIFT SUPERV.
OFFICE, THERAPY STAFF
OFFICE, THERAPY STAFF
OFFICE, THERAPY STAFF
OFFICE, NURSE MGR
EXAM
STORAGE
MOVEMENT STUDIOACTIVITY & REC. / SOCIAL
COMPUTER ROOM
PEER SUPPORT ROOM
CONSULT/ VISIT
EXERCISE/ FITNESS
MULTI-PURPOSE ROOM
GROUP THERAPY
CONSULT/ VISIT
GENERAL CLASSROOM
GENERAL CLASSROOM
GENERAL CLASSROOM
MULTI-PURPOSE ROOM
GROUP THERAPY
CONSULT
CONSULT
BEDROOM
CONSULT
BEDROOM
CONSULT
CONSULT CONSULT
CONSULT
CORRIDOR
SALLY PORT
BEDROOM
BEDROOM BUSINESS CENTER
OFFICE, REIMB.
OFFICE, FIN.
CONFERENCE, LARGE
OFFICE, UTILIZATION MGMT.
PATIENT VALUABLES
MEETING
INTERVIEW ROOM
OFFICE, WORKER'S COMP
VOL. SVCS.OFFICE, VS.
INTERVIEW ROOM
HR RECEPTIONST
VISITOR LOCKERS
VT
VT
VISIT. LOUNGE
LOCKERS
OFFICE
OFFICE
MUSTER
SECURITY CONTROL
RECEPTION
SALLY PORT
SALLY PORTSALLY PORT
LOBBY
VESTIBULE
CORRIDOR
PT
RADIOGRAPHIC ROOM
ST
TECH
PT
LABDENTAL LAB
PANOREX
EXAM (BAR.)
EQUIP./ FILES
ST
CONSULT
CLEANING EQUIP.
ALCOVE
MED EQUIP
CORRIDOR
CORRIDOR
PATIENT STORAGE
CORRIDOR
TOILET
BATH BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH BATH
BATHBATH
BATH BATH BATH BATH BATH BATH
BATHBATH BATHBATH
BATH BATH
BATHBATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH BATH
BATH BATH
CONFERENCE ROOM
PT
HK
CORRIDOR
CLINIC WAITING
HALL
CORRIDOR
CORRIDOR CORRIDOR
CORRIDOR
MEDS
LAUNDRY
CHARTING
HK
TEAM ROOM
RESPITE
SOILED U.
SHAFT
PT
DINING
VT
VISITING QUIET ACTIVITY
COMFORT
PT
SHAFT
CLEAN U.
ST
CORRIDOR
CORRIDOR
VESTIBULE
STORAGE
BEDROOM
CORRIDOR
(E) PORCH
QUIET ACTIVITY
ACTIVITY
BEDROOM
BEDROOM (HC)
BATH (HC)
BEDROOM BEDROOM
CLOSET
BEDROOMBEDROOMBEDROOM
ACTIVITY
CORRIDOR
BEDROOM
QUIET ACTIVITY
ACTIVITY
BEDROOM
BEDROOM (HC)
BATH (HC)
BEDROOM
CLOSET
BEDROOM BEDROOM BEDROOM
BEDROOM
CORRIDOR
QUIET ACTIVITY
BEDROOM
BEDROOM (HC)
BATH (HC)
BEDROOM
BEDROOM
CLOSET
BEDROOM
BEDROOM
BEDROOM
DATA
ST
ANTE
PT
SECLUSION
SALLY PORT
SERVER ROOM
STORAGE
IT WORKROOM
OFFICE, NSM
VESTIBULE
SALLY PORT
CORRIDOR
CORRIDOR
OFFICE
FINANCIAL OFFICE
SAFETY & RISK MGMT
HALL
WAITING
S
TA
F F
Q U
IE
T
BATH
STORAGE
COURT ROOM
OFFICE
OFFICE
COURT OFFICE SUITE
WAITING
PT/VT
ST
OFFICE
MEETING SPACE
OFFICE
ST ST
EQUIP.
SALLY PORT
HALL HALL
CLINICAL TEAM OFFICE
CLINICAL TEAM OFFICE
BATH
BATH
CORRIDOR
PT/VTST
PT/VT
ST
PANTRY
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CLOSET
OFFICE, HIRING SVCS.
ELEV LOBBY
VESTIBULE
MEDS
LAUNDRY
CHARTING
HK
TEAM ROOM
RESPITE
SOILED U.
PT
DINING
VT
VISITING
QUIET ACTIVITY
COMFORT PT
CLEAN U.
ST
CORRIDOR
CORRIDOR
CARE STATION
VESTIBULE
STORAGE
BEDROOM
CORRIDOR
(E) PORCH
QUIET ACTIVITY
ACTIVITY
BEDROOM
BEDROOM (HC)
BATH (HC)
BEDROOMBEDROOM
CLOSET
BEDROOM BEDROOM BEDROOM
ACTIVITY
CORRIDOR
BEDROOM
QUIET ACTIVITY
ACTIVITY
BEDROOM
BEDROOM (HC)
BATH (HC)
BEDROOM
CLOSET
BEDROOMBEDROOMBEDROOM
BEDROOM
CORRIDOR
QUIET ACTIVITY
BEDROOM
BEDROOM (HC)
BATH (HC)
BEDROOM
BEDROOM
CLOSET
BEDROOM
BEDROOM
BEDROOM
DATA
ST
ANTE
PT
SECLUSION
CLINICAL TEAM OFFICE
CLINICAL TEAM OFFICE
PANTRY
MEDS
LAUNDRY
CHARTING
HK
TEAM ROOM
RESPITE
SOILED U.
PT
DINING
VT
PANTRY
VISITING
QUIET ACTIVITY
COMFORT
PT CLEAN U.
CLINICAL TEAM OFFICE
CLINICAL TEAM OFFICE
ST
CORRIDOR
VESTIBULE
STORAGE
BEDROOM
CORRIDOR
(E) PORCH
QUIET ACTIVITY
ACTIVITY
BEDROOM
BEDROOM (HC)BATH (HC)
BEDROOM
BEDROOM
CLOSET
BEDROOM BEDROOM BEDROOM
ACTIVITY
CORRIDOR
BEDROOM
(E) PORCH
QUIET ACTIVITY
ACTIVITY
BEDROOM BEDROOM
BEDROOM
BEDROOMBEDROOM
BEDROOM
(E) PORCH
QUIET ACTIVITY
BEDROOM
BEDROOM (HC)
BATH (HC)
BEDROOM
BEDROOM
CLOSET
BEDROOM
BEDROOM
BEDROOM
DATA
ST
ANTE
PT
SECLUSION
CORRIDOR
MEDS
LAUNDRY
CHARTING
HK
TEAM ROOM
RESPITE
SOILED U.
SHAFT
PT
DINING
VT
PANTRY
VISITING
QUIET ACTIVITY
COMFORTPT
SHAFT
CLEAN U.
CLINICAL TEAM OFFICE
CLINICAL TEAM OFFICE
ST
CORRIDOR
CARE STATION
VESTIBULE
STORAGE
BEDROOM
CORRIDOR
(E) PORCHQUIET ACTIVITY
ACTIVITY
BEDROOM
BEDROOM (HC)
BATH (HC)
BEDROOM BEDROOM
CLOSET
BEDROOMBEDROOMBEDROOM
ACTIVITY
CORRIDOR
BEDROOM
(E) PORCH
QUIET ACTIVITY
ACTIVITY
BEDROOM
BEDROOM (HC)
BATH (HC)
BEDROOM
CLOSET
BEDROOM BEDROOM
BEDROOM
BEDROOM
C O
R R
ID
O
R
(E ) P
O R
C H
QUIET ACTIVITY
BEDROOM
BEDROOM (HC)
BATH (HC)
BEDROOM
BEDROOM
CLOSET
BEDROOM
BEDROOM
BEDROOM
DATA
BATH
BATH
BATH
BATH BATH BATH
BATHBATH
BATH BATH
BATHBATH
BATH
BATH
BATH
BATH
BATH
BATH BATH
ST
ANTE
PT
SECLUSION
BATH
CORRIDOR
BATHBATHBATH
BATH BATH
BATHBATH
BATH BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH
CORRIDOR
CORRIDOR
STORAGE
CORRIDOR
BATH
BATH
DATA(E) ELECTRICAL
(E) ELECTRICAL
(E) ELECTRICAL
(E) ELECTRICAL (E) ELECTRICAL
(E) ELECTRICAL
(E) MAIN ELECTRICAL ROOM
(NORMAL)
(E) GENERATOR ROOM
(E) STAIR
(E) STAIR
COURTYARD 2-4
(E) STAIR
(E) STAIR
(E) STAIR
(E) STAIR
(E) STAIR
(E) STAIR
(E) VEHICLE SALLY PORT
FHC
F H
C
FHC
FHC
HE
189' - 8"
SUITE
L2J.b
570 SF
184' - 9"
(E) PORCH
(E) PORCH
CORRIDOR
CORRIDOR
CORRIDOR
BANK/ATM
SHARED OFFICE
STORAGE, REC THERAPY
ALCOVE
OFFICE, THERAPY STAFF
CORRIDOR
STORAGE
SHAFT
SHAFT
C O
R R
ID
O
R
DATA(E) ELECTRICAL
PREP/COOK
REF. STORAGE
BEVERAGE DISPENSING
CAFE
STORAGE, LIBRARY
VENDING
ST PT
PT
TOWN SQUARE
SERVERY
(E) ELECTRICAL
(E) STAIR
(E) STAIR
(E) FIRE PUMP ROOM
(E) ELECTRICAL ROOM
(E) ELECTRICAL
(E) STAIR
(E) STAIR
(E) STAIR
(E) STAIR
(E) STAIR
(E) STAIR
(E) STAIR
COURTYARD 2-3
EQUIP.
(E) ELECTRICAL
EQUIP. STORAGE
50' - 0"
SC-L2H
FEC
F E
C
BEDROOM (HC) / ISOLATION
BATH (HC)
ANTE
FEC
F E
C
FEC
FEC
FEC FEC
F E
C
EXAM / ISOLATION ANTE
BATH
KIT.
FEC
F E
C
(E) VESTIBULE
SC-L2E
10,161 SF
FEC
F E
C F
E C
EQUIP. STORAGE
EQUIP.
GL.02
G L.
G L.
FEC
0'
1"
FEC-K
F E
GL.02
HK
G L.
NOT AN EXIT
(E) STAIR
74' - 5"
FEC-K
LIFE SAFETY LEGEND
REFERENCE SHEET GL-001 FOR FULL CODE REVIEW AND REQUIREMENTS
SMOKE COMPARTMENT SQUARE FOOTAGES
LIFE SAFETY PLAN LEGEND
SMOKE COMPARTMENT NAME
SMOKE COMPARTMENT AREA
SMOKE PARTITION
1-HOUR FIRE BARRIER
SMOKE BARRIER WITH 1-HOUR FIRE RESISTANCE
2-HOUR FIRE BARRIER
SMOKE BARRIER WITH 2-HOUR FIRE RESISTANCE
SC-L1A
150 SF
U S
E O
C C
S F
B
5,000
@ 100/OCC OCC PER GSF/NSF
USE GROUP
GSF/NSF
OCC LOADO
C
C U
P A
N C
Y T
A G
S M
O K
E C
M P
R M
N T
T A
G
EXIT LIGHT
EXIT LIGHT WITH DIRECTIONAL ARROW
FIRE EXTINGUISHER CABINET
FIRE EXTINGUISHER
FEC
FE
PATH OF TRAVEL & DISTANCE (TO EXIT)100'
XX XX
DOOR/STAIR
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
SMOKE COMPARTMENT SEPARATION
B - BUSINESS (100 SF/OCC.)
A - ASSEMBLY- UNCONCENTRATED (15 NET SF/OCC.)
S - STORAGE (300 SF/OCC.)
MEP - MECH / ELEC/ BUILDING SUPPORT (300 SF/OCC.)
IT- IT/TELECOM USE (300SF/OCC.)
HORIZONTAL EXITHE
XX" .XX
PATH OF TRAVEL & DISTANCE (TO ADJACENT
SMOKE COMPARTMENT)
FIRE HOSE VALVE CABINETFHC
COMMON PATH OF TRAVEL
100'
100'
(EGRESS FACTOR
INCHES/PERSON)
(CALCULATED EGRESS
CAPACITY)
(EGRESS LOAD)
(WIDTH OF EGRESS
COMPONENT
HATCH PATTERN CODE + AREA USE
INP - INPATIENT TREATMENT (240 SF/OCC.)
SL - SLEEPING (120 SF/OCC.)
K- KITCHEN (100 SF/OCC.)
EX - EXERCISE ROOMS (50 SF/OCC.)
LKR- LOCKER ROOMS (50 SF/OCC.)
SUITE C - CLASSROOM (20 SF/OCC.)
OCCUPANT LOAD - LEVEL 02
REFERENCE SHEET GL-001 FOR FULL CODE REVIEW AND REQUIREMENTS
USE GROUP
TOTAL
AREA OCC. LOAD FACTOR OCC. LOAD
USE GROUP AREA OCC. LOAD FACTOR OCC. LOAD
SMOKE COMPARTMENT - L2A
SL - SLEEPING 3,671 SF 120 SF/OCC 33
S - STORAGE 159 SF 300 SF/OCC 4
INP- INPATIENT TREAT 5,567 SF 240 SF/OCC 24
SMOKE COMPARTMENT - L2B
A- ASSEMBLY 1,840 SF 15 NSF/OCC 127
TOTAL 231
MEP - MECH/ELECT 235 SF 300 SF/OCC 2
IT - DATA 274 SF 300 SF/OCC 2
B - BUSINESS 1,408 SF 100 SF/OCC 16
INP- INPATIENT TREAT 7,373 SF 240 SF/OCC 31
A- ASSEMBLY 2,455 SF 15 NSF/OCC 168
USE GROUP AREA OCC. LOAD FACTOR OCC. LOAD
SMOKE COMPARTMENT - L2C
TOTAL 281
EX - EXERCISE 687 SF 50 SF/OCC & 15 SF/OCC 32
MEP - MECH/ELECT 447 SF 300 SF/OCC 2
S - STORAGE 686 SF 300 SF/OCC 4
B - BUSINESS 1,717 SF 100 SF/OCC 23
INP - INPATIENT TREAT 9,164 SF 240 SF/OCC 39
A - ASSEMBLY 1,900 SF 15 NSF/OCC 130
USE GROUP AREA OCC. LOAD FACTOR OCC. LOAD
SMOKE COMPARTMENT - L2D
TOTAL 223
MEP - MECH/ELECT 236 SF 300 SF/OCC 2
IT - DATA 272 SF 300 SF/OCC 2
B - BUSINESS 1,436 SF 100 SF/OCC 16
INP- INPATIENT TREAT 7,003 SF 240 SF/OCC 30
A - ASSEMBLY 2,348 SF 15 NSF/OCC 160
USE GROUP AREA OCC. LOAD FACTOR OCC. LOAD
SMOKE COMPARTMENT - L2E
USE GROUP AREA OCC. LOAD FACTOR OCC. LOAD
SMOKE COMPARTMENT - L2F
TOTAL 168
SL - SLEEPING 3,671 SF 120 SF/OCC 33
INP- INPATIENT TREAT 5,354 SF 240 SF/OCC 23
A- ASSEMBLY 1,564 SF 15 NSF/OCC 108
USE GROUP AREA OCC. LOAD FACTOR OCC. LOAD
SMOKE COMPARTMENT - L2G
TOTAL 144
S - STORAGE 172 SF 300 SF/OCC 4
INP- INPATIENT TREAT 5,318 SF 240 SF/OCC 23
A- ASSEMBLY 1,210 SF 15 NSF/OCC 84
USE GROUP AREA OCC. LOAD FACTOR OCC. LOAD
SMOKE COMPARTMENT - L2K
TOTAL 136
INP- INPATIENT TREAT 8,179 SF 240 SF/OCC 34
S - STORAGE 788 SF 300 SF/OCC 8
B - BUSINESS 3,474 SF 100 SF/OCC 42
A - ASSEMBLY 667 SF 15 NSF/OCC 47
S - STORAGE 176 SF 300 SF/OCC 4
S - STORAGE 1,683 SF 300 SF/OCC 13
S - STORAGE 1,537 SF 300 SF/OCC 12
TOTAL 184
TOTAL LEVEL 02 OCCUPANT LOAD
SL - SLEEPING 3,635 SF 120 SF/OCC 33
S - STORAGE 142 SF 300 SF/OCC 3
INP- INPATIENT TREAT 5,552 SF 240 SF/OCC 24
A- ASSEMBLY 1,790 SF 15 NSF/OCC 124
SL - SLEEPING 3,675 SF 120 SF/OCC 33
2,623
USE GROUP AREA OCC. LOAD FACTOR OCC. LOAD
SMOKE COMPARTMENT - L2H
TOTAL 696
MEP - MECH/ELECT 118 SF 300 SF/OCC 1
S - STORAGE 1,534 SF 300 SF/OCC 13
B - BUSINESS 2,627 SF 100 SF/OCC 29
INP- INPATIENT TREAT 6,866 SF 240 SF/OCC 29
A- ASSEMBLY 9,308 SF 15 NSF/OCC 623
IT - DATA 118 SF 300 SF/OCC 1
USE GROUP AREA OCC. LOAD FACTOR OCC. LOAD
SMOKE COMPARTMENT - L2J
TOTAL 372
LKR - LOCKERS 287 SF 50 SF/OCC 7
MEP - MECH/ELECT 100 SF 300 SF/OCC 1
S - STORAGE 538 SF 300 SF/OCC 5
B - BUSINESS 9,617 SF 100 SF/OCC 108
INP- INPATIENT TREAT 6,798 SF 240 SF/OCC 29
A- ASSEMBLY 3,248 SF 15 NSF/OCC 221
IT - DATA 73 SF 300 SF/OCC 1
C - CLASSROOM 972 SF 20 SF/OCC 51
IT - DATA 460 SF 300 SF/OCC 2
LKR - LOCKERS 67 SF 50 SF/OCC 2
SUITE SUMMARY - LEVEL 02
REFERENCE SHEET GL-001 FOR FULL CODE REVIEW AND REQUIREMENTS
# AREA
L2H.a OT/PT
NAME SUITE TYPE
PATIENT CARE
NON-SLEEPING1,044 SF
REQUIRED EXITS
1 EXIT REQ./2 PROVIDED
L2J.a EXECUTIVE
L2J.b SAFETY & RISK MGMT NON PATIENT CARE570 SF
2,061 SF 1 EXIT REQ./2 PROVIDED
1 EXIT REQ./1 PROVIDED
L2J.c CLIENTS RIGHTS 834 SF 1 EXIT REQ./1 PROVIDED
L2J.d FINANCIAL OFFICE
L2J.e HR 1,079 SF
2,995 SF 2 EXIT REQ./2 PROVIDED
1 EXIT REQ./1 PROVIDED
L2J.f OFFICE 1,068 SF 1 EXIT REQ./1 PROVIDED
L2J.g COURT SUITE
L2K.a IT 1,543 SF
1,004 SF 1 EXIT REQ./2 PROVIDED
1 EXIT REQ./1 PROVIDED
NON PATIENT CARE
NON PATIENT CARE
NON PATIENT CARE
NON PATIENT CARE
NON PATIENT CARE
NON PATIENT CARE
NON PATIENT CARE
A T
T S
XETE FO
S A
18 2 4 4
R E G
IS
TE
RED ARCH
ITE
C T
D.
B R
IA
N
RO
E D
E R
PROFESSIONAL SEALS
DESCRIPTIONREVISION DATE
DATE
CHECKED BYDRAWN BY
PROJECT NUMBER
ORIGINAL ISSUE
SHEET NUMBER
F
IL
E
P A
E R
N A
M E
D A
T E S
T A
M P
REVISION HISTORY
KEY PLAN (NOT TO SCALE)
Page Southerland Page, Inc.
pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Dubai / Houston / Mexico City /
San Francisco / Washington DC / International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701
512 472 6721
512 477 3211
MECHANICAL ENGINEER
AFFILIATED ENGINEERS, INC
ONE GREEWAY PLAZA
SUITE 150
713-548-8900
HOUSTON, TX 77046
ELECTRICAL ENGINEER
CNG ENGINEERING, PLLC
1917 N. NEW BRAUNFELS AVE
SUITE 201
210-224-8841
SAN ANTONIO, TX 78208
CIVIL ENGINEER
GARZA EMC
7708 RIALTO BLVD
SUITE 125
512-298-3284
AUSTIN, TX 78735
ASSOCIATE ARCHITECT
ARCHITECTURE+
297 RIVER STREET
TROY, NY 12180
518-272-4481
U N
IV
E
R S
IT
Y
O F
T E
X A
S A
T A
U S
T
IN
D E
L L
M E
D
IC
A L S
C H
O O
L T
E X
A S
H E
A L
T H
A N
D H
U M
A N
S E
R V
IC
DATUM RIOS, LLC
8140 N MOPAC, BLDG 1
SUITE 120
512-469-9490
AUSTIN, TX 78759
FOODSERVICE CONSULTANT
RICCA DESIGN STUDIOS
5325 S VALENTA WAY
GREENWOOD VILLAGE
303-221-0500
CO, 80111
LANDSCAPE ARCHITECTURE
ASAKURA ROBINSON
1224 E 12TH STREET
SUITE 310
512-351-9601
AUSTIN, TX 78702
TELECOMMUNICATIONS
DATACOM DESIGN GROUP
7600 BURNET ROAD
SUITE 350
512-478-6001
AUSTIN, TX 78757
A E
B F
GC
J
K
L
D H
07/02/2020
W
\1
-B
A S H
-A -R
-n h a r k r e a d e r.
R V T
/2
/2
:4 :0
P
M
HC-GL-102
02 JULY 2020ISSUED FOR CONSTRUCTION
BDREDB
GENERAL - LIFE SAFETY PLAN - LEVEL
G
U A D
A
LU
P E S
T A U
S T
IN
T X
A U
S T
IN
S T A T E H
O S P
IT
A L
R E P
LA
C E M
E N
T
H O
S P
IT
A L
C O
M P
LE
T
IO
N P
A C K A G
E
PLAN
NORTH
TRUE
NORTH
SCALE: 1" = 30'-0"1 ARCHITECTURAL - LIFE SAFETY PLAN - LEVEL 02
KEYED NOTES
NUMBER DESCRIPTION
SC-L1A 12,163 SF
SC-L1B 14,721 SF
SC-L1C 15,334 SF
SC-L1D 7,095 SF
SC-L1E 10,134 SF
SC-L1F 11,985 SF
SC-L1H 20,126 SF
SC-L1K 8,225 SF
SC-L2A 11,194 SF
SC-L2B 14,054 SF
SC-L2C 15,719 SF
SC-L2D 13,485 SF
SC-L2E 10,161 SF
SC-L2F 10,912 SF
SC-L2G 10,313 SF
SC-L2H 22,208 SF
SC-L2J 20,865 SF
SC-L2K 13,388 SF
SC-L3B 7,011 SF
SC-L3C 16,129 SF
SC-L3D 13,564 SF
SC-L3E 10,532 SF
SC-L3F 11,208 SF
SC-L3G 10,788 SF
SC-L3J 13,933 SF
GL.02 CARD READER + KEY OVERRIDE AT GATE DOORS. KEYS
PROVIDED TO STAFF FOR EGRESS AND FIRE FIGHTERS FOR
INGRESS.
DN
ROOF AREA BELOW
H E
H E
H E
H E
SC-L3G
10,788 SF
SC-L3D
13,564 SF
SC-L3C
16,129 SF
SC-L3F
11,208 SF
SC-L3B
7,011 SF
SC-L3J
13,933 SF
172' - 0"
6"
172' - 4"
1"
4'
69' - 5"
199' - 8"
94' - 0"
8'
7"
122' - 0"
2"
143' - 6"
SC-L
3B
SC-L
3F
SC-L
3D
SC-L
3C
SC-L
3E
SC-L
3D
SC-L3GSC-L3E
SC-L3D
SC-L3G
SC-L3GSC-L3E
SC-L
3C
SC-L
3B
S C
-L 3B
S C
-L 3C
SC-L3E
10,532 SF
ROOF AREA BELOW
FEC
FEC
F E
C
FEC
F E
C
FEC
FEC
FEC
F E
C
F E
C
F E
C
FEC
FEC
F E
C
F E
C
FEC
SUITE L3J.b
2,787 SF
SUITE L3J.a
1,366 SF
SUITE L3J.c
786 SF
FEC
FEC
GROUP THERAPY
EXAM
HK
OFFICE, ADON
STORAGE
NURSING LAB
EXAMGROUP THERAPY
STAFF ELEV LOBBY
OFFICE, NURSE MGR
OFFICE, SHIFT SUPERV. OFFICE, THERAPY STAFF
OFFICE, THERAPY STAFF
SUPPLIES/ STORAGE
MOVEMENT STUDIO
ACTIVITY & REC. / SOCIAL
COMPUTER ROOM
PEER SUPPORT ROOM
CONSULT / VISIT
MULTI-PURPOSE ROOM
CONSULT / VISIT
GENERAL CLASSROOMGENERAL CLASSROOM
GROUP THERAPY
EXERCISE / FITNESS
THERAPY STAFF OFFICES
CONSULT
CONSULTCONSULT CONSULT
CORRIDOR
BEDROOM
CONSULT
CONSULT
CORRIDOR
CORRIDOR
CORRIDOR
BEDROOM
PATIENT STORAGE
BATHBATH
BATH BATHBATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATHBATH
BATH
BATH
CONFERENCE ROOM
BATH
BATH
BATH BATH
BATHBATH
BATH BATH BATH BATH BATH BATH
BATHBATH BATHBATH
BATH BATH
BATHBATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH
BATH BATH
BATH BATH
OFFICE, PSYCH.
OFFICE, THERAPY STAFF
CORRIDOR
CLEANING EQUIP.
CORRIDOR
TOILET TOILET
DATA
TOILET
TOILET
COMPUTER TRAINING
MEDICAL RECORDS
EQUIP. STORAGE
HK
KITCHENETTE
LARGE TRAINING
OFFICE
MEDIUM TRAINING
AV STOR.
ED & TRAINING OFFICE
RECORD REVIEW RECORD REVIEW
OFFICE
COPY
PRE-FUNCTION
STAFF RESPITE
STAFF QUIET
BUSINESS CENTER
RECORD STORAGE
SHAFT
CORRIDOR
CONFERENCE, SMALL
OFFICE, HIM DIRECTOR
BUSINESS CENTER
OFFICE, QM DIRECTOR
SHAFT
STORAGE
TOILET
TOILET
NURSING STAFF OFFICE
OFFICE, ADMIN. STAFF
MEDICAL RECORDS OFFICE
PT/VTST
PT/VT
ST
SOCIAL WORK OFFICE
OFFICE, DIR. SW
OFFICE, ASST. DIR. SW
OFFICE, DIR. REHAB
OFFICE, THERAPY STAFF
CORRIDOR
CPR TRAINING
HALL
BEDROOM
CORRIDOR
ELEV LOBBY
MEDS
LAUNDRY
CHARTING
HK
EQUIP.
TEAM ROOM
RESPITE
SOILED U.
PT
DINING
VT
VISITING
QUIET ACTIVITY
COMFORTPT
CLEAN U.
ST
C O
R R
ID
O
R
CORRIDOR
CARE STATION
VESTIBULE
STORAGE
BEDROOM
CORRIDOR
(E) PORCH
QUIET ACTIVITY
ACTIVITY
BEDROOM
BEDROOM (HC)
BATH (HC)
BEDROOM BEDROOM
CLOSET
BEDROOMBEDROOMBEDROOM
ACTIVITY
CORRIDOR
BEDROOM
QUIET ACTIVITY
ACTIVITY
BEDROOM
BEDROOM (HC)
BATH (HC)
BEDROOM
CLOSET
BEDROOM
BEDROOM
BEDROOM
BEDROOM
CORRIDOR
QUIET ACTIVITY
BEDROOM
BEDROOM (HC)
BATH (HC)
BEDROOM
BEDROOM
CLOSET
BEDROOM
BEDROOM
BEDROOM
DATA
ST
ANTE
PT
SECLUSION
CLINICAL TEAM OFFICE
CLINICAL TEAM OFFICE
PANTRY
MEDS
LAUNDRY
CHARTING
HK
TEAM ROOM
RESPITE
SOILED U.
PT
DINING
VT
VISITING
QUIET ACTIVITY
COMFORT
PT
CLEAN U.
ST
C O
R R
ID
O
R
C O
R R
ID
O
R
CARE STATION
VESTIBULE
STORAGE
BEDROOM
CORRIDOR
(E) PORCH
QUIET ACTIVITY
ACTIVITY
BEDROOM
BEDROOM (HC)
BATH (HC)
BEDROOMBEDROOM
CLOSET
BEDROOM BEDROOM BEDROOM
ACTIVITY
CORRIDOR
BEDROOM
QUIET ACTIVITY
ACTIVITY
BEDROOM
BEDROOM (HC)
BATH (HC)
BEDROOM
CLOSET
BEDROOM
BEDROOM
BEDROOM
BEDROOM
CORRIDOR
QUIET ACTIVITY
BEDROOM
BEDROOM (HC)
BATH (HC)
BEDROOM
BEDROOM
CLOSET
BEDROOM
BEDROOM
BEDROOM
DATA
ST
ANTE
PT
SECLUSION
CLINICAL TEAM OFFICE
CLINICAL TEAM OFFICE
PANTRY
MEDS
LAUNDRY
CHARTING
HK
TEAM ROOM
RESPITE
SOILED U.
SHAFT
PT
DINING
VT
PANTRY
VISITING
QUIET ACTIVITY
COMFORT PT
SHAFT
CLEAN U.
CLINICAL TEAM OFFICE
CLINICAL TEAM OFFICE
ST
CORRIDOR
CARE STATION
VESTIBULE
STORAGE
BEDROOM
CORRIDOR
(E) PORCH
QUIET ACTIVITY
ACTIVITY
BEDROOM
BEDROOM (HC)BATH (HC)
BEDROOMBEDROOM
CLOSET
BEDROOM BEDROOM BEDROOM
ACTIVITY
CORRIDOR
BEDROOM
(E) PORCH
QUIET ACTIVITY
ACTIVITY
BEDROOM
BEDROOM (HC)
BATH (HC)
BEDROOM
CLOSET
BEDROOM
BEDROOM
BEDROOM
BEDROOM
C O
R R
ID
O
R
(E) PORCH
QUIET ACTIVITY
BEDROOM
BEDROOM (HC)
BATH (HC)
BEDROOM
BEDROOM
CLOSET
BEDROOM
BEDROOM
BEDROOM
DATA
ST
ANTE
PT
SECLUSION
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
(E) STAIR
(E) STAIR
(E) STAIR
(E) STAIR
(E) STAIR
(E) STAIR
(E) STAIR
(E) STAIR
STAIR #12
(E) STAIR
STAIR
(E) STAIR
(E) STAIR
(E) STAIR
(E) ELECTRICAL
(E) ELECTRICAL
(E) ELECTRICAL
(E) ELECTRICAL
FHCFHC
OPEN TO BELOW
O P
E N
T O
B E
LO
W
OFFICE, FOR. PSYCH.
ROOF AREA BELOW
(E) ELECTRICAL
FEC
(E) ELECTRICAL
F E
C
FEC
FE
FE
FE
NFPA 101 7.13
NUBSEA: UNOCCUPIED
MECHANICAL PENTHOUSE
APPROX. 4,500 SQ FT
NFPA 101 7.13
NUBSEA: UNOCCUPIED
MECHANICAL PENTHOUSE
APPROX. 1,860 SQ FT
GL.01
FEC
F E
C
F E
C
(E) PORCH
(E) PORCH
(E) PORCH
(E) PORCH
ROOF AREA BELOW
171' - 10"
GL.06
GL.06
ROOF AREA BELOW
ROOF AREA BELOW
ROOF AREA BELOW
ROOF AREA
BELOW
LIFE SAFETY PLAN LEGEND
SMOKE COMPARTMENT NAME
SMOKE COMPARTMENT AREA
SMOKE PARTITION
1-HOUR FIRE BARRIER
SMOKE BARRIER WITH 1-HOUR FIRE RESISTANCE
2-HOUR FIRE BARRIER
SMOKE BARRIER WITH 2-HOUR FIRE RESISTANCE
SC-L1A
150 SF
U S
E O
C C
S F
B
5,000
@ 100/OCC OCC PER GSF/NSF
USE GROUP
GSF/NSF
OCC LOADO
C
C U
P A
N C
Y T
A G
S M
O K
E C
M P
R M
N T
T A
G
EXIT LIGHT
EXIT LIGHT WITH DIRECTIONAL ARROW
FIRE EXTINGUISHER CABINET
FIRE EXTINGUISHER
FEC
FE
PATH OF TRAVEL & DISTANCE (TO EXIT)100'
XX XX
DOOR/STAIR
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
SMOKE COMPARTMENT SEPARATION
B - BUSINESS (100 SF/OCC.)
A - ASSEMBLY- UNCONCENTRATED (15 NET SF/OCC.)
S - STORAGE (300 SF/OCC.)
MEP - MECH / ELEC/ BUILDING SUPPORT (300 SF/OCC.)
IT- IT/TELECOM USE (300SF/OCC.)
HORIZONTAL EXITHE
XX" .XX
PATH OF TRAVEL & DISTANCE (TO ADJACENT
SMOKE COMPARTMENT)
FIRE HOSE VALVE CABINETFHC
COMMON PATH OF TRAVEL
100'
100'
(EGRESS FACTOR
INCHES/PERSON)
(CALCULATED EGRESS
CAPACITY)
(EGRESS LOAD)
(WIDTH OF EGRESS
COMPONENT
HATCH PATTERN CODE + AREA USE
INP - INPATIENT TREATMENT (240 SF/OCC.)
SL - SLEEPING (120 SF/OCC.)
K- KITCHEN (100 SF/OCC.)
EX - EXERCISE ROOMS (50 SF/OCC.)
LKR- LOCKER ROOMS (50 SF/OCC.)
SUITE C - CLASSROOM (20 SF/OCC.)
LIFE SAFETY LEGEND
REFERENCE SHEET GL-001 FOR FULL CODE REVIEW AND REQUIREMENTS
SMOKE COMPARTMENT SQUARE FOOTAGES
OCCUPANT LOAD - LEVEL 03
REFERENCE SHEET GL-001 FOR FULL CODE REVIEW AND REQUIREMENTS
USE GROUP AREA OCC. LOAD FACTOR OCC. LOAD
SMOKE COMPARTMENT - L3B
TOTAL 101
MEP - MECH/ELECT 118 SF 300 SF/OCC 1
IT - DATA 144 SF 300 SF/OCC 1
B - BUSINESS 1,059 SF 100 SF/OCC 12
INP- INPATIENT TREAT 3,798 SF 240 SF/OCC 16
A- ASSEMBLY 946 SF 15 NSF/OCC 65
USE GROUP AREA OCC. LOAD FACTOR OCC. LOAD
SMOKE COMPARTMENT - L3C
TOTAL 215
EX - EXERCISE 665 SF 50 SF/OCC 14
MEP - MECH/ELECT 400 SF 300 SF/OCC 2
S - STORAGE 913 SF 300 SF/OCC 5
B - BUSINESS 3,315 SF 100 SF/OCC 44
INP - INPATIENT TREAT 6,815 SF 240 SF/OCC 29
A - ASSEMBLY 1,289 SF 15 NSF/OCC 87
USE GROUP AREA OCC. LOAD FACTOR OCC. LOAD
SMOKE COMPARTMENT - L3D
TOTAL 236
MEP - MECH/ELECT 237 SF 300 SF/OCC 2
IT - DATA 272 SF 300 SF/OCC 2
B - BUSINESS 1,442 SF 100 SF/OCC 16
INP- INPATIENT TREAT 6,815 SF 240 SF/OCC 29
A - ASSEMBLY 1,851 SF 15 NSF/OCC 174
USE GROUP AREA OCC. LOAD FACTOR OCC. LOAD
SMOKE COMPARTMENT - L3E
USE GROUP AREA OCC. LOAD FACTOR OCC. LOAD
SMOKE COMPARTMENT - L3G
TOTAL 171
SL - SLEEPING 3,664 SF 120 SF/OCC 33
INP- INPATIENT TREAT 5,408 SF 240 SF/OCC 23
A- ASSEMBLY 1,599 SF 15 NSF/OCC 111
S - STORAGE 217 SF 300 SF/OCC 4
S - STORAGE 1,664 SF 300 SF/OCC 13
S - STORAGE 773 SF 300 SF/OCC 6
TOTAL
TOTAL LEVEL 03 OCCUPANT LOAD
SL - SLEEPING 3,678 SF 120 SF/OCC 33
S - STORAGE 222 SF 300 SF/OCC 4
INP- INPATIENT TREAT 5,366 SF 240 SF/OCC 23
A- ASSEMBLY 1,574 SF 15 NSF/OCC 108
1,379
USE GROUP AREA OCC. LOAD FACTOR OCC. LOAD
SMOKE COMPARTMENT - L3F
TOTAL
SL - SLEEPING 3,647 SF 120 SF/OCC 33
S - STORAGE 157 SF 300 SF/OCC 4
INP- INPATIENT TREAT 5,623 SF 240 SF/OCC 24
A- ASSEMBLY 1,806 SF 15 NSF/OCC 125
USE GROUP AREA OCC. LOAD FACTOR OCC. LOAD
SMOKE COMPARTMENT - L3J
TOTAL 302
MEP - MECH/ELECT 127 SF 300 SF/OCC 1
S - STORAGE 1,207 SF 300 SF/OCC 8
B - BUSINESS 4,540 SF 100 SF/OCC 50
INP - INPATIENT TREAT 3,168 SF 240 SF/OCC 14
A - ASSEMBLY 2,862 SF 15 NSF/OCC 194
IT - DATA 73 SF 300 SF/OCC 1
C - CLASSROOM 673 SF 20 SF/OCC 34
C- CLASSROOM 647 SF 20 SF/OCC 34
SUITE SUMMARY - LEVEL 03
REFERENCE SHEET GL-001 FOR FULL CODE REVIEW AND REQUIREMENTS
# AREA
L3J.a QM/HIM
NAME
L3J.b MED RECORDS
SLEEPING TYPE
NON-SLEEPING
NON-SLEEPING2,787 SF
1,366 SF
REQUIRED EXITS
1 EXIT REQ./1 PROVIDED
2 EXIT REQ./3 PROVIDED
L3J.c ED TRAINING NON-SLEEPING786 SF 1 EXIT REQ./1 PROVIDED
AT
T S
XETE FO
S A
18 2 4 4
R E G
IS
TE
RED ARCH
ITE
C T
D.
B R
IA
N
RO
E D
E R
PROFESSIONAL SEALS
DESCRIPTIONREVISION DATE
DATE
CHECKED BYDRAWN BY
PROJECT NUMBER
ORIGINAL ISSUE
SHEET NUMBER
F
IL
E
P A
E R
N A
M E
D A
T E S
T A
M P
REVISION HISTORY
KEY PLAN (NOT TO SCALE)
Page Southerland Page, Inc.
pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Dubai / Houston / Mexico City /
San Francisco / Washington DC / International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701
512 472 6721
512 477 3211
MECHANICAL ENGINEER
AFFILIATED ENGINEERS, INC
ONE GREEWAY PLAZA
SUITE 150
713-548-8900
HOUSTON, TX 77046
ELECTRICAL ENGINEER
CNG ENGINEERING, PLLC
1917 N. NEW BRAUNFELS AVE
SUITE 201
210-224-8841
SAN ANTONIO, TX 78208
CIVIL ENGINEER
GARZA EMC
7708 RIALTO BLVD
SUITE 125
512-298-3284
AUSTIN, TX 78735
ASSOCIATE ARCHITECT
ARCHITECTURE+
297 RIVER STREET
TROY, NY 12180
518-272-4481
U N
IV
E
R S
IT
Y
O F
T E
X A
S A
T A
U S
T
IN
D E
L L
M E
D
IC
A L S
C H
O O
L T
E X
A S
H E
A L
T H
A N
D H
U M
A N
S E
R V
IC
DATUM RIOS, LLC
8140 N MOPAC, BLDG 1
SUITE 120
512-469-9490
AUSTIN, TX 78759
FOODSERVICE CONSULTANT
RICCA DESIGN STUDIOS
5325 S VALENTA WAY
GREENWOOD VILLAGE
303-221-0500
CO, 80111
LANDSCAPE ARCHITECTURE
ASAKURA ROBINSON
1224 E 12TH STREET
SUITE 310
512-351-9601
AUSTIN, TX 78702
TELECOMMUNICATIONS
DATACOM DESIGN GROUP
7600 BURNET ROAD
SUITE 350
512-478-6001
AUSTIN, TX 78757
A E
B F
GC
J
K
L
D H
07/02/2020
W
\1
-b
A S H
-A -R
-e b a r ri s .r v t
/1
/2
:0 :4
P
M
HC-GL-103
02 JULY 2020ISSUED FOR CONSTRUCTION
BDREDB
GENERAL - LIFE SAFETY PLAN - LEVEL
G
U A D
A
LU
P E S
T A U
S T
IN
T X
A U
S T
IN
S T A T E H
O S P
IT
A L
R E P
LA
C E M
E N
T
H O
S P
IT
A L
C O
M P
LE
T
IO
N P
A C K A G
E
SCALE: 1" = 30'-0"1 ARCHITECTURAL - LIFE SAFETY PLAN - LEVEL 03
PLAN
NORTH
TRUE
NORTH
KEYED NOTES
NUMBER DESCRIPTION
SC-L1A 12,163 SF
SC-L1B 14,721 SF
SC-L1C 15,334 SF
SC-L1D 7,095 SF
SC-L1E 10,134 SF
SC-L1F 11,985 SF
SC-L1H 20,126 SF
SC-L1K 8,225 SF
SC-L2A 11,194 SF
SC-L2B 14,054 SF
SC-L2C 15,719 SF
SC-L2D 13,485 SF
SC-L2E 10,161 SF
SC-L2F 10,912 SF
SC-L2G 10,313 SF
SC-L2H 22,208 SF
SC-L2J 20,865 SF
SC-L2K 13,388 SF
SC-L3B 7,011 SF
SC-L3C 16,129 SF
SC-L3D 13,564 SF
SC-L3E 10,532 SF
SC-L3F 11,208 SF
SC-L3G 10,788 SF
SC-L3J 13,933 SF
GL.01 2-HR GLAZING; REFERENCE SPECIFICATION
GL.06 ELEVATOR SMOKE CURTAIN AT THIS LOCATION, ALL LEVELS
(INCLUDING PENTHOUSE, WHERE APPLICABLE).
| Pages from ASH_ HCP IFC Drawings - Vol 1A |
| Pages from ASH_ HCP IFC Drawings - Vol 1A-2 |
| Pages from ASH_ HCP IFC Drawings - Vol 1A-3 |
File details come from the government source that posted it. Updated .