ESBD_385005_1734099315364_2023-06178_Notice of Project-CS_24.12.12.pdf
PDF 530 KB Posted
- Solicitation number
- SSC_2023-06178-1
- Issued by
- Brazos County, Texas
About this file
This is a Notice of Project (NOP) issued by SSC Services for Education on behalf of Texas A&M University for project number 2023-06178. The project involves replacing hydronic pumps and piping in the Bright building #0353, specifically replacing the building's chilled water (ChW) and heating hot water (HHW) piping and pumps, removing computer room process ChW piping, pumps, and abandoned CRAC units, with an alternate option to replace wind tunnel ChW piping and pumps. CSP RFP submissions are due February 5, 2025 at 2:00 PM, with HSP submissions due February 6, 2025 at 2:00 PM. A pre-proposal meeting is scheduled for January 8, 2025 at 10:00 AM in SSC Facilities Services Conference Room S118. The public proposal opening will occur on February 6, 2025 at 3:00 PM in Conference Room 204.
The project requires a Historically Underutilized Business (HUB) Subcontracting Plan, with monthly HUB Progress Assessment Reports (PARs) required with each pay application. All construction documents and information are available electronically through the provided e-Builder web link. Technical inquiries should be directed to Mark Claypool at Ramirez-Simon Engineering, while submission process inquiries should be directed to SSC Project Manager Iraj Solouki. The project start and completion dates are listed as "ASAP" with no specific contract term provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SSC Services for Education Facilities Services Revised 02/2024
NOTICE OF PROJECT (NOP)
POSTED ON BEHALF OF SSC BY Texas A&M University (Part 02)
Attention: (02/23) Shawna Kennedy - Shawna.Kennedy@tamu.edu Date of Request: 12/12/2024
PROJECT INFORMATION
Project Number: 2023-06178 Project Name: Replace Hydronic pumps and Piping in the building Project Location: Bright bldg. # 0353 Project Start Date: ASAP Project Finish Date: ASAP Project Description: Replace bldg. ChW & HHW piping and pumps. Remove computer room process ChW piping, pumps, and abandoned CRAC units. Replace wind tunnel ChW piping & pumps as alternate 1 as per drawings by RSE dated 12/09/2024.
DOCUMENT ACQUSITION INFORMATION
RFP & Construction Documents (CSP) and information are available electronically at (web link):https://app.e-builder.net/public/publicLanding.aspx?QS=8656403df1ff42eea265655bf789520c
SUBMISSION INFORMATION
CSP RFP Submissions are due: Date: 2/5/2025 Time: 2:00 P.M.
HSP Submissions are due: Date: 2/6/2025 Time: 2:00 P.M.
Public Proposal Opening: SSC Facilities Services, Conf. Rm 204 Date: 2/6/2025 Time: 3:00 P.M.
Public Proposal Virtual Meeting (web link): Join the meeting now
Mail or Hand-deliver to: SSC Service Solutions Facilities Services EDCS 1371 TAMU (Physical Address: 600 Agronomy Road, Suite 218) College Station, TX 77843
HISTORICALLY UNDERUTILIZED BUSINESS (HUB)
HUB Subcontracting Plan Required: Yes ☒ No ☐ If yes, monthly HUB Progress Assessment Reports (PARs) are required with each pay application.
Contact (02/23) Shawna Kennedy - shawna.kennedy@tamu.edu, 979-845-3425 with all HUB-related questions.
QUERY INFORMATION
Pre-proposal Meeting Location (if applicable): SSC Facilities Services, Conf Rm S118 Date: 1/8/2025 Time: 10:00 A.M.
Inquiries regarding the submission process/requirements should be directed to SSC Project Manager: Iraj Solouki Email: iraj.solouki@sscserv.com Phone: 979-436-7863
If applicable, inquiries regarding the technical aspects of the Construction Documents shall be directed to:
A/E Contact: Mark Claypool A/E Firm: Ramirez – Simon Engineering Email: mcclaypool@ramirez-simon.com Phone: 832-890-3544 https://app.e-builder.net/public/publicLanding.aspx?QS=8656403df1ff42eea265655bf789520c https://app.e-builder.net/public/publicLanding.aspx?QS=8656403df1ff42eea265655bf789520c https://teams.microsoft.com/l/meetup-join/19%3ameeting_N2ViNTk5ZWQtZWExNC00ZjE3LWE1NjYtYjIwOWVkNmIzZGY3%40thread.v2/0?context=%7b%22Tid%22%3a%22cd62b7dd-4b48-44bd-90e7-e143a22c8ead%22%2c%22Oid%22%3a%225864570b-8fad-4b06-bbd3-e3ab9714fd90%22%7d
File details come from the government source that posted it. Updated .