This Addendum #1, issued by SSC Services for Education for Texas A&M University's Bright Building hydronic pumps and piping replacement project (#2023-06178), modifies contract documents dated December 9, 2024, prepared by Ramirez Simon Engineering, LLC. The addendum makes several key changes to the project drawings, including the addition of new mechanical drawings MD601, MD602, M601, and M602 to the sheet list. The modifications include installation of new isolation valves for chilled water and heating water piping systems, with 4 new isolation valves added to 10" CHS/R and 4" HWS/R piping at the point of entry, and 2 new isolation valves for 2-1/2" CHS/R branch piping in the mechanical room.
The electrical drawing changes include removal of the temporary location of CWP-1 from demolition phase 1, modification of contractor coordination requirements, removal of keynote 4, and changes to disconnecting means from VFD to safety switch for ACCP-2 in the wind tunnel demolition plan. Circuit sources were added for HVAC units to be demolished on multiple floors (second, fourth, and fifth), and the ACCP-2 VFD label was removed from the renovation plan for the wind tunnel. The addendum must be acknowledged by proposers when submitting their proposals, and it takes precedence over previously issued Contract Documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SSC Services for Education Facilities Services Revised 11/2023
File: Documents / 06 Bid & Awards / Bid Package
ADDENDUM
SECTION 00 91 13
Project Title: Replace Hydronic Pumps and Piping in the Building
Project #: 2023-06178
Bldg. Name: Bright Bldg. #: 03535
ADDENDUM # 01 - Dated 01/21/2025
This Addendum shall modify, amend, extend and become a part of the Contract Documents dated 12/09/2024 prepared by Ramirez Simon Engineering, LLC (RSE) in accordance with the terms therein, as if written out in full therein and bound originally therewith.
Questions concerning this Addendum, or the Contract Documents should be addressed to Mark Claypool PE by email
(mcclaypool@ramirez-simon.com).
In cases of conflict, the Addendum shall take precedence over previously issued Contract Documents.
Proposers shall acknowledge receipt of this Addendum when they submit their proposal.
The following items have been amended:
General Drawing Changes
1. G001 - GENERAL INFORMATION
a. Added drawings MD601, MD602, M601, and M602 to sheet list.
Mechanical Drawing Changes
1. MD601 - MECHANICAL DEMOLITION CHILLED WATER FLOW DIAGRAM
a. Added new MD601 drawing.
2. MD602 - MECHANICAL DEMOLITION HEATING WATER FLOW DIAGRAM
a. Added new MD602 drawing.
3. M301 - MECHANICAL RENOVATION PLANS – BASEMENT LEVEL
a. Added 4 new isolation valves to 10” CHS/R and 4” HWS/R piping adjacent to point of entry.
SSC Services for Education Facilities Services Revised 11/2023
File: Documents / 06 Bid & Awards / Bid Package
4. M401 - MECHANICAL RENOVATION ENLARGED PLAN AND SECTIONS – BASEMENT LEVEL – MECHANICAL
ROOM
a. Added 2 new isolation valves to 2-1/2” CHS/R branch piping in mechanical room.
5. M601 – MECHANICAL RENOVATION CHILLED WATER FLOW DIAGRAM
a. Added new M601 drawing.
6. M602 - MECHANICAL RENOVATION HEATING WATER FLOW DIAGRAM
a. Added new M602 drawing.
Electrical Drawing Changes
1. ED101 - ELECTRICAL DEMOLITION PLAN – BASEMENT LEVEL
a. Removed temporary location of CWP-1 from the demolition phase 1 plan. Modified keynote 3 to instruct the electrical contractor to coordinate location of unit with mechanical contactor.
b. Removed keynote 4 from plans.
c. Changed the local disconnecting means from a VFD to a safety switch serving ACCP-2 in the demolition plan for the wind tunnel.
2. ED102 - ELECTRICAL DEMOLITION PLAN – SECOND FLOOR
d. Added circuit source of HVAC units to be demolished.
3. ED103 - ELECTRICAL DEMOLITION PLAN – FOURTH FLOOR
e. Added circuit source of HVAC unit to be demolished.
4. ED104 - ELECTRICAL DEMOLITION PLAN – FIFTH FLOOR
f. Added circuit source of HVAC unit to be demolished.
5. E101 - ELECTRICAL RENOVATION PLAN – BASEMENT LEVEL
g. Removed ACCP-2 VFD label from renovation plan for the wind tunnel.
END OF ADDENDUM # 01
GENERAL
INFORMATION
G001
PROJECT
LOCATION
VICINITY MAP
DRAWING LIST
SHEET
NO. SCALE SHEET TITLE
G001 NTS GENERAL INFORMATION
MD301 1/8" = 1'-0" MECHANICAL DEMOLITION PLAN - BASEMENT
MD303 1/8" = 1'-0"
M501 NTS MECHANICAL DETAILS
APPLICABLE CODES:
NFPA 101 - LIFE SAFETY CODE (2024)
INTERNATIONAL BUILDING CODE (IBC 2024)
INTERNATIONAL FIRE CODE (IFC 2024)
INTERNATIONAL MECHANICAL CODE (IMC 2024)
INTERNATIONAL ENERGY CONSERVATION CODE (IECC 2018)
NEC (2023)
NFPA 1 - FIRE CODE (2024)
NFPA 72 - NATIONAL FIRE ALARM AND SIGNALING CODE (2024)
M001 NTS MECHANICAL LEGEND AND GENERAL INFORMATION
MECHANICAL DEMOLITION PLAN - SECOND FLOOR
M301 1/8" = 1'-0" MECHANICAL RENOVATION PLAN - BASEMENT
M303 1/8" = 1'-0" MECHANICAL RENOVATION PLAN - SECOND FLOOR
MD304 1/8" = 1'-0" MECHANICAL DEMOLITION PLAN - THIRD FLOOR
MD305 1/8" = 1'-0" MECHANICAL DEMOLITION PLAN - FOURTH FLOOR
M304 1/8" = 1'-0" MECHANICAL RENOVATION PLAN - THIRD FLOOR
M305 1/8" = 1'-0" MECHANICAL RENOVATION PLAN - FOURTH FLOOR
LIST OF ALTERNATES:
BASE BID: REPLACE BLDG. CHILLED WATER AND HEATING WATER PIPING AND PUMPS. REMOVE
ED101
M701 NTS MECHANICAL SCHEDULES
NTS MECHANICAL CONTROLSM801
E001 ELECTRICAL LEGEND AND GENERAL NOTES
1/8" = 1'-0"
NTS
ELECTRICAL DEMOLITION PLAN - BASEMENT LEVEL
ED601 NTS ELECTRICAL DEMOLITION ONE LINE DIAGRAM
E701 ELECTRICAL SCHEDULES
M302 1/8" = 1'-0" MECHANICAL RENOVATION PLAN - FIRST FLOOR
MD302 1/8" = 1'-0" MECHANICAL DEMOLITION PLAN - FIRST FLOOR
PROJECT ADDRESS:
PROJECT NAME:
CLIENT NAME:
Bright Building Texas A&M University, College Station, Texas 77843
Texas A&M University
SSC PROJECT No.:
FULL SIZE SHEET: 30X42
A
B
C
D
2 3 4 5
SEAL
CONSULTANTS
SHEET TITLE
RSE PROJECT NO: 1515
MARK DATE DESCRIPTION
ISSUED FOR CONSTRUCTION
PROJECT INFORMATION
ISSUE
SHEET NUMBER
1 2 3 4 5
2023-06178
Bright Building Replace Hydronic Pumps and Piping in the Building
1/21/2025
DECEMBER 9, 2024
MD306 1/8" = 1'-0" MECHANICAL DEMOLITION PLAN - FIFTH FLOOR
MD307 1/8" = 1'-0" MECHANICAL DEMOLITION PLAN - SIXTH FLOOR
MD308 1/8" = 1'-0" MECHANICAL DEMOLITION PLAN - SEVENTH FLOOR
MD309 1/8" = 1'-0" MECHANICAL DEMOLITION PLAN - ROOF LEVEL
M306 1/8" = 1'-0" MECHANICAL RENOVATION PLAN - FIFTH FLOOR
M307 1/8" = 1'-0" MECHANICAL RENOVATION PLAN - SIXTH FLOOR
M308 1/8" = 1'-0" MECHANICAL RENOVATION PLAN - SEVENTH FLOOR
M309 1/8" = 1'-0" MECHANICAL RENOVATION PLAN - ROOF LEVEL
E002 ELECTRICAL LEGEND AND GENERAL NOTESNTS
E101 1/8" = 1'-0" ELECTRICAL RENOVATION PLAN - BASEMENT LEVEL
E401 1/4" = 1'-0" ELECTRICAL ENLARGED PLANS
E601 ELECTRICAL RENOVATION ONE LINE DIAGRAMNTS
NTS
ALT #1: REPLACE WIND TUNNEL CHILLED WATER PIPING AND PUMP.
COMPUTER ROOM PROCESS CHILLED WATER PIPING, PUMPS, AND ABANDONED CRAC UNITS.
M401 1/4" = 1'-0" MECHANICAL RENOVATION ENLARGED PLAN AND SECTIONS - BASEMENT LEVEL
MD401 1/4" = 1'-0" MECHANICAL DEMOLITION ENLARGED PLANS - BASEMENT LEVEL
ED102 1/8" = 1'-0" ELECTRICAL DEMOLITION PLAN - SECOND FLOOR
ED103 1/8" = 1'-0" ELECTRICAL DEMOLITION PLAN - FOURTH FLOOR
ED104 1/8" = 1'-0" ELECTRICAL DEMOLITION PLAN - FIFTH FLOOR
E102 1/8" = 1'-0" ELECTRICAL RENOVATION PLAN - SECOND FLOOR
E103 1/8" = 1'-0" ELECTRICAL RENOVATION PLAN - FOURTH FLOOR
E104 1/8" = 1'-0" ELECTRICAL RENOVATION PLAN - FIFTH FLOOR
E702 ELECTRICAL SCHEDULESNTS
NTS MECHANICAL CONTROLSM802
E501 ELECTRICAL DETAILSNTS
MD601 NTS MECHANICAL DEMOLITION CHILLED WATER FLOW DIAGRAM
MD602 NTS MECHANICAL DEMOLITION HEATING WATER FLOW DIAGRAM
M601 NTS MECHANICAL RENOVATION CHILLED WATER FLOW DIAGRAM
M602 NTS MECHANICAL RENOVATION HEATING WATER FLOW DIAGRAM
1 01/21/25 ADDENDUM 1
BASEMENT LEVEL
FIRST FLOOR LEVEL
SECOND FLOOR LEVEL
THIRD FLOOR LEVEL
FOURTH FLOOR LEVEL
FIFTH FLOOR LEVEL
SIXTH FLOOR LEVEL
SEVENTH FLOOR LEVEL
ROOF LEVEL
AHU-G-1
8" C
H S
8" C
H S
CWP-1
4" CHS
4" CHR
8" C
H R
8" C
H S
8" CHS
8" CHR
FLOW
METER
M
4" C
C H
R
4" C
C H
S
4" C
C H
S
4" C
C H
S
ACCP-1
M
AHU-1-1
EXP-2
4" CCHS
4" CCHR
4" W
C H
S
4" W
C H
S
ACCP-2
4" WCHS
4" WCHR
M
EXP-1
M
2-1/2" WCHS
2-1/2" WCHR
2-1/2" WCHS
2-1/2" WCHR
M
AHU-2-1
M
AHU-3-1
M
AHU-4-1
M
AHU-5-1
M
AHU-6-1
AHU-7-1
CFP-1
MTS-1 MTS-2 AC
FCU-P-1
4" CCHS
4" CCHR
CRAC-2-1 CRAC-2-2
2-1/2" CCHS
2-1/2" CCHR
1-1/2" CCHS
1-1/2" CCHR
1-1/2" CCHS1-1/2" CCHR RECESSED FLOOR
CRAC-6-1 CRAC-6-2
2" CCHS
2" CCHR
RECESSED FLOOR
4" CHS
4" CHR
4" CHS
4" CHR
4" CHS
4" CHR
4" CHS
4" CHR
4" CHS
4" CHR
4" CHS
4" CHR
4" CHS
4" CHR
2" CHS
2" CHR
M
4" CCHS
4" CCHR
DEMOLISH TO POINT
OF ENTRY AT BLDG.
DEMOLISH TO POINT
OF ENTRY AT BLDG.
PENTHOUSE
2" CCHS
2" CCHR
DEMOLISH TO POINT
OF ENTRY AT BLDG.
1-1/2" CCHS
1-1/2" CCHR
1-1/2" CCHS
1-1/2" CCHR
FCU
3/ 4"
C C
H S
3/ 4"
C C
H R
1-1/2" CCHS
1-1/2" CCHR
1-1/2" CCHS
1-1/2" CCHR
FCU
3/ 4"
C C
H S
3/ 4"
C C
H R
M
CFP-2
2- 1/
2" W
C H
S
2- 1/
2" W
C H
R
2" CCHS
2" CCHR
1" CCHS
1" CCHR
1-1/2" CCHS
1-1/2" CCHR
1" C
C H
S
1" C
C H
R
3/4" CCHR
3/4" CCHS
3/ 4"
C C
H R
3/4" CCHS
4" CCHR
4" CCHS
8" C
H R
8" C
H S
4" C
C H
R
4" C
C H
S
6" C
H R
6" C
H S
4" C
C H
R
4" C
C H
S
6" C
H R
6" C
H S
4" C
C H
R
4" C
C H
S
6" C
H R
6" C
H S
4" C
C H
R
4" C
C H
S
4" C
H R
4" C
H S
4" C
C H
R
4" C
C H
S
4" C
H R
4" C
H S
4" C
C H
R
4" C
C H
S
TEMPORARILY
RELOCATE
TEMPORARILY
RELOCATE
8" CHS
8" CHR
WIND TUNNEL PIT
MECHANICAL
DEMOLITION CHILLED
WATER
MD601NTS
PROJECT ADDRESS:
PROJECT NAME:
CLIENT NAME:
Bright Building Texas A&M University, College Station, Texas 77843
Texas A&M University
SSC PROJECT No.:
FULL SIZE SHEET: 30X42
A
B
C
D
2 3 4 5
SEAL
CONSULTANTS
SHEET TITLE
RSE PROJECT NO: 1515
MARK DATE DESCRIPTION
ISSUED FOR CONSTRUCTION
PROJECT INFORMATION
ISSUE
SHEET NUMBER
1 2 3 4 5
2023-06178
Bright Building Replace Hydronic Pumps and Piping in the Building
1/21/2025
DECEMBER 9, 2024
1 01/21/25 ADDENDUM 1
FLOW DIAGRAM
SECOND FLOOR LEVEL
THIRD FLOOR LEVEL
FOURTH FLOOR LEVEL
FIFTH FLOOR LEVEL
SIXTH FLOOR LEVEL
SEVENTH FLOOR LEVEL
ROOF LEVEL
4" H
W S
4" H
W S
HWP-1
4" H
W R
4" H
W S
4" HWS
4" HWR
FLOW
METER
FCU-P-1
1" HWS
1" HWR
M
PENTHOUSE
DEMOLISH TO POINT
OF ENTRY AT BLDG.
3" HWS
3" HWR
TEMPORARILY
RELOCATE
DEMOLISH HWS/R BRANCH PIPING UP TO
EXISTING TERMINAL UNITS INCLUDING
ISOLATION VALVES. DEMOLISH HWS/R BRANCH
PIPING UP TO UNIT HEATER'S (UH-G-1) AND
AHU'S (AHU-G-2) ISOLATION VALVES. EXISTING
TERMINAL UNIT COIL PACKAGES TO REMAIN.
2" HWR
2" HWS
2" HWR
2" HWS
2" HWR
2" HWS
4" H
W R
4" H
W S
4" H
W R
4" H
W S
4" H
W R
4" H
W S
4" H
W R
4" H
W S
4" H
W R
4" H
W S
2- 1/
2" H
W R
2- 1/
2" H
W S
DEMOLISH HWS/R BRANCH PIPING UP TO
EXISTING TERMINAL UNITS INCLUDING
ISOLATION VALVES. EXISTING TERMINAL UNIT
COIL PACKAGES TO REMAIN.
DEMOLISH HWS/R BRANCH PIPING
UP TO EXISTING TERMINAL UNITS
INCLUDING ISOLATION VALVES.
EXISTING TERMINAL UNIT COIL
PACKAGES TO REMAIN.
1-1/2" HWR
1-1/2" HWS
1-1/2" HWR
1-1/2" HWS
2" HWR
2" HWS
DEMOLISH HWS/R BRANCH PIPING UP TO
EXISTING TERMINAL UNITS INCLUDING
ISOLATION VALVES. EXISTING TERMINAL UNIT
COIL PACKAGES TO REMAIN.
DEMOLISH HWS/R BRANCH PIPING
UP TO EXISTING TERMINAL UNITS
INCLUDING ISOLATION VALVES.
EXISTING TERMINAL UNIT COIL
PACKAGES TO REMAIN.
1-1/2" HWR
1-1/2" HWS
1-1/2" HWR
1-1/2" HWS
2" HWR
2" HWS
EXISTING HWS/R
BRANCH PIPING
TO REMAIN
EXISTING HWS/R
BRANCH PIPING
TO REMAIN
1-1/2" HWR
1-1/2" HWS
1-1/2" HWR
1-1/2" HWS
2" HWR
2" HWS
EXISTING HWS/R
BRANCH PIPING
TO REMAIN
EXISTING HWS/R
BRANCH PIPING
TO REMAIN
1-1/2" HWR
1-1/2" HWS
1-1/2" HWR
1-1/2" HWS
2" HWR
2" HWS
DEMOLISH HWS/R BRANCH PIPING UP TO
EXISTING TERMINAL UNITS INCLUDING
ISOLATION VALVES. EXISTING TERMINAL UNIT
COIL PACKAGES TO REMAIN.
DEMOLISH HWS/R BRANCH PIPING
UP TO EXISTING TERMINAL UNITS
INCLUDING ISOLATION VALVES.
EXISTING TERMINAL UNIT COIL
PACKAGES TO REMAIN.
1-1/2" HWR
1-1/2" HWS
2" HWR
2" HWS
2" HWR
2" HWS
DEMOLISH HWS/R BRANCH PIPING UP TO
EXISTING TERMINAL UNITS INCLUDING
ISOLATION VALVES. EXISTING TERMINAL UNIT
COIL PACKAGES TO REMAIN.
DEMOLISH HWS/R BRANCH PIPING
UP TO EXISTING TERMINAL UNITS
INCLUDING ISOLATION VALVES.
EXISTING TERMINAL UNIT COIL
PACKAGES TO REMAIN.
1-1/2" HWR
1-1/2" HWS
1-1/2" HWR
1-1/2" HWS
2" HWR
2" HWS
DEMOLISH HWS/R BRANCH PIPING UP TO
EXISTING TERMINAL UNITS INCLUDING
ISOLATION VALVES. EXISTING TERMINAL UNIT
COIL PACKAGES TO REMAIN.
DEMOLISH HWS/R BRANCH PIPING
UP TO EXISTING TERMINAL UNITS
INCLUDING ISOLATION VALVES.
EXISTING TERMINAL UNIT COIL
PACKAGES TO REMAIN.
WIND TUNNEL PIT
1- 1/
2" H
W R
1- 1/
2" H
W
S UH-P-1
1" HWS
1" HWR
MECHANICAL
DEMOLITION HEATING
WATER FLOW
DIAGRAM
MD602NTS
PROJECT ADDRESS:
PROJECT NAME:
CLIENT NAME:
Bright Building Texas A&M University, College Station, Texas 77843
Texas A&M University
SSC PROJECT No.:
FULL SIZE SHEET: 30X42
A
B
C
D
2 3 4 5
SEAL
CONSULTANTS
SHEET TITLE
RSE PROJECT NO: 1515
MARK DATE DESCRIPTION
ISSUED FOR CONSTRUCTION
PROJECT INFORMATION
ISSUE
SHEET NUMBER
1 2 3 4 5
2023-06178
Bright Building Replace Hydronic Pumps and Piping in the Building
1/21/2025
DECEMBER 9, 2024
SHEET KEYED NOTES
1. ALTERNATE #1: PROVIDE NEW PUMP AND ASSOCIATED VFD.
2. CONNECT NEW CHS/R AND HWS/R PIPING EXISTING MAINS AT BUILDING
POINT OF ENTRY.
3. PROVIDE NEW 1-1/2" CHS/R PIPING AND CONNECT TO EXISTING MTS
MACHINES.
4. PROVIDE NEW HWS/R BRANCH PIPING UP AHU. REPLACE ISOLATION
VALVES AND REUSE EXISTING COIL PACKAGE.
5. PROVIDE NEW 3/4" HWS/R BRANCH PIPING UP TO EXISTING TERMINAL UNIT.
PROVIDE NEW ISOLATION VALVES AT TERMINAL, UNIT AND REUSE
EXISTING COIL PACKAGE.
6. PROVIDE NEW 1" CHS/R PIPING AND CONNECT TO EXISTING AUTOCLAVE.
7. ALTERNATE #1: PROVIDE NEW CHS/R BRANCH PIPING UP TO EXISTING
ISOLATION VALVES AT WIND TUNNEL EQUIPMENT.
8. ALTERNATE #1: PROVIDE NEW WIND TUNNEL PROCESS CHILLED WATER
PIPING UP TO BUILDING POINT OF ENTRY.
9. ALTERNATE #1: CONNECT TO EXISTING CHILLED MAKEUP WATER PIPING.
10. ALTERNATE #1: PROVIDE NEW CHEMICAL POT FEEDER.
11. PROVIDE SHORT RADIUS ELBOW.
12. CONNECT TO EXISTING MAKEUP WATER PIPING.
GENERAL NOTES
A. ALL EQUIPMENT TO BE REMOVED SHALL BE COORDINATED WITH
ELECTRICAL FOR COMPLETE DEMOLITION.
B. ALL EXISTING CONDITIONS SHALL BE FIELD VERIFIED BY CONTRACTOR.
CONDITIONS SHOWN IN DRAWINGS MAY DEVIATE FROM EXACT
CONFIGURATION.
C. ALL WIND TUNNEL WCHS/R PIPING AND PUMPS ARE INCLUDED IN
ALTERNATE #1.
D. IF POLYPROPYLENE IS USED AS PIPING MATERIAL, CONTRACTOR IS
RESPONSIBLE FOR PROPERLY FITTING PIPING INTO SPACE. HYDRONIC
PIPING LAYOUT WAS DESIGNED USING CARBON STEEL AND COPPER AS
PIPING MATERIALS.
VENT
VENT
027A
028A 028B
032A
006A 006B
010011
013C013B
026A
025 024
022A
028C
016A
012A
004A
015A
C00
E00
MEN
WOMEN
ELEV
PIT ENTRANCE
UP
UP
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
H
I
RE: 1/M2.2
RE: 1/M2.2
2- 1/
2" H
W R
2- 1/
2" H
W S
1- 1/
2" H
W R
1- 1/
2" H
W S
" C
H S
" C
H R
4" H
W R
4" H
W S
2" HWR
2" HWS
1" HWR
1" HWS 1" HWR
1" HWS
2" H
W S
2" H
W R
AHU-G-2
5 5 5 5
5 55
MTS-1 MTS-2
AC6
1" C
H S
1" C
H R
1- 1/
2" C
H S
1- 1/
2" C
H R
" C
H S
" C
H R
4" H
W R
4" H
W S
REFER TO
1/M401
FOR
ENLARGED
RENOVATION
PLAN
3/4" HWS
3/4" HWR
" C
H S
" C
H R
3/4" HWR
3/4" HWS
2-1/2" CHS
2-1/2" CHR
2-1/2" HWS
2-1/2" HWR
2" H
W R
2" HWS
2" H
W S
2" H
W R
2" H
W S
2" HWR
1-1/4" HWS
1-1/4" HWR
UH-G-1
3/ 4"
H W
S 3/
4" H
W R
3/ 4"
H W
R 3/
4" H
W S
3/ 4"
H W
S 3/
4" H
W R
3/ 4"
H W
S 3/
4" H
W R
3/ 4"
H W
S 3/
4" H
W R
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/ 4"
H W
S 3/
4" H
W R
3/ 4"
H W
S 3/
4" H
W R
1" HWR
1" HWS
3/4" HWR
3/4" HWS
3/ 4"
H W
R 3/
4" H
W S
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
1" HWR
1" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/ 4"
H W
R 3/
4" H
W S
3/4" HWS
3/4" HWR
2- 1/
2" W
C H
S 2-
1/ 2"
W C
H R
3" W
C H
S 3"
W C
H R
4" WCHS
4" WCHR
SUB BASEMENT
B
C
D
E
8 9 10
EXP-1
CPF-1
EXISTING WIND
TUNNEL
EQUIPMENT
EXISTING
WIND TUNNEL
EQUIPMENT
ACCP-2
1" W
C H
S
AS-2
MECHANICAL RENOVATION
PLANS - BASEMENT LEVEL
M301SCALE: 1/8" = 1'-0"
PROJECT ADDRESS:
PROJECT NAME:
CLIENT NAME:
Bright Building Texas A&M University, College Station, Texas 77843
Texas A&M University
SSC PROJECT No.:
FULL SIZE SHEET: 30X42
A
B
C
D
2 3 4 5
SEAL
CONSULTANTS
SHEET TITLE
RSE PROJECT NO: 1515
MARK DATE DESCRIPTION
ISSUED FOR CONSTRUCTION
PROJECT INFORMATION
ISSUE
SHEET NUMBER
1 2 3 4 5
N
2023-06178
Bright Building Replace Hydronic Pumps and Piping in the Building
0' 4' 8' 16'
1/8" = 1'-0"
0' 4' 8' 16'
1/8" = 1'-0"
1/21/2025
DECEMBER 9, 2024
1/8" = 1'-0"
SHEET KEYED NOTES
1. PROVIDE NEW PUMP VFD AND MOUNT TO WALL.
2. RELOCATE EXISTING WAGES PANEL.
3. PROVIDE NEW FLOW METER DISPLAYS.
4. PROVIDE NEW PUMP AND ASSOCIATED 4" CONCRETE HOUSE KEEPING
PAD.
5. PROVIDE NEW FLOW METER.
6. PROVIDE NEW CONTROL VALVE.
7. RELOCATE EXISTING CONTROL VALVE.
8. PROVIDE SHORT RADIUS ELBOW.
9. PROVIDE CHAINWHEEL OPERATOR TO VALVE.
GENERAL NOTES
A. ALL EQUIPMENT TO BE REMOVED SHALL BE COORDINATED WITH
ELECTRICAL FOR COMPLETE DEMOLITION.
B. ALL EXISTING CONDITIONS SHALL BE FIELD VERIFIED BY CONTRACTOR.
CONDITIONS SHOWN IN DRAWINGS MAY DEVIATE FROM EXACT
CONFIGURATION.
022A
E00
MEN
ELEV
AS-1
HWP-1
10" CHR
4" HWR
4" H
W S
AHU-G
HWP-1
VFD
CWP-1
VFD
4" HWS
10" CHS
4" C
H R
4" C
H S
AS-3
2- 1/
2" C
H S
2- 1/
2" C
H R
2 3
1 1
CWP-1
2- 1/
2" H
W S
2- 1/
2" H
W R
4" HWS
4" HWR 3
M401
M402
4" HWS
BOP
120"
AS-2
HWP-1
4" HWS
BOP
96"
4" HWS
BOP
112"
4" CHS
BOP
92" 4" HWS
BOP
72"
4" CHR
BOP
92"
AHU-G
AS-1
CWP-1
10" CHR BOP 142"
10" CHS BOP 101"
2-1/2" CHS
BOP 126"
4" HWS
BOP 112"
4" H
W S
4" H
W R
" C
H S
" C
H R
4" HWR
4" HWS
BOP
120" BOP 112"
4" CHS
BOP
92" 4" CHR
BOP
92"
2-1/2" HWS
BOP 126"
2-1/2" HWR
BOP 126"
2-1/2" CHR
BOP 126"
MECHANICAL RENOVATION
ENLARGED PLAN AND
SECTIONS - BASEMENT
LEVEL - MECHANICAL
ROOM
M401
PROJECT ADDRESS:
PROJECT NAME:
CLIENT NAME:
Bright Building Texas A&M University, College Station, Texas 77843
Texas A&M University
SSC PROJECT No.:
1/4" = 1'-0"
0' 2' 4' 8'
FULL SIZE SHEET: 30X42
A
B
C
D
2 3 4 5
SEAL
CONSULTANTS
SHEET TITLE
RSE PROJECT NO: 1515
MARK DATE DESCRIPTION
ISSUED FOR CONSTRUCTION
PROJECT INFORMATION
ISSUE
SHEET NUMBER
1 2 3 4 5
N
2023-06178
Bright Building Replace Hydronic Pumps and Piping in the Building
1/21/2025
DECEMBER 9, 2024
SCALE: 1/4" = 1'-0"SCALE: 1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
1 01/21/25 ADDENDUM 1
1 1
SECOND FLOOR LEVEL
THIRD FLOOR LEVEL
FOURTH FLOOR LEVEL
FIFTH FLOOR LEVEL
SIXTH FLOOR LEVEL
SEVENTH FLOOR LEVEL
ROOF LEVEL
AHU-G-1
CWP-1
4" CHS
4" CHR
" C
H R
" C
H S
10" CHS
10" CHR
M
M
AHU-1-1
ACCP-2
4" WCHS
4" WCHR
M
EXP-1
M
2-1/2" WCHS
2-1/2" WCHR
M
AHU-2-1
M
AHU-3-1
M
AHU-4-1
M
AHU-5-1
M
AHU-6-1
AHU-7-1
CFP-1
MTS-1 MTS-2 AC
FCU-P-1
RECESSED FLOOR
CRAC-6-1 CRAC-6-2
4" CHS
4" CHR RECESSED FLOOR
4" CHS
4" CHR
4" CHS
4" CHR
4" CHS
4" CHR
4" CHS
4" CHR
4" CHS
4" CHR
4" CHS
4" CHR
4" CHS
4" CHR
2" CHS
2" CHR
M
4" CCHS
4" CCHR
DEMOLISH TO POINT
OF ENTRY AT BLDG.
PENTHOUSE
CONNECTION POINT
AT ENTRY TO BLDG.
M
3" W
C H
S
3" W
C H
R
1" CHS
1" CHR
1- 1/
2" C
H S
1- 1/
2" C
H R
3/4" CHR
3/4" CHS
3/ 4"
C C
H R
3/4" CHS
" C
H R
" C
H S
8" C
H R
8" C
H S
6" C
H R
6" C
H S
6" C
H R
6" C
H S
6" C
H R
6" C
H S
4" C
H R
4" C
H S
RELOCATED
" C
H S
" C
H S
AIR/DIRT
SEPARATOR
FLOW
METER
4" W
C H
S
4" W
C H
S
2" CHS
2" CHR
2" CHS
2" CHR
8" CHS
8" CHR
M
2-1/2" CHS
2-1/2" CHR
RELOCATED
CAP AT ENTRY TO
BLDG.
3/4" WCHS
WIND TUNNEL PIT
MECHANICAL
RENOVATION CHILLED
WATER FLOW DIAGRAM
PROJECT ADDRESS:
PROJECT NAME:
CLIENT NAME:
Bright Building Texas A&M University, College Station, Texas 77843
Texas A&M University
SSC PROJECT No.:
FULL SIZE SHEET: 30X42
A
B
C
D
2 3 4 5
SEAL
CONSULTANTS
SHEET TITLE
RSE PROJECT NO: 1515
MARK DATE DESCRIPTION
ISSUED FOR CONSTRUCTION
PROJECT INFORMATION
ISSUE
SHEET NUMBER
1 2 3 4 5
2023-06178
Bright Building Replace Hydronic Pumps and Piping in the Building
1/21/2025
DECEMBER 9, 2024
M601NTS 1
SECOND FLOOR LEVEL
THIRD FLOOR LEVEL
FOURTH FLOOR LEVEL
FIFTH FLOOR LEVEL
SIXTH FLOOR LEVEL
SEVENTH FLOOR LEVEL
ROOF LEVEL
HWP-1
4" H
W R
4" H
W S
4" HWS
4" HWR
FCU-P-1
1" HWS
1" HWR
M
PENTHOUSE
CONNECT TO POINT
OF ENTRY AT BLDG.
2-1/2" HWS
2-1/2" HWR
RELOCATED
PROVIDE NEW HWS/R BRANCH PIPING UP TO
EXISTING TERMINAL UNITS INCLUDING
ISOLATION VALVES. PROVIDE NEW HWS/R
BRANCH PIPING UP TO UNIT HEATER'S (UH-G-1)
AND AHU'S (AHU-G-2) ISOLATION VALVES.
2" HWR
2" HWS
2" HWR
2" HWS
2" HWR
2" HWS
4" H
W R
4" H
W S
4" H
W R
4" H
W S
4" H
W R
4" H
W S
4" H
W R
4" H
W S
4" H
W R
4" H
W S
2- 1/
2" H
W R
2- 1/
2" H
W S
PROVIDE NEW HWS/R BRANCH PIPING UP TO
EXISTING TERMINAL UNITS INCLUDING
ISOLATION VALVES.
PROVIDE NEW HWS/R BRANCH
PIPING UP TO EXISTING TERMINAL
UNITS INCLUDING ISOLATION
VALVES.
1-1/2" HWR
1-1/2" HWS
2" HWR
2" HWS
2" HWR
2" HWS
1-1/2" HWR
1-1/2" HWS
1-1/2" HWR
1-1/2" HWS
2" HWR
2" HWS
1-1/2" HWR
1-1/2" HWS
1-1/2" HWR
1-1/2" HWS
2" HWR
2" HWS
1-1/2" HWR
1-1/2" HWS
1-1/2" HWR
1-1/2" HWS
2" HWR
2" HWS
1-1/2" HWR
1-1/2" HWS
2" HWR
2" HWS
2" HWR
2" HWS
1-1/2" HWR
1-1/2" HWS
2" HWR
2" HWS
2" HWR
2" HWS
WIND TUNNEL PIT
1- 1/
2" H
W R
1- 1/
2" H
W
S UH-P-1
1" HWS
1" HWR
4" H
W S
4" H
W S
AIR/DIRT
SEPARATOR
FLOW
METER
M
PROVIDE NEW HWS/R BRANCH PIPING UP TO
EXISTING TERMINAL UNITS INCLUDING
ISOLATION VALVES.
PROVIDE NEW HWS/R BRANCH
PIPING UP TO EXISTING TERMINAL
UNITS INCLUDING ISOLATION
VALVES.
PROVIDE NEW HWS/R BRANCH PIPING UP TO
EXISTING TERMINAL UNITS INCLUDING
ISOLATION VALVES.
PROVIDE NEW HWS/R BRANCH
PIPING UP TO EXISTING TERMINAL
UNITS INCLUDING ISOLATION
VALVES.
PROVIDE NEW HWS/R BRANCH PIPING UP TO
EXISTING TERMINAL UNITS INCLUDING
ISOLATION VALVES.
PROVIDE NEW HWS/R BRANCH
PIPING UP TO EXISTING TERMINAL
UNITS INCLUDING ISOLATION
VALVES.
PROVIDE NEW HWS/R BRANCH PIPING UP TO
EXISTING TERMINAL UNITS INCLUDING
ISOLATION VALVES.
PROVIDE NEW HWS/R BRANCH
PIPING UP TO EXISTING TERMINAL
UNITS INCLUDING ISOLATION
VALVES.
PROVIDE NEW 3/4" HWS/R PIPING UP TO NEW
TERMINAL UNIT (TU-4-1). CONNECT TO EXISTING
HWS/R BRANCH PIPING. REFER TO DRAWING
1/M305.
MECHANICAL
RENOVATION HEATING
WATER FLOW DIAGRAM
PROJECT ADDRESS:
PROJECT NAME:
CLIENT NAME:
Bright Building Texas A&M University, College Station, Texas 77843
Texas A&M University
SSC PROJECT No.:
FULL SIZE SHEET: 30X42
A
B
C
D
2 3 4 5
SEAL
CONSULTANTS
SHEET TITLE
RSE PROJECT NO: 1515
MARK DATE DESCRIPTION
ISSUED FOR CONSTRUCTION
PROJECT INFORMATION
ISSUE
SHEET NUMBER
1 2 3 4 5
2023-06178
Bright Building Replace Hydronic Pumps and Piping in the Building
1/21/2025
DECEMBER 9, 2024
M602NTS 1
VENT
027A
028A 028B
026A
025 024
022A
028C
E00
MEN
WOMEN
ELEV
UP
(E)
DPHG2
(D) HWP-1
AHU-G
(D) ACCP-1
(D) HWP-1
VFD
(E) CWP-1
VFD
E401
DPHG2-5
DPHG2-4
(E) CWP-1
1 1 1 1
J J J
SUB BASEMENT
B
C
D
E
8 9 10
DPHG1-8
(D) ACCP-2
EXISTING WIND
TUNNEL
EQUIPMENT
EXISTING
WIND TUNNEL
EQUIPMENT
ALT. #1
VENT
006A 006B
013C
026A
025 024
022A
016A
E00
MEN
WOMEN
ELEV
UP
(E)
DPHG2
AHU-G
MTS-2
(D) CWP-1
VFD (D CWP-1
DPEM-8 5
ELECTRICAL
DEMOLITION PLAN -
BASEMENT LEVEL
ED101
GENERAL NOTES
1. HVAC EQUIPMENT IS EXISTING TO REMAIN AND SHOWN FOR REFERENCE
ONLY.
2. HVAC EQUIPMENT TO BE DEMOLISHED. DEMO LOCAL DISCONNECT/VFD.
DEMO BRANCH CIRCUIT WIRING AND CONDUIT BACK TO SOURCE, TURN
OFF BREAKER AND LABEL AS SPARE. CIRCUIT SOURCE SHOWN BASED ON
OBSERVABLE FIELD CONDITIONS, CONTRACTOR TO FIELD VERIFY.
3. EXISTING CWP-1 AND VFD SHALL BE RELOCATED TEMPORARILY FOR
PHASE 1 OF CONSTRUCTION. COORDINATE WITH MECHANICAL
CONTRACTOR FOR NEW LOCATION. EXTEND BRANCH CIRCUIT WIRING
AND CONDUIT AS REQUIRED.
4. NOT USED.
5. HVAC EQUIPMENT TO BE DEMOLISHED DURING PHASE 2 OF
CONSTRUCTION. DEMO LOCAL DISCONNECT/VFD. DEMO BRANCH CIRCUIT
WIRING AND CONDUIT BACK TO SOURCE, TURN OFF BREAKER AND LABEL
AS SPARE. CIRCUIT SOURCE SHOWN BASED ON OBSERVABLE FIELD
CONDITIONS, CONTRACTOR TO FIELD VERIFY. COORDINATE TIMING WITH
MECHANICAL CONTRACTOR.
6. EXISTING JUNCTION BOXES AND CONDUIT SERVING CONTROL WIRING ON
THIS WALL TO BE SHIFTED UP SLIGHTLY TO MAKE SPACE FOR NEW VFDS
AND CONTROL PANELS. REFER TO ELECTRICAL RENOVATION PLAN FOR
LOCATION OF NEW EQUIPMENT. COORDINATE WITH MECHANICAL
CONTRACTOR.
7. EXITING HVAC CONTROL PANEL TO BE RELOCATED. REFER TO
RENOVATION PLAN FOR NEW LOCATION. EXTEND WIRING AND CONDUIT
AS REQUIRED. COORDINATE WITH MECHANICAL CONTRACTOR.
KEYED NOTES
A. REFER TO ELECTRICAL LEGEND AND PROJECT GENERAL NOTES ON
SHEETS E001 AND E002.
B. DRAWINGS ARE SCHEMATIC IN NATURE; VERIFY DIMENSIONS AND
EQUIPMENT LOCATIONS IN THE FIELD. CONTRACTOR SHALL VERIFY
EXACT LOCATION AND CONFIGURATION OF INSTALLATIONS TO REMAIN.
PROJECT ADDRESS:
PROJECT NAME:
CLIENT NAME:
Bright Building Texas A&M University, College Station, Texas 77843
Texas A&M University
SSC PROJECT No.:
FULL SIZE SHEET: 30X42
A
B
C
D
2 3 4 5
SEAL
CONSULTANTS
SHEET TITLE
RSE PROJECT NO: 1515
MARK DATE DESCRIPTION
ISSUED FOR CONSTRUCTION
PROJECT INFORMATION
ISSUE
SHEET NUMBER
1 2 3 4 5
2023-06178
Bright Building Replace Hydronic Pumps and Piping in the Building
0' 4' 8' 16'
1/8" = 1'-0"
0' 4' 8' 16'
1/8" = 1'-0"
DECEMBER 9, 2024
1 01/21/25 ADDENDUM 1
01/21/25
RE: 1/M2.2 RE: 1/M2.2
AHU-2-1CRAC-2-2
CRAC-2-1
206205
MEN
WOMEN
221B 221A
221C
221D
C002
E002
UP
UP
DOWN
ELEV
ELEVELEV
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
H
(E)
L2A-LFT
(E)
L2A-RGHT
T
(E)
C2A-RGHT
(E)
C2A-LFT
(E) EH2A
(E) BUS
RISER
(E) BUS
RISER
T (E) H2A
H2A-20,22,24
H2A-13,15,17
ELECTRICAL DEMOLITION
PLAN - SECOND FLOOR
ED102
PROJECT ADDRESS:
PROJECT NAME:
CLIENT NAME:
Bright Building Texas A&M University, College Station, Texas 77843
Texas A&M University
SSC PROJECT No.:
FULL SIZE SHEET: 30X42
A
B
C
D
2 3 4 5
SEAL
CONSULTANTS
SHEET TITLE
RSE PROJECT NO: 1515
MARK DATE DESCRIPTION
ISSUED FOR CONSTRUCTION
PROJECT INFORMATION
ISSUE
SHEET NUMBER
1 2 3 4 5
N
2023-06178
Bright Building Replace Hydronic Pumps and Piping in the Building
0' 4' 8' 16'
1/8" = 1'-0"
0' 4' 8' 16'
1/8" = 1'-0"
DECEMBER 9, 2024
GENERAL NOTES
1. HVAC EQUIPMENT IS EXISTING TO REMAIN AND SHOWN FOR REFERENCE
ONLY.
2. HVAC EQUIPMENT TO BE DEMOLISHED. DEMO LOCAL DISCONNECT/VFD.
DEMO BRANCH CIRCUIT WIRING AND CONDUIT BACK TO SOURCE, TURN
OFF BREAKER AND LABEL AS SPARE. CIRCUIT SOURCE SHOWN BASED ON
OBSERVABLE FIELD CONDITIONS, CONTRACTOR TO FIELD VERIFY.
3. ALL ELECTRICAL EQUIPMENT SHOWN IN THIS ROOM IS EXISTING TO
REMAIN UNLESS OTHERWISE NOTED.
KEYED NOTES
A. REFER TO ELECTRICAL LEGEND AND PROJECT GENERAL NOTES ON
SHEETS E001 AND E002.
B. DRAWINGS ARE SCHEMATIC IN NATURE; VERIFY DIMENSIONS AND
EQUIPMENT LOCATIONS IN THE FIELD. CONTRACTOR SHALL VERIFY
EXACT LOCATION AND CONFIGURATION OF INSTALLATIONS TO REMAIN.
AHU-4-1
MEN
WOMEN
407A407B
407C
407D 407E
402A
402B 402E
402D 403
RM#?
425F
425G
425A
RM#?
427A
427B 427C
427D
423A423B
423C 423D
419A 419B
419C 419D
415 414D
414C
416 414A
414B
C004
410A
410C
410D
425H
408C
408B
408E
408B
408A
408C
408D
410B
408H
C004A
C004B
MECH
UP
UP
ELEV
ELEV
E004 ELEV
417A
417B
RM#?
1(E)
L4A-LFT
(E)
L4A-RGHT
(E)
C4A-RGHT
(E)
C4A-LFT
(E) EH4A
(E) BUS
RISER
(E) BUS
RISER
T (E) H4A
3 T
H4A-20,22,24
ELECTRICAL DEMOLITION
PLAN - FOURTH FLOOR
ED103
PROJECT ADDRESS:
PROJECT NAME:
CLIENT NAME:
Bright Building Texas A&M University, College Station, Texas 77843
Texas A&M University
SSC PROJECT No.:
FULL SIZE SHEET: 30X42
A
B
C
D
2 3 4 5
SEAL
CONSULTANTS
SHEET TITLE
RSE PROJECT NO: 1515
MARK DATE DESCRIPTION
ISSUED FOR CONSTRUCTION
PROJECT INFORMATION
ISSUE
SHEET NUMBER
1 2 3 4 5
N
2023-06178
Bright Building Replace Hydronic Pumps and Piping in the Building
0' 4' 8' 16'
1/8" = 1'-0"
0' 4' 8' 16'
1/8" = 1'-0"
DECEMBER 9, 2024
GENERAL NOTES
1. HVAC EQUIPMENT IS EXISTING TO REMAIN AND SHOWN FOR REFERENCE
ONLY.
2. HVAC EQUIPMENT TO BE DEMOLISHED. DEMO LOCAL DISCONNECT/VFD.
DEMO BRANCH CIRCUIT WIRING AND CONDUIT BACK TO SOURCE, TURN
OFF BREAKER AND LABEL AS SPARE. CIRCUIT SOURCE SHOWN BASED ON
OBSERVABLE FIELD CONDITIONS, CONTRACTOR TO FIELD VERIFY.
3. ALL ELECTRICAL EQUIPMENT SHOWN IN THIS ROOM IS EXISTING TO
REMAIN UNLESS OTHERWISE NOTED.
KEYED NOTES
A. REFER TO ELECTRICAL LEGEND AND PROJECT GENERAL NOTES ON
SHEETS E001 AND E002.
B. DRAWINGS ARE SCHEMATIC IN NATURE; VERIFY DIMENSIONS AND
EQUIPMENT LOCATIONS IN THE FIELD. CONTRACTOR SHALL VERIFY
EXACT LOCATION AND CONFIGURATION OF INSTALLATIONS TO REMAIN.
RE: 1/M2.2 RE: 1/M2.2
AHU-5-1
UP
UP
520A 520B
516 515D
515C
525522 526
527A
527B 527C
527D
515B
515A
C005
512 510
WOMEN MEN
509C 509B
509A
509D
501B
502D502A
502B 502C
501A
506B 506A
503B
518A
518B
514C
514F
514G
514D
514E
514A
514B
501C
508A
C005A
C005B
503A
E005
ELEVELEV ELEV
1(E)
L5A-LFT
(E)
L5A-RGHT
(E) C5A
(E) EH5A
(E) BUS
RISER
(E) BUS
RISER
(E) H5A
3 T
1 1
1 1 1 1 1
1 1
H5A-14,16,18
ELECTRICAL DEMOLITION
PLAN - FIFTH FLOOR
ED105
PROJECT ADDRESS:
PROJECT NAME:
CLIENT NAME:
Bright Building Texas A&M University, College Station, Texas 77843
Texas A&M University
SSC PROJECT No.:
FULL SIZE SHEET: 30X42
A
B
C
D
2 3 4 5
SEAL
CONSULTANTS
SHEET TITLE
RSE PROJECT NO: 1515
MARK DATE DESCRIPTION
ISSUED FOR CONSTRUCTION
PROJECT INFORMATION
ISSUE
SHEET NUMBER
1 2 3 4 5
N
2023-06178
Bright Building Replace Hydronic Pumps and Piping in the Building
0' 4' 8' 16'
1/8" = 1'-0"
0' 4' 8' 16'
1/8" = 1'-0"
DECEMBER 9, 2024
GENERAL NOTES
1. HVAC EQUIPMENT IS EXISTING TO REMAIN AND SHOWN FOR REFERENCE
ONLY.
2. HVAC EQUIPMENT TO BE DEMOLISHED. DEMO LOCAL DISCONNECT/VFD.
DEMO BRANCH CIRCUIT WIRING AND CONDUIT BACK TO SOURCE, TURN
OFF BREAKER AND LABEL AS SPARE. CIRCUIT SOURCE SHOWN BASED ON
OBSERVABLE FIELD CONDITIONS, CONTRACTOR TO FIELD VERIFY.
3. ALL ELECTRICAL EQUIPMENT SHOWN IN THIS ROOM IS EXISTING TO
REMAIN UNLESS OTHERWISE NOTED.
KEYED NOTES
A. REFER TO ELECTRICAL LEGEND AND PROJECT GENERAL NOTES ON
SHEETS E001 AND E002.
B. DRAWINGS ARE SCHEMATIC IN NATURE; VERIFY DIMENSIONS AND
EQUIPMENT LOCATIONS IN THE FIELD. CONTRACTOR SHALL VERIFY
EXACT LOCATION AND CONFIGURATION OF INSTALLATIONS TO REMAIN.
027A
028A 028B
032A
006A 006B
010011
013C013B
026A
025 024
022A
028C
016A
012A
004A
015A
C00
E00
MEN
WOMEN
ELEV
PIT ENTRANCE
UP
UP
A
B
C
D
E
F
G
H
I
(E)
DPHG2
AHU-G
E401
DPHG2-5
HWP-1
CWP-1
HWP-1
VFD
CWP-1
VFD
DPHG2-6
M
M
LGA-173
LGA-194
GFCI
LGA-21
SUB BASEMENT
8 9 10
DPHG1-8
EXISTING WIND
TUNNEL
EQUIPMENT
EXISTING
WIND TUNNEL
EQUIPMENT
ACCP-2
GFCI
LGA-23
ELECTRICAL
RENOVATION PLAN -
BASEMENT LEVEL
E101
GENERAL NOTES
1. HVAC EQUIPMENT IS EXISTING TO REMAIN AND SHOWN FOR REFERENCE
ONLY.
2. FURNISH AND INSTALL POWER TO SERVE HVAC EQUIPMENT. VFD IS
PROVIDED BY MECHANICAL CONTRACTOR AND INSTALLED BY ELECTRICAL
CONTRACTOR.
3. PROVIDE POWER TO SERVE MOTORIZED VALVES. CIRCUIT TO PANEL AS
INDICATED. PROVIDE NEW CIRCUIT BREAKER IN PANEL.
4. PROVIDE POWER TO SERVE CONTROL PANELS. CIRCUIT TO ELECTRICAL
PANEL AS INDICATED. PROVIDE NEW CIRCUIT BREAKER IN PANEL.
5. APPROXIMATE LOCATION OF RELOCATED CONTROL PANEL. COORDINATE
EXACT LOCATION WITH MECHANICAL CONTRACTOR. EXTEND WIRING AND
CONDUIT AS REQUIRED.
6. PROVIDE POWER TO SERVE PUMP. PROVIDE A 30A/600V/3P/NEMA 3R
COMBINATION NEMA 1 MOTOR STARTER DISCONNECT, FUSIBLE,
NON-REVERSING WITH OVERLOAD PROTECTION. PROVIDE (3) 20A FUSES.
7. IF NO GFCI RECEPTACLE IS LOCATED WITHIN 25 FEET OF UNIT(S), INSTALL
GFCI RECEPTACLE.
KEYED NOTES
A. REFER TO ELECTRICAL LEGEND AND PROJECT GENERAL NOTES ON
SHEETS E001 AND E002.
B. DRAWINGS ARE SCHEMATIC IN NATURE; VERIFY DIMENSIONS AND
EQUIPMENT LOCATIONS IN THE FIELD. CONTRACTOR SHALL VERIFY
EXACT LOCATION AND CONFIGURATION OF INSTALLATIONS TO REMAIN.
PROJECT ADDRESS:
PROJECT NAME:
CLIENT NAME:
Bright Building Texas A&M University, College Station, Texas 77843
Texas A&M University
SSC PROJECT No.:
FULL SIZE SHEET: 30X42
A
B
C
D
2 3 4 5
SEAL
CONSULTANTS
SHEET TITLE
RSE PROJECT NO: 1515
MARK DATE DESCRIPTION
ISSUED FOR CONSTRUCTION
PROJECT INFORMATION
ISSUE
SHEET NUMBER
1 2 3 4 5
2023-06178
Bright Building Replace Hydronic Pumps and Piping in the Building
0' 4' 8' 16'
1/8" = 1'-0"
0' 4' 8' 16'
1/8" = 1'-0"
DECEMBER 9, 2024
File details come from the government source that posted it. Updated .