About this file

This Addendum #1, issued by SSC Services for Education for Texas A&M University's Bright Building hydronic pumps and piping replacement project (#2023-06178), modifies contract documents dated December 9, 2024, prepared by Ramirez Simon Engineering, LLC. The addendum makes several key changes to the project drawings, including the addition of new mechanical drawings MD601, MD602, M601, and M602 to the sheet list. The modifications include installation of new isolation valves for chilled water and heating water piping systems, with 4 new isolation valves added to 10" CHS/R and 4" HWS/R piping at the point of entry, and 2 new isolation valves for 2-1/2" CHS/R branch piping in the mechanical room.

The electrical drawing changes include removal of the temporary location of CWP-1 from demolition phase 1, modification of contractor coordination requirements, removal of keynote 4, and changes to disconnecting means from VFD to safety switch for ACCP-2 in the wind tunnel demolition plan. Circuit sources were added for HVAC units to be demolished on multiple floors (second, fourth, and fifth), and the ACCP-2 VFD label was removed from the renovation plan for the wind tunnel. The addendum must be acknowledged by proposers when submitting their proposals, and it takes precedence over previously issued Contract Documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SSC Services for Education Facilities Services Revised 11/2023

File: Documents / 06 Bid & Awards / Bid Package

ADDENDUM

SECTION 00 91 13

Project Title: Replace Hydronic Pumps and Piping in the Building

Project #: 2023-06178

Bldg. Name: Bright Bldg. #: 03535

ADDENDUM # 01 - Dated 01/21/2025

This Addendum shall modify, amend, extend and become a part of the Contract Documents dated 12/09/2024 prepared by Ramirez Simon Engineering, LLC (RSE) in accordance with the terms therein, as if written out in full therein and bound originally therewith.

Questions concerning this Addendum, or the Contract Documents should be addressed to Mark Claypool PE by email

(mcclaypool@ramirez-simon.com).

In cases of conflict, the Addendum shall take precedence over previously issued Contract Documents.

Proposers shall acknowledge receipt of this Addendum when they submit their proposal.

The following items have been amended:

General Drawing Changes

1. G001 - GENERAL INFORMATION

a. Added drawings MD601, MD602, M601, and M602 to sheet list.

Mechanical Drawing Changes

1. MD601 - MECHANICAL DEMOLITION CHILLED WATER FLOW DIAGRAM

a. Added new MD601 drawing.

2. MD602 - MECHANICAL DEMOLITION HEATING WATER FLOW DIAGRAM

a. Added new MD602 drawing.

3. M301 - MECHANICAL RENOVATION PLANS – BASEMENT LEVEL

a. Added 4 new isolation valves to 10” CHS/R and 4” HWS/R piping adjacent to point of entry.

SSC Services for Education Facilities Services Revised 11/2023

File: Documents / 06 Bid & Awards / Bid Package

4. M401 - MECHANICAL RENOVATION ENLARGED PLAN AND SECTIONS – BASEMENT LEVEL – MECHANICAL

ROOM

a. Added 2 new isolation valves to 2-1/2” CHS/R branch piping in mechanical room.

5. M601 – MECHANICAL RENOVATION CHILLED WATER FLOW DIAGRAM

a. Added new M601 drawing.

6. M602 - MECHANICAL RENOVATION HEATING WATER FLOW DIAGRAM

a. Added new M602 drawing.

Electrical Drawing Changes

1. ED101 - ELECTRICAL DEMOLITION PLAN – BASEMENT LEVEL

a. Removed temporary location of CWP-1 from the demolition phase 1 plan. Modified keynote 3 to instruct the electrical contractor to coordinate location of unit with mechanical contactor.

b. Removed keynote 4 from plans.

c. Changed the local disconnecting means from a VFD to a safety switch serving ACCP-2 in the demolition plan for the wind tunnel.

2. ED102 - ELECTRICAL DEMOLITION PLAN – SECOND FLOOR

d. Added circuit source of HVAC units to be demolished.

3. ED103 - ELECTRICAL DEMOLITION PLAN – FOURTH FLOOR

e. Added circuit source of HVAC unit to be demolished.

4. ED104 - ELECTRICAL DEMOLITION PLAN – FIFTH FLOOR

f. Added circuit source of HVAC unit to be demolished.

5. E101 - ELECTRICAL RENOVATION PLAN – BASEMENT LEVEL

g. Removed ACCP-2 VFD label from renovation plan for the wind tunnel.

END OF ADDENDUM # 01

GENERAL

INFORMATION

G001

PROJECT

LOCATION

VICINITY MAP

DRAWING LIST

SHEET

NO. SCALE SHEET TITLE

G001 NTS GENERAL INFORMATION

MD301 1/8" = 1'-0" MECHANICAL DEMOLITION PLAN - BASEMENT

MD303 1/8" = 1'-0"

M501 NTS MECHANICAL DETAILS

APPLICABLE CODES:

NFPA 101 - LIFE SAFETY CODE (2024)

INTERNATIONAL BUILDING CODE (IBC 2024)

INTERNATIONAL FIRE CODE (IFC 2024)

INTERNATIONAL MECHANICAL CODE (IMC 2024)

INTERNATIONAL ENERGY CONSERVATION CODE (IECC 2018)

NEC (2023)

NFPA 1 - FIRE CODE (2024)

NFPA 72 - NATIONAL FIRE ALARM AND SIGNALING CODE (2024)

M001 NTS MECHANICAL LEGEND AND GENERAL INFORMATION

MECHANICAL DEMOLITION PLAN - SECOND FLOOR

M301 1/8" = 1'-0" MECHANICAL RENOVATION PLAN - BASEMENT

M303 1/8" = 1'-0" MECHANICAL RENOVATION PLAN - SECOND FLOOR

MD304 1/8" = 1'-0" MECHANICAL DEMOLITION PLAN - THIRD FLOOR

MD305 1/8" = 1'-0" MECHANICAL DEMOLITION PLAN - FOURTH FLOOR

M304 1/8" = 1'-0" MECHANICAL RENOVATION PLAN - THIRD FLOOR

M305 1/8" = 1'-0" MECHANICAL RENOVATION PLAN - FOURTH FLOOR

LIST OF ALTERNATES:

BASE BID: REPLACE BLDG. CHILLED WATER AND HEATING WATER PIPING AND PUMPS. REMOVE

ED101

M701 NTS MECHANICAL SCHEDULES

NTS MECHANICAL CONTROLSM801

E001 ELECTRICAL LEGEND AND GENERAL NOTES

1/8" = 1'-0"

NTS

ELECTRICAL DEMOLITION PLAN - BASEMENT LEVEL

ED601 NTS ELECTRICAL DEMOLITION ONE LINE DIAGRAM

E701 ELECTRICAL SCHEDULES

M302 1/8" = 1'-0" MECHANICAL RENOVATION PLAN - FIRST FLOOR

MD302 1/8" = 1'-0" MECHANICAL DEMOLITION PLAN - FIRST FLOOR

PROJECT ADDRESS:

PROJECT NAME:

CLIENT NAME:

Bright Building Texas A&M University, College Station, Texas 77843

Texas A&M University

SSC PROJECT No.:

FULL SIZE SHEET: 30X42

A

B

C

D

2 3 4 5

SEAL

CONSULTANTS

SHEET TITLE

RSE PROJECT NO: 1515

MARK DATE DESCRIPTION

ISSUED FOR CONSTRUCTION

PROJECT INFORMATION

ISSUE

SHEET NUMBER

1 2 3 4 5

2023-06178

Bright Building Replace Hydronic Pumps and Piping in the Building

1/21/2025

DECEMBER 9, 2024

MD306 1/8" = 1'-0" MECHANICAL DEMOLITION PLAN - FIFTH FLOOR

MD307 1/8" = 1'-0" MECHANICAL DEMOLITION PLAN - SIXTH FLOOR

MD308 1/8" = 1'-0" MECHANICAL DEMOLITION PLAN - SEVENTH FLOOR

MD309 1/8" = 1'-0" MECHANICAL DEMOLITION PLAN - ROOF LEVEL

M306 1/8" = 1'-0" MECHANICAL RENOVATION PLAN - FIFTH FLOOR

M307 1/8" = 1'-0" MECHANICAL RENOVATION PLAN - SIXTH FLOOR

M308 1/8" = 1'-0" MECHANICAL RENOVATION PLAN - SEVENTH FLOOR

M309 1/8" = 1'-0" MECHANICAL RENOVATION PLAN - ROOF LEVEL

E002 ELECTRICAL LEGEND AND GENERAL NOTESNTS

E101 1/8" = 1'-0" ELECTRICAL RENOVATION PLAN - BASEMENT LEVEL

E401 1/4" = 1'-0" ELECTRICAL ENLARGED PLANS

E601 ELECTRICAL RENOVATION ONE LINE DIAGRAMNTS

NTS

ALT #1: REPLACE WIND TUNNEL CHILLED WATER PIPING AND PUMP.

COMPUTER ROOM PROCESS CHILLED WATER PIPING, PUMPS, AND ABANDONED CRAC UNITS.

M401 1/4" = 1'-0" MECHANICAL RENOVATION ENLARGED PLAN AND SECTIONS - BASEMENT LEVEL

MD401 1/4" = 1'-0" MECHANICAL DEMOLITION ENLARGED PLANS - BASEMENT LEVEL

ED102 1/8" = 1'-0" ELECTRICAL DEMOLITION PLAN - SECOND FLOOR

ED103 1/8" = 1'-0" ELECTRICAL DEMOLITION PLAN - FOURTH FLOOR

ED104 1/8" = 1'-0" ELECTRICAL DEMOLITION PLAN - FIFTH FLOOR

E102 1/8" = 1'-0" ELECTRICAL RENOVATION PLAN - SECOND FLOOR

E103 1/8" = 1'-0" ELECTRICAL RENOVATION PLAN - FOURTH FLOOR

E104 1/8" = 1'-0" ELECTRICAL RENOVATION PLAN - FIFTH FLOOR

E702 ELECTRICAL SCHEDULESNTS

NTS MECHANICAL CONTROLSM802

E501 ELECTRICAL DETAILSNTS

MD601 NTS MECHANICAL DEMOLITION CHILLED WATER FLOW DIAGRAM

MD602 NTS MECHANICAL DEMOLITION HEATING WATER FLOW DIAGRAM

M601 NTS MECHANICAL RENOVATION CHILLED WATER FLOW DIAGRAM

M602 NTS MECHANICAL RENOVATION HEATING WATER FLOW DIAGRAM

1 01/21/25 ADDENDUM 1

BASEMENT LEVEL

FIRST FLOOR LEVEL

SECOND FLOOR LEVEL

THIRD FLOOR LEVEL

FOURTH FLOOR LEVEL

FIFTH FLOOR LEVEL

SIXTH FLOOR LEVEL

SEVENTH FLOOR LEVEL

ROOF LEVEL

AHU-G-1

8" C

H S

8" C

H S

CWP-1

4" CHS

4" CHR

8" C

H R

8" C

H S

8" CHS

8" CHR

FLOW

METER

M

4" C

C H

R

4" C

C H

S

4" C

C H

S

4" C

C H

S

ACCP-1

M

AHU-1-1

EXP-2

4" CCHS

4" CCHR

4" W

C H

S

4" W

C H

S

ACCP-2

4" WCHS

4" WCHR

M

EXP-1

M

2-1/2" WCHS

2-1/2" WCHR

2-1/2" WCHS

2-1/2" WCHR

M

AHU-2-1

M

AHU-3-1

M

AHU-4-1

M

AHU-5-1

M

AHU-6-1

AHU-7-1

CFP-1

MTS-1 MTS-2 AC

FCU-P-1

4" CCHS

4" CCHR

CRAC-2-1 CRAC-2-2

2-1/2" CCHS

2-1/2" CCHR

1-1/2" CCHS

1-1/2" CCHR

1-1/2" CCHS1-1/2" CCHR RECESSED FLOOR

CRAC-6-1 CRAC-6-2

2" CCHS

2" CCHR

RECESSED FLOOR

4" CHS

4" CHR

4" CHS

4" CHR

4" CHS

4" CHR

4" CHS

4" CHR

4" CHS

4" CHR

4" CHS

4" CHR

4" CHS

4" CHR

2" CHS

2" CHR

M

4" CCHS

4" CCHR

DEMOLISH TO POINT

OF ENTRY AT BLDG.

DEMOLISH TO POINT

OF ENTRY AT BLDG.

PENTHOUSE

2" CCHS

2" CCHR

DEMOLISH TO POINT

OF ENTRY AT BLDG.

1-1/2" CCHS

1-1/2" CCHR

1-1/2" CCHS

1-1/2" CCHR

FCU

3/ 4"

C C

H S

3/ 4"

C C

H R

1-1/2" CCHS

1-1/2" CCHR

1-1/2" CCHS

1-1/2" CCHR

FCU

3/ 4"

C C

H S

3/ 4"

C C

H R

M

CFP-2

2- 1/

2" W

C H

S

2- 1/

2" W

C H

R

2" CCHS

2" CCHR

1" CCHS

1" CCHR

1-1/2" CCHS

1-1/2" CCHR

1" C

C H

S

1" C

C H

R

3/4" CCHR

3/4" CCHS

3/ 4"

C C

H R

3/4" CCHS

4" CCHR

4" CCHS

8" C

H R

8" C

H S

4" C

C H

R

4" C

C H

S

6" C

H R

6" C

H S

4" C

C H

R

4" C

C H

S

6" C

H R

6" C

H S

4" C

C H

R

4" C

C H

S

6" C

H R

6" C

H S

4" C

C H

R

4" C

C H

S

4" C

H R

4" C

H S

4" C

C H

R

4" C

C H

S

4" C

H R

4" C

H S

4" C

C H

R

4" C

C H

S

TEMPORARILY

RELOCATE

TEMPORARILY

RELOCATE

8" CHS

8" CHR

WIND TUNNEL PIT

MECHANICAL

DEMOLITION CHILLED

WATER

MD601NTS

PROJECT ADDRESS:

PROJECT NAME:

CLIENT NAME:

Bright Building Texas A&M University, College Station, Texas 77843

Texas A&M University

SSC PROJECT No.:

FULL SIZE SHEET: 30X42

A

B

C

D

2 3 4 5

SEAL

CONSULTANTS

SHEET TITLE

RSE PROJECT NO: 1515

MARK DATE DESCRIPTION

ISSUED FOR CONSTRUCTION

PROJECT INFORMATION

ISSUE

SHEET NUMBER

1 2 3 4 5

2023-06178

Bright Building Replace Hydronic Pumps and Piping in the Building

1/21/2025

DECEMBER 9, 2024

1 01/21/25 ADDENDUM 1

FLOW DIAGRAM

SECOND FLOOR LEVEL

THIRD FLOOR LEVEL

FOURTH FLOOR LEVEL

FIFTH FLOOR LEVEL

SIXTH FLOOR LEVEL

SEVENTH FLOOR LEVEL

ROOF LEVEL

4" H

W S

4" H

W S

HWP-1

4" H

W R

4" H

W S

4" HWS

4" HWR

FLOW

METER

FCU-P-1

1" HWS

1" HWR

M

PENTHOUSE

DEMOLISH TO POINT

OF ENTRY AT BLDG.

3" HWS

3" HWR

TEMPORARILY

RELOCATE

DEMOLISH HWS/R BRANCH PIPING UP TO

EXISTING TERMINAL UNITS INCLUDING

ISOLATION VALVES. DEMOLISH HWS/R BRANCH

PIPING UP TO UNIT HEATER'S (UH-G-1) AND

AHU'S (AHU-G-2) ISOLATION VALVES. EXISTING

TERMINAL UNIT COIL PACKAGES TO REMAIN.

2" HWR

2" HWS

2" HWR

2" HWS

2" HWR

2" HWS

4" H

W R

4" H

W S

4" H

W R

4" H

W S

4" H

W R

4" H

W S

4" H

W R

4" H

W S

4" H

W R

4" H

W S

2- 1/

2" H

W R

2- 1/

2" H

W S

DEMOLISH HWS/R BRANCH PIPING UP TO

EXISTING TERMINAL UNITS INCLUDING

ISOLATION VALVES. EXISTING TERMINAL UNIT

COIL PACKAGES TO REMAIN.

DEMOLISH HWS/R BRANCH PIPING

UP TO EXISTING TERMINAL UNITS

INCLUDING ISOLATION VALVES.

EXISTING TERMINAL UNIT COIL

PACKAGES TO REMAIN.

1-1/2" HWR

1-1/2" HWS

1-1/2" HWR

1-1/2" HWS

2" HWR

2" HWS

DEMOLISH HWS/R BRANCH PIPING UP TO

EXISTING TERMINAL UNITS INCLUDING

ISOLATION VALVES. EXISTING TERMINAL UNIT

COIL PACKAGES TO REMAIN.

DEMOLISH HWS/R BRANCH PIPING

UP TO EXISTING TERMINAL UNITS

INCLUDING ISOLATION VALVES.

EXISTING TERMINAL UNIT COIL

PACKAGES TO REMAIN.

1-1/2" HWR

1-1/2" HWS

1-1/2" HWR

1-1/2" HWS

2" HWR

2" HWS

EXISTING HWS/R

BRANCH PIPING

TO REMAIN

EXISTING HWS/R

BRANCH PIPING

TO REMAIN

1-1/2" HWR

1-1/2" HWS

1-1/2" HWR

1-1/2" HWS

2" HWR

2" HWS

EXISTING HWS/R

BRANCH PIPING

TO REMAIN

EXISTING HWS/R

BRANCH PIPING

TO REMAIN

1-1/2" HWR

1-1/2" HWS

1-1/2" HWR

1-1/2" HWS

2" HWR

2" HWS

DEMOLISH HWS/R BRANCH PIPING UP TO

EXISTING TERMINAL UNITS INCLUDING

ISOLATION VALVES. EXISTING TERMINAL UNIT

COIL PACKAGES TO REMAIN.

DEMOLISH HWS/R BRANCH PIPING

UP TO EXISTING TERMINAL UNITS

INCLUDING ISOLATION VALVES.

EXISTING TERMINAL UNIT COIL

PACKAGES TO REMAIN.

1-1/2" HWR

1-1/2" HWS

2" HWR

2" HWS

2" HWR

2" HWS

DEMOLISH HWS/R BRANCH PIPING UP TO

EXISTING TERMINAL UNITS INCLUDING

ISOLATION VALVES. EXISTING TERMINAL UNIT

COIL PACKAGES TO REMAIN.

DEMOLISH HWS/R BRANCH PIPING

UP TO EXISTING TERMINAL UNITS

INCLUDING ISOLATION VALVES.

EXISTING TERMINAL UNIT COIL

PACKAGES TO REMAIN.

1-1/2" HWR

1-1/2" HWS

1-1/2" HWR

1-1/2" HWS

2" HWR

2" HWS

DEMOLISH HWS/R BRANCH PIPING UP TO

EXISTING TERMINAL UNITS INCLUDING

ISOLATION VALVES. EXISTING TERMINAL UNIT

COIL PACKAGES TO REMAIN.

DEMOLISH HWS/R BRANCH PIPING

UP TO EXISTING TERMINAL UNITS

INCLUDING ISOLATION VALVES.

EXISTING TERMINAL UNIT COIL

PACKAGES TO REMAIN.

WIND TUNNEL PIT

1- 1/

2" H

W R

1- 1/

2" H

W

S UH-P-1

1" HWS

1" HWR

MECHANICAL

DEMOLITION HEATING

WATER FLOW

DIAGRAM

MD602NTS

PROJECT ADDRESS:

PROJECT NAME:

CLIENT NAME:

Bright Building Texas A&M University, College Station, Texas 77843

Texas A&M University

SSC PROJECT No.:

FULL SIZE SHEET: 30X42

A

B

C

D

2 3 4 5

SEAL

CONSULTANTS

SHEET TITLE

RSE PROJECT NO: 1515

MARK DATE DESCRIPTION

ISSUED FOR CONSTRUCTION

PROJECT INFORMATION

ISSUE

SHEET NUMBER

1 2 3 4 5

2023-06178

Bright Building Replace Hydronic Pumps and Piping in the Building

1/21/2025

DECEMBER 9, 2024

SHEET KEYED NOTES

1. ALTERNATE #1: PROVIDE NEW PUMP AND ASSOCIATED VFD.

2. CONNECT NEW CHS/R AND HWS/R PIPING EXISTING MAINS AT BUILDING

POINT OF ENTRY.

3. PROVIDE NEW 1-1/2" CHS/R PIPING AND CONNECT TO EXISTING MTS

MACHINES.

4. PROVIDE NEW HWS/R BRANCH PIPING UP AHU. REPLACE ISOLATION

VALVES AND REUSE EXISTING COIL PACKAGE.

5. PROVIDE NEW 3/4" HWS/R BRANCH PIPING UP TO EXISTING TERMINAL UNIT.

PROVIDE NEW ISOLATION VALVES AT TERMINAL, UNIT AND REUSE

EXISTING COIL PACKAGE.

6. PROVIDE NEW 1" CHS/R PIPING AND CONNECT TO EXISTING AUTOCLAVE.

7. ALTERNATE #1: PROVIDE NEW CHS/R BRANCH PIPING UP TO EXISTING

ISOLATION VALVES AT WIND TUNNEL EQUIPMENT.

8. ALTERNATE #1: PROVIDE NEW WIND TUNNEL PROCESS CHILLED WATER

PIPING UP TO BUILDING POINT OF ENTRY.

9. ALTERNATE #1: CONNECT TO EXISTING CHILLED MAKEUP WATER PIPING.

10. ALTERNATE #1: PROVIDE NEW CHEMICAL POT FEEDER.

11. PROVIDE SHORT RADIUS ELBOW.

12. CONNECT TO EXISTING MAKEUP WATER PIPING.

GENERAL NOTES

A. ALL EQUIPMENT TO BE REMOVED SHALL BE COORDINATED WITH

ELECTRICAL FOR COMPLETE DEMOLITION.

B. ALL EXISTING CONDITIONS SHALL BE FIELD VERIFIED BY CONTRACTOR.

CONDITIONS SHOWN IN DRAWINGS MAY DEVIATE FROM EXACT

CONFIGURATION.

C. ALL WIND TUNNEL WCHS/R PIPING AND PUMPS ARE INCLUDED IN

ALTERNATE #1.

D. IF POLYPROPYLENE IS USED AS PIPING MATERIAL, CONTRACTOR IS

RESPONSIBLE FOR PROPERLY FITTING PIPING INTO SPACE. HYDRONIC

PIPING LAYOUT WAS DESIGNED USING CARBON STEEL AND COPPER AS

PIPING MATERIALS.

VENT

VENT

027A

028A 028B

032A

006A 006B

010011

013C013B

026A

025 024

022A

028C

016A

012A

004A

015A

C00

E00

MEN

WOMEN

ELEV

PIT ENTRANCE

UP

UP

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

G

H

I

RE: 1/M2.2

RE: 1/M2.2

2- 1/

2" H

W R

2- 1/

2" H

W S

1- 1/

2" H

W R

1- 1/

2" H

W S

" C

H S

" C

H R

4" H

W R

4" H

W S

2" HWR

2" HWS

1" HWR

1" HWS 1" HWR

1" HWS

2" H

W S

2" H

W R

AHU-G-2

5 5 5 5

5 55

MTS-1 MTS-2

AC6

1" C

H S

1" C

H R

1- 1/

2" C

H S

1- 1/

2" C

H R

" C

H S

" C

H R

4" H

W R

4" H

W S

REFER TO

1/M401

FOR

ENLARGED

RENOVATION

PLAN

3/4" HWS

3/4" HWR

" C

H S

" C

H R

3/4" HWR

3/4" HWS

2-1/2" CHS

2-1/2" CHR

2-1/2" HWS

2-1/2" HWR

2" H

W R

2" HWS

2" H

W S

2" H

W R

2" H

W S

2" HWR

1-1/4" HWS

1-1/4" HWR

UH-G-1

3/ 4"

H W

S 3/

4" H

W R

3/ 4"

H W

R 3/

4" H

W S

3/ 4"

H W

S 3/

4" H

W R

3/ 4"

H W

S 3/

4" H

W R

3/ 4"

H W

S 3/

4" H

W R

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/ 4"

H W

S 3/

4" H

W R

3/ 4"

H W

S 3/

4" H

W R

1" HWR

1" HWS

3/4" HWR

3/4" HWS

3/ 4"

H W

R 3/

4" H

W S

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

1" HWR

1" HWS

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/ 4"

H W

R 3/

4" H

W S

3/4" HWS

3/4" HWR

2- 1/

2" W

C H

S 2-

1/ 2"

W C

H R

3" W

C H

S 3"

W C

H R

4" WCHS

4" WCHR

SUB BASEMENT

B

C

D

E

8 9 10

EXP-1

CPF-1

EXISTING WIND

TUNNEL

EQUIPMENT

EXISTING

WIND TUNNEL

EQUIPMENT

ACCP-2

1" W

C H

S

AS-2

MECHANICAL RENOVATION

PLANS - BASEMENT LEVEL

M301SCALE: 1/8" = 1'-0"

PROJECT ADDRESS:

PROJECT NAME:

CLIENT NAME:

Bright Building Texas A&M University, College Station, Texas 77843

Texas A&M University

SSC PROJECT No.:

FULL SIZE SHEET: 30X42

A

B

C

D

2 3 4 5

SEAL

CONSULTANTS

SHEET TITLE

RSE PROJECT NO: 1515

MARK DATE DESCRIPTION

ISSUED FOR CONSTRUCTION

PROJECT INFORMATION

ISSUE

SHEET NUMBER

1 2 3 4 5

N

2023-06178

Bright Building Replace Hydronic Pumps and Piping in the Building

0' 4' 8' 16'

1/8" = 1'-0"

0' 4' 8' 16'

1/8" = 1'-0"

1/21/2025

DECEMBER 9, 2024

1/8" = 1'-0"

SHEET KEYED NOTES

1. PROVIDE NEW PUMP VFD AND MOUNT TO WALL.

2. RELOCATE EXISTING WAGES PANEL.

3. PROVIDE NEW FLOW METER DISPLAYS.

4. PROVIDE NEW PUMP AND ASSOCIATED 4" CONCRETE HOUSE KEEPING

PAD.

5. PROVIDE NEW FLOW METER.

6. PROVIDE NEW CONTROL VALVE.

7. RELOCATE EXISTING CONTROL VALVE.

8. PROVIDE SHORT RADIUS ELBOW.

9. PROVIDE CHAINWHEEL OPERATOR TO VALVE.

GENERAL NOTES

A. ALL EQUIPMENT TO BE REMOVED SHALL BE COORDINATED WITH

ELECTRICAL FOR COMPLETE DEMOLITION.

B. ALL EXISTING CONDITIONS SHALL BE FIELD VERIFIED BY CONTRACTOR.

CONDITIONS SHOWN IN DRAWINGS MAY DEVIATE FROM EXACT

CONFIGURATION.

022A

E00

MEN

ELEV

AS-1

HWP-1

10" CHR

4" HWR

4" H

W S

AHU-G

HWP-1

VFD

CWP-1

VFD

4" HWS

10" CHS

4" C

H R

4" C

H S

AS-3

2- 1/

2" C

H S

2- 1/

2" C

H R

2 3

1 1

CWP-1

2- 1/

2" H

W S

2- 1/

2" H

W R

4" HWS

4" HWR 3

M401

M402

4" HWS

BOP

120"

AS-2

HWP-1

4" HWS

BOP

96"

4" HWS

BOP

112"

4" CHS

BOP

92" 4" HWS

BOP

72"

4" CHR

BOP

92"

AHU-G

AS-1

CWP-1

10" CHR BOP 142"

10" CHS BOP 101"

2-1/2" CHS

BOP 126"

4" HWS

BOP 112"

4" H

W S

4" H

W R

" C

H S

" C

H R

4" HWR

4" HWS

BOP

120" BOP 112"

4" CHS

BOP

92" 4" CHR

BOP

92"

2-1/2" HWS

BOP 126"

2-1/2" HWR

BOP 126"

2-1/2" CHR

BOP 126"

MECHANICAL RENOVATION

ENLARGED PLAN AND

SECTIONS - BASEMENT

LEVEL - MECHANICAL

ROOM

M401

PROJECT ADDRESS:

PROJECT NAME:

CLIENT NAME:

Bright Building Texas A&M University, College Station, Texas 77843

Texas A&M University

SSC PROJECT No.:

1/4" = 1'-0"

0' 2' 4' 8'

FULL SIZE SHEET: 30X42

A

B

C

D

2 3 4 5

SEAL

CONSULTANTS

SHEET TITLE

RSE PROJECT NO: 1515

MARK DATE DESCRIPTION

ISSUED FOR CONSTRUCTION

PROJECT INFORMATION

ISSUE

SHEET NUMBER

1 2 3 4 5

N

2023-06178

Bright Building Replace Hydronic Pumps and Piping in the Building

1/21/2025

DECEMBER 9, 2024

SCALE: 1/4" = 1'-0"SCALE: 1/4" = 1'-0"

SCALE: 1/4" = 1'-0"

1 01/21/25 ADDENDUM 1

1 1

SECOND FLOOR LEVEL

THIRD FLOOR LEVEL

FOURTH FLOOR LEVEL

FIFTH FLOOR LEVEL

SIXTH FLOOR LEVEL

SEVENTH FLOOR LEVEL

ROOF LEVEL

AHU-G-1

CWP-1

4" CHS

4" CHR

" C

H R

" C

H S

10" CHS

10" CHR

M

M

AHU-1-1

ACCP-2

4" WCHS

4" WCHR

M

EXP-1

M

2-1/2" WCHS

2-1/2" WCHR

M

AHU-2-1

M

AHU-3-1

M

AHU-4-1

M

AHU-5-1

M

AHU-6-1

AHU-7-1

CFP-1

MTS-1 MTS-2 AC

FCU-P-1

RECESSED FLOOR

CRAC-6-1 CRAC-6-2

4" CHS

4" CHR RECESSED FLOOR

4" CHS

4" CHR

4" CHS

4" CHR

4" CHS

4" CHR

4" CHS

4" CHR

4" CHS

4" CHR

4" CHS

4" CHR

4" CHS

4" CHR

2" CHS

2" CHR

M

4" CCHS

4" CCHR

DEMOLISH TO POINT

OF ENTRY AT BLDG.

PENTHOUSE

CONNECTION POINT

AT ENTRY TO BLDG.

M

3" W

C H

S

3" W

C H

R

1" CHS

1" CHR

1- 1/

2" C

H S

1- 1/

2" C

H R

3/4" CHR

3/4" CHS

3/ 4"

C C

H R

3/4" CHS

" C

H R

" C

H S

8" C

H R

8" C

H S

6" C

H R

6" C

H S

6" C

H R

6" C

H S

6" C

H R

6" C

H S

4" C

H R

4" C

H S

RELOCATED

" C

H S

" C

H S

AIR/DIRT

SEPARATOR

FLOW

METER

4" W

C H

S

4" W

C H

S

2" CHS

2" CHR

2" CHS

2" CHR

8" CHS

8" CHR

M

2-1/2" CHS

2-1/2" CHR

RELOCATED

CAP AT ENTRY TO

BLDG.

3/4" WCHS

WIND TUNNEL PIT

MECHANICAL

RENOVATION CHILLED

WATER FLOW DIAGRAM

PROJECT ADDRESS:

PROJECT NAME:

CLIENT NAME:

Bright Building Texas A&M University, College Station, Texas 77843

Texas A&M University

SSC PROJECT No.:

FULL SIZE SHEET: 30X42

A

B

C

D

2 3 4 5

SEAL

CONSULTANTS

SHEET TITLE

RSE PROJECT NO: 1515

MARK DATE DESCRIPTION

ISSUED FOR CONSTRUCTION

PROJECT INFORMATION

ISSUE

SHEET NUMBER

1 2 3 4 5

2023-06178

Bright Building Replace Hydronic Pumps and Piping in the Building

1/21/2025

DECEMBER 9, 2024

M601NTS 1

SECOND FLOOR LEVEL

THIRD FLOOR LEVEL

FOURTH FLOOR LEVEL

FIFTH FLOOR LEVEL

SIXTH FLOOR LEVEL

SEVENTH FLOOR LEVEL

ROOF LEVEL

HWP-1

4" H

W R

4" H

W S

4" HWS

4" HWR

FCU-P-1

1" HWS

1" HWR

M

PENTHOUSE

CONNECT TO POINT

OF ENTRY AT BLDG.

2-1/2" HWS

2-1/2" HWR

RELOCATED

PROVIDE NEW HWS/R BRANCH PIPING UP TO

EXISTING TERMINAL UNITS INCLUDING

ISOLATION VALVES. PROVIDE NEW HWS/R

BRANCH PIPING UP TO UNIT HEATER'S (UH-G-1)

AND AHU'S (AHU-G-2) ISOLATION VALVES.

2" HWR

2" HWS

2" HWR

2" HWS

2" HWR

2" HWS

4" H

W R

4" H

W S

4" H

W R

4" H

W S

4" H

W R

4" H

W S

4" H

W R

4" H

W S

4" H

W R

4" H

W S

2- 1/

2" H

W R

2- 1/

2" H

W S

PROVIDE NEW HWS/R BRANCH PIPING UP TO

EXISTING TERMINAL UNITS INCLUDING

ISOLATION VALVES.

PROVIDE NEW HWS/R BRANCH

PIPING UP TO EXISTING TERMINAL

UNITS INCLUDING ISOLATION

VALVES.

1-1/2" HWR

1-1/2" HWS

2" HWR

2" HWS

2" HWR

2" HWS

1-1/2" HWR

1-1/2" HWS

1-1/2" HWR

1-1/2" HWS

2" HWR

2" HWS

1-1/2" HWR

1-1/2" HWS

1-1/2" HWR

1-1/2" HWS

2" HWR

2" HWS

1-1/2" HWR

1-1/2" HWS

1-1/2" HWR

1-1/2" HWS

2" HWR

2" HWS

1-1/2" HWR

1-1/2" HWS

2" HWR

2" HWS

2" HWR

2" HWS

1-1/2" HWR

1-1/2" HWS

2" HWR

2" HWS

2" HWR

2" HWS

WIND TUNNEL PIT

1- 1/

2" H

W R

1- 1/

2" H

W

S UH-P-1

1" HWS

1" HWR

4" H

W S

4" H

W S

AIR/DIRT

SEPARATOR

FLOW

METER

M

PROVIDE NEW HWS/R BRANCH PIPING UP TO

EXISTING TERMINAL UNITS INCLUDING

ISOLATION VALVES.

PROVIDE NEW HWS/R BRANCH

PIPING UP TO EXISTING TERMINAL

UNITS INCLUDING ISOLATION

VALVES.

PROVIDE NEW HWS/R BRANCH PIPING UP TO

EXISTING TERMINAL UNITS INCLUDING

ISOLATION VALVES.

PROVIDE NEW HWS/R BRANCH

PIPING UP TO EXISTING TERMINAL

UNITS INCLUDING ISOLATION

VALVES.

PROVIDE NEW HWS/R BRANCH PIPING UP TO

EXISTING TERMINAL UNITS INCLUDING

ISOLATION VALVES.

PROVIDE NEW HWS/R BRANCH

PIPING UP TO EXISTING TERMINAL

UNITS INCLUDING ISOLATION

VALVES.

PROVIDE NEW HWS/R BRANCH PIPING UP TO

EXISTING TERMINAL UNITS INCLUDING

ISOLATION VALVES.

PROVIDE NEW HWS/R BRANCH

PIPING UP TO EXISTING TERMINAL

UNITS INCLUDING ISOLATION

VALVES.

PROVIDE NEW 3/4" HWS/R PIPING UP TO NEW

TERMINAL UNIT (TU-4-1). CONNECT TO EXISTING

HWS/R BRANCH PIPING. REFER TO DRAWING

1/M305.

MECHANICAL

RENOVATION HEATING

WATER FLOW DIAGRAM

PROJECT ADDRESS:

PROJECT NAME:

CLIENT NAME:

Bright Building Texas A&M University, College Station, Texas 77843

Texas A&M University

SSC PROJECT No.:

FULL SIZE SHEET: 30X42

A

B

C

D

2 3 4 5

SEAL

CONSULTANTS

SHEET TITLE

RSE PROJECT NO: 1515

MARK DATE DESCRIPTION

ISSUED FOR CONSTRUCTION

PROJECT INFORMATION

ISSUE

SHEET NUMBER

1 2 3 4 5

2023-06178

Bright Building Replace Hydronic Pumps and Piping in the Building

1/21/2025

DECEMBER 9, 2024

M602NTS 1

VENT

027A

028A 028B

026A

025 024

022A

028C

E00

MEN

WOMEN

ELEV

UP

(E)

DPHG2

(D) HWP-1

AHU-G

(D) ACCP-1

(D) HWP-1

VFD

(E) CWP-1

VFD

E401

DPHG2-5

DPHG2-4

(E) CWP-1

1 1 1 1

J J J

SUB BASEMENT

B

C

D

E

8 9 10

DPHG1-8

(D) ACCP-2

EXISTING WIND

TUNNEL

EQUIPMENT

EXISTING

WIND TUNNEL

EQUIPMENT

ALT. #1

VENT

006A 006B

013C

026A

025 024

022A

016A

E00

MEN

WOMEN

ELEV

UP

(E)

DPHG2

AHU-G

MTS-2

(D) CWP-1

VFD (D CWP-1

DPEM-8 5

ELECTRICAL

DEMOLITION PLAN -

BASEMENT LEVEL

ED101

GENERAL NOTES

1. HVAC EQUIPMENT IS EXISTING TO REMAIN AND SHOWN FOR REFERENCE

ONLY.

2. HVAC EQUIPMENT TO BE DEMOLISHED. DEMO LOCAL DISCONNECT/VFD.

DEMO BRANCH CIRCUIT WIRING AND CONDUIT BACK TO SOURCE, TURN

OFF BREAKER AND LABEL AS SPARE. CIRCUIT SOURCE SHOWN BASED ON

OBSERVABLE FIELD CONDITIONS, CONTRACTOR TO FIELD VERIFY.

3. EXISTING CWP-1 AND VFD SHALL BE RELOCATED TEMPORARILY FOR

PHASE 1 OF CONSTRUCTION. COORDINATE WITH MECHANICAL

CONTRACTOR FOR NEW LOCATION. EXTEND BRANCH CIRCUIT WIRING

AND CONDUIT AS REQUIRED.

4. NOT USED.

5. HVAC EQUIPMENT TO BE DEMOLISHED DURING PHASE 2 OF

CONSTRUCTION. DEMO LOCAL DISCONNECT/VFD. DEMO BRANCH CIRCUIT

WIRING AND CONDUIT BACK TO SOURCE, TURN OFF BREAKER AND LABEL

AS SPARE. CIRCUIT SOURCE SHOWN BASED ON OBSERVABLE FIELD

CONDITIONS, CONTRACTOR TO FIELD VERIFY. COORDINATE TIMING WITH

MECHANICAL CONTRACTOR.

6. EXISTING JUNCTION BOXES AND CONDUIT SERVING CONTROL WIRING ON

THIS WALL TO BE SHIFTED UP SLIGHTLY TO MAKE SPACE FOR NEW VFDS

AND CONTROL PANELS. REFER TO ELECTRICAL RENOVATION PLAN FOR

LOCATION OF NEW EQUIPMENT. COORDINATE WITH MECHANICAL

CONTRACTOR.

7. EXITING HVAC CONTROL PANEL TO BE RELOCATED. REFER TO

RENOVATION PLAN FOR NEW LOCATION. EXTEND WIRING AND CONDUIT

AS REQUIRED. COORDINATE WITH MECHANICAL CONTRACTOR.

KEYED NOTES

A. REFER TO ELECTRICAL LEGEND AND PROJECT GENERAL NOTES ON

SHEETS E001 AND E002.

B. DRAWINGS ARE SCHEMATIC IN NATURE; VERIFY DIMENSIONS AND

EQUIPMENT LOCATIONS IN THE FIELD. CONTRACTOR SHALL VERIFY

EXACT LOCATION AND CONFIGURATION OF INSTALLATIONS TO REMAIN.

PROJECT ADDRESS:

PROJECT NAME:

CLIENT NAME:

Bright Building Texas A&M University, College Station, Texas 77843

Texas A&M University

SSC PROJECT No.:

FULL SIZE SHEET: 30X42

A

B

C

D

2 3 4 5

SEAL

CONSULTANTS

SHEET TITLE

RSE PROJECT NO: 1515

MARK DATE DESCRIPTION

ISSUED FOR CONSTRUCTION

PROJECT INFORMATION

ISSUE

SHEET NUMBER

1 2 3 4 5

2023-06178

Bright Building Replace Hydronic Pumps and Piping in the Building

0' 4' 8' 16'

1/8" = 1'-0"

0' 4' 8' 16'

1/8" = 1'-0"

DECEMBER 9, 2024

1 01/21/25 ADDENDUM 1

01/21/25

RE: 1/M2.2 RE: 1/M2.2

AHU-2-1CRAC-2-2

CRAC-2-1

206205

MEN

WOMEN

221B 221A

221C

221D

C002

E002

UP

UP

DOWN

ELEV

ELEVELEV

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

G

H

(E)

L2A-LFT

(E)

L2A-RGHT

T

(E)

C2A-RGHT

(E)

C2A-LFT

(E) EH2A

(E) BUS

RISER

(E) BUS

RISER

T (E) H2A

H2A-20,22,24

H2A-13,15,17

ELECTRICAL DEMOLITION

PLAN - SECOND FLOOR

ED102

PROJECT ADDRESS:

PROJECT NAME:

CLIENT NAME:

Bright Building Texas A&M University, College Station, Texas 77843

Texas A&M University

SSC PROJECT No.:

FULL SIZE SHEET: 30X42

A

B

C

D

2 3 4 5

SEAL

CONSULTANTS

SHEET TITLE

RSE PROJECT NO: 1515

MARK DATE DESCRIPTION

ISSUED FOR CONSTRUCTION

PROJECT INFORMATION

ISSUE

SHEET NUMBER

1 2 3 4 5

N

2023-06178

Bright Building Replace Hydronic Pumps and Piping in the Building

0' 4' 8' 16'

1/8" = 1'-0"

0' 4' 8' 16'

1/8" = 1'-0"

DECEMBER 9, 2024

GENERAL NOTES

1. HVAC EQUIPMENT IS EXISTING TO REMAIN AND SHOWN FOR REFERENCE

ONLY.

2. HVAC EQUIPMENT TO BE DEMOLISHED. DEMO LOCAL DISCONNECT/VFD.

DEMO BRANCH CIRCUIT WIRING AND CONDUIT BACK TO SOURCE, TURN

OFF BREAKER AND LABEL AS SPARE. CIRCUIT SOURCE SHOWN BASED ON

OBSERVABLE FIELD CONDITIONS, CONTRACTOR TO FIELD VERIFY.

3. ALL ELECTRICAL EQUIPMENT SHOWN IN THIS ROOM IS EXISTING TO

REMAIN UNLESS OTHERWISE NOTED.

KEYED NOTES

A. REFER TO ELECTRICAL LEGEND AND PROJECT GENERAL NOTES ON

SHEETS E001 AND E002.

B. DRAWINGS ARE SCHEMATIC IN NATURE; VERIFY DIMENSIONS AND

EQUIPMENT LOCATIONS IN THE FIELD. CONTRACTOR SHALL VERIFY

EXACT LOCATION AND CONFIGURATION OF INSTALLATIONS TO REMAIN.

AHU-4-1

MEN

WOMEN

407A407B

407C

407D 407E

402A

402B 402E

402D 403

RM#?

425F

425G

425A

RM#?

427A

427B 427C

427D

423A423B

423C 423D

419A 419B

419C 419D

415 414D

414C

416 414A

414B

C004

410A

410C

410D

425H

408C

408B

408E

408B

408A

408C

408D

410B

408H

C004A

C004B

MECH

UP

UP

ELEV

ELEV

E004 ELEV

417A

417B

RM#?

1(E)

L4A-LFT

(E)

L4A-RGHT

(E)

C4A-RGHT

(E)

C4A-LFT

(E) EH4A

(E) BUS

RISER

(E) BUS

RISER

T (E) H4A

3 T

H4A-20,22,24

ELECTRICAL DEMOLITION

PLAN - FOURTH FLOOR

ED103

PROJECT ADDRESS:

PROJECT NAME:

CLIENT NAME:

Bright Building Texas A&M University, College Station, Texas 77843

Texas A&M University

SSC PROJECT No.:

FULL SIZE SHEET: 30X42

A

B

C

D

2 3 4 5

SEAL

CONSULTANTS

SHEET TITLE

RSE PROJECT NO: 1515

MARK DATE DESCRIPTION

ISSUED FOR CONSTRUCTION

PROJECT INFORMATION

ISSUE

SHEET NUMBER

1 2 3 4 5

N

2023-06178

Bright Building Replace Hydronic Pumps and Piping in the Building

0' 4' 8' 16'

1/8" = 1'-0"

0' 4' 8' 16'

1/8" = 1'-0"

DECEMBER 9, 2024

GENERAL NOTES

1. HVAC EQUIPMENT IS EXISTING TO REMAIN AND SHOWN FOR REFERENCE

ONLY.

2. HVAC EQUIPMENT TO BE DEMOLISHED. DEMO LOCAL DISCONNECT/VFD.

DEMO BRANCH CIRCUIT WIRING AND CONDUIT BACK TO SOURCE, TURN

OFF BREAKER AND LABEL AS SPARE. CIRCUIT SOURCE SHOWN BASED ON

OBSERVABLE FIELD CONDITIONS, CONTRACTOR TO FIELD VERIFY.

3. ALL ELECTRICAL EQUIPMENT SHOWN IN THIS ROOM IS EXISTING TO

REMAIN UNLESS OTHERWISE NOTED.

KEYED NOTES

A. REFER TO ELECTRICAL LEGEND AND PROJECT GENERAL NOTES ON

SHEETS E001 AND E002.

B. DRAWINGS ARE SCHEMATIC IN NATURE; VERIFY DIMENSIONS AND

EQUIPMENT LOCATIONS IN THE FIELD. CONTRACTOR SHALL VERIFY

EXACT LOCATION AND CONFIGURATION OF INSTALLATIONS TO REMAIN.

RE: 1/M2.2 RE: 1/M2.2

AHU-5-1

UP

UP

520A 520B

516 515D

515C

525522 526

527A

527B 527C

527D

515B

515A

C005

512 510

WOMEN MEN

509C 509B

509A

509D

501B

502D502A

502B 502C

501A

506B 506A

503B

518A

518B

514C

514F

514G

514D

514E

514A

514B

501C

508A

C005A

C005B

503A

E005

ELEVELEV ELEV

1(E)

L5A-LFT

(E)

L5A-RGHT

(E) C5A

(E) EH5A

(E) BUS

RISER

(E) BUS

RISER

(E) H5A

3 T

1 1

1 1 1 1 1

1 1

H5A-14,16,18

ELECTRICAL DEMOLITION

PLAN - FIFTH FLOOR

ED105

PROJECT ADDRESS:

PROJECT NAME:

CLIENT NAME:

Bright Building Texas A&M University, College Station, Texas 77843

Texas A&M University

SSC PROJECT No.:

FULL SIZE SHEET: 30X42

A

B

C

D

2 3 4 5

SEAL

CONSULTANTS

SHEET TITLE

RSE PROJECT NO: 1515

MARK DATE DESCRIPTION

ISSUED FOR CONSTRUCTION

PROJECT INFORMATION

ISSUE

SHEET NUMBER

1 2 3 4 5

N

2023-06178

Bright Building Replace Hydronic Pumps and Piping in the Building

0' 4' 8' 16'

1/8" = 1'-0"

0' 4' 8' 16'

1/8" = 1'-0"

DECEMBER 9, 2024

GENERAL NOTES

1. HVAC EQUIPMENT IS EXISTING TO REMAIN AND SHOWN FOR REFERENCE

ONLY.

2. HVAC EQUIPMENT TO BE DEMOLISHED. DEMO LOCAL DISCONNECT/VFD.

DEMO BRANCH CIRCUIT WIRING AND CONDUIT BACK TO SOURCE, TURN

OFF BREAKER AND LABEL AS SPARE. CIRCUIT SOURCE SHOWN BASED ON

OBSERVABLE FIELD CONDITIONS, CONTRACTOR TO FIELD VERIFY.

3. ALL ELECTRICAL EQUIPMENT SHOWN IN THIS ROOM IS EXISTING TO

REMAIN UNLESS OTHERWISE NOTED.

KEYED NOTES

A. REFER TO ELECTRICAL LEGEND AND PROJECT GENERAL NOTES ON

SHEETS E001 AND E002.

B. DRAWINGS ARE SCHEMATIC IN NATURE; VERIFY DIMENSIONS AND

EQUIPMENT LOCATIONS IN THE FIELD. CONTRACTOR SHALL VERIFY

EXACT LOCATION AND CONFIGURATION OF INSTALLATIONS TO REMAIN.

027A

028A 028B

032A

006A 006B

010011

013C013B

026A

025 024

022A

028C

016A

012A

004A

015A

C00

E00

MEN

WOMEN

ELEV

PIT ENTRANCE

UP

UP

A

B

C

D

E

F

G

H

I

(E)

DPHG2

AHU-G

E401

DPHG2-5

HWP-1

CWP-1

HWP-1

VFD

CWP-1

VFD

DPHG2-6

M

M

LGA-173

LGA-194

GFCI

LGA-21

SUB BASEMENT

8 9 10

DPHG1-8

EXISTING WIND

TUNNEL

EQUIPMENT

EXISTING

WIND TUNNEL

EQUIPMENT

ACCP-2

GFCI

LGA-23

ELECTRICAL

RENOVATION PLAN -

BASEMENT LEVEL

E101

GENERAL NOTES

1. HVAC EQUIPMENT IS EXISTING TO REMAIN AND SHOWN FOR REFERENCE

ONLY.

2. FURNISH AND INSTALL POWER TO SERVE HVAC EQUIPMENT. VFD IS

PROVIDED BY MECHANICAL CONTRACTOR AND INSTALLED BY ELECTRICAL

CONTRACTOR.

3. PROVIDE POWER TO SERVE MOTORIZED VALVES. CIRCUIT TO PANEL AS

INDICATED. PROVIDE NEW CIRCUIT BREAKER IN PANEL.

4. PROVIDE POWER TO SERVE CONTROL PANELS. CIRCUIT TO ELECTRICAL

PANEL AS INDICATED. PROVIDE NEW CIRCUIT BREAKER IN PANEL.

5. APPROXIMATE LOCATION OF RELOCATED CONTROL PANEL. COORDINATE

EXACT LOCATION WITH MECHANICAL CONTRACTOR. EXTEND WIRING AND

CONDUIT AS REQUIRED.

6. PROVIDE POWER TO SERVE PUMP. PROVIDE A 30A/600V/3P/NEMA 3R

COMBINATION NEMA 1 MOTOR STARTER DISCONNECT, FUSIBLE,

NON-REVERSING WITH OVERLOAD PROTECTION. PROVIDE (3) 20A FUSES.

7. IF NO GFCI RECEPTACLE IS LOCATED WITHIN 25 FEET OF UNIT(S), INSTALL

GFCI RECEPTACLE.

KEYED NOTES

A. REFER TO ELECTRICAL LEGEND AND PROJECT GENERAL NOTES ON

SHEETS E001 AND E002.

B. DRAWINGS ARE SCHEMATIC IN NATURE; VERIFY DIMENSIONS AND

EQUIPMENT LOCATIONS IN THE FIELD. CONTRACTOR SHALL VERIFY

EXACT LOCATION AND CONFIGURATION OF INSTALLATIONS TO REMAIN.

PROJECT ADDRESS:

PROJECT NAME:

CLIENT NAME:

Bright Building Texas A&M University, College Station, Texas 77843

Texas A&M University

SSC PROJECT No.:

FULL SIZE SHEET: 30X42

A

B

C

D

2 3 4 5

SEAL

CONSULTANTS

SHEET TITLE

RSE PROJECT NO: 1515

MARK DATE DESCRIPTION

ISSUED FOR CONSTRUCTION

PROJECT INFORMATION

ISSUE

SHEET NUMBER

1 2 3 4 5

2023-06178

Bright Building Replace Hydronic Pumps and Piping in the Building

0' 4' 8' 16'

1/8" = 1'-0"

0' 4' 8' 16'

1/8" = 1'-0"

DECEMBER 9, 2024