ESBD_394328_1738940388091_Appendix G - Hardware & Location List.pdf
PDF 106 KB Posted
- Solicitation number
- 735-2025-4405
- Issued by
- Texas
About this file
This is a Hardware and Location List (Appendix G) for Midwestern State University's RFP 73520254405, detailing required door hardware installations across three campus buildings. The document specifies quantities and locations for various door hardware components including mortise locksets, exit device trims, rim housings, and cylinder assemblies. Section 1 (Dillard College of Business) requires installation of 4 mortise locksets, 8 exit device trims, 8 rim housings, 8 double cylinder head assemblies, and 8 thumbturn cylinders. Section 2 (Bridwell Hall) calls for 10 mortise locksets and 1 exit device trim. Section 3 (Fain Fine Arts, D.L. Ligon Coliseum & Martin Hall) requires 5 mortise locksets, 1 wrap-around component, and 2 2SI kits.
The document includes detailed room locations for each hardware installation, with specific right-hand/left-hand configurations and finish requirements (primarily in 626 and US26D finishes). Each section includes separate line items for shipping, handling, and onsite installation services. The hardware specifications indicate this is for new equipment installation, with components requiring professional installation in specific campus locations like room 306, 335B, 129B, and others across the three building sections.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix G: Hardware and Location List
RFP 735‐2025‐4405
Sec. Line Description Quantity UOM Unit Price Extended Pricie Section 1: Dillard College of Business
1 1 Mortise Lockset ML2067 LSM RH 626 2 Each 1 2 Mortise Lockset ML2067 LSM LH 626 2 Each 1 3 Exit Device Trim 996L ‐ R&V LHR US26D 3 Each 1 4 Exit Device Trim 996L ‐ R&V RHR US26D 5 Each 1 5 Rim Housing 3070‐178‐6 626 8 Each 1 6 Double Cylinder Head Assembly 98/99 RIM F‐2 CONVERSION KIT LHR US28 8 Each 1 7 Thumbturn Cylinder XB11‐979 626 8 Each 1 8 Shipping & Handling (Total): 1 Each 1 9 Onsite Lock Installation 2 Each 1 10 Onsite Head Assembly Installation 8 Each
Section 1 SUB‐TOTAL:
Section 2: Bridwell Hall 2 1 Mortise Lockset ML2067 LSM LHR 626 1 Each 2 2 Mortise Lockset ML2067 LSM LH 626 2 Each 2 3 Mortise Lockset ML2067 LSM RH 626 7 Each 2 4 Exit Device Trim 996L‐NL‐R&V LHR US26D 1 Each 2 5 Shipping & Handling: 1 Each 2 6 Onsite Hardware Installation 11 Each
Section 2 SUB‐TOTAL:
Section 3: Fain Fine Arts, D.L. Ligon Coliseum & Martin Hall 3 1 Mortise Lockset ML2067 LSF CL6 RHR 613 1 Each 3 2 Mortise Lockset ML2067 LSF CL6 RH 626 2 Each 3 3 Mortise Lockset ML 2067 LSF CL6 RHR 626 2 Each 3 4 Wrap Around 9080‐CW RHR 10B 1 Each 3 5 2SI Kit‐2SI KIT 2SI 626 2 Each 3 6 Shipping & Handling: 1 Each 3 7 Onsite Hardware Installation 8 Each
Section 3 SUB‐TOTAL:
Overall TOTAL:
Appendix G: Hardware and Location List
RFP 735‐2025‐4405
Sec. Line
1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 9 1 10
2 1 2 2 2 3 2 4 2 6
3 1 3 2 3 3 3 4 3 5 3 7
Section 2: Bridwell Hall
Opening Location for Corresponding Hardware/install (Room) Section 1: Dillard College of Business
306, 335B 306B, 335 129B, 101B, 131 101A, 121A, 177, 178, 178B 129A, 101A, 101B, 121A, 131, 177, 178, 178B 129A, 101A, 101B, 121A, 131, 177, 178, 178B 129A, 101A, 101B, 121A, 131, 177, 178, 178B 306B, 335 129A, 101A, 101B, 121A, 131, 177, 178, 178B
DL LIGON 131 DL LIGON 219, DL LIGON 223A, DL LIGON 223B, FFA 105A, FFA 105B, FFA C111, MARTIN 108
209B 109A, ,209A 109B/110, 204A, 204B, 205B, 209A, 308A, 308A/B Facility Serv Admin 109, 109B/110, 204A, 204B, 209A, 209B, 308A, 308A/B, Facility Serv Admin
Section 3: Fain Fine Arts, D.L. Ligon Coliseum & Martin Hall
FFA C111
DL LIGON 219, FFA 105A
DL LIGON 131, Martin 108
FFA C111
DL LIGON 223A, DL LIGON 223B
File details come from the government source that posted it. Updated .