ESBD_394328_1738940388091_Appendix G - Hardware & Location List.pdf

PDF 106 KB Posted

Attached to
Request for Proposal 735-2025-4405 Provide/Install Door Locksets & Hardware
Solicitation number
735-2025-4405
Issued by
Texas

About this file

This is a Hardware and Location List (Appendix G) for Midwestern State University's RFP 73520254405, detailing required door hardware installations across three campus buildings. The document specifies quantities and locations for various door hardware components including mortise locksets, exit device trims, rim housings, and cylinder assemblies. Section 1 (Dillard College of Business) requires installation of 4 mortise locksets, 8 exit device trims, 8 rim housings, 8 double cylinder head assemblies, and 8 thumbturn cylinders. Section 2 (Bridwell Hall) calls for 10 mortise locksets and 1 exit device trim. Section 3 (Fain Fine Arts, D.L. Ligon Coliseum & Martin Hall) requires 5 mortise locksets, 1 wrap-around component, and 2 2SI kits.

The document includes detailed room locations for each hardware installation, with specific right-hand/left-hand configurations and finish requirements (primarily in 626 and US26D finishes). Each section includes separate line items for shipping, handling, and onsite installation services. The hardware specifications indicate this is for new equipment installation, with components requiring professional installation in specific campus locations like room 306, 335B, 129B, and others across the three building sections.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix G: Hardware and Location List

RFP 735‐2025‐4405

Sec. Line Description Quantity UOM Unit Price Extended Pricie Section 1: Dillard College of Business

1 1 Mortise Lockset ML2067 LSM RH 626 2 Each 1 2 Mortise Lockset ML2067 LSM LH 626 2 Each 1 3 Exit Device Trim 996L ‐ R&V LHR US26D 3 Each 1 4 Exit Device Trim 996L ‐ R&V RHR US26D 5 Each 1 5 Rim Housing 3070‐178‐6 626 8 Each 1 6 Double Cylinder Head Assembly 98/99 RIM F‐2 CONVERSION KIT LHR US28 8 Each 1 7 Thumbturn Cylinder XB11‐979 626 8 Each 1 8 Shipping & Handling (Total): 1 Each 1 9 Onsite Lock Installation 2 Each 1 10 Onsite Head Assembly Installation 8 Each

Section 1 SUB‐TOTAL:

Section 2: Bridwell Hall 2 1 Mortise Lockset ML2067 LSM LHR 626 1 Each 2 2 Mortise Lockset ML2067 LSM LH 626 2 Each 2 3 Mortise Lockset ML2067 LSM RH 626 7 Each 2 4 Exit Device Trim 996L‐NL‐R&V LHR US26D 1 Each 2 5 Shipping & Handling: 1 Each 2 6 Onsite Hardware Installation 11 Each

Section 2 SUB‐TOTAL:

Section 3: Fain Fine Arts, D.L. Ligon Coliseum & Martin Hall 3 1 Mortise Lockset ML2067 LSF CL6 RHR 613 1 Each 3 2 Mortise Lockset ML2067 LSF CL6 RH 626 2 Each 3 3 Mortise Lockset ML 2067 LSF CL6 RHR 626 2 Each 3 4 Wrap Around 9080‐CW RHR 10B 1 Each 3 5 2SI Kit‐2SI KIT 2SI 626 2 Each 3 6 Shipping & Handling: 1 Each 3 7 Onsite Hardware Installation 8 Each

Section 3 SUB‐TOTAL:

Overall TOTAL:

Appendix G: Hardware and Location List

RFP 735‐2025‐4405

Sec. Line

1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 9 1 10

2 1 2 2 2 3 2 4 2 6

3 1 3 2 3 3 3 4 3 5 3 7

Section 2: Bridwell Hall

Opening Location for Corresponding Hardware/install (Room) Section 1: Dillard College of Business

306, 335B 306B, 335 129B, 101B, 131 101A, 121A, 177, 178, 178B 129A, 101A, 101B, 121A, 131, 177, 178, 178B 129A, 101A, 101B, 121A, 131, 177, 178, 178B 129A, 101A, 101B, 121A, 131, 177, 178, 178B 306B, 335 129A, 101A, 101B, 121A, 131, 177, 178, 178B

DL LIGON 131 DL LIGON 219, DL LIGON 223A, DL LIGON 223B, FFA 105A, FFA 105B, FFA C111, MARTIN 108

209B 109A, ,209A 109B/110, 204A, 204B, 205B, 209A, 308A, 308A/B Facility Serv Admin 109, 109B/110, 204A, 204B, 209A, 209B, 308A, 308A/B, Facility Serv Admin

Section 3: Fain Fine Arts, D.L. Ligon Coliseum & Martin Hall

FFA C111

DL LIGON 219, FFA 105A

DL LIGON 131, Martin 108

FFA C111

DL LIGON 223A, DL LIGON 223B

File details come from the government source that posted it. Updated .