About this file
This document is a bid response process guide issued by the Texas Tech University System Facilities Planning and Construction department for using the Trimble Unity Construct electronic bidding system. The guide outlines a detailed 9-step process for submitting bids, including locating the bidding link on the Electronic State Business Daily (ESBD) website, signing into the bid portal, verifying company information, viewing bid documents, accepting/declining bid invitations, submitting questions through the Q&A board, reviewing addenda, completing the response form, and submitting the final bid. The process includes specific deadlines for questions and responses, with all communications being tracked electronically through the system.
The system eliminates paper-based processes by maintaining an automatically generated log of all communications and bid activity, which helps minimize risks and decrease liability. Bidders must submit responses in PDF format combined into one document, with specific requirements for RFP versus RFQ submissions (RFQ submissions require entering "0" in the Total Cost field). The platform includes features for downloading/uploading bid costs in Excel format, viewing addenda, and receiving email confirmations of submissions. After bid closing, a Selection Committee reviews submissions outside of Trimble Unity Construct, with bidders receiving notifications of awards or rejections through the system.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Trimble Unity Construct Bid Response Process
Indicates that field is required
Last updated 10/25/2024*1
Last updated 10/25/2024*22
The Bidding Process
The Bidding Module eliminates the large paper trail. The system keeps an automatically generated log of all communications and activity, enabling the ability to document all bid activity and associated information exchange. This minimizes risks, decreases liability, and eliminates miscommunication.
Maintaining an online database of bidders and activity reporting for bids won, bids lost, and responsiveness provides historical references for future reference.
Executives or other individuals from the organization requiring visibility into bid activity can automatically generate the necessary bid reports.
Last updated 10/25/2024*3
Step 1: Locating the Bidding Link on the ESBD Website
Public Bidders will access the Project Solicitation from the link provided on the ESBD (Electronic State Business Daily) Website:
txsmartbuy.com/esbd
Please follow the link to the Trimble Unity Construct website in the
Solicitation Description on ESBD’s Project Solicitation page to be directed to the Trimble Unity Construct Bid Portal log-in screen.
https://bidders.e-builder.net/landing?bidpackageid=6e87edf5-853c-4136-a3c4-a645aa89d7d6
Once the Bidding goes live, Bidders can directly access the Bid Portal from the ESBD Website.
Last updated 10/25/2024*4
Step 2: Signing into the Bid Portal in Trimble Unity Construct
Existing Users:
• Login with existing Trimble Unity
Construct credentials
• Once logged in, continue to Step 3
New Users:
• Click on Create Account at the bottom of the login screen
• Follow the steps provided to create a new
Trimble Unity Construct account
• You will receive an email from Trimble
Unity Construct to verify your account once it is created
• Click the Get Started button in the email as shown below
• You will be prompted to create a password for your Trimble Unity Construct account
• Once done, continue to Step 3
Once on the Trimble Unity Construct Bid Portal log-in screen, follow the steps below related to whether you have an Existing Trimble Unity
Construct Bid Portal Account or whether you are a New User.
*If you have submitted a Bid Response through this Trimble Unity Construct
Bid Portal previously, you can use the same account login information. If this is your first time, you are New User.
Pictured: Account Verification Email.
Last updated 10/25/2024*5
Step 3: Verifying Information
When first logging into an invitation to bid on the
Bid Portal, Bidders must confirm their Company and Contact Information before proceeding to Bid
Information. To confirm your information, click
Save.
Pictured: Email Notification of Bid Invitation.
testemail@email.com
An Email Notification of a Bid Invitation from e-
Builder will also be sent to Bidders once Bidders log-in to the Bid Portal, an example is shown to the right.
*If Bidder does not ever see a screen to confirm their Company and Contact Information, please contact Alexis Henry, Contract Administrator, at alexis.henry@ttu.edu. Bidder may need a new link sent to them.
Last updated 10/25/2024*6
After logging into the Trimble Unity Construct Bid Portal, the user will be redirected to the bid to review and respond.
Step 4: View Bid Documents Before choosing whether to accept or decline the bid, you can view the Bid
Documents (RFP, RFQ, etc.) in the Invitation Documents tab under the
Package Invitation section.
View the documents by clicking the Download Icon beside the files. This will download the documents onto your computer for you to read over the bid package details.
Last updated 10/25/2024*7
* Step 5: Accept/Decline Bid After viewing the Bid Documents, you can Accept or Decline the bid.
If you choose to Accept, click the blue Accept button. When accepted, a time stamp will show the Date and Time that you chose to accept. Once accepted, proceed to Step 6 and follow the instructions within the Bid Documents to prepare your bid response.
If you choose to Decline, click the gray
Decline button. A time stamp will show the Date and Time that you chose to decline. Once declined, you are finished with your bid response.
Pictured: (Above) Accepted button with timestamp.
(Below) Declined button with timestamp.
Last updated 10/25/2024*8
Step 6: Questions/Responses The Q&A Board section of the Bid Package allows for electronic tracking and management of questions and bid related responses that occur during the bidding cycle.
Subject:
• Enter the Subject of your question here.
Question:
• Enter the Question here.
After the time frame to submit questions has passed, questions will be collected by the Contract Administrator and addressed in an Addenda. Once the
Addenda is posted, Bidders can submit bid responses.
The time frame to submit questions will be in the Bid Documents located in the
Invitation Documents tab (See Step 4).
Once submitted, the question will appear on the bidder’s screen. An example is shown below.
To submit a question, click on the blue Submit Question button. A pop-up window with fields to ask the question will appear. When done, press the blue
Submit Question button again to submit.
Pictured: Submit Question pop-up window.
Last updated 10/25/2024*9
*** If Bidders have already submitted a bid response and an
Addenda is posted, Trimble Unity Construct will kick out your bid and you will need to resubmit. The Contract Administrator will make an attempt to contact you, but it is your responsibility to resubmit the bid. ***
Step 7: Addenda After the time frame has passed to submit questions, the Contract Administrator will collect the questions submitted and they will be addressed in the Addenda.
A message that an Addenda is available will be located in the Package Invitation section under the Addenda tab. The
Addenda message will alert the bidders to view the Addenda Document in the
Invitation Documents tab. Bidders will also receive an email when an Addenda has been posted.
Addenda 1 has been added to the Bid Documents. Please view Addenda under Invitation Documents Tab. You will need to re-submit your bid if you have already submitted.
Pictured: Email notification that an Addenda has been adding to the bid.
Last updated 10/25/2024*10
Step 8: Response Form After you have reviewed the Addenda and your Bid Response is prepared, fill out the required fields and attach your Bid Response Documents in the
Response Form section. Follow the Steps below to submit your bid:
Step 1 – Bid Form
Fill out the Bid Scope line items below. If you prefer to fill out line items in
Excel, use the Download and Upload Bid Cost buttons ( ) to do so.
If the Bid is for an RFQ, enter 0 in the Total Cost field (shown below).
If the Bid is for an RFP, fill out all required Bid Scope fields.
Last updated 10/25/2024*11
Step 8: Response Form (Continued) After you have reviewed the Addenda and your Bid Response is prepared, fill out the required fields and attach your Bid Response Documents in the
Response Form section. Follow the Steps below to submit your bid:
Step 2 – Response Documents
Upload the Bid Response Documents using the Upload Box shown above.
The Documents must be in PDF Format and all be Combined into One (1)
Document.
Once uploaded, you can view/edit the documents as shown below.
Last updated 10/25/2024*12
Step 8: Response Form (Continued) After you have reviewed the Addenda and your Bid Response is prepared, fill out the required fields and attach your Bid Response Documents in the
Response Form section. Follow the Steps below to submit your bid:
Step 3 – Additional Info
Before submitting your Bid Response, you must acknowledge that you have viewed all Addenda items. Check the box confirming that you have Read and
Agreed to the terms of the Addenda. If you do not, an Error message will prevent you from submitting your Bid Response like the one pictured below.
Please leave the Qualifications field blank, as all of the required information will be submitted in your Bid Response documents.
Last updated 10/25/2024*13
Step 9: Submit Bid After the Addenda is posted and all the Response Form steps complete, the bidder will click the blue Submit button to submit their bid. A time stamp with the Date and Time submitted will be shown, as well as an Email Confirmation of your submission.
Pictured: (Above) Timestamp of submitted bid.
(Below) Email confirmation of submitted bid.
Last updated 10/25/2024*14
Once selections have been made, Bidders will receive an e-Builder notification from the Contract Administrator of a Bid Award or Bid
Rejection.
If Awarded, Bidder will be contacted directly for further instruction.
After bidding has closed, the Contract Administrator will initiate the process of opening and reviewing the bids on the designated opening date. A Selection
Committee will review the bids outside of Trimble Unity Construct.
Bid Award/Rejection
Pictured: Email Notification of Bid Award.