ESBD_368991_1724082890585_ATTACHMENT G.N.1 - Ellington Field (EF) Manufacturer’s Certificate Of Proper Installation.pdf
PDF 99 KB Posted
- Attached to
- HUSH HOUSE POWER RESTORATION BLDG 1395
- Solicitation number
- TMD24-ANG-WJ-24142008
- Issued by
- Harris County, Texas
About this file
This document is a Manufacturer's Certificate of Proper Installation for equipment/systems installed at Ellington Field (EF) as part of a state or local government contract. The certificate is signed by the manufacturer's authorized representative, certifying that the installed equipment/system has been installed in accordance with the manufacturer's recommendations, inspected, serviced, and performance tested to meet or exceed specified requirements. The document includes details such as the project manager, equipment serial and tag numbers, equipment/system type, project number, and specification section. The certificate confirms the manufacturer's authorization to inspect, approve, and operate the equipment, and that all information provided is true and accurate.
View the file
Other files
Show 40 more
Latest 50 of 97 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT G.N.1 - ELLINGTON AFB (EF) MANUFACTURER’S
CERTIFICATE OF PROPER INSTALLATION
PROJECT MANAGER: ______________ EQPT SERIAL NO: ________________
EQPT TAG NO: ________________________ EQPT/SYSTEM: ___________________
PROJECT NO: _________________________ SPEC. SECTION: __________________
I hereby certify that the above-reference equipment/system has been (Check Applicable):
Installed in accordance with Manufacturer’s recommendations. Inspected, checked, and adjusted.
Serviced with proper initial lubricants.
Electrical and mechanical connections meet quality and safety standards. All applicable safety equipment has been properly installed.
System has been performance tested and meets or exceeds specified performance requirements. (When complete system of one manufacturer)
Comments:
I, the undersigned Manufacturer’s Representative, hereby certify that I am (I) a duly authorized representative of the manufacturer, (ii) empowered by the manufacturer to inspect, approve, and operate his equipment and (iii) authorized to make recommendations required to assure that the equipment furnished by the manufacturer is complete and operational, except as may be otherwise indicated herein. I further certify that all information contained herein is true and accurate.
Date ___________________, 20__
Manufacturer: ____________________________________________________________
By Manufacturer’s Authorized Representative: _______________________________________
(Authorized Signature)
File details come from the government source that posted it. Updated .